You are on page 1of 1

No.

Description

QTY

A1.1
Mobilization & Demobilization 1
A1.2
PTW for local Authority i.e KTMB,DBKL,ERL,MRCB etc
1
A1.3
Provide the utilities mapping for area installation HDPE pipe from MDS 3
to MUSB Manholes 18 and submit to MUSB before excavation or open cut Works to c
arry-out
1
A1.4
Compliance to the Safety Measurement, Aspect and Issue i.e PPE, Safety P
assport NIOSH, Safety Harness 1
A1.5
Provide Site Supervisor or Persin in-charge of work (PICOW) for site sup
ervision & inspection during carry-out the Works
1
A1.6
To supply and install cable ladder size minimum size 600mm c/w suspensio
n brackets,earth-link and necessary and coring works the existing service tunnel
to connect with new cable ladder
600
A1.7
supply, install and joint of 11kV Power Cable size 2 X 1 X 3C 240 mmsq X
LPE/CTS/PE/PE ALU (5MVA@300A) as per utilities Specification or standard i.e TNB
1600
A1.8
Supply and install HDPE pipes 3 x 200mm 350
Supply and install HDPE pipes 6 x 100mm 350
A1.9
to verify, clear and remove all construction debris
1
A1.10 Provide competent person (confine space)
1
A1.11 To make good the addected/working area 1
A.2
Supply and install 2x 7C Pilot cable
1600
A.3
Supply, install, termination,testing and commisioning of 1 x 12C optical
fibre cable
850
A.4
To supply and install 11kV cable joint and termination for item A1.7
1
A.5
To supply and install terminal block and terminate for item A.2 1
A.6
Provide competent person (Jointer Cable 11kV) for item A.5 and A.6
1
Total Part A