Purpose
Work
Breakdown
Structure
Responsibility
Matrix
R
Project Background
A
S
Resource
Plan
Budget
Resource
Plan
A
Project Deliverables
Gantt
Network
TIME
PROJE
CT
Perform
Tasks
LEADERSHIP
AR
NED
S
RE
EN
LE
PO
RT
Track
Progress
SO
LES
EOS
CL
COMMUNICATION
O
UT
Evaluate
Success
ME
S
I NG
Conduct
Close-Out
Meeting
Share
Lessons
Learned
BOOK
E
T
ET
PLAN
E
L
IM P
Update
Plan
Resolve
Issues
Manage
Change
ASSIGNING RESOURCES
A schedule is not complete until all the resources necessary to complete
the project have been committed or assigned.
NON-LABOR RESOURCES
Lab time
Facilities
Prototype parts/systems
Equipment
Materials
Roadmap to Project Management Success
Statement
of Work
Form
Project
Team
Purpose
Work
Breakdown
Structure
Responsibility
Matrix
R
Project Background
Resource
Plan
Resource
Plan
Gantt
Network
A
A
Project Deliverables
R
Budget
TIME
Track
Progress
P
OR
T
RE
EN
LE
IM P
SO
E
OS
CL
COMMUNICATION
O EARNED
UT
Evaluate
Success
Perform
Tasks
LEADERSHIP
LES
Share
Lessons
Learned
ME
GS
Conduct
Close-Out
Meeting
OK
EB O
IN
PROJE
CT
OT
ET
PLAN
Update
Plan
Resolve
Issues
Manage
Change
85
86
Resource-Constrained Scheduling
The duration of a project may be increased by delaying the late start of some of its
activities if resources are not adequate to meet peak demands.
87
Physical Constraints
Activities that cannot occur in parallel or are affected by contractual or
environmental conditions.
Resource Constraints
The absence, shortage, or unique interrelationship and interaction
characteristics of resources that require a particular sequencing of project
activities
88
CONSTRAINT EXAMPLES
FIGURE 8.2
89
CLASSIFICATION OF A SCHEDULING
PROBLEM
Classification of Problem
Using a priority matrix will help determine if
the project is time or resource constrained.
Time-Constrained Project
Must be completed by an imposed date.
Time is fixed, resources are flexible: additional resources are required to ensure project meets schedule.
Resource-Constrained Project
Is one in which the level of resources available cannot be exceeded.
Resources are fixed, time is flexible: inadequate resources
will delay the project.
810
Limiting Assumptions
Risk Assumptions
Activities with the most slack pose the least risk.
Reduction of flexibility does not increase risk.
The nature of an activity (easy, complex) doesnt increase risk.
811
812
813
1.
Minimum slack
2.
3.
814
Purpose
Work
Breakdown
Structure
Responsibility
Matrix
R
Project Background
Resource
Plan
Gantt
Network
Budget
A
A
Project Deliverables
Budget
TIME
PROJE
CT
Perform
Tasks
LEADERSHIP
AR
NED
S
RE
EN
LE
PO
RT
Track
Progress
TIME
SO
LES
EOS
CL
COMMUNICATION
O
UT
Evaluate
Success
ME
S
I NG
Conduct
Close-Out
Meeting
Share
Lessons
Learned
BOOK
E
T
ET
PLAN
E
L
IM P
Update
Plan
Resolve
Issues
Manage
Change
15
516
COST BUDGETING
Cost Budgeting involves allocating overall cost
estimates to individual work items in order to
establish a cost baseline for measuring project
performance. Using cost estimates, the WBS, the
project schedule, and cost estimating tools, the
project team develops a time-phased budget.
This budget will be used to measure and monitor
cost performance on the project.
Source: PMI
BY: DR. ZEESHAN BHATTI
17
ESTIMATING PROJECTS
Estimating
The process of forecasting or approximating the time and cost of completing project
deliverables.
The task of balancing expectations of stakeholders and need for control while the
project is implemented.
Types of Estimates
Top-down (macro) estimates: analogy, group consensus, or mathematical relationships
Bottom-up (micro) estimates: estimates of elements
of the work breakdown structure
518
519
Other
(Nonproject)
Factors
Organization
Culture
Padding
Estimates
Project
Duration
Quality of
Estimates
People
Project Structure
and Organization
520
521
Top-Down Estimates
Are usually are derived from someone who uses experience and/or information to
determine the project duration and total cost.
Are made by top managers who have little knowledge of the processes used to
complete the project.
Bottom-Up Approach
Can serve as a check on cost elements in the WBS
by rolling up the work packages and associated cost accounts to major deliverables
at the work package level.
522
Condition
Strategic decision making
Macro Estimates
Micro Estimates
High uncertainty
Fixed-price contract
Unstable scope
TABLE 5.1
BY: DR. ZEESHAN BHATTI
523
524
Project Estimate
Times
Costs
525
FIGURE 5.1
BY: DR. ZEESHAN BHATTI
526
TABLE 5.2
BY: DR. ZEESHAN BHATTI
527
TABLE 5.3
BY: DR. ZEESHAN BHATTI
528
529
FIGURE 5.2
BY: DR. ZEESHAN BHATTI
530
FIGURE 5.3
BY: DR. ZEESHAN BHATTI
531
FIGURE 5.4
BY: DR. ZEESHAN BHATTI
532
LEVEL OF DETAIL
Level of detail is different for
different levels of management.
Level of detail in the WBS varies
with the complexity of the project.
Excessive detail is costly.
Fosters a focus on departmental outcomes
533
TYPES OF COSTS
Direct Costs
Costs that are clearly chargeable
to a specific work package.
Labor, materials, equipment, and other
534
Direct costs
Direct overhead
Total direct costs
G&A overhead (20%)
Total costs
Profit (20%)
Total bid
$80,000
$20,000
$100,000
$20,000
$120,000
$24,000
$144,000
FIGURE 5.5
BY: DR. ZEESHAN BHATTI
535
FIGURE 5.6
BY: DR. ZEESHAN BHATTI
536
REFINING ESTIMATES
Reasons for Adjusting Estimates
Interaction costs are hidden in estimates.
Normal conditions do not apply.
Things go wrong on projects.
Changes in project scope and plans.
Adjusting Estimates
Time and cost estimates of specific activities are adjusted as the risks, resources, and
situation particulars become more clearly defined.
537
FIGURE 5.7
BY: DR. ZEESHAN BHATTI
538
KEY TERMS
Apportionment methods
Bottom-up estimates
Contingency funds
Delphi method
Direct costs
Function points
Learning curves
Overhead costs
Padding estimates
Phase estimating
Range estimating
Ratio methods
Template method
Time and cost databases
539
WBS FIGURE
TABLE 5.4
BY: DR. ZEESHAN BHATTI
540
Purpose
Work
Breakdown
Structure
Responsibility
Matrix
R
Project Background
Gantt
Network
Resource
Plan
Budget
A
A
Project Deliverables
S
R
TIME
PROJE
CT
Perform
Tasks
LEADERSHIP
AR
NED
S
RE
EN
LE
PO
RT
Track
Progress
SO
LES
EOS
CL
COMMUNICATION
O
UT
Evaluate
Success
ME
S
I NG
Conduct
Close-Out
Meeting
Share
Lessons
Learned
BOOK
E
T
ET
PLAN
E
L
IM P
Update
Plan
Resolve
Issues
Manage
Change
41
Purpose
Work
Breakdown
Structure
Responsibility
Matrix
R
Project Background
Gantt
Network
Resource
Plan
Budget
A
A
Project Deliverables
S
R
TIME
PROJE
CT
Perform
Tasks
LEADERSHIP
AR
NED
S
RE
EN
LE
PO
RT
Track
Progress
SO
LES
EOS
CL
COMMUNICATION
O
UT
Evaluate
Success
ME
S
I NG
Conduct
Close-Out
Meeting
Share
Lessons
Learned
BOOK
E
T
ET
PLAN
E
L
IM P
Update
Plan
Resolve
Issues
Manage
Change
42
REFERRED NOTES
REFERRED BOOK
43
THANKYOU
Q&A