CONSTRUCTION SCHEDULE

NAME OF PROJECT

: CONSTRUCTION OF FARM TO MARKET ROAD,BOALAN, ZAMBOANGA CITY

LOCATION

: BOALAN, ZAMBONGA CITY

APPROPRIATION

: Php

DURATION

: 56

UNDERTAKEN

: BY CONTRACT

ITEM
NO.

2,970,000.00
CALENDAR DAYS

DESCRIPTION

MANPOWER SCHEDULE
March

April

May

June

30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 # 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 # 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 56 57 58 59 60 61 62 63 64 65 66 67 68 69

10
PART A.1.1

Construction of Low Cost Bunkhouse (Type 1)

SPL1

Mobilization & Demoblization

SPL2

Project Billboard

PART B.2

Construction Safety and Health

PART B.4

Construction Survey and Staking

50

60

6 M.P.

102(2)

Surplus Common Excavation

105(1)

Subgrade Preparation

8 M.P.
8 M.P.
8 M.P.
10 M.P.

Aggregate Subbase Course

25 M.P.

PCC Pavement(Plain)- Conventional Method, 200 mm thk.


(with 14 dyas Curing Period)

40

4 M.P.

Removal of actual Structures/ Obstruction (Existing Pavement)

311(1)a

30

4 M.P.

101(3)

200

20

6M.P.

14 days curing period


14 days curing period

1-Phase 3-m width

14 days curing period

2-Phase 3-m width

as per Schedule

as per Actual