You are on page 1of 2

Form of Certification of

Design of Temporary Works


Design of Temporary Works
Part 1:

To be signed by the Temporary Woks Coordinator.

Description of Temporary Works (full description including drawing references, if any):


Report:
Drawing / Document No.

Title

Date
23/03/2016
23/03/2016
23/03/2016
30/03/2016

I/*We certify that the above named Temporary Works has been designed with reasonable
professional skill and care and that the design has been checked and found satisfactory by
the undersigned/*checking engineer.

Date

Signed

Name [for and on behalf of *Contractor/Contractors name]

Part 2:
Application when checking of the design has been carried out by the checking
engineer.

I/*We certify that I/*We have used reasonable professional skill and care to check the design
of the above named Temporary Works and have found the design to be satisfactory.

Date

Signed

Name of checking engineer, qualifications, company name.


* Use only one of the alternatives, as appropriate.

February 2009

You might also like