Control Measures
Immediate and longer term
actions
Timescale
Hazard
Belt cover was absent for air compressor
running at work site and the workers
were passing nearby.
Consequence
Loose clothing worn by the workers may
get entangled in the air compressors
rotating wheels and thereby severe
injuries can happen to them.
Immediate
Hazard
Cement bricks were scattered on the
pathway for workers and the workers
were using this way.
Consequence
Scattered cement bricks on pathway
can cause tripping and falling of workers
and thereby serious injuries can happen
to them.
Hazard
Excavation was going on at site and the
reposed soil was kept near the edges of
excavation. Safe distance from the
edges of excavation for keeping reposed
soil was not maintained.
Consequence
Reposed soil may fall down to
excavation and thereby serious injuries
or even death of workers can happen.
Hazard
Underground water pipe line found
inside the excavation. Pipe line was
slightly broken and water was coming
out of the hole on pipe line. Water line
was not isolated.
Consequence
Hole on pipe line can get bigger and
thus excavation may get flooded and
thus drowning and thereby death of
01 Day
Temporary barricading to be
provided around the air
compressor.
01 Week
01 Day
Maintain proper housekeeping.
Immediate
01 Day
Immediate
01 Week
Water pipe line to be re routed
away from excavation area.
06
07
08
Hazard
In the canteen for workers, uncovered
waste bins were found. Waste bins were
full with food waste and food waste were
scattered around it. Flies were present
over food waste.
Consequence
Flies over food waste can spread
diseases like cholera, dysentery etc to
the workers.
Immediate
01 Day
Immediate
01 Day
Provide sufficient waste bins in
canteen to avoid overflow.
02 Days
Anti flies spray to be used for
destroying flies in the canteen
area.
Immediate
01 Week
Conduct a training programme
to workers on right lifting
methods.
Immediate
01 Week
Training programme to be
conducted for workers working
at height regarding the safe
practices to be followed while
working at height.
09
10
11
12
Immediate
02 Week
Conduct a health surveillance
programme to the cement
plastering workers on the ill
health effects of chemicals like
cement on human body.
Immediate
01 Day
Replace the cylinder with a new
one.
01 Week
Immediate
1 week
Immediate
1 week
workers.
13
14
15
Immediate
2 Days
Immediate
Immediate
Consequence
Flying objects from the welding process
can cause eye injury or facial burns to
welders.
16
01 Week
Maintenance of the sling to be
done on a weekly basis.
Immediate
02 Weeks
01 Week
01 Day
Provide temporary guard for
17
18
grinding machine.
03 Weeks
The grinding machine to be
replaced with a new one with
appropriate guard.
Keep the workers away from fork
lift operating area and depute a
competent banks man for fork
lift truck.
Immediate
02 Days
Warning signs to be placed in
fork lift operating area and
reverse alarm to be fitted on
fork lift truck.
Heat resistant clothing and
drinking water to be provided to
the workers.
Immediate
01 Day
19
20
Consequence
Health problems like dehydration, heat
cramp, heat stroke etc. can happen to
the workers due to direct heat exposure
for a longer duration.
Workers involved in concrete mixing
were not worn nose mask and were
exposed to cement dust.
Consequence
Cement dust can be inhaled by the
workers and thus breathing problems,
lung cancer etc. can happen to them.
Hazard
On the first floor of the building, welding
work was going on. Wastes like papers,
empty cement bags etc. were scattered
around the welding area.
Consequence
Flying hot particles coming out of
welding process can give ignition to
papers, empty cement bags etc. and
Immediate
01 Week
01 Day
Immediate
01 Day
Depute a competent supervisor
for monitoring.