Observations and consequences

Control Measures
Immediate and longer term
actions

Timescale

Hazard
Belt cover was absent for air compressor
running at work site and the workers
were passing nearby.
Consequence
Loose clothing worn by the workers may
get entangled in the air compressors
rotating wheels and thereby severe
injuries can happen to them.

Divert the workers pathway from


near the air compressor running
area.

Immediate

Hazard
Cement bricks were scattered on the
pathway for workers and the workers
were using this way.
Consequence
Scattered cement bricks on pathway
can cause tripping and falling of workers
and thereby serious injuries can happen
to them.
Hazard
Excavation was going on at site and the
reposed soil was kept near the edges of
excavation. Safe distance from the
edges of excavation for keeping reposed
soil was not maintained.
Consequence
Reposed soil may fall down to
excavation and thereby serious injuries
or even death of workers can happen.
Hazard
Underground water pipe line found
inside the excavation. Pipe line was
slightly broken and water was coming
out of the hole on pipe line. Water line
was not isolated.
Consequence
Hole on pipe line can get bigger and
thus excavation may get flooded and
thus drowning and thereby death of

Remove the scattered cement


bricks from the pathway for
workers.

01 Day
Temporary barricading to be
provided around the air
compressor.

01 Week

Provide belt cover for the air


compressor.
Immediate

01 Day
Maintain proper housekeeping.

Remove the reposed soil from


near the edges of excavation.

Immediate

Depute a competent person to


monitor the activity.

01 Day

Stop the excavation activity and


isolate the water supply to the
pipe line running beneath
excavation.

Immediate

01 Week
Water pipe line to be re routed
away from excavation area.

workers working inside excavation can


happen.
05

06

07

08

Hazard
In the canteen for workers, uncovered
waste bins were found. Waste bins were
full with food waste and food waste were
scattered around it. Flies were present
over food waste.
Consequence
Flies over food waste can spread
diseases like cholera, dysentery etc to
the workers.

Clear the waste in waste bin


and the waste scattered around
the waste bin.

Immediate

Staircase giving access to first floor was


found wet and slippery and the workers
were using this way.
Consequence
During the course of work, workers may
get slip on staircase and thereby serious
injuries can happen to them.

Restrict the workers from using


wet and slippery stair case.
Clean and dry the stair case and
non slippery mats to be spread
on stair case.

01 Day

Workers found shifting cement bags


from ground floor to second floor and
they were followed wrong lifting
techniques.
Consequence
Adoption of wrong lifting techniques can
cause back injury, bone injury etc to the
workers

Enforce the workers to adopt


right lifting techniques and
depute a competent supervisor
for monitoring.

Immediate

Workers found doing the steel frame


work of second floor top and they had
not worn safety harness.
Consequence
Non usage of safety harness by the
workers while working at height can lead
to falling of them from height and thus
severe injuries like head injury or even
death can happen to them.

Enforce the workers to wear


safety harness while working at
height and if insufficient, provide
them with the same.

01 Day
Provide sufficient waste bins in
canteen to avoid overflow.
02 Days
Anti flies spray to be used for
destroying flies in the canteen
area.

Immediate

01 Week
Conduct a training programme
to workers on right lifting
methods.

Immediate

01 Week
Training programme to be
conducted for workers working
at height regarding the safe
practices to be followed while
working at height.

09

10

11

12

Mason as well as labours involved in the


cement plastering work of first floor
were not worn PPEs against chemicals
like cement.
Consequence
Contact with chemicals like cement can
cause corrosive effect, allergic effect,
carcinogenic effect etc. on workers
body

Provide appropriate PPEs like


rubberized hand gloves, gum
boots etc. to cement plastering
workers.

Acetylene gas cylinder was found


leaking and welding was going on
nearby.
Consequence
Leaked acetylene gas may catch fire
from flying objects coming out of
welding process and the fire inturn can
cause the explosion of acetylene gas
cylinder. Explosion of cylinder can cause
severe injuries to the workers in the
vicinity.

Stop the welding work and stop


the leakage of acetylene
cylinder.

At one part of work site, piling was going


on and heavy noise was coming out of
piling equipments.
Consequence
Exposure to heavy noise from piling
equipments can cause NIHL, tinnitus etc.
to the workers working nearby.

Substitute the equipments with


those of lesser noise or provide
appropriate PPEs such as ear
defender, ear muffler etc. to the
workers.

Workers were found using welding


machine whose cable insulation was
broken at several places.
Consequence
Usage of cables for welding machine
with broken insulation can lead to severe
electric shock to the welders as well as
workers passing nearby and thereby
serious burns and death can happen to

Immediate

02 Week
Conduct a health surveillance
programme to the cement
plastering workers on the ill
health effects of chemicals like
cement on human body.

Immediate

01 Day
Replace the cylinder with a new
one.

01 Week

Awareness programme on safe


practices to be followed during
hot work to be imparted to
welders.

Provide proper training and


awareness to all workers.
Stop the work and the welding
equipments cable to be
insulated temporarily with
insulating tape.
Renew the cable of welding
equipment.

Immediate

1 week

Immediate

1 week

workers.

13

14

15

Mobile crane was operating at work site.


Safe load was not maintained on it. SWL
certificate was absent for the mobile
crane. Workers were found working
beneath the suspended load.
Consequence
As safe working load was not maintained
on mobile crane and as SWL certificate
was absent on it, the load may fell on
top of workers working beneath and thus
serious injuries or death can happen to
the workers.

Stop mobile crane operation and


restrict the workers to work
beneath suspended load.

Immediate

Remove the old sling and static


crane to be fitted with a new
sling.

2 Days

Jack hammer was used by the workers


for concrete breaking near entrance of
work site without wearing PPEs against
vibration from the equipment. The
process was continuous and exposure to
vibration was maximum.
Consequence
Exposure to heavy vibration for a longer
duration can cause HAVS, WRULD etc. to
the workers.

PPEs like rubberized hand


gloves to be provided to the
workers and to minimize the
vibration effect, jack hammer to
be provided with rubber
handles.

Welders were found using welding glass


instead of face shield during welding.

Instruct the welders to use face


shield instead of welding glass
and provide them with the
same.
Depute a competent supervisor
to monitor welding activity.

Immediate

Provide appropriate PPEs like


rubberized hand gloves to the
operator of grinding machine.

Immediate

Consequence
Flying objects from the welding process
can cause eye injury or facial burns to
welders.

16

Workers were found using grinding


machine which was without guard.
Consequence
Absence of guard on grinding machine

01 Week
Maintenance of the sling to be
done on a weekly basis.

Immediate

02 Weeks

Work rotation system and shift


system to be provided for the
workers

01 Week

01 Day
Provide temporary guard for

can cause cuts from its sharp blades to


the operator.

17

18

Fork lift truck was found reversing


without banks man and the workers
were working near fork lift truck.
Consequence
Absence of banks man for Fork lift truck
while reversing can cause collisions of it
with the workers and thus serious
injuries or even death of workers can
happen.
Workers involved in steel frame work
erection were exposed to direct heat
from sun for a long duration.

grinding machine.
03 Weeks
The grinding machine to be
replaced with a new one with
appropriate guard.
Keep the workers away from fork
lift operating area and depute a
competent banks man for fork
lift truck.

Immediate

02 Days
Warning signs to be placed in
fork lift operating area and
reverse alarm to be fitted on
fork lift truck.
Heat resistant clothing and
drinking water to be provided to
the workers.

Immediate

01 Day

19

20

Consequence
Health problems like dehydration, heat
cramp, heat stroke etc. can happen to
the workers due to direct heat exposure
for a longer duration.
Workers involved in concrete mixing
were not worn nose mask and were
exposed to cement dust.
Consequence
Cement dust can be inhaled by the
workers and thus breathing problems,
lung cancer etc. can happen to them.

Hazard
On the first floor of the building, welding
work was going on. Wastes like papers,
empty cement bags etc. were scattered
around the welding area.
Consequence
Flying hot particles coming out of
welding process can give ignition to
papers, empty cement bags etc. and

Rest place to be provided.


03 Weeks
Work rotation system to be
implemented.
Provide sufficient nose masks to
the concrete workers and
enforce the workers to wear
nose mask while doing concrete
mixing .

Immediate

Depute competent supervisor


for monitoring.

01 Week

Conduct health surveillance


programme for the workers.
Stop welding and remove the
wastes around the welding area
and place a fire watch.

01 Day

Immediate

01 Day
Depute a competent supervisor
for monitoring.

thus fire can happen and due to the


spread of fire, severe burns to the
workers in the proximity and damages to
the material can happen.
21

Absence of drugs and alcohol at entire


work site was a good observation.

22

Visitors sign in and sign out register


maintained at the work site was a good
observation

23

Adequate illumination at work site was a


good observation.

24

Safety helmets with appropriate color


coding were worn by one and all at work
site. That was a good observation.

25

First aider and ambulance service were


available at work site for 24 hours. That
was a good observation.