NO
DAFTAR TENAGA
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Mandor
Kepala Tukang Besi
Kepala Tukang Batu
Kepala Tukang Kayu
Kepala Tukang Cat
Tukang Politur
Tukang Batu
Tukang Kayu
Tukang Besi
Tukang Cat
Tukang Gali
Pekerja
Tukang Stile bali
Kepala Tk. Stile Bali
HARGA SATUAN
Rp.
3
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
SATUAN
70,000.00
65,000.00
55,000.00
60,000.00
55,000.00
45,000.00
55,000.00
55,000.00
55,000.00
45,000.00
55,000.00
45,000.00
85,000.00
85,000.00
4
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
2
3
4
5
5
6
7
8
9
10
11
12
13
1
2
3
4
5
6
7
8
9
10
11
JENIS BAHAN
2
BAHAN PASANGAN
SATUAN
3
HARGA ( Rp )
4
Bata Pasangan
Batu karang
bh
m3
Rp
Rp
950.00
110,000.00
Batako lubang kw I
Bata gosok ex tulikup
Batu karang bukit
bj
bj
m3
Rp
Rp
Rp
1,600.00
2,100.00
77,500.00
Pasir beton
Pasir pasang
Pasir urug
Tanah urug
Kerikil / koral
m3
m3
m3
m3
m3
Rp
Rp
Rp
Rp
Rp
150,000.00
160,000.00
150,000.00
85,000.00
110,000.00
bj
bj
bj
bj
m2
m2
bj
bj
bj
bj
m2
zak
kg
bj
m2
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
14,000.00
12,000.00
13,000.00
12,000.00
107,500.00
93,750.00
7,500.00
7,500.00
21,500.00
18,000.00
37,500.00
54,500.00
1,090.00
10,000.00
95,000.00
btg
btg
btg
btg
btg
btg
kg
kg
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
36,500.00
57,000.00
82,000.00
100,000.00
152,000.00
214,000.00
10,987.15
17,500.00
Baja profil WF
kg
Rp
14,250.00
Paku reng
Paku seng
Paku usuk
kg
kg
kg
Rp
Rp
Rp
17,000.00
32,000.00
17,000.00
Paku lis SQ
kg
Rp
17,000.00
BAHAN KAYU
Kayu begesting balok
Kayu begesting papan
m3
m3
Rp
Rp
2,000,000.00
2,200,000.00
m3
m3
m3
m3
m3
m3
m3
m3
m'
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
5,200,000.00
5,500,000.00
7,500,000.00
7,800,000.00
4,100,000.00
4,300,000.00
2,000,000.00
2,500,000.00
26,250.00
BAHAN PESI
Besi beton 8"mm
Besi beton 10"mm
Besi beton 12"mm
Besi beton 13"mm
Besi beton 16"mm
Besi beton 19"mm
Besi beton
Kawat ikat beton
No
JENIS BAHAN
1
2
12 Kayu kamper USUK 5/7
13 Kayu kamper USUK 4/6
14 Kayu kruing USUK 5/7
15 Kayu kruing USUK 4/6
16 Kayu Reng Kamper
17 Kayu Reng Kruing
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
1
2
3
4
5
6
7
8
9
10
BAHAN LANTAI
Keramik Asia Tile 40x40 KW I (warna muda)
Keramik Asia Tile 30x30 KW.I (warna muda)
Keramik Asia Tile 30x30 KW.I (warna tua)
Keramik Asia Tile 20x20 KW.I (warna muda)
Keramik Asia Tile 20x20 KW.I (warna tua)
Keramik Asia Tile 20x25 KW.I (warna muda)
Keramik Asia Tile 20x25 KW.I (warna tua)
Keramik Asia Tile 10x30 KW I (warna muda)
Keramik Asia Tile 10x40 KW I (warna muda)
Keramik Innessa 30 x 30 (warna muda)
Keramik Innessa 10 x 40 (warna muda)
Keramik Asia Tile 20x20 KW.I (anti slip)
Marmer 60 x 60 cm (Citatah)
Marmer Plin 10 x 60 cm
Marmer 30 x 30 cm
Marmer plin 10 x 30 cm
Granit
Koral sikat
Paping blok orion 20x20x8 K 225
BAHAN FINISHING/CATX
Amplas
Cat dasar
Cat meni
Cat kayu (emco)
Cat tembok (vinilex)
Cat tembok (paragon)
Cat tembok (decolith)
Cat tembok (dulux)
Cat zyncromate
Ceillingteak (0,62 x 2,40)
Dempul impra
Impra wood filler
Minyak cat
Minyak thinner
Politur ultra
Politur vernis
BAHAN FLAPOND
Ceillingteak (0,62 x 2,40)
Plywood +aluminium jeruk
Teakwood 4mm (0,9x2,4)
Teakwood 4mm (1,2x2,4)
Teakblock
Plywood 3mm
Plywood 4mm
Plywood 6 mm
Megateak
Gypsum 12mm ex Jayaboard
SATUAN
3
HARGA ( Rp )
4
m3
M3
m3
m3
ikat
ikat
Rp
Rp
Rp
Rp
Rp
Rp
7,000,000.00
6,800,000.00
4,800,000.00
4,400,000.00
330,000.00
280,000.00
m2
m2
m2
m2
m2
m2
m2
m'
m'
m2
m'
m2
m2
m'
m2
m'
m2
zak
m2
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
42,000.00
27,000.00
30,000.00
37,000.00
37,000.00
38,000.00
40,000.00
6,000.00
6,500.00
164,800.00
16,480.00
41,000.00
245,000.00
29,500.00
147,500.00
15,500.00
1,250,000.00
36,000.00
95,000.00
lbr
kg
kg
kg
kg
kg
kg
kg
kg
lbr
kg
ltr
ltr
ltr
ltr
ltr
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
6,000.00
17,000.00
24,000.00
48,000.00
24,000.00
22,000.00
23,000.00
25,000.00
39,500.00
70,000.00
21,000.00
22,000.00
6,500.00
8,000.00
45,000.00
30,000.00
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
M2
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
70,000.00
60,000.00
54,000.00
86,500.00
135,000.00
40,000.00
47,000.00
68,000.00
125,000.00
42,000.00
No
JENIS BAHAN
1
2
11 Gypsum 4mm ex Jayaboard
12
13
14
15
16
17
18
19
20
1
2
3
4
5
6
7
8
9
10
11
1
2
3
4
5
1
2
3
4
5
6
7
8
9
10
11
12
13
14
1
2
3
4
5
6
7
8
9
1
Kalsiboard 6 mm
Besi Hollow
Paku Ramset
Gantungan
Staping
GRC
Scrup
Compoun
Gedeg kulit kls. I
BAHAN ATAP
Genteng karang pilang bambe
Genteng karang pilang bambe (dicat)
Genteng bubungan bambe
Genteng press lokal
Genteng bubungan press lokal
Genteng metal KW I (gerard)
Genteng bubungan metal (plat sheet)
Genteng marigional (natural)
Genteng morigional (glazur)
Genteng bubungan marigional bulat (natural)
Genteng bubungan marigional bulat (glazur)
BAHAN KACA
Kaca bening 3 mm
Kaca bening 5 mm
Kaca bening 8 mm
Kaca bening 10 mm
Kaca 12 mm (Tempred)
BAHAN GANTUNGAN/ENGSEL
Kait angin biasa
Kait angin kuningan
Kait angin (silver)
Grendel barel bolt antik
Grendel barel bolt kuningan
Grendel tanam antik
Grendel tanam kuningan
Grendel ELT (jendela/ventilasi)
Engsel nylon (pintu)
Engsel nylon (jendela)
Engsel Vanessa (pintu)
Engsel Vanessa (jendela/ventilasi)
Kunci Cavel 2 slaag
Kunci vanesa 2 slaag
BAHAN SANITARE
Floor Drain (TOTO)
Wastafel (TOTO)
Shower dinding
Kloset duduk monoblok "American standart"
Kloset duduk duduk (TOTO)
Kran Buth Tub
Kloset jongkok "Amercan standart"
Kran biasa 1/2"
Jet Washer (TOTO)
BAHAN LAINYA
Minyak bekisting
SATUAN
3
HARGA ( Rp )
4
M2
M2
M'
Bh
Bh
Bh
M2
Bj
Kg
m2
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
26,000.00
45,000.00
23,000.00
3,000.00
7,500.00
250.00
32,000.00
200.00
15,000.00
13,500.00
bj
bj
bj
bj
bj
m2
lbr
pcs
pcs
pcs
pcs
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
2,800.00
3,675.00
10,000.00
600.00
1,800.00
135,000.00
120,000.00
6,750.00
8,250.00
7,800.00
15,000.00
m2
m2
m2
m2
m2
Rp
Rp
Rp
Rp
Rp
53,800.00
86,500.00
180,000.00
350,000.00
1,900,000.00
bh
bh
ps
bh
bh
bh
bh
bh
ps
ps
ps
ps
bh
bh
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
4,500.00
11,500.00
17,500.00
3,500.00
7,500.00
33,750.00
14,500.00
19,500.00
12,500.00
10,000.00
38,000.00
35,000.00
175,000.00
577,500.00
bh
bh
bh
bh
bh
bh
bh
bh
bh
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
185,000.00
1,325,000.00
475,000.00
950,000.00
2,325,000.00
825,000.00
175,000.00
52,500.00
280,000.00
ltr
Rp
22,000.00
No
1
2
3
4
JENIS BAHAN
2
Multiplek 9 mm
Water profing/membran
Water profing/semen base
SATUAN
3
lbr
m2
m2
Rp
Rp
Rp
HARGA ( Rp )
4
125,000.00
95,000.00
45,000.00
URAIAN PEKERJAAN
2
Pekerjaan Tanah & Outsite
1 1 M1Pengukuran dan Pasangan Bowplank
0.007 M3 Kayu Meranti Papan
0.012 M3 Kayu Meranti Usuk 5/7
0.02 Kg Paku 2"-5"
0.100 OH Pekerja
0.100 OH Tukang kayu
0.010 OH Kep Tukang
0.005 OH Mandor
2 1 M3 Pekerjaan Galian Tanah Biasa Sedalam 1 M1
0.4 OH Pekerja
0.04 OH Mandor
3 1 M3 Pekerjaan Galian Tanah Biasa Sedalam 2 M1
0.526 OH Pekerja
0.0526 OH Mandor
4 1 M3 Pekerjaan Galian Tanah Biasa Sedalam 3 M1
0.735 OH Pekerja
0.0735 OH Mandor
5 1 M3 Pekerjaan Galian Foot Plat
1.00 OH Pekerja
0.10 OH Mandor
SATUAN
( Rp. )
2
UPAH
( Rp. )
BAHAN
( Rp. )
3
HARGA
( Rp. )
4
15,400.00
24,000.00
340.00
15,400.00
24,000.00
340.00
4,500.00
5,500.00
600.00
350.00
44,240.00
2,200,000.00
2,000,000.00
17,000.00
45,000.00
55,000.00
60,000.00
70,000.00
Jumlah
4,500.00
5,500.00
600.00
350.00
10,950.00
45,000.00
70,000.00
Jumlah
18,000.00
2,800.00
20,800.00
18,000.00
2,800.00
20,800.00
45,000.00
70,000.00
Jumlah
23,670.00
3,682.00
27,352.00
23,670.00
3,682.00
27,352.00
45,000.00
70,000.00
Jumlah
33,075.00
5,145.00
38,220.00
33,075.00
5,145.00
38,220.00
45,000.00
70,000.00
Jumlah
45,000.00
7,000.00
52,000.00
45,000.00
7,000.00
52,000.00
45,000.00
70,000.00
25,000.00
Jumlah
22,500.00
3,500.00
2,225.00
28,225.00
22,500.00
3,500.00
2,225.00
28,225.00
85,000.00
45,000.00
70,000.00
25,000.00
Jumlah
102,000.00
13,500.00
700.00
2,000.00
118,200.00
150,000.00
45,000.00
70,000.00
Jumlah
13,500.00
700.00
14,200.00
39,740.00
6 1 M3 Pekerjaan Pemadatan
0.500 OH Pekerja
0.050 OH Mandor
0.089 Jam Stamper
7 1 M3 Pekerjaan Urugan Tanah & Pemadatan
1.2 M3 Tanah Urug
0.3 OH Pekerja
0.01 OH Mandor
0.08 Jam Stamper
8 1 M3 Pekerjaan Urugan Pasir & Penyiraman
1.2 M3 Pasir Urug
0.3 OH Pekerja
0.01 OH Mandor
Pekerjaan Pasangan
9 1 M3 Pasangan Batu Kali Camp 1 : 5
1.1 M3 Batu Kali
2.92 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.544 M3 Pasir Pasang
0.6 OH Tukang Batu
0.06 OH Kepala Tukang Batu
1.5 OH Pekerja
0.075 OH Mandor
10 1 M3 Pekerjaan Urugan sirtu dan peninggian
1.2 M3 sirtu
0.3 OH Pekerja
0.03 OH Mandor
0.125 Jam Stamper
11 1 M3 Pekerjaan Beton cor struktur
0.970 M3 Kerikil Beton
336.0 kg Portland Cement 50 Kg (Indo Cement klas I)
102,000.00
180,000.00
110,000.00
54,500.00
90,000.00
50,000.00
55,000.00
45,000.00
70,000.00
Jumlah
30,000.00
3,300.00
67,500.00
5,250.00
106,050.00
150,000.00
45,000.00
70,000.00
25,000.00
Jumlah
13,500.00
2,100.00
3,125.00
18,725.00
110,000.00
1,090.00
102,000.00
180,000.00
121,000.00
159,140.00
48,960.00
329,100.00
180,000.00
102,000.00
13,500.00
700.00
2,000.00
118,200.00
180,000.00
13,500.00
700.00
194,200.00
121,000.00
159,140.00
48,960.00
30,000.00
3,300.00
67,500.00
5,250.00
435,150.00
180,000.00
180,000.00
13,500.00
2,100.00
3,125.00
195,600.00
106,700.00
366,240.00
106,700.00
366,240.00
NO
URAIAN PEKERJAAN
2
0.540
0.275
1.050
0.265
5.300
0.262
M3
OH
OH
OH
OH
OH
Pasir Beton
Tukang Batu
Tukang Besi
Kepala Tukang Batu
Pekerja
Mandor
SATUAN
( Rp. )
2
150,000.00
55,000.00
55,000.00
55,000.00
45,000.00
70,000.00
Jumlah
1,090.00
160,000.00
55,000.00
55,000.00
45,000.00
70,000.00
Jumlah
1,090.00
160,000.00
55,000.00
45,000.00
55,000.00
70,000.00
Jumlah
1,090.00
160,000.00
55,000.00
45,000.00
55,000.00
70,000.00
Jumlah
54,500.00
160,000.00
55,000.00
55,000.00
45,000.00
70,000.00
Jumlah
54,500.00
160,000.00
55,000.00
55,000.00
45,000.00
70,000.00
Jumlah
54,500.00
160,000.00
55,000.00
55,000.00
45,000.00
70,000.00
Jumlah
54,500.00
160,000.00
55,000.00
55,000.00
45,000.00
70,000.00
Jumlah
163,000.00
UPAH
( Rp. )
BAHAN
( Rp. )
3
15,125.00
57,750.00
14,575.00
238,500.00
18,340.00
344,290.00
4
81,000.00
553,940.00
16,899.36
2,560.00
8,250.00
825.00
13,500.00
1,050.00
23,625.00
19,459.36
11,144.16
3,200.00
8,250.00
675.00
16,500.00
1,050.00
26,475.00
14,344.16
5,650.56
3,200.00
8,250.00
675.00
16,500.00
1,050.00
26,475.00
8,850.56
4,708.80
3,520.00
8,250.00
825.00
9,000.00
700.00
18,775.00
8,228.80
8,829.00
3,040.00
8,250.00
825.00
9,000.00
700.00
18,775.00
11,869.00
9,286.80
2,720.00
8,250.00
825.00
9,000.00
700.00
18,775.00
12,006.80
10,137.00
2,560.00
8,250.00
825.00
9,000.00
700.00
18,775.00
HARGA
( Rp. )
5
81,000.00
15,125.00
57,750.00
14,575.00
238,500.00
18,340.00
898,230.00
16,899.36
2,560.00
8,250.00
825.00
13,500.00
1,050.00
43,084.36
11,144.16
3,200.00
8,250.00
675.00
16,500.00
1,050.00
40,819.16
5,650.56
3,200.00
8,250.00
675.00
16,500.00
1,050.00
35,325.56
4,708.80
3,520.00
8,250.00
825.00
9,000.00
700.00
27,003.80
8,829.00
3,040.00
8,250.00
825.00
9,000.00
700.00
30,644.00
9,286.80
2,720.00
8,250.00
825.00
9,000.00
700.00
30,781.80
12,697.00
10,137.00
2,560.00
8,250.00
825.00
9,000.00
700.00
31,472.00
16,130.48
16,130.48
NO
URAIAN PEKERJAAN
2
0.04
0.002
0.04
0.08
OH
OH
OH
OH
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor
20 1 M Pekerjaan Acian
3.25 kg Portland Cement 50 Kg (Indo Cement klas I)
0.1 OH Tukang Batu
0.01 OH Kepala Tukang Batu
0.2 OH Pekerja
0.01 OH Mandor
21 1 M3 Pekerjaan Beton
0.752 M3 Kerikil Beton
8.05 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.3854 M3 Pasir Beton
0.25 OH Tukang Batu
0.025 OH Kepala Tukang Batu
3.257 OH Pekerja
0.035 OH Mandor
1 M3 Beton
0.91 M3
0.54 M3
181.60 kg
0.20 Hr
0.02 Hr
1.20 Hr
0.06 Hr
SATUAN
( Rp. )
2
55,000.00
55,000.00
45,000.00
70,000.00
Jumlah
1,090.00
55,000.00
55,000.00
45,000.00
70,000.00
Jumlah
110,000.00
54,500.00
150,000.00
55,000.00
55,000.00
45,000.00
70,000.00
Jumlah
110,000.0
150,000.0
1,090.0
55,000.0
55,000.0
45,000.0
70,000.0
10,987.15
17,500.00
55,000.00
65,000.00
45,000.00
70,000.00
Jumlah
125,000.00
2,000,000.00
15,500.00
55,000.00
60,000.00
45,000.00
70,000.00
22,000.00
Jumlah
135,000.00
3,000,000.00
15,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
125,000.00
2,000,000.00
4,100,000.00
17,000.00
55,000.00
60,000.00
UPAH
( Rp. )
3
2,200.00
110.00
1,800.00
5,600.00
9,710.00
BAHAN
( Rp. )
HARGA
( Rp. )
4
16,130.48
3,542.50
5,500.00
550.00
9,000.00
700.00
15,750.00
57,810.00
13,750.00
1,375.00
146,565.00
2,450.00
221,950.00
3,542.50
82,720.00
438,725.00
57,810.00
579,255.00
100,100.0
81,000.0
197,944.0
11,000.0
1,100.0
54,000.0
4,200.0
70,300.0
379,044.0
10,987.15
262.50
104.50
292.50
315.00
280.00
992.00
11,249.65
43,750.00
90,000.00
4,650.00
14,300.00
1,560.00
23,400.00
1,820.00
41,080.00
2,200.00
138,400.00
47,250.00
43,200.00
3,100.00
18,750.00
2,062.50
12,950.00
406.25
34,168.75
93,550.00
43,750.00
60,000.00
164,000.00
5,440.00
21,450.00
2,340.00
5
2,200.00
110.00
1,800.00
5,600.00
25,840.48
3,542.50
5,500.00
550.00
9,000.00
700.00
19,292.50
82,720.00
438,725.00
57,810.00
13,750.00
1,375.00
146,565.00
2,450.00
743,395.00
100,100.0
81,000.0
197,944.0
11,000.0
1,100.0
54,000.0
4,200.0
449,344.0
10,987.15
262.50
104.50
292.50
315.00
280.00
12,241.65
43,750.00
90,000.00
4,650.00
14,300.00
1,560.00
23,400.00
1,820.00
2,200.00
181,680.00
47,250.00
43,200.00
3,100.00
18,750.00
2,062.50
12,950.00
406.25
127,718.75
43,750.00
60,000.00
164,000.00
5,440.00
21,450.00
2,340.00
NO
URAIAN PEKERJAAN
2
0.364 OH Pekerja
0.0065 OH Mandor
SATUAN
( Rp. )
2
45,000.00
70,000.00
Jumlah
125,000.00
2,000,000.00
4,100,000.00
17,000.00
55,000.00
60,000.00
45,000.00
70,000.00
Jumlah
125,000.00
2,000,000.00
4,100,000.00
17,000.00
55,000.00
60,000.00
45,000.00
70,000.00
Jumlah
UPAH
( Rp. )
3
16,380.00
455.00
40,625.00
BAHAN
( Rp. )
HARGA
( Rp. )
4
273,190.00
43,750.00
64,000.00
184,500.00
6,800.00
22,275.00
2,430.00
17,010.00
472.50
42,187.50
299,050.00
43,750.00
60,000.00
184,500.00
6,800.00
20,625.00
2,250.00
15,750.00
437.50
39,062.50
295,050.00
5
16,380.00
455.00
313,815.00
43,750.00
64,000.00
184,500.00
6,800.00
22,275.00
2,430.00
17,010.00
472.50
341,237.50
43,750.00
60,000.00
184,500.00
6,800.00
20,625.00
2,250.00
15,750.00
437.50
334,112.50
Beton Bertulang
28 1 M3 Pekerjaan Beton Bertulang Plat Dinding = 20 cm (dinding Pit lift)
1.000 M3 Beton Cor Ready Mix K-300
743,395.00
10.000 M2 Pekerjaan Begisting Plat Dinding
334,112.50
80.000 Kg Pekerjaan Besi beton
12,241.65
Jumlah
743,395.00
3,341,125.00
979,332.28
5,063,852.28
860,000.00
1,705,140.00
2,025,237.50
4,590,377.50
860,000.00
1,420,950.00
2,025,237.50
4,306,187.50
860,000.00
1,184,125.00
2,025,237.50
4,069,362.50
47,250.00
75,000.00
6,200.00
20,250.00
2,227.50
13,986.00
438.75
36,902.25
128,450.00
47,250.00
75,000.00
6,200.00
20,250.00
2,227.50
13,986.00
438.75
165,352.25
860,000.00
1,322,818.00
3,314,025.00
5,496,843.00
200,000.00
860,000.00
587,301.59
200,000.00
NO
1
URAIAN PEKERJAAN
2
Pekerjaan ATAP
35 1 Kg Pekerjaan Kuda-Kuda Baja
1.1 Kg Baja Profile
0.02 Kg Cat Metal ICI Dulux
0.00675 OH Pekerja
0.0675 OH Tukang Besi
0.00675 OH Kepala Tukang Besi
0.000675 OH Mandor
36 1 M2 Pek. Usuk
0.0156 M3 Kayu Kamper Samarida Usuk 5/7
0.25 Kg Paku 2"-5"
0.56 OH Tukang Kayu
0.12 OH Kepala Tukang Kayu
0.85 OH Pekerja
0.045 OH Mandor
36 1 M2 Pek. Reng
0.016 M3 Kayu Kamper Samarinda Reng 3/4
0.25 Kg Paku 2"-5"
0.56 OH Tukang Kayu
0.12 OH Kepala Tukang Kayu
0.85 OH Pekerja
0.045 OH Mandor
37 1 M2 Pekerjaan Pasang Atap Genteng
16.67 Bh Genteng Kodok produksi Goodyear
0.175 OH Tukang Batu
0.0175 OH Kepala Tukang Batu
0.35 OH Pekerja
0.0175 OH Mandor
38 1 M1 Pekerjaan Pasang Bubungan Genteng
3.5 Bh Bubungan Genteng Keramik Berglasur
0.036 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.032 M3 Pasir Pasang
0.3 OH Tukang Batu
0.03 OH Kepala Tukang Batu
0.6 OH Pekerja
0.03 OH Mandor
39 1 M1 Pekerjaan Papan List Plank
0.0135 M3 Kayu Kamper Samarinda Balok
0.25 Kg Paku 2"-5"
0.56 OH Tukang Kayu
0.12 OH Kepala Tukang Kayu
0.85 OH Pekerja
0.045 OH Mandor
40 1 M3 Pekerjaan Listplank Kayu Kamper
1.1 M3 Kayu Kamper Samarinda Balok
15 Kg Paku 2"-5"
0.15 Kg Paku Lis
24 OH Tukang Kayu
2.4 OH Kepala Tukang Kayu
8 OH Pekerja
0.4 OH Mandor
Pekerjaan Kaca mati
41 1 M2 Pekerjaan Pasang Kaca Mati 8 mm
1.00 M2 Kaca 8mm
0.12 OH Tukang Kayu
0.012 OH Kepala Tukang Kayu
0.0188 OH Pekerja
SATUAN
( Rp. )
2
Jumlah
15,000.00
180,000.00
37,000.00
50,000.00
50,000.00
65,000.00
Jumlah
7,000,000.00
15,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
UPAH
( Rp. )
3
200,000.00
249.75
3,375.00
337.50
43.88
4,006.13
28,000.00
6,600.00
31,450.00
2,925.00
68,975.00
28,000.00
6,600.00
31,450.00
2,925.00
68,975.00
3,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
8,750.00
962.50
12,950.00
1,137.50
23,800.00
7,800,000.00
15,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
HARGA
( Rp. )
4
5
1,647,301.59
16,500.00
3,600.00
16,500.00
3,600.00
249.75
3,375.00
337.50
43.88
24,106.13
20,100.00
109,200.00
3,875.00
6,000,000.00
15,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
16,500.00
49,000.00
90,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
BAHAN
( Rp. )
113,075.00
96,000.00
3,875.00
99,875.00
50,010.00
50,010.00
57,750.00
1,764.00
2,880.00
15,000.00
1,650.00
22,200.00
1,950.00
40,800.00
62,394.00
105,300.00
3,875.00
28,000.00
6,600.00
31,450.00
2,925.00
68,975.00
7,500,000.00
15,500.00
22,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
1,200,000.00
132,000.00
296,000.00
26,000.00
1,654,000.00
174,000.00
50,000.00
55,000.00
37,000.00
6,000.00
660.00
695.60
109,175.00
8,250,000.00
232,500.00
3,300.00
8,485,800.00
174,000.00
109,200.00
3,875.00
28,000.00
6,600.00
31,450.00
2,925.00
182,050.00
96,000.00
3,875.00
28,000.00
6,600.00
31,450.00
2,925.00
168,850.00
50,010.00
8,750.00
962.50
12,950.00
1,137.50
73,810.00
57,750.00
1,764.00
2,880.00
15,000.00
1,650.00
22,200.00
1,950.00
103,194.00
105,300.00
3,875.00
28,000.00
6,600.00
31,450.00
2,925.00
178,150.00
8,250,000.00
232,500.00
3,300.00
1,200,000.00
132,000.00
296,000.00
26,000.00
10,139,800.00
174,000.00
6,000.00
660.00
695.60
NO
URAIAN PEKERJAAN
2
0.032 OH Mandor
SATUAN
( Rp. )
2
65,000.00
Jumlah
UPAH
( Rp. )
3
2,080.00
9,435.60
100,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
6,000.00
660.00
695.60
2,080.00
9,435.60
172,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
6,000.00
660.00
695.60
2,080.00
9,435.60
30,000.00
1,090.00
160,000.00
12,500.00
45,000.00
55,000.00
55,000.00
70,000.00
Jumlah
37,000.00
1,090.00
160,000.00
12,500.00
45,000.00
55,000.00
55,000.00
70,000.00
Jumlah
66,250.00
1,090.00
160,000.00
12,500.00
45,000.00
55,000.00
55,000.00
70,000.00
Jumlah
132,500.00
54,500.00
160,000.00
12,500.00
50,000.00
55,000.00
37,000.00
70,000.00
Jumlah
93,750.00
54,500.00
160,000.00
12,500.00
50,000.00
55,000.00
37,000.00
BAHAN
( Rp. )
HARGA
( Rp. )
4
174,000.00
100,000.00
100,000.00
172,500.00
172,500.00
36,000.00
10,900.00
7,200.00
18,750.00
31,500.00
19,250.00
1,925.00
2,450.00
55,125.00
72,850.00
40,700.00
11,336.00
7,200.00
20,250.00
31,500.00
19,250.00
1,925.00
2,450.00
55,125.00
15,625.00
31,500.00
19,250.00
1,925.00
2,450.00
70,750.00
79,486.00
79,500.00
13,625.00
7,200.00
15,625.00
115,950.00
139,125.00
13,625.00
3,680.00
3,125.00
24,750.00
2,722.50
17,094.00
15,400.00
59,966.50
159,555.00
98,437.50
13,625.00
3,680.00
4,166.67
24,750.00
2,722.50
17,094.00
5
2,080.00
183,435.60
100,000.00
6,000.00
660.00
695.60
2,080.00
109,435.60
172,500.00
6,000.00
660.00
695.60
2,080.00
181,935.60
36,000.00
10,900.00
7,200.00
18,750.00
31,500.00
19,250.00
1,925.00
2,450.00
127,975.00
40,700.00
11,336.00
7,200.00
20,250.00
31,500.00
19,250.00
1,925.00
2,450.00
134,611.00
79,500.00
13,625.00
7,200.00
15,625.00
31,500.00
19,250.00
1,925.00
2,450.00
171,075.00
139,125.00
13,625.00
3,680.00
3,125.00
24,750.00
2,722.50
17,094.00
15,400.00
219,521.50
98,437.50
13,625.00
3,680.00
4,166.67
24,750.00
2,722.50
17,094.00
NO
URAIAN PEKERJAAN
2
0.22 OH Mandor
SATUAN
( Rp. )
2
65,000.00
Jumlah
68,000.00
54,500.00
160,000.00
12,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
129,600.00
160,000.00
12,500.00
12,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
60,750.00
54,500.00
160,000.00
12,500.00
55,000.00
37,000.00
65,000.00
Jumlah
43,200.00
54,500.00
160,000.00
12,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
3,250.00
54,500.00
160,000.00
12,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
3,250.00
54,500.00
160,000.00
12,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
Pengecatan/Finishing
54 1 M2 Pekerjaan Cat Tembok 1x Plamur, 1x Dasar, 2x Cat Halus
UPAH
( Rp. )
3
14,300.00
58,866.50
BAHAN
( Rp. )
HARGA
( Rp. )
4
119,909.17
71,400.00
13,625.00
3,680.00
6,250.00
24,750.00
2,722.50
17,094.00
14,300.00
58,866.50
94,955.00
324.00
4,000.00
28.75
625.00
2,450.00
269.50
1,709.40
1,430.00
5,858.90
4,977.75
63,787.50
13,625.00
3,680.00
6,250.00
2,475.00
17,760.00
1,950.00
22,185.00
87,342.50
45,360.00
1,689.50
3,200.00
416.67
2,500.00
275.00
5,550.00
390.00
8,715.00
50,666.17
3,412.50
1,689.50
3,200.00
833.33
3,000.00
275.00
6,660.00
390.00
10,325.00
9,135.33
3,412.50
1,689.50
3,200.00
18,750.00
2,500.00
275.00
5,550.00
390.00
8,715.00
27,052.00
5
14,300.00
178,775.67
71,400.00
13,625.00
3,680.00
6,250.00
24,750.00
2,722.50
17,094.00
14,300.00
153,821.50
324.00
4,000.00
28.75
625.00
2,450.00
269.50
1,709.40
1,430.00
10,836.65
63,787.50
13,625.00
3,680.00
6,250.00
2,475.00
17,760.00
1,950.00
109,527.50
45,360.00
1,689.50
3,200.00
416.67
2,500.00
275.00
5,550.00
390.00
59,381.17
3,412.50
1,689.50
3,200.00
833.33
3,000.00
275.00
6,660.00
390.00
19,460.33
3,412.50
1,689.50
3,200.00
18,750.00
2,500.00
275.00
5,550.00
390.00
35,767.00
NO
1
URAIAN PEKERJAAN
2
Dinding Dalam
0.333 Lbr Amplas
0.12 Kg Cat Dasar
0.208 Kg Cat Dinding ICI Dulux
0.1 Kg Plamur Tembok
0.04095 OH Tukang Cat
0.004095 OH Kepala Tukang Cat
0.13 OH Pekerja
0.01625 OH Mandor
55
56
57
58
59
60
SATUAN
( Rp. )
2
3,000.00
21,500.00
125,000.00
6,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
1 M2 Pekerjaan Cat Tembok 1x Plamur, 1x Dasar, 2x Cat Halus
Dinding Luar
0.333 Lbr Amplas
3,000.00
0.12 Kg Cat Dasar
21,500.00
0.26 Kg Cat Dinding ICI Dulux Weathersield
168,500.00
0.1 Kg Plamur Tembok
6,000.00
0.04095 OH Tukang Cat
50,000.00
0.004095 OH Kepala Tukang Cat
55,000.00
0.13 OH Pekerja
37,000.00
0.01625 OH Mandor
65,000.00
Jumlah
1 M2 Pekerjaan Cat Tembok 1x Plamur, 1x Dasar, 2x Cat Halus (Cat Jotun)
0.333 Lbr Amplas
3,000.00
0.12 Kg Cat Dasar
21,500.00
0.26 Kg Cat Jotun
198,000.00
0.1 Kg Plamur Tembok
6,000.00
0.063 OH Tukang Cat
50,000.00
0.0063 OH Kepala Tukang Cat
55,000.00
0.2 OH Pekerja
37,000.00
0.025 OH Mandor
65,000.00
Jumlah
1 M2 Pekerjaan Cat Kayu 1x Cat Dasar, 2x Cat Halus
0.333 Lbr Amplas
3,000.00
0.12 Kg Cat Danapaints
160,000.00
0.26 Kg Cat Kayu ICI Dulux
170,000.00
0.1 Kg Dempul Kayu
18,000.00
0.018 OH Tukang Cat
50,000.00
0.012 OH Kepala Tukang Cat
55,000.00
0.14 OH Pekerja
37,000.00
0.005 OH Mandor
65,000.00
Jumlah
1 M Pekerjaan Tempelan Paras Palimanan
12.5 bj Batu Palimanan 20 x 40 cm
7,500.00
0.1 Zak Portland Cement 50 Kg (Indo Cement klas I)
54,500.00
0.65 OH Tukang Stile bali
85,000.00
0.065 OH Kepala Tk. Stile Bali
85,000.00
0.5625 OH Pekerja Stile Bali
50,000.00
0.065 OH Mandor
70,000.00
Jumlah
1 M Pekerjaan Pasang Batu Alam
1.1 M2 Batu Alam Abu-Abu/Hitam 20 x 40 cm
93,750.00
0.023 M3 Pasir Pasang
160,000.00
0.25 M3 Pasir Urug
150,000.00
0.65 OH Tukang Stile bali
85,000.00
0.065 OH Kepala Tk. Stile Bali
85,000.00
0.5625 OH Pekerja Stile Bali
50,000.00
0.065 OH Mandor
70,000.00
Jumlah
1 M Pekerjaan Pasang Batu Candi
12.5 M2 Batu Alam Abu-Abu/Hitam 20 x 40 cm
7,500.00
0.023 M3 Pasir Pasang
160,000.00
0.25 M3 Pasir Urug
150,000.00
0.65 OH Tukang Stile bali
85,000.00
0.065 OH Kepala Tk. Stile Bali
50,000.00
0.5625 OH Pekerja Stile Bali
70,000.00
UPAH
( Rp. )
BAHAN
( Rp. )
3
2,047.50
225.23
4,810.00
1,056.25
8,138.98
HARGA
( Rp. )
4
999.00
2,580.00
26,000.00
600.00
999.00
2,580.00
26,000.00
600.00
2,047.50
225.23
4,810.00
1,056.25
38,317.98
30,179.00
999.00
2,580.00
43,810.00
600.00
2,047.50
225.23
4,810.00
1,056.25
8,138.98
47,989.00
999.00
2,580.00
51,480.00
600.00
3,150.00
346.50
7,400.00
1,625.00
12,521.50
55,659.00
999.00
19,200.00
44,200.00
1,800.00
900.00
660.00
5,180.00
325.00
7,065.00
66,199.00
93,750.00
5,450.00
55,250.00
5,525.00
28,125.00
4,550.00
93,450.00
99,200.00
103,125.00
3,680.00
37,500.00
55,250.00
5,525.00
28,125.00
4,550.00
93,450.00
144,305.00
93,750.00
3,680.00
37,500.00
55,250.00
3,250.00
39,375.00
999.00
2,580.00
43,810.00
600.00
2,047.50
225.23
4,810.00
1,056.25
56,127.98
999.00
2,580.00
51,480.00
600.00
3,150.00
346.50
7,400.00
1,625.00
68,180.50
999.00
19,200.00
44,200.00
1,800.00
900.00
660.00
5,180.00
325.00
73,264.00
93,750.00
5,450.00
55,250.00
5,525.00
28,125.00
4,550.00
192,650.00
103,125.00
3,680.00
37,500.00
55,250.00
5,525.00
28,125.00
4,550.00
237,755.00
93,750.00
3,680.00
37,500.00
55,250.00
3,250.00
39,375.00
NO
1
URAIAN PEKERJAAN
2
0.065 OH Mandor
Pekerjaan Watterprofing
61 1 M2 Pekerjaan Waterproffing Semen base
0.635 Kg Waterproof semen base ex fosrox
0.400 OH Pekerja
0.040 OH Mandor
62 1 M2 Pekerjaan Waterproffing Membrane
1.100 m2 Waterproof membrane ex fosrox
0.400 OH Pekerja
0.040 OH Mandor
63 1 M Pekerjaan Acian 1 : 3
0.2096 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.04 OH Tukang Batu
0.002 OH Kepala Tukang Batu
0.04 OH Pekerja
0.08 OH Mandor
64 M3 Pekerjaan Beton 1 : 3 : 5 (rabatan lantai kerja)
0.87 M3 Kerikil Beton
4.666 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.344 M3 Pasir Beton
1.000 OH Tukang Batu
0.010 OH Kepala Tukang Batu
4.000 OH Pekerja
0.040 OH Mandor
Pekerjaan Plafond
65 1 M2 Pek. Rangka Plapond Besi Hollow
1.1 M' Besi Hollow
2.0833 Bh Gantungan
2.0833 Bh Paku Ramset
0.2 Bh Staping
1 Ls Ongkos Pasang
66 1 M2 Pek. Dinding Partisi GRC (Rangka Besi Hollow)
4 M' Rangka Partisi Besi Hollow
1.125 Bj Scrup
0.49 M2 GRC
0.7 Kg High Modulus Acetate Silicon Sealant 4200 Pol
1 m2. GlassWoll density 60 kg/m3.
0.42 Kg Compoun
1.2 Roll Textile Tape (plaster)
1 Ls Ongkos Pasang
67 1 M2 Pek. Plapond Calsiboard
1.1 M2 Kalsiboard 6 mm
14 Bj Paku Beton
1.4 Bj Scrup
0.25 Kg Compoun
0.055556 Roll Textile Tape (plaster)
1 Ls Ongkos Pasang
68 1 M2 Pekerjaan Paving
1.05 m2 Paving Blok
0.15 OH Tukang Batu
0.02 OH Kepala Tukang Batu
0.35 OH Pekerja
0.02 OH Mandor
Pasangan Bata
69 1 M2 Pekerjaan Pasangan Bata ringan( 7,5x20x60)
8.4 Bj Bata ringan
0.2874 Zak Perekat bata ringan MU (40 kg)
SATUAN
( Rp. )
2
Jumlah
UPAH
( Rp. )
BAHAN
( Rp. )
HARGA
( Rp. )
3
97,875.00
4
134,930.00
5
232,805.00
40,000.00
45,000.00
70,000.00
Jumlah
25,400.00
18,000.00
2,800.00
20,800.00
25,400.00
18,000.00
2,800.00
46,200.00
75,000.00
45,000.00
70,000.00
Jumlah
18,000.00
2,800.00
20,800.00
54,500.00
55,000.00
55,000.00
45,000.00
70,000.00
Jumlah
2,200.00
110.00
1,800.00
5,600.00
9,710.00
110,000.00
54,500.00
150,000.00
55,000.00
55,000.00
45,000.00
70,000.00
Jumlah
23,000.00
7,500.00
3,000.00
250.00
7,500.00
Jumlah
25,000.00
200.00
32,000.00
65,000.00
215,000.00
15,000.00
8,000.00
20,000.00
Jumlah
82,500.00
82,500.00
11,423.20
11,423.20
95,700.00
254,297.00
51,600.00
55,000.00
550.00
180,000.00
2,800.00
238,350.00
401,597.00
25,300.00
15,624.75
6,249.90
50.00
7,500.00
7,500.00
47,224.65
100,000.00
225.00
15,680.00
45,500.00
215,000.00
6,300.00
9,600.00
20,000.00
20,000.00
45,000.00
250.00
200.00
15,000.00
8,000.00
7,500.00
Jumlah
7,500.00
7,500.00
65,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
7,500.00
1,100.00
12,950.00
1,300.00
22,850.00
10,000.00
154,000.00
25,400.00
392,305.00
49,500.00
3,500.00
280.00
3,750.00
444.44
57,474.44
68,250.00
82,500.00
18,000.00
2,800.00
103,300.00
11,423.20
2,200.00
110.00
1,800.00
5,600.00
21,133.20
95,700.00
254,297.00
51,600.00
55,000.00
550.00
180,000.00
2,800.00
639,947.00
25,300.00
15,624.75
6,249.90
50.00
7,500.00
54,724.65
100,000.00
225.00
15,680.00
45,500.00
215,000.00
6,300.00
9,600.00
20,000.00
412,305.00
49,500.00
3,500.00
280.00
3,750.00
444.44
7,500.00
64,974.44
68,250.00
68,250.00
7,500.00
1,100.00
12,950.00
1,300.00
91,100.00
84,000.00
44,259.60
84,000.00
44,259.60
NO
URAIAN PEKERJAAN
2
0.11
0.011
0.352
0.0165
Oh
Oh
Oh
Oh
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor
SATUAN
( Rp. )
2
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
12,500.00
154,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
950.00
1,090.00
160,000.00
55,000.00
55,000.00
45,000.00
70,000.00
Jumlah
950.00
1,090.00
160,000.00
55,000.00
55,000.00
45,000.00
70,000.00
Jumlah
UPAH
( Rp. )
3
5,500.00
605.00
13,024.00
1,072.50
20,201.50
BAHAN
( Rp. )
HARGA
( Rp. )
4
128,259.60
105,000.00
44,259.60
5,500.00
605.00
13,024.00
1,072.50
20,201.50
149,259.60
66,500.00
24,198.00
7,200.00
6,050.00
605.00
15,840.00
1,155.00
23,650.00
97,898.00
133,000.00
47,415.00
13,600.00
11,550.00
1,155.00
29,340.00
2,555.00
44,600.00
7,500,000.00
17,000.00
12,000.00
45,000.00
55,000.00
60,000.00
70,000.00
Jumlah
8,250,000.00
21,250.00
12,000.00
4,300,000.00
17,000.00
12,000.00
45,000.00
55,000.00
85,000.00
55,000.00
Jumlah
4,730,000.00
21,250.00
12,000.00
8,283,250.00
5
5,500.00
605.00
13,024.00
1,072.50
148,461.10
105,000.00
44,259.60
5,500.00
605.00
13,024.00
1,072.50
169,461.10
66,500.00
24,198.00
7,200.00
6,050.00
605.00
15,840.00
1,155.00
121,548.00
194,015.00
133,000.00
47,415.00
13,600.00
11,550.00
1,155.00
29,340.00
2,555.00
238,615.00
315,000.00
1,155,000.00
126,000.00
24,500.00
1,620,500.00
8,250,000.00
21,250.00
12,000.00
315,000.00
1,155,000.00
126,000.00
24,500.00
9,903,750.00
315,000.00
1,155,000.00
178,500.00
19,250.00
1,667,750.00
4,730,000.00
21,250.00
12,000.00
315,000.00
1,155,000.00
178,500.00
19,250.00
6,431,000.00
7,500,000.00
55,000.00
60,000.00
45,000.00
70,000.00
Jumlah
990,000.00
108,000.00
270,000.00
21,000.00
1,389,000.00
8,250,000.00
8,250,000.00
8,250,000.00
990,000.00
108,000.00
270,000.00
21,000.00
9,639,000.00
110,000.00
160,000.00
1,090.00
55,000.00
11,000.00
100,100.00
86,400.00
197,944.00
-
100,100.00
86,400.00
197,944.00
11,000.00
NO
URAIAN PEKERJAAN
2
0.02 Hr
1.2 Hr
0.06 Hr
1 M2 Pekerjaan polituran
0.1 Ltr Politur Ultra
0.15 Ltr Impra wood filler
0.2 Ltr
Thiner
0.5 Lbr Amplas
0.35 Hr Tukang cat
0.005 Hr Kepala tukang cat
0.5 Hr Pekerja
0.001 Hr Mandor
SATUAN
( Rp. )
2
55,000.00
45,000.00
70,000.00
UPAH
( Rp. )
BAHAN
( Rp. )
HARGA
( Rp. )
3
1,100.00
54,000.00
4,200.00
70,300.00
4
384,444.00
5
1,100.00
54,000.00
4,200.00
454,744.00
14,250.00
55,000.00
65,000.00
45,000.00
70,000.00
149.50
1,125.00
560.00
1,834.50
14,250.00
1,265.00
15,515.00
14,250.00
1,265.00
149.50
1,125.00
560.00
17,349.50
625,000.00
90,000.00
45,000.00
22,000.00
Jumlah
625,000.00
90,000.00
45,000.00
22,000.00
782,000.00
625,000.00
90,000.00
45,000.00
22,000.00
782,000.00
660,000.00
90,000.00
45,000.00
22,000.00
Jumlah
90,000.00
45,000.00
22,000.00
157,000.00
660,000.00
90,000.00
45,000.00
22,000.00
817,000.00
35,000.00
35,000.00
15,000.00
3,000.00
55,000.00
45,000.00
45,000.00
70,000.00
3,500.00
5,250.00
3,000.00
1,500.00
19,250.00
225.00
22,500.00
70.00
3,500.00
5,250.00
3,000.00
1,500.00
19,250.00
225.00
22,500.00
70.00
55,295.00
55,000.00
250.00
200.00
15,000.00
8,000.00
7,500.00
Jumlah
55,000.00
3,500.00
280.00
3,750.00
444.44
55,000.00
3,500.00
280.00
3,750.00
444.44
7,500.00
70,474.44
12,500.00
250.00
200.00
7,500.00
Jumlah
7,500.00
7,500.00
12,500.00
3,500.00
280.00
7,500.00
7,500.00
80,000.00
2,100.00
1,090.00
160,000.00
55,000.00
62,974.44
16,280.00
12,500.00
3,500.00
280.00
7,500.00
23,780.00
80,000.00
80,000.00
31,500.00
10,682.00
20,000.00
5,500.00
31,500.00
10,682.00
20,000.00
5,500.00
NO
1
URAIAN PEKERJAAN
0.01 OH
Kepala tukang batu
0.3 OH Pekerja
0.015 OH Mandor
SATUAN
( Rp. )
2
55,000.00
45,000.00
70,000.00
2,100.00
1,090.00
160,000.00
-
8,162.00
13,000.00
55,000.00
65,000.00
40,000.00
70,000.00
Jumlah
UPAH
( Rp. )
BAHAN
( Rp. )
3
550.00
13,500.00
1,050.00
15,100.00
104.50
292.50
280.00
280.00
957.00
HARGA
( Rp. )
4
67,682.00
5
550.00
13,500.00
1,050.00
82,782.00
39,900.00
8,284.00
15,680.00
63,864.00
39,900.00
8,284.00
15,680.00
63,864.00
8,570.10
195.00
8,570.10
195.00
104.50
292.50
280.00
280.00
9,722.10
8,765.10
1080
336
0.0042
16.666666667
66,250.00
0.08
12.5
5600
9130
1.575
harga besi
19
16
13
12
250,048.14
182,287.90
122,727.67
106,240.93
*
8,162.72
6,905.32
5,516.32
5,098.58
9,362.72
8,105.32
6,716.32
6,298.58
0ngkos/kg
32,048.14
26,987.90
21,927.67
20,240.93
1200
1200
1200
1200
1200
NO
1
ANALISA
HARGA SATUAN
(RP)
HARGA
UPAH
( Rp)
BAHAN
3.0
4.0
50,000.0
60,000.0
37,500.0
1,500.0
39,000.0
42,966.7
50,000.0
60,000.0
5,000.0
51,560.0
12,500.0
600.0
64,660.0
5,000.0
5,000.0
3,000.0
50,000.0
60,000.0
15,000.0
600.0
15,600.0
3,600.0
3,600.0
110,000.0
150,000.0
50,000.0
60,000.0
55,000.0
60,000.0
39,000.0
23,400.0
2,145.0
2,340.0
66,885.0
132,000.0
45,000.0
177,000.0
25,000.0
15,000.0
60,000.0
50,000.0
60,000.0
60,000.0
75,000.0
45,000.0
4,500.0
124,500.0
27,500.0
2,040,000.0
32,640.0
2,100,140.0
6 Beton bertulang
a Beton bertulang dengan mutu K300
371.00 Kg
Semen portland
0.65 M3
Pasir cor
0.65 M3
Kerikil
8.00 OH
Pekerja
0.28 OH
Tukang batu
0.03 OH
Kepala tukang batu
0.08 OH
Mandor
15,000.0
1,050.0
125,000.0
50,000.0
60,000.0
60,000.0
400,000.0
16,500.0
4,980.0
421,480.0
5,565,000.0
682.5
81,250.0
5,646,932.5
15,000.0
1,050.0
125,000.0
50,000.0
60,000.0
60,000.0
82,500.0
16,500.0
4,980.0
103,980.0
4,890,000.0
546.0
97,500.0
4,988,046.0
2,500,000.0
10,000,000.0
50,000.0
350.0
2,625,000.0
150,000.0
-
1 M3 Urugan pasir
1.20 M3
Pasir urug
0.30 OH
Pekerja
0.01 OH
Mandor
1 M3 Pasangan batu kosong
1.20 M3
Batu karang
0.30 M3
Pasir urug
0.78 OH
Pekerja
0.39 OH
Tukang batu
0.04 OH
Kepala tukang batu
0.04 OH
Mandor
1 M3 Pasangan batu kali 1pc : 5ps (batu karang)
1.10 M3
Batu karang
136.00 kg
Semen portland
0.54 M3
Pasir pasang
1.50 OH
Pekerja
0.75 OH
Tukang batu
0.08 OH
Kepala tukang batu
0.08 OH
Mandor
5.0
55,000.0
60,000.0
60,000.0
385.0
42.0
18.0
795.0
2,775,000.0
12,000,000.0
115,000.0
10,000.0
50,000.0
65,000.0
60,000.0
26,000.0
16,900.0
1,560.0
44,460.0
480,000.0
34,500.0
1,000.0
515,500.0
12,000,000.0
115,000.0
10,000.0
50,000.0
65,000.0
60,000.0
26,000.0
16,900.0
1,560.0
44,460.0
540,000.0
34,500.0
1,000.0
575,500.0
12,000,000.0
115,000.0
10,000.0
12,000,000.0
17,000.0
2,750,000.0
50,000.0
65,000.0
60,000.0
33,000.0
21,450.0
1,980.0
56,430.0
480,000.0
46,000.0
2,000.0
180,000.0
5,950.0
5,500,000.0
6,213,950.0
12,000,000.0
115,000.0
10,000.0
12,000,000.0
17,000.0
2,750,000.0
50,000.0
65,000.0
60,000.0
16,000.0
21,450.0
360.0
37,810.0
480,000.0
46,000.0
2,000.0
216,000.0
5,950.0
5,500,000.0
6,249,950.0
12,000,000.0
115,000.0
10,000.0
12,000,000.0
17,000.0
2,750,000.0
480,000.0
46,000.0
2,000.0
216,000.0
5,950.0
5,500,000.0
0.66
0.33
0.03
0.03
OH
OH
OH
OH
Pekerja
Tukang kayu
Kep. Tukang kayu
Mandor
50,000.0
65,000.0
60,000.0
33,000.0
21,450.0
1,980.0
56,430.0
6,249,950.0
12,000,000.0
115,000.0
10,000.0
12,000,000.0
17,000.0
2,750,000.0
50,000.0
65,000.0
60,000.0
33,000.0
21,450.0
1,980.0
56,430.0
480,000.0
46,000.0
2,000.0
180,000.0
5,950.0
16,500,000.0
17,213,950.0
12,000,000.0
115,000.0
10,000.0
12,000,000.0
17,000.0
2,750,000.0
50,000.0
65,000.0
60,000.0
33,000.0
21,450.0
1,980.0
56,430.0
360,000.0
46,000.0
1,500.0
180,000.0
5,950.0
5,500,000.0
6,093,450.0
12,000,000.0
115,000.0
10,000.0
12,000,000.0
17,000.0
2,750,000.0
50,000.0
65,000.0
60,000.0
33,000.0
21,450.0
1,980.0
56,430.0
360,000.0
46,000.0
1,500.0
180,000.0
5,950.0
8,250,000.0
8,843,450.0
M3
M3
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
6,068,412.5
###
86,634,050.0
6,068,412.5
###
86,634,050.0
6,068,412.5
###
86,634,050.0
6,068,412.5
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
220.00
10.00
1.00
190.00
10.00
1.00
190.00
10.00
1.00
265.00
10.00
1.00
185.00
10.00
1.00
205.00
10.00
1.00
210.00
10.00
1.00
225.00
10.00
1.00
220.00
10.00
1.00
320.00
10.00
1.00
330.00
10.00
1.00
425.00
10.00
1.00
275.00
10.00
1.00
150.00
10.00
1.00
180.00
10.00
1.00
210.00
10.00
1.00
100.00
10.00
1.00
100.00
10.00
1.00
120.00
10.00
1.00
170.00
10.00
1.00
130.00
1.00
160.00
1.00
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
Kg
m3
Kg
m3
###
3,322,100.0
6,068,412.5
###
31,627,850.0
6,068,412.5
###
31,814,050.0
6,068,412.5
###
31,814,050.0
6,068,412.5
###
21,277,466.7
6,068,412.5
###
21,277,466.7
6,068,412.5
###
21,277,466.7
6,068,412.5
###
21,277,466.7
6,068,412.5
###
21,277,466.7
6,068,412.5
###
21,277,466.7
6,068,412.5
###
21,277,466.7
6,068,412.5
###
21,277,466.7
6,068,412.5
###
21,277,466.7
6,068,412.5
###
564,660.0
6,068,412.5
###
564,660.0
6,068,412.5
###
564,660.0
6,068,412.5
###
31,031,550.0
6,068,412.5
###
44,781,550.0
6,068,412.5
###
44,781,550.0
6,068,412.5
###
44,781,550.0
6,068,412.5
###
6,068,412.5
###
5,092,026.0
160.00 Kg
33
a
34
35
36
37
38
###
125,000.0
1,050.0
15,000.0
60,000.0
50,000.0
60,000.0
12,000.0
60,000.0
3,600.0
75,600.0
113,750.0
567.0
2,724,000.0
2,838,317.0
125,000.0
1,050.0
15,000.0
60,000.0
50,000.0
60,000.0
16,500.0
82,500.0
4,950.0
103,950.0
102,500.0
567.0
4,884,000.0
4,987,067.0
1,700.0
1,070.0
157,200.0
60,000.0
50,000.0
60,000.0
15,000.0
900.0
15,900.0
25,500.0
5,136.0
3,930.0
6,000.0
40,566.0
1,000.0
1,070.0
157,200.0
55,000.0
65,000.0
40,000.0
70,000.0
650.0
12,000.0
1,050.0
13,700.0
70,000.0
10,272.0
7,074.0
5,500.0
92,846.0
1,000.0
1,070.0
157,200.0
55,000.0
65,000.0
40,000.0
60,000.0
5,500.0
650.0
12,000.0
900.0
19,050.0
70,000.0
15,375.9
6,288.0
91,663.9
1,070.0
157,200.0
40,000.0
55,000.0
65,000.0
60,000.0
5,546.9
4,087.2
9,634.1
12,000.0
8,250.0
975.0
900.0
22,125.0
1,070.0
157,200.0
40,000.0
55,000.0
65,000.0
60,000.0
12,000.0
8,250.0
975.0
900.0
22,125.0
10,939.7
3,144.0
14,083.7
39
18
Pasir pasang
Pekerja
0.15 OH
0.02 OH
0.02 OH
1,070.0
11,600.0
1,200.0
2,500.0
150.0
15,450.0
12,000.0
Tukang batu
Kepala tukang batu
55,000.0
65,000.0
8,250.0
975.0
Mandor
60,000.0
900.0
22,125.0
11,935.9
10,000,000.0
65,000.0
1,170,000.0
11,000,000.0
-
Kayu merbau
Tukang kayu
1.80 OH
6.00 OH
50,000.0
300,000.0
0.30 OH
Mandor
60,000.0
18,000.0
1,488,000.0
1,488,000.0
7,650,000.0
15,000.0
11,000,000.0
8,415,000.0
105,000.0
Tukang cat
Kepala tukang cat
58,000.0
60,000.0
8,120.0
900.0
0.20 OH
0.00 OH
Pekerja
Mandor
50,000.0
60,000.0
10,000.0
120.0
105,000.0
Zak
kg
Mil
PC 50 Kg
17,000.0
15,000.0
0.08 OH
0.01 OH
Tukang cat
Kepala tukang cat
58,000.0
60,000.0
4,350.0
420.0
0.10 OH
0.01 OH
Pekerja
Mandor
50,000.0
60,000.0
5,000.0
600.0
10,370.0
16,700.0
70,000.0
65,000.0
162,500.0
2,800.0
-
1,700.0
15,000.0
-
0.25
1.00
Hr
Hr
50,000.0
50,000.0
0.05
Hr
Mandor
60,000.0
3,000.0
215,500.0
2,800.0
250,000.0
215,500.0
10,000.0
22
3,615.6
-
0.14 OH
0.02 OH
19,140.0
21
8,320.3
157,200.0
40,000.0
20
135,000.0
135,000.0
1 M3 Pekerjaan kuzen
1.10
M3
18.00 OH
19
135,000.0
58,000.0
60,000.0
50,000.0
60,000.0
3,454.5
41,005.5
10.00
0.05
Kg
M3
Semen portland
Pasir pasang
15,000.0
60,000.0
150,000.0
2,700.0
1.50
0.13
Kg
Hr
Semen warna
Tukang batu
15,000.0
60,000.0
7,800.0
0.01
0.27
0.01
Hr
Hr
Hr
50,000.0
60,000.0
13,500.0
780.0
38,000.0
22,080.0
22,080.0
22,500.0
216,205.5
213,200.0
39,000.0
38,000.0
22,080.0
22,080.0
214,200.0
213,200.0
40,000.0
41,000.0
45,000.0
22,080.0
22,080.0
22,080.0
215,200.0
216,200.0
220,200.0
165,000.0
125,000.0
22,080.0
22,080.0
356,700.0
300,200.0
1M2
1M2
23
Esensa 40x40
Nero Granit 40 x40
1,151.5
3,834.5
1.65
0.00
0.10
Kg
M3
Kg
Semen portland
Pasir pasang
Semen warna
15,000.0
60,000.0
15,000.0
24,750.0
192.0
1,500.0
0.03
0.00
Hr
Hr
Tukang batu
Kepala tukang batu
60,000.0
-
1,800.0
-
0.06
0.00
Hr
Hr
Pekerja
Mandor
50,000.0
60,000.0
3,000.0
180.0
4,980.0
24
2.50
1.65
0.00
Bh
Kg
M3
1,875.0
15,000.0
60,000.0
0.10
0.03
Kg
Hr
Semen warna
Tukang batu
15,000.0
60,000.0
1,800.0
0.00
0.06
Hr
Hr
50,000.0
3,000.0
0.00
Hr
Mandor
60,000.0
180.0
4,980.0
4,980.0
Kramik Isensa
37
6,500.0
4,687.5
24,750.0
192.0
1,500.0
31,129.5
42,692.0
Kg
Kg
Kg
cat dasar
Cat tembok vinilek
Plamur tembok
33,750.0
6,000.0
-
0.06
0.01
Hr
Hr
Tukang cat
Kepala tukang cat
58,000.0
60,000.0
3,654.0
378.0
0.02
0.03
Hr
Hr
Pekerja
Mandor
50,000.0
60,000.0
1,000.0
1,500.0
53,800.0
6,532.0
6,532.0
4,935.0
19,368.0
280,000.0
6,532.0
100,800.0
Cat Dulux
Decolith
16
30,276.5
7,500.0
1.75 KG
0.06 M3
1.20 OH
PC 50 kg
Pasir pasang
Tukang batu
15,000.0
60,000.0
60,000.0
72,000.0
0.85 OH
0.12 OH
Pekerja
Kep. tukang batu
50,000.0
-
42,500.0
-
0.06 OH
Mandor
60,000.0
3,600.0
118,100.0
3,375.0
1,560.0
-
2,850.0
26,250.0
3,600.0
32,700.0
Kg
Kg
12.00 OH
1.20 OH
4.00 OH
0.20 OH
a
b
Besi strip
Paku biasa 1/2"-1"
6,750.0
115,000.0
101,250.0
92,000.0
Tukang kayu
Kepala tukang kayu
65,000.0
-
780,000.0
-
Pekerja
Mandor
50,000.0
60,000.0
200,000.0
12,000.0
992,000.0
193,250.0
1,240,000.0
1,240,000.0
193,250.0
193,250.0
Balok kruing
Balok kamper diketam
c
Balok jati diketam
1 M2 Pekerjaan usuk kamper 5/7
1,240,000.0
0.01
M3
0.10
Kg
0.06 OH
Usuk kamper
Paku usuk
Tukang kayu
80,000.0
65,000.0
3,711.5
0.01 OH
0.06 OH
50,000.0
2,855.0
0.00 OH
Mandor
60,000.0
168.0
6,734.5
8,000.0
8,418.1
6,734.5
8,000.0
-
a
b
c
Usuk kruing diketam
d
Usuk jati
1 M2 Pekerjaan usuk expose
0.01
0.15
M3
Kg
10,522.7
6,734.5
80,000.0
0.11 OH
0.01 OH
Tukang Kayu
Kepala Tukang Kayu
65,000.0
-
6,825.0
-
0.11 OH
0.03 OH
Pekerja
Mandor
50,000.0
60,000.0
5,250.0
1,890.0
13,965.0
12,000.0
13,965.0
13,965.0
12,000.0
12,000.0
Usuk kruing
Usuk jati
1 M2 Pekerjaan reng kamper untuk genteng
0.01
M3 Reng kayu kamper
8,000.0
-
0.15
Kg
0.04 OH
Paku reng
Tukang kayu
80,000.0
65,000.0
2,782.0
0.00 OH
0.04 OH
0.00 OH
50,000.0
60,000.0
2,140.0
126.0
12,000.0
-
12,000.0
-
5,048.0
12,000.0
5,048.0
5,048.0
12,000.0
Kg
OH
OH
Paku reng
Tukang kayu
Kepala tukang kayu
OH
OH
Pekerja
Mandor
Bedeg kulit
Lbr
M3
Plywood 4 mm
Usuk kruing
0.06
Kg
0.40 OH
Paku usuk
Tukang kayu
80,000.0
65,000.0
26,000.0
0.04 OH
0.27 OH
50,000.0
13,500.0
0.01 OH
Mandor
60,000.0
810.0
40,310.0
40,310.0
4,800.0
4,800.0
1 M2 Pek.plafond cellingteak
1 M2 Plafond Calciboard 6 mm
40,310.0
40,310.0
4,800.0
4,800.0
0.00
Kg
0.02 OH
0.00 OH
Paku list
Tukang kayu
Kepala tukang kayu
19,000.0
65,000.0
-
1,365.0
-
0.02 OH
0.00 OH
Pekerja
Mandor
50,000.0
60,000.0
1,050.0
63.0
2,415.0
80,000.0
4,800.0
-
19.0
19.0
8,000.0
0.80 OH
0.08 OH
Tukang kayu
Kepala tukang kayu
65,000.0
-
52,000.0
-
0.28 OH
0.01 OH
Pekerja
Mandor
50,000.0
60,000.0
14,000.0
840.0
papan jati
66,840.0
66,840.0
8,000.0
8,000.0
66,840.0
8,000.0
56,000.0
-
2,800.0
65,000.0
3,900.0
0.01 OH
0.15 OH
50,000.0
7,500.0
0.01 OH
Mandor
60,000.0
480.0
11,880.0
11,880.0
Genteng spandek
56,000.0
-
10,000.0
35,000.0
Semen portland
Pasir pasang
15,000.0
60,000.0
120,000.0
1,920.0
0.20 OH
0.02 OH
0.40 OH
Tukang kayu
Kepala tukang kayu
Pekerja
65,000.0
50,000.0
13,000.0
20,000.0
0.02 OH
Mandor
60,000.0
1,200.0
34,200.0
8.00
0.03
Kg
M3
Bubungan spandek
34,200.0
156,920.0
-
44
45
1.65
0.00
Kg
M3
Semen portland
Pasir pasang
0.10
0.03
Kg
Hr
Semen warna
Tukang batu
0.00
0.06
0.00
Hr
Hr
Hr
Bh
Hr
0.01
0.15
Hr
Hr
0.01
Hr
Mandor
Genteng spandek
46
8.00
0.03
Kg
M3
Semen portland
Pasir pasang
0.20
0.02
0.40
Hr
Hr
Hr
Tukang kayu
Kepala tukang kayu
Pekerja
0.02
Hr
Mandor
Bubungan spandek
47
Hr
Hr
Tukang kayu
Kepala tukang kayu
0.28
0.01
Hr
Hr
Pekerja
Mandor
papan jati
48
49
Hr
Hr
Tukang kayu
Kepala tukang kayu
0.25
0.01
Hr
Hr
Pekerja
Mandor
1 M2 Memvernis
0.37
Ltr Vernis
50
0.50
0.12
Lbr
Hr
Amplas
Tukang cat
0.13
0.15
0.02
Hr
Hr
Hr
Batu bata
Semen Portland
0.04 M3
0.10 OH
0.01 OH
Pasir pasang
Tukang batu
Kepala tukang batu
0.32 OH
0.02 OH
Pekerja
Mandor
Batu bata
Semen Portland
0.04 M3
0.10 OH
0.01 OH
Pasir pasang
Tukang batu
Kepala tukang batu
0.32 OH
0.02 OH
Pekerja
Mandor
Galian tanah
Pasir urug
Beton cor
Plesteran 1 pc : 3 ps
Acian
51
54
1.00 M2
1.50 M3
Ijuk
Galian tanah
0.50 M3
0.06 M3
Pasir urug
Beton cor
0.50 M2
0.60 M3
Kerikil
Pas. Bata merah 1 pc : 3 ps
1 M2 Pekerjaan polituran
0.10
Ltr
Politur Ultra
0.15
0.20
Ltr
Ltr
0.50
0.35
Lbr
Hr
Amplas
Tukang cat
0.01
0.50
0.00
Hr
Hr
Hr
55
1 M3 Pekerjaan kuzen
1.20
18.00
M3
Hr
Balok jati
Tukang kayu
54,000.0
58,000.0
2.00
6.00
Hr
Hr
0.30
Hr
Mandor
57
135,000.0
1,044,000.0
1,044,000.0
0.02
0.03
M3
Kg
Papan kamper
Paku 1/2"-1"
250,000.0
-
0.30
1.00
2.00
Ltr
Lbr
Hr
Lem kayu
Teakwood
Tukang kayu
15,000.0
65,000.0
130,000.0
0.20
0.60
Hr
Hr
50,000.0
30,000.0
0.03
Hr
Mandor
60,000.0
1,800.0
161,800.0
161,800.0
50
64,800.0
162,000.0
4,900.0
4,500.0
9,400.0
-
1,050.0
-
1,875.0
0.39
0.13
Lbr
Kg
15,000.0
0.10
3.00
Kg
Hr
Paku list
Tukang kayu
58,000.0
174,000.0
0.30
1.25
0.06
Hr
Hr
Hr
50,000.0
60,000.0
62,500.0
3,750.0
2,925.0
M3
M2
0.10
6.00
0.60
Kg
Hr
Hr
Paku list
Tukang kayu
Kepala tukang kayu
2.00
0.10
Hr
Hr
Pekerja
Mandor
Kaca 3 mm
49
70,000.0
-
240,250.0
48
64,800.0
-
Plywood 4 mm
58
1,044,000.0
Hr
Hr
Hr
Tukang besi
Kepala tukang besi
Pekerja
0.00
Hr
Mandor
Hr
Hr
Hr
Tukang besi
Kepala tukang besi
Pekerja
70,000.0
4,100,000.0
7,650,000.0
17,500.0
46,000.0
55,000.0
-
11,500.0
46,000.0
55,000.0
-
1,050.0
3,280,000.0
3,281,050.0
3,394,750.0
17,500.0
4,600.0
550.0
5,150.0
6,900.0
825.0
-
17,500.0
11,500.0
-
0.00
51
52
53
54
55
56
Hr
Mandor
Hr
Hr
0.00
Hr
Mandor
Hr
Hr
0.00
Hr
Mandor
Hr
Hr
Hr
Tukang besi
Kepala tukang besi
Pekerja
0.00
Hr
Mandor
7,725.0
11,500.0
5,500,000.0
46,000.0
6,900.0
5,500,000.0
-
55,000.0
-
825.0
-
7,725.0
58
59
5,500,000.0
46,000.0
6,900.0
55,000.0
-
825.0
-
7,725.0
30,000.0
46,000.0
55,000.0
-
27,600.0
3,300.0
-
30,000.0
-
30,900.0
30,000.0
23,000.0
2,750.0
85,000.0
-
Bh
Hr
Hr
Kunci silinder
Tukang besi
Kepala tukang besi
0.05
0.00
Hr
Hr
Pekerja
Mandor
85,000.0
46,000.0
55,000.0
-
25,750.0
85,000.0
6,900.0
825.0
6,500.0
-
Bh
Hr
Hr
Kait angin
Tukang besi
Kepala tukang besi
0.02
0.00
Hr
Hr
Pekerja
Mandor
6,500.0
46,000.0
55,000.0
-
7,725.0
6,500.0
950,000.0
46,000.0
27,600.0
950,000.0
-
55,000.0
-
3,300.0
-
Bh
Hr
0.06
0.06
0.00
Hr
Hr
Hr
30,900.0
57
950,000.0
Bh
Ls
Kloset duduk
Perelengkapan (6%)
1.10
0.00
3.30
Hr
Hr
Hr
Tukang batu
Kepala tukang batu
Pekerja
0.16
Hr
Mandor
8,000.0
480.0
55,000.0
-
60,500.0
60,500.0
8,000.0
480.0
8,480.0
60,000.0
60,000.0
6.00
0.01
Kg
M3
Semen portland
Pasir pasang
300.0
60,000.0
1,800.0
600.0
1.50
1.50
1.00
Hr
Hr
Hr
Tukang batu
Kepala tukang batu
Pekerja
55,000.0
-
0.16
Hr
Mandor
82,500.0
82,500.0
-
62,400.0
-
1.00
6.00
Ls
Kg
Perlengkapan (12%)
Semen portland
0.01
1.45
0.15
M3
Hr
Hr
Pasir pasang
Tukang batu
Kepala tukang batu
1.20
0.10
Hr
Hr
Pekerja
Mandor
300.0
60,000.0
55,000.0
-
79,750.0
79,750.0
60
61
62
1,800.0
600.0
2,400.0
Bh
Ls
Kg
Urinoir
Perlengkapan (30%)
Semen portland
0.01
1.00
M3
Hr
Pasir pasang
Tukang batu
0.10
1.00
Hr
Hr
0.10
Hr
Mandor
1,125,000.0
337,500.0
300.0
60,000.0
55,000.0
12,000.0
55,000.0
0.01
0.01
Hr
Hr
0.01
Hr
Mandor
Hr
Hr
Tukang batu
Kepala tukang batu
1.80
0.11
Hr
Hr
Pekerja
Mandor
175,000.0
31,500.0
55,000.0
-
55,000.0
-
0.01 M3
0.15 OH
Papan jati
Tukang besi
0.02 OH
0.02 OH
0.00 OH
Kaca 6 mm
65 1 M' Pasangan keramik stop nose camp 1pc : 2ps
5.00
Bj
Keramik stop nose 6 x 20 cm
0.03
Zak PC 50 kg
0.00
M3 Pasir pasang
0.05
Hr
Tukang batu
0.01
Hr
Kepala tukang batu
0.10
Hr
Pekerja
0.01
Hr
Mandor
600.0
-
55,000.0
1,464,900.0
5,500.0
12,000.0
-
5,500.0
148,500.0
148,500.0
1,125,000.0
337,500.0
1,800.0
12,000.0
175,000.0
31,500.0
206,500.0
4,100,000.0
4,510,000.0
70,000.0
-
350.0
-
7,650,000.0
4,510,350.0
8,415,350.0
4,300,000.0
4,730,350.0
12,500.0
15,000.0
60,000.0
55,000.0
45,000.0
55,000.0
2,750.0
4,500.0
550.0
7,800.0
62,500.0
375.0
120.0
62,995.0
56,700.0
3,000.0
900.0
20,000.0
55,000.0
45,000.0
55,000.0
15,125.0
10,125.0
825.0
26,075.0
56,700.0
180.0
43.2
10,000.0
66,923.2
45,000.0
35,000.0
220,000.0
22,000.0
5,500.0
1,350,000.0
1,050,000.0
6,600,000.0
9,000,000.0
660,000.0
3,300,000.0
3,960,000.0
66 1 M2 Aspal Pecing
0.09 Ton
Aspal AC
0.25 OH
Pekerja
0.02 OH
Mandor
0.05 Biaya Gilas
900,000.0
45,000.0
55,000.0
129,600.0
11,250.0
825.0
5,832.0
12,075.0
81,810.0
1.0
2.0
81,811.0
67 1 M2 Aspal AC t = 4 cm
0.09 Ton
Aspal AC
0.25 OH
Pekerja
0.02 OH
Mandor
0.05 Biaya Gilas
900,000.0
45,000.0
55,000.0
129,600.0
11,250.0
825.0
5,832.0
12,075.0
81,810.0
1.0
2.0
81,811.0
900,000.0
45,000.0
55,000.0
129,600.0
11,250.0
825.0
5,832.0
12,075.0
32,130.0
1.0
2.0
32,131.0
6,000.0
45,000.0
55,000.0
11,250.0
825.0
12,075.0
4,800.0
1.0
4,801.0
11,000.0
12,500.0
2,500.0
48,000.0
55,000.0
45,000.0
55,000.0
6,096.0
3,575.0
10,125.0
935.0
20,731.0
44,000.0
12,500.0
1,375.0
57,875.0
71 1 M3 Urugan tanah
1.00 M3
0.25 OH
0.01 OH
1,000.0
45,000.0
55,000.0
11,250.0
550.0
11,800.0
1,000.0
1,000.0
85,000.0
45,000.0
55,000.0
11,250.0
550.0
550.0
85,000.0
85,000.0
subur
Tanah subur
Pekerja
Mandor
1,618,000.0
-
1,618,000.0
-
0.47
2.45
0.25
2.00
0.10
M3
M2
OH
OH
OH
Beton 1 : 2 : 3
Plesteran 1 : 2
Tukang Listrik
Pekerja / Pekerja tak terlatih
Mandor Lapangan
15,375.9
11,250.0
90,000.0
5,500.0
106,750.0
7,195.9
#VALUE!
#VALUE!
1,557,600.0
9,600.0
31,000.0
200,000.0
200,000.0
200,000.0
1,557,600.0
67,200.0
62,000.0
1,686,800.0
20,000.0
15,000.0
42,000.0
45,000.0
55,000.0
84,000.0
90,000.0
5,500.0
179,500.0
400,000.0
2,175.0
402,175.0
45,000.0
45,000.0
55,000.0
76 1 M2 Bongkar Genteng
0.02
OH
Pekerja
45,000.0
900.0
0.01
OH
Mandor
55,000.0
550.0
1,450.0
77 1 M2 Bongkar Plafond
0.03
OH
Tukang Kayu
0.03
OH
0.05
OH
Pekerja
45,000.0
2,250.0
0.01
OH
Mandor
55,000.0
275.0
2,525.0
OH
Pekerja
45,000.0
4,500.0
0.01
OH
Mandor
55,000.0
275.0
4,775.0
37,500.0
1,500.0
39,000.0
51,560.0
12,500.0
600.0
5,000.0
69,660.0
3,600.0
15,000.0
600.0
19,200.0
132,000.0
45,000.0
39,000.0
23,400.0
2,145.0
2,340.0
243,885.0
27,500.0
2,040,000.0
32,640.0
75,000.0
45,000.0
4,500.0
2,224,640.0
5,565,000.0
682.5
81,250.0
400,000.0
16,500.0
4,980.0
6,068,412.5
4,890,000.0
546.0
97,500.0
82,500.0
16,500.0
4,980.0
5,092,026.0
2,625,000.0
150,000.0
350.0
385.0
42.0
18.0
2,775,795.0
480,000.0
34,500.0
1,000.0
26,000.0
16,900.0
1,560.0
559,960.0
302,210.0
540,000.0
34,500.0
1,000.0
26,000.0
16,900.0
1,560.0
619,960.0
332,210.0
480,000.0
46,000.0
2,000.0
180,000.0
5,950.0
5,500,000.0
33,000.0
21,450.0
1,980.0
6,270,380.0
2,127,746.7
480,000.0
46,000.0
2,000.0
216,000.0
5,950.0
5,500,000.0
16,000.0
21,450.0
360.0
6,287,760.0
3,162,785.0
480,000.0
46,000.0
2,000.0
216,000.0
5,950.0
5,500,000.0
###
33,000.0
21,450.0
1,980.0
6,306,380.0
3,181,405.0
480,000.0
46,000.0
2,000.0
180,000.0
5,950.0
16,500,000.0
33,000.0
21,450.0
1,980.0
17,270,380.0
8,663,405.0
360,000.0
46,000.0
1,500.0
180,000.0
5,950.0
5,500,000.0
33,000.0
21,450.0
1,980.0
6,149,880.0
3,103,155.0
360,000.0
46,000.0
1,500.0
180,000.0
5,950.0
8,250,000.0
33,000.0
21,450.0
1,980.0
8,899,880.0
4,478,155.0
439,676,837.5
467,434,787.5
536,829,662.5
620,065,412.5
565,097,312.5
565,283,512.5
773,468,137.5
540,867,954.2
596,383,854.2
610,262,829.2
651,899,754.2
638,020,779.2
915,600,279.2
943,358,229.2
###
790,689,504.2
423,002,322.5
506,276,172.5
589,550,022.5
314,679,462.5
328,429,462.5
383,945,362.5
522,735,112.5
366,921,762.5
450,195,612.5
449,219,226.0
113,750.0
567.0
2,724,000.0
12,000.0
60,000.0
3,600.0
2,913,917.0
102,500.0
567.0
4,884,000.0
16,500.0
82,500.0
4,950.0
5,091,017.0
25,500.0
5,136.0
3,930.0
6,000.0
15,000.0
900.0
56,466.0
70,000.0
10,272.0
7,074.0
5,500.0
650.0
12,000.0
1,050.0
106,546.0
70,000.0
15,375.9
6,288.0
5,500.0
650.0
12,000.0
900.0
110,713.9
5,546.9
4,087.2
12,000.0
8,250.0
975.0
900.0
31,759.1
10,939.7
3,144.0
12,000.0
8,250.0
975.0
900.0
36,208.7
135,000.0
11,600.0
1,200.0
2,500.0
150.0
150,450.0
8,320.3
3,615.6
12,000.0
8,250.0
975.0
900.0
34,060.9
11,000,000.0
1,170,000.0
300,000.0
18,000.0
12,488,000.0
9,903,000.0
105,000.0
8,120.0
900.0
10,000.0
120.0
124,140.0
1,700.0
15,000.0
4,350.0
420.0
5,000.0
600.0
27,070.0
2,800.0
162,500.0
50,000.0
3,000.0
218,300.0
225,500.0
41,005.5
150,000.0
2,700.0
22,500.0
7,800.0
13,500.0
780.0
238,285.5
235,280.0
236,280.0
235,280.0
237,280.0
238,280.0
242,280.0
378,780.0
322,280.0
3,834.5
24,750.0
192.0
1,500.0
1,800.0
3,000.0
180.0
35,256.5
4,687.5
24,750.0
192.0
1,500.0
1,800.0
3,000.0
180.0
36,109.5
47,672.0
3,375.0
1,560.0
3,654.0
378.0
1,000.0
1,500.0
11,467.0
25,900.0
107,332.0
2,850.0
26,250.0
3,600.0
72,000.0
42,500.0
3,600.0
150,800.0
101,250.0
92,000.0
780,000.0
200,000.0
12,000.0
1,185,250.0
1,433,250.0
1,433,250.0
1,240,000.0
8,000.0
3,711.5
2,855.0
168.0
14,734.5
16,418.1
6,734.5
10,522.7
6,734.5
12,000.0
6,825.0
5,250.0
1,890.0
25,965.0
25,965.0
25,965.0
12,000.0
2,782.0
2,140.0
126.0
17,048.0
5,048.0
17,048.0
4,800.0
26,000.0
13,500.0
810.0
45,110.0
45,110.0
45,110.0
45,110.0
19.0
1,365.0
1,050.0
63.0
2,497.0
8,000.0
52,000.0
14,000.0
840.0
74,840.0
74,840.0
74,840.0
56,000.0
3,900.0
7,500.0
480.0
67,880.0
11,880.0
35,000.0
120,000.0
1,920.0
13,000.0
20,000.0
1,200.0
191,120.0
34,200.0
64,800.0
1,044,000.0
1,108,800.0
1,206,000.0
4,900.0
4,500.0
130,000.0
30,000.0
1,800.0
171,200.0
161,800.0
1,050.0
1,875.0
174,000.0
62,500.0
3,750.0
243,175.0
1,050.0
3,280,000.0
3,281,050.0
3,394,750.0
17,500.0
4,600.0
550.0
22,650.0
11,500.0
6,900.0
825.0
-
19,225.0
5,500,000.0
6,900.0
825.0
5,507,725.0
6,900.0
825.0
7,725.0
30,000.0
27,600.0
3,300.0
60,900.0
85,000.0
23,000.0
2,750.0
110,750.0
6,500.0
6,900.0
825.0
14,225.0
950,000.0
27,600.0
3,300.0
980,900.0
8,000.0
480.0
60,500.0
68,980.0
60,000.0
1,800.0
600.0
82,500.0
144,900.0
-
1,800.0
600.0
79,750.0
82,150.0
1,125,000.0
337,500.0
1,800.0
600.0
55,000.0
1,519,900.0
12,000.0
5,500.0
17,500.0
175,000.0
31,500.0
148,500.0
355,000.0
4,510,000.0
350.0
4,510,350.0
8,415,350.0
4,730,350.0
62,500.0
375.0
120.0
2,750.0
4,500.0
550.0
70,795.0
56,700.0
180.0
43.2
10,000.0
15,125.0
10,125.0
825.0
92,998.2
1,350,000.0
1,050,000.0
6,600,000.0
660,000.0
3,300,000.0
12,960,000.0
81,810.0
11,250.0
825.0
5,832.0
93,885.0
81,810.0
11,250.0
825.0
5,832.0
93,885.0
32,130.0
11,250.0
825.0
5,832.0
44,205.0
4,800.0
11,250.0
825.0
16,875.0
44,000.0
12,500.0
1,375.0
6,096.0
3,575.0
10,125.0
935.0
78,606.0
1,000.0
11,250.0
550.0
12,800.0
85,000.0
11,250.0
550.0
96,800.0
1,618,000.0
-
7,195.9
#VALUE!
11,250.0
90,000.0
5,500.0
#VALUE!
1,557,600.0
67,200.0
62,000.0
200,000.0
1,886,800.0
400,000.0
2,175.0
84,000.0
90,000.0
5,500.0
581,675.0
900.0
550.0
1,450.0
2,250.0
275.0
2,525.0
4,500.0
275.0
4,775.0
NO
SATUAN
( Rp. )
2
UPAH
( Rp. )
BAHAN
( Rp. )
3
HARGA
( Rp. )
4
22,000.00
7,560.00
1,550.00
22,000.00
7,560.00
1,550.00
55,000.00
86,110.00
4,400,000.00
2,520,000.00
15,500.00
55,000.00
Jumlah
3,000.00
3,000.00
40,000.00
70,000.00
Jumlah
30,000.00
5,250.00
35,250.00
30,000.00
5,250.00
35,250.00
40,000.00
70,000.00
Jumlah
39,810.40
6,482.00
46,292.40
39,810.40
6,482.00
46,292.40
40,000.00
70,000.00
Jumlah
69,400.00
12,145.00
81,545.00
69,400.00
12,145.00
81,545.00
40,000.00
70,000.00
Jumlah
40,000.00
7,000.00
47,000.00
40,000.00
7,000.00
47,000.00
40,000.00
70,000.00
27,500.00
Jumlah
12,000.00
700.00
2,200.00
14,900.00
12,000.00
700.00
2,200.00
14,900.00
85,000.00
40,000.00
70,000.00
27,500.00
Jumlah
102,000.00
12,000.00
700.00
2,200.00
116,900.00
105,000.00
40,000.00
70,000.00
Jumlah
12,000.00
700.00
12,700.00
105,000.00
40,000.00
55,000.00
30,000.00
Jumlah
12,000.00
550.00
30,000.00
12,550.00
126,000.00
126,000.00
12,000.00
550.00
30,000.00
168,550.00
2,200.0
1,070.0
157,200.0
55,000.0
65,000.0
6,500.0
33,000.0
5,136.0
3,930.0
5,500.0
-
33,000.0
5,136.0
3,930.0
5,500.0
6,500.0
31,110.00
102,000.00
102,000.00
126,000.00
126,000.00
126,000.00
102,000.00
12,000.00
700.00
2,200.00
116,900.00
126,000.00
12,000.00
700.00
138,700.00
0.30 OH Pekerja
0.02 OH Mandor
9 1 M3 Pasangan Batu Kali Camp 1 : 5
1.1 M3 Batu Kali
2.92 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.544 M3 Pasir Pasang
0.6 OH Tukang Batu
0.06 OH Kepala Tukang Batu
1.5 OH Pekerja
0.075 OH Mandor
10 1 M2 Pekerjaan Pasangan HEBEL Tebal 10 cm
9.163 Bj HEBEL t = 10 cm
0.2874 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.043 M3 Pasir Pasang
0.1 OH Tukang Batu
0.01 OH Kepala Tukang Batu
0.32 OH Pekerja
0.015 OH Mandor
11 1 M2 Pekerjaan Pasangan HEBEL Tebal 12 cm
9.163 Bj HEBEL t = 12 cm
0.23 Zak Mortar perekat bata ringan
0.1 OH Tukang Batu
0.01 OH Kepala Tukang Batu
0.32 OH Pekerja
0.015 OH Mandor
40,000.0
70,000.0
135,000.00
53,500.00
157,200.00
55,000.00
65,000.00
40,000.00
70,000.00
Jumlah
14,772.73
53,500.00
157,200.00
55,000.00
65,000.00
40,000.00
70,000.00
Jumlah
11,800.00
154,000.00
50,000.00
55,000.00
40,000.00
65,000.00
Jumlah
12,745.10
154,000.00
50,000.00
55,000.00
40,000.00
70,000.00
Jumlah
12,000.0
1,050.0
19,550.0
33,000.00
3,900.00
60,000.00
5,250.00
102,150.00
5,500.00
650.00
12,800.00
1,050.00
20,000.00
148,500.00
156,220.00
85,516.80
148,500.00
156,220.00
85,516.80
33,000.00
3,900.00
60,000.00
5,250.00
492,386.80
390,236.80
157,498.00
108,123.40
35,420.00
5,000.00
550.00
12,800.00
975.00
19,325.00
143,543.40
116,783.33
28,182.00
5,000.00
550.00
12,800.00
1,050.00
19,400.00
5,500.00
550.00
12,800.00
1,050.00
19,900.00
53,500.00
90,000.00
50,000.00
55,000.00
40,000.00
65,000.00
Jumlah
4,622.40
1,980.00
7,500.00
825.00
8,000.00
650.00
23,577.40
53,500.00
90,000.00
12,000.0
1,050.0
67,116.0
135,362.50
15,375.90
6,759.60
12,745.10
53,500.00
157,200.00
55,000.00
55,000.00
40,000.00
70,000.00
Jumlah
150,000.00
50,000.00
55,000.00
40,000.00
65,000.00
Jumlah
47,566.0
144,965.33
116,783.33
15,375.90
6,759.60
138,918.83
4,622.40
1,980.00
6,602.40
18,000.00
825.00
8,000.00
650.00
9,475.00
135,362.50
15,375.90
6,759.60
5,500.00
650.00
12,800.00
1,050.00
177,498.00
108,123.40
35,420.00
5,000.00
550.00
12,800.00
975.00
162,868.40
116,783.33
28,182.00
5,000.00
550.00
12,800.00
1,050.00
164,365.33
116,783.33
15,375.90
6,759.60
5,500.00
550.00
12,800.00
1,050.00
158,818.83
4,622.40
1,980.00
7,500.00
825.00
8,000.00
650.00
23,577.40
18,000.00
18,000.00
7,500.00
825.00
8,000.00
650.00
34,975.00
9,116.40
1,530.00
9,116.40
1,530.00
0.15
0.015
0.2
0.01
OH
OH
OH
OH
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor
50,000.00
55,000.00
40,000.00
65,000.00
Jumlah
53,500.00
90,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
7,500.00
825.00
8,000.00
650.00
16,975.00
10,646.40
9,951.00
1,440.00
7,500.00
825.00
7,400.00
650.00
16,375.00
11,391.00
145,500.00
387,875.00
52,414.40
7,500.00
825.00
8,000.00
650.00
27,621.40
9,951.00
1,440.00
7,500.00
825.00
7,400.00
650.00
27,766.00
150,000.00
53,500.00
136,000.00
55,000.00
65,000.00
40,000.00
70,000.00
Jumlah
52,250.00
6,175.00
228,000.00
19,950.00
306,375.00
752,000.00
100,000.00
25,000.00
18,500.00
Jumlah
752,000.00
100,000.00
25,000.00
18,500.00
895,500.00
752,000.00
100,000.00
25,000.00
18,500.00
895,500.00
752,000.00
90,000.00
45,000.00
22,000.00
Jumlah
90,000.00
45,000.00
22,000.00
157,000.00
752,000.00
90,000.00
45,000.00
22,000.00
909,000.00
585,789.40
145,500.00
387,875.00
52,414.40
52,250.00
6,175.00
228,000.00
19,950.00
892,164.40
8,745.30
17,000.00
55,000.00
65,000.00
40,000.00
70,000.00
Jumlah
9,182.56
170.00
368.50
507.00
396.00
44.10
1,315.60
9,352.56
9,182.56
170.00
368.50
507.00
396.00
44.10
10,668.16
Begisting
22 1 M2 Pekerjaan Begisting Beton Pondasi & Sloop
0.35 Lbr Multiplek 9 mm
0.028 M3 Kayu Meranti Usuk 4/6
0.2 Kg Paku 2"-5"
0.4 ltr Minyak Begisting
0.375 OH Tukang Kayu
0.0375 OH Kepala Tukang Kayu
0.35 OH Pekerja
0.0063 OH Mandor
140,000.00
2,520,000.00
15,500.00
17,000.00
50,000.00
55,000.00
40,000.00
65,000.00
Jumlah
140,000.00
2,520,000.00
15,500.00
50,000.00
55,000.00
40,000.00
49,000.00
70,560.00
3,100.00
6,800.00
18,750.00
2,062.50
14,000.00
406.25
35,218.75
129,460.00
49,000.00
36,288.00
3,100.00
18,750.00
2,062.50
14,000.00
49,000.00
70,560.00
3,100.00
6,800.00
18,750.00
2,062.50
14,000.00
406.25
164,678.75
49,000.00
36,288.00
3,100.00
18,750.00
2,062.50
14,000.00
0.0063 OH Mandor
65,000.00
Jumlah
140,000.00
2,520,000.00
5,400,000.00
17,000.00
15,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
140,000.00
2,520,000.00
5,400,000.00
17,000.00
15,500.00
55,000.00
65,000.00
40,000.00
70,000.00
Jumlah
406.25
35,218.75
88,388.00
49,000.00
75,600.00
81,000.00
6,800.00
4,960.00
19,500.00
2,145.00
13,468.00
422.50
35,535.50
217,360.00
49,000.00
80,640.00
81,000.00
6,800.00
6,200.00
22,275.00
2,632.50
15,120.00
472.50
40,500.00
223,640.00
406.25
123,606.75
49,000.00
75,600.00
81,000.00
6,800.00
4,960.00
19,500.00
2,145.00
13,468.00
422.50
252,895.50
49,000.00
80,640.00
81,000.00
6,800.00
6,200.00
22,275.00
2,632.50
15,120.00
472.50
264,140.00
Beton Bertulang
26 1 M3 Pekerjaan Beton Bertulang Pondasi Telapak
1 M3 Pekerjaan Beton K-300
3.168 M2 Pekerjaan Begisting Beton Pondasi
180 Kg Pekerjaan Besi beton
895,500.00
168,518.75
10,668.16
Jumlah
895,500.00
533,867.40
1,920,269.17
895,500.00
533,867.40
1,920,269.17
3,349,636.57
895,500.00
168,518.75
10,668.16
Jumlah
895,500.00
667,334.25
1,920,269.17
895,500.00
667,334.25
1,920,269.17
3,483,103.42
895,500.00
168,518.75
10,668.16
Jumlah
895,500.00
1,572,841.67
1,920,269.17
895,500.00
1,572,841.67
1,920,269.17
4,388,610.84
895,500.00
264,140.00
10,668.16
Jumlah
895,500.00
2,113,120.00
2,240,314.03
895,500.00
2,113,120.00
2,240,314.03
5,248,934.03
895,500.00
186,352.25
10,668.16
30,000.00
Jumlah
31 1 M3 Pekerjaan Beton Bertulang Plat Atas = 20 cm (groundtank plat atas)
1 M3 Beton Cor Ready Mix K-300
895,500.00
5.55 M2 Pekerjaan Begisting Plat Lantai
186,352.25
210 Kg Pekerjaan Besi beton
10,668.16
2.5 ltr Watterprofing integral Fx fosroc
30,000.00
Jumlah
32 1 M3 Pekerjaan Beton Bertulang Plat Lantai = 25 cm (dasar pit lift)
1 M3 Beton Cor Ready Mix K-300
895,500.00
4.8 M2 Pekerjaan Begisting Plat Lantai
186,352.25
210 Kg Pekerjaan Besi beton
10,668.16
2.5 ltr Watterprofing integral Fx fosroc
30,000.00
895,500.00
1,863,522.50
1,760,246.74
75,000.00
895,500.00
1,863,522.50
1,760,246.74
75,000.00
4,594,269.24
895,500.00
1,034,254.99
2,240,314.03
75,000.00
895,500.00
1,034,254.99
2,240,314.03
75,000.00
4,245,069.02
895,500.00
894,490.80
2,240,314.03
75,000.00
895,500.00
894,490.80
2,240,314.03
75,000.00
Jumlah
33 1 M3 Pekerjaan Beton Bertulang Plat Atas = 25 cm (sawage treatment plant)
1 M3 Beton Cor Ready Mix K-300
895,500.00
4.8 M2 Pekerjaan Begisting Plat Lantai
186,352.25
210 Kg Pekerjaan Besi beton
10,668.16
2.5 ltr Watterprofing integral Fx fosroc
30,000.00
Jumlah
34 1 M3 Pekerjaan Beton Bertulang Plat Lantai = 30 cm (grountank plat dasar)
1 M3 Beton Cor Ready Mix K-300
895,500.00
3 M2 Pekerjaan Begisting Plat Lantai
186,352.25
220 Kg Pekerjaan Besi beton
10,668.16
2.5 ltr Watterprofing integral Fx fosroc
30,000.00
Jumlah
35 1 M2 Pekerjaan Begisting Dinding
0.35 Lbr Multiplek 9 mm
140,000.00
0.03 M3 Kayu Meranti Usuk 4/6
2,520,000.00
0.4 Kg Paku 2"-5"
17,500.00
0.375 OH Tukang Kayu
50,000.00
0.0375 OH Kepala Tukang Kayu
55,000.00
0.35 OH Pekerja
40,000.00
0.0063 OH Mandor
65,000.00
Jumlah
36 1 M3 Pekerjaan Beton Bertulang Plat Dinding = 20 cm (dinding Pit lift)
1 M3 Beton Cor Ready Mix K-300
909,000.00
10 M2 Pekerjaan Begisting Plat Dinding
166,818.75
2.5 ltr Watterprofing integral Fx fosroc
30,000.00
180 Kg Pekerjaan Besi beton
10,668.16
Jumlah
37 1 M3 Pekerjaan Beton Bertulang Plat Dinding = 25 cm (dinding groundtank)
1 M3 Beton Cor Ready Mix K-300
909,000.00
10 M2 Pekerjaan Begisting Plat Dinding
166,818.75
2.5 ltr Watterprofing integral Fx fosroc
30,000.00
210 Kg Pekerjaan Besi beton
10,668.16
Jumlah
38 1 M3 Pekerjaan Beton Bertulang Plat Dinding = 30 cm (dinding groundtank)
1 M3 Beton Cor Ready Mix K-300
909,000.00
10 M2 Pekerjaan Begisting Plat Dinding
166,818.75
2.5 ltr Watterprofing integral Fx fosroc
30,000.00
220 Kg Pekerjaan Besi beton
10,668.16
Jumlah
4,105,304.83
18,750.00
2,062.50
14,000.00
406.25
35,218.75
135,000.00
2,520,000.00
15,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
895,500.00
895,500.00
894,490.80
2,240,314.03
75,000.00
4,105,304.83
895,500.00
559,056.75
2,346,995.65
75,000.00
895,500.00
559,056.75
2,346,995.65
75,000.00
3,876,552.40
49,000.00
75,600.00
7,000.00
49,000.00
75,600.00
7,000.00
18,750.00
2,062.50
14,000.00
406.25
166,818.75
131,600.00
909,000.00
1,668,187.50
75,000.00
2,652,187.50
895,500.00
894,490.80
2,240,314.03
75,000.00
909,000.00
1,668,187.50
75,000.00
1,920,269.17
4,572,456.67
909,000.00
1,668,187.50
75,000.00
909,000.00
1,668,187.50
75,000.00
2,240,314.03
4,892,501.53
909,000.00
1,668,187.50
75,000.00
909,000.00
1,668,187.50
75,000.00
2,346,995.65
4,999,183.15
909,000.00
1,668,187.50
75,000.00
909,000.00
1,668,187.50
75,000.00
2,240,314.03
4,892,501.53
909,000.00
1,668,187.50
75,000.00
909,000.00
1,668,187.50
75,000.00
2,346,995.65
4,999,183.15
47,250.00
63,000.00
6,200.00
47,250.00
63,000.00
6,200.00
20,250.00
2,227.50
13,986.00
438.75
153,352.25
895,500.00
895,500.00
20,250.00
2,227.50
13,986.00
438.75
36,902.25
153,352.25
10,668.16
Jumlah
895,500.00
5,550,000.00
200,000.00
Jumlah
150,000.00
136,000.00
1,070.00
55,000.00
65,000.00
40,000.00
70,000.00
1,226,818.00
1,920,269.17
895,500.00
587,301.59
200,000.00
1,682,801.59
200,000.00
200,000.00
136,500.00
73,440.00
194,312.00
11,000.00
1,300.00
48,000.00
4,200.00
1,226,818.00
1,920,269.17
4,042,587.17
136,500.00
73,440.00
194,312.00
11,000.00
1,300.00
48,000.00
4,200.00
468,752.00
15,000.00
180,000.00
37,000.00
50,000.00
50,000.00
65,000.00
Jumlah
6,000,000.00
15,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
16,500.00
3,600.00
249.75
3,375.00
337.50
43.88
4,006.13
84,000.00
2,325.00
13,000.00
6,600.00
10,360.00
2,925.00
32,885.00
5,500,000.00
15,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
10,000.00
1,925.00
5,550.00
2,275.00
19,750.00
3,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
8,750.00
962.50
12,950.00
1,137.50
23,800.00
16,500.00
49,000.00
90,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
7,500,000.00
15,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
7,500,000.00
15,500.00
22,000.00
50,000.00
55,000.00
37,000.00
20,100.00
86,325.00
33,000.00
2,325.00
35,325.00
42,000.00
42,000.00
57,750.00
1,764.00
2,880.00
15,000.00
1,650.00
22,200.00
1,950.00
40,800.00
62,394.00
262,500.00
1,550.00
40,000.00
4,400.00
10,360.00
1,170.00
55,930.00
264,050.00
8,250,000.00
232,500.00
3,300.00
1,200,000.00
132,000.00
296,000.00
16,500.00
3,600.00
249.75
3,375.00
337.50
43.88
24,106.13
84,000.00
2,325.00
13,000.00
6,600.00
10,360.00
2,925.00
119,210.00
33,000.00
2,325.00
10,000.00
1,925.00
5,550.00
2,275.00
55,075.00
42,000.00
8,750.00
962.50
12,950.00
1,137.50
65,800.00
57,750.00
1,764.00
2,880.00
15,000.00
1,650.00
22,200.00
1,950.00
103,194.00
262,500.00
1,550.00
40,000.00
4,400.00
10,360.00
1,170.00
319,980.00
8,250,000.00
232,500.00
3,300.00
1,200,000.00
132,000.00
296,000.00
0.4 OH Mandor
62 1 M2 Pekerjaan Pasang Kaca Mati 8 mm
1 M2 Kaca 8mm
0.12 OH Tukang Kayu
0.012 OH Kepala Tukang Kayu
0.0188 OH Pekerja
0.032 OH Mandor
63 1 M2 Pekerjaan Pasang Kaca Mati 6 mm
1 M2 Kaca 6mm
0.12 OH Tukang Kayu
0.012 OH Kepala Tukang Kayu
0.0188 OH Pekerja
0.032 OH Mandor
64 1 M2 Pekerjaan Pasang Kaca Mati 5 mm
1 M2 Kaca 5mm
0.12 OH Tukang Kayu
0.012 OH Kepala Tukang Kayu
0.0188 OH Pekerja
0.032 OH Mandor
65 1 M2 Pek. Pasang Keramik Lantai 60x60 Niro Granit
1.05 Duz Keramik 60 x 60 Niro Granit
0.25 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.023 M3 Pasir Pasang
0.25 Kg Semen Naat AM 50 + am 55
0.495 OH Tukang Batu
0.0495 OH Kepala Tukang Batu
0.462 OH Pekerja
0.22 OH Mandor
66 1 M2 Pek. Pasang Keramik Lantai 40/40 essenza
1.05 Duz Keramik 40 x 40 Niro Granit
0.25 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.023 M3 Pasir Pasang
0.3333 Kg Semen Naat AM 50 + am 55
0.495 OH Tukang Batu
0.0495 OH Kepala Tukang Batu
0.462 OH Pekerja
0.22 OH Mandor
67 1 M2 Pek. Pasang Keramik Lantai 33/33 Roman
1.05 Duz Keramik 33 x 33 ex roman
0.25 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.023 M3 Pasir Pasang
0.5 Kg Semen Naat AM 50 + am 55
0.495 OH Tukang Batu
0.0495 OH Kepala Tukang Batu
0.462 OH Pekerja
0.22 OH Mandor
68 1 M2 Pek. Pasang Keramik Lantai 20/20
1.05 Duz Keramik 20 x 20 Roman
0.25 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.023 M3 Pasir Pasang
0.5 Kg Semen Naat AM 50 + am 55
0.045 OH Kepala Tukang Batu
0.48 OH Pekerja
0.03 OH Mandor
69 1 M1 Pek. Pasang Keramik Plint 10/60
1.05 M' Keramik Plint 10 x 60 Niro Granit
0.031 Zak Portland Cement 50 Kg (Indo Cement klas I)
65,000.00
Jumlah
26,000.00
1,654,000.00
174,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
6,000.00
660.00
695.60
2,080.00
9,435.60
100,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
6,000.00
660.00
695.60
2,080.00
9,435.60
172,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
6,000.00
660.00
695.60
2,080.00
9,435.60
252,000.00
49,000.00
90,000.00
12,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
257,654.50
49,000.00
90,000.00
12,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
93,750.00
53,500.00
157,200.00
17,500.00
55,000.00
55,000.00
40,000.00
70,000.00
Jumlah
88,500.00
49,000.00
90,000.00
12,500.00
55,000.00
37,000.00
65,000.00
Jumlah
57,500.00
49,000.00
8,485,800.00
174,000.00
174,000.00
100,000.00
100,000.00
172,500.00
172,500.00
264,600.00
12,250.00
2,070.00
3,125.00
24,750.00
2,722.50
17,094.00
14,300.00
58,866.50
282,045.00
270,537.23
12,250.00
2,070.00
4,166.67
24,750.00
2,722.50
17,094.00
14,300.00
58,866.50
289,023.89
98,437.50
13,375.00
3,615.60
8,750.00
27,225.00
2,722.50
18,480.00
15,400.00
63,827.50
124,178.10
92,925.00
12,250.00
2,070.00
6,250.00
2,475.00
17,760.00
1,950.00
22,185.00
26,000.00
10,139,800.00
174,000.00
6,000.00
660.00
695.60
2,080.00
183,435.60
100,000.00
6,000.00
660.00
695.60
2,080.00
109,435.60
172,500.00
6,000.00
660.00
695.60
2,080.00
181,935.60
264,600.00
12,250.00
2,070.00
3,125.00
24,750.00
2,722.50
17,094.00
14,300.00
340,911.50
270,537.23
12,250.00
2,070.00
4,166.67
24,750.00
2,722.50
17,094.00
14,300.00
347,890.39
98,437.50
13,375.00
3,615.60
8,750.00
27,225.00
2,722.50
18,480.00
15,400.00
188,005.60
113,495.00
92,925.00
12,250.00
2,070.00
6,250.00
2,475.00
17,760.00
1,950.00
135,680.00
60,375.00
1,519.00
60,375.00
1,519.00
0.02
0.0333
0.05
0.005
0.15
0.006
M3
Kg
OH
OH
OH
OH
Pasir Pasang
Semen Naat AM 50 + am 55
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor
90,000.00
12,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
41,500.00
49,000.00
90,000.00
12,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
25,000.00
49,000.00
90,000.00
12,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
13,250.00
49,000.00
90,000.00
12,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
73 1 M2 Pekerjaan Cat Tembok 1x Plamur, 1x Dasar, 2x Cat Halus
Dinding Dalam
0.333 Lbr Amplas
3,000.00
0.12 Kg Cat Dasar
21,500.00
0.208 Kg Cat Dinding ICI Dulux
165,000.00
0.1 Kg Plamur Tembok
6,000.00
0.041 OH Tukang Cat
50,000.00
0.0041 OH Kepala Tukang Cat
55,000.00
0.13 OH Pekerja
37,000.00
0.0163 OH Mandor
65,000.00
Jumlah
74 1 M2 Pekerjaan Cat Tembok 1x Plamur, 1x Dasar, 2x Cat Halus
Dinding Luar
0.333 Lbr Amplas
3,000.00
0.12 Kg Cat Dasar
21,500.00
0.26 Kg Cat Dinding ICI Dulux Weathersield
168,500.00
0.1 Kg Plamur Tembok
6,000.00
0.041 OH Tukang Cat
50,000.00
0.0041 OH Kepala Tukang Cat
55,000.00
0.13 OH Pekerja
37,000.00
0.0163 OH Mandor
65,000.00
Jumlah
75 1 M2 Pekerjaan Cat Tembok 1x Plamur, 1x Dasar, 2x Cat Halus (Cat Jotun)
0.333 Lbr Amplas
3,000.00
0.12 Kg Cat Dasar
21,500.00
0.26 Kg Cat Jotun
198,000.00
0.1 Kg Plamur Tembok
6,000.00
0.063 OH Tukang Cat
50,000.00
1,800.00
416.67
2,500.00
275.00
5,550.00
390.00
8,715.00
64,110.67
43,575.00
1,519.00
1,800.00
833.33
3,000.00
275.00
6,660.00
390.00
10,325.00
47,727.33
26,250.00
1,519.00
1,800.00
18,750.00
2,500.00
275.00
5,550.00
390.00
8,715.00
48,319.00
13,912.50
1,519.00
1,800.00
18,750.00
2,500.00
275.00
5,550.00
390.00
8,715.00
35,981.50
999.00
2,580.00
34,320.00
600.00
2,047.50
225.23
4,810.00
1,056.25
8,138.98
38,499.00
999.00
2,580.00
43,810.00
600.00
2,047.50
225.23
4,810.00
1,056.25
8,138.98
47,989.00
999.00
2,580.00
51,480.00
600.00
3,150.00
1,800.00
416.67
2,500.00
275.00
5,550.00
390.00
72,825.67
43,575.00
1,519.00
1,800.00
833.33
3,000.00
275.00
6,660.00
390.00
58,052.33
26,250.00
1,519.00
1,800.00
18,750.00
2,500.00
275.00
5,550.00
390.00
57,034.00
13,912.50
1,519.00
1,800.00
18,750.00
2,500.00
275.00
5,550.00
390.00
44,696.50
999.00
2,580.00
34,320.00
600.00
2,047.50
225.23
4,810.00
1,056.25
46,637.98
999.00
2,580.00
43,810.00
600.00
2,047.50
225.23
4,810.00
1,056.25
56,127.98
999.00
2,580.00
51,480.00
600.00
3,150.00
55,000.00
37,000.00
65,000.00
Jumlah
3,000.00
160,000.00
170,000.00
18,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
235,000.00
49,000.00
70,000.00
80,000.00
50,000.00
65,000.00
Jumlah
346.50
7,400.00
1,625.00
12,521.50
999.00
19,200.00
44,200.00
1,800.00
900.00
660.00
5,180.00
325.00
7,065.00
45,500.00
13,200.00
28,125.00
10,725.00
97,550.00
45,500.00
13,200.00
28,125.00
10,725.00
97,550.00
45,000.00
37,000.00
65,000.00
Jumlah
14,800.00
2,600.00
17,400.00
106,000.00
49,000.00
80,300.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
23,000.00
7,500.00
3,000.00
250.00
7,500.00
Jumlah
25,000.00
200.00
32,000.00
65,000.00
66,199.00
258,500.00
4,900.00
255,000.00
90,000.00
75,000.00
70,000.00
80,000.00
50,000.00
65,000.00
Jumlah
49,000.00
90,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
55,659.00
263,400.00
280,500.00
2,070.00
18,750.00
301,320.00
45,000.00
45,000.00
10,270.40
2,000.00
110.00
1,480.00
5,200.00
8,790.00
10,270.40
102,820.00
277,585.00
43,683.20
50,000.00
5,500.00
148,000.00
26,000.00
229,500.00
424,088.20
25,300.00
15,624.75
6,249.90
50.00
7,500.00
7,500.00
346.50
7,400.00
1,625.00
68,180.50
999.00
19,200.00
44,200.00
1,800.00
900.00
660.00
5,180.00
325.00
73,264.00
258,500.00
4,900.00
45,500.00
13,200.00
28,125.00
10,725.00
360,950.00
280,500.00
2,070.00
18,750.00
45,500.00
13,200.00
28,125.00
10,725.00
398,870.00
45,000.00
14,800.00
2,600.00
62,400.00
10,270.40
2,000.00
110.00
1,480.00
5,200.00
19,060.40
102,820.00
277,585.00
43,683.20
50,000.00
5,500.00
148,000.00
26,000.00
653,588.20
47,224.65
25,300.00
15,624.75
6,249.90
50.00
7,500.00
54,724.65
100,000.00
225.00
15,680.00
45,500.00
100,000.00
225.00
15,680.00
45,500.00
1
0.42
1.2
1
m2.
Kg
Roll
Ls
215,000.00
15,000.00
8,000.00
20,000.00
Jumlah
45,000.00
250.00
200.00
15,000.00
8,000.00
7,500.00
Jumlah
215,000.00
6,300.00
9,600.00
20,000.00
20,000.00
392,305.00
49,500.00
3,500.00
280.00
3,750.00
444.44
7,500.00
7,500.00
57,474.44
35,200.00
37,375.00
280.00
3,150.00
1,000.00
7,500.00
7,500.00
77,005.00
60,900.00
4,900.00
9,000.00
12,500.00
2,200.00
12,950.00
1,300.00
28,950.00
74,800.00
45,000.00
14,800.00
2,600.00
17,400.00
45,000.00
299,838.00
12,250.00
2,070.00
3,125.00
33,750.00
3,712.50
23,310.00
19,500.00
80,272.50
317,283.00
249,018.00
12,250.00
2,070.00
3,125.00
33,750.00
3,712.50
23,310.00
19,500.00
80,272.50
266,463.00
188,034.00
12,250.00
2,070.00
3,125.00
33,750.00
3,712.50
23,310.00
19,500.00
80,272.50
205,479.00
215,000.00
6,300.00
9,600.00
20,000.00
412,305.00
49,500.00
3,500.00
280.00
3,750.00
444.44
7,500.00
64,974.44
35,200.00
37,375.00
280.00
3,150.00
1,000.00
7,500.00
84,505.00
60,900.00
4,900.00
9,000.00
12,500.00
2,200.00
12,950.00
1,300.00
103,750.00
45,000.00
14,800.00
2,600.00
62,400.00
299,838.00
12,250.00
2,070.00
3,125.00
33,750.00
3,712.50
23,310.00
19,500.00
397,555.50
249,018.00
12,250.00
2,070.00
3,125.00
33,750.00
3,712.50
23,310.00
19,500.00
346,735.50
188,034.00
12,250.00
2,070.00
3,125.00
33,750.00
3,712.50
23,310.00
19,500.00
285,751.50
950.00
49,000.00
90,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
10,000.00
154,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
12,500.00
154,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
66,500.00
11,446.40
4,050.00
5,500.00
605.00
13,024.00
1,072.50
20,201.50
81,996.40
84,000.00
44,259.60
5,500.00
605.00
13,024.00
1,072.50
20,201.50
128,259.60
105,000.00
44,259.60
5,500.00
605.00
13,024.00
1,072.50
20,201.50
149,259.60
0.012
83.333333333
10,560.00
880,000.00
66,500.00
11,446.40
4,050.00
5,500.00
605.00
13,024.00
1,072.50
102,197.90
84,000.00
44,259.60
5,500.00
605.00
13,024.00
1,072.50
148,461.10
105,000.00
44,259.60
5,500.00
605.00
13,024.00
1,072.50
169,461.10
URAIAN
SATUAN
BESI
10
Baja Profile
11
Kawat ikat
12
13
14
15
16
Wiremesh M6
Paku 2"-5"
Paku Lis
Paku Reng
Paku Usuk
1
2
3
4
5
6
6
7
8
btg
btg
btg
btg
btg
Kg
btg
btg
btg
btg
Kg
kg
Roll
Kg
Kg
Kg
Kg
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
214,000.00
136,000.00
99,000.00
53,000.00
32,000.00
8,745.30
47,000.00
71,000.00
123,000.00
177,500.00
15,000.00
17,000.00
5,550,000.00
15,500.00
22,000.00
17,500.00
17,500.00
M3
M3
M3
M3
M3
Rp
Rp
Rp
Rp
Rp
525,000.00
625,000.00
752,000.00
775,000.00
412,000.00
M3
M3
M3
M3
M3
M3
M3
M3
M3
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
85,000.00
135,000.00
136,000.00
157,200.00
207,000.00
105,000.00
150,000.00
121,500.00
135,000.00
BETON
II
1
2
3
4
5
Pekerjaan urug
III
1
2
3
4
5
6
7
8
10
Tanah Urug
Batu Kali
Pasir Beton
Pasir Pasang
Pasir Super
Pasir Urug
Kerikil Beton
Kerikil Biasa
Batu kosong
Watterprofing
IV
1
2
3
4
5
6
7
ltr
m2
m2
m1
m2
m2
m2
Rp
Rp
Rp
Rp
Rp
Rp
Rp
30,000.00
40,000.00
135,000.00
72,500.00
95,000.00
80,000.00
75,000.00
M3
M3
M3
M3
M3
ikat
m3
m3
m3
M3
M3
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
7,800,000.00
7,000,001.00
4,400,000.00
2,520,000.00
4,800,000.00
280,000.00
5,400,000.00
5,400,000.00
4,800,000.00
8,000,000.00
9,000,000.00
Lbr
Lbr
Lbr
Lbr
Lbr
Rp
Rp
Rp
Rp
Rp
140,000.00
106,000.00
42,000.00
65,000.00
85,000.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
3,250.00
60,750.00
132,500.00
175,000.00
66,375.00
68,000.00
22,666.67
93,750.00
93,750.00
93,750.00
93,750.00
68,000.00
93,750.00
93,750.00
KAYU
V
17
18
19
20
21
22
23
24
25
33
34
Playwood /Multiplek
VI
39
40
41
42
43
Keramik
VII
1
2
3
4
5
6
7
8
9
bj
Duz
Duz
Duz
Duz
Duz
Duz
Duz
Duz
10
11
12
13
14
Duz
Duz
Duz
Duz
Duz
15
17
18
Duz
m1
m1
Rp
Rp
Rp
68,000.00
43,200.00
129,600.00
285,000.00
39,500.00
185,500.00
25,500.00
Marmer
VIII
19
Marmer 60 x 60 cm (Citatah)
m2
20
21
22
Marmer Plin 10 x 60 cm
m'
m2
m'
Rp
Rp
Rp
Rp
m2
m2
m2
M2
Rp
Rp
Rp
Rp
75,000.00
82,500.00
95,000.00
85,500.00
Kg
zak
zak
zak
zak
zak
Rp
Rp
Rp
Rp
Rp
Rp
17,500.00
53,500.00
42,800.00
52,500.00
42,000.00
15,500.00
zak
zak
zak
zak
zak
kg
Rp
Rp
Rp
Rp
Rp
Rp
150,000.00
154,000.00
163,000.00
205,000.00
146,000.00
11,500.00
bj
bj
bj
m3
bj
bj
m3
bj
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
1,000.00
950.00
2,200.00
1,300,000.00
14,772.73
11,800.00
1,300,000.00
12,745.10
Kg
Kg
Kg
Kg
Rp
Rp
Rp
Rp
60,000.00
65,000.00
68,500.00
98,000.00
Marmer 30 x 30 cm
Marmer plin 10 x 30 cm
IX
1
2
3
4
Semen
X
1
2
3
4
5
6
Semen Naat AM 50 + am 55
Semen Gersik 50 kg
Semen Gersik 40 kg
Semen Tiga roda 50 kg
Semen Tiga roda 40 kg
Mill
XI
1
2
3
4
5
6
Mortar Plesteran 40 kg
Mortar Perekat Bata ringan 40 kg
Mortar acian putih 25 kg
Mortar perekat keramik lantai 40 kg
Mortar perekat keramik dinding 25 kg
Mortar pengisi nat
Material Dinding
XII
1
2
3
4
5
6
7
8
Pengecatan
XIII
1
2
3
4
Cat Danapaints
Cat Dinding ICI Dulux
Cat Dinding ICI Dulux Weathersield
Cat Jotun
5
6
7
8
10
11
12
13
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
70,000.00
80,000.00
835,000.00
1,322,000.00
659,000.00
726,500.00
106,500.00
89,000.00
M2
M2
M2
M2
M2
M2
Kg
M2
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
72,500.00
174,000.00
550,000.00
600,000.00
250,000.00
125,000.00
15,000.00
100,000.00
m1
m1
set
2 daun
Rp
Rp
Rp
Rp
80,000.00
125,000.00
275,000.00
1,800,000.00
M3
M3
M3
M3
M3
M3
M3
M3
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
65,000.00
110,000.00
80,300.00
90,000.00
115,000.00
75,000.00
106,000.00
75,000.00
Rp
Rp
Rp
Rp
Rp
Rp
571,250.00
218,760.00
187,500.00
187,500.00
325,000.00
1,490,010.00
Rp
Rp
2,850,000.00
290,000.00
Kg
Kg
pil
pil
pil
pil
kg
ltr
XIV
1
2
3
4
5
6
7
8
Kaca 5mm
Kaca 8mm
Kaca Cermin 50 x 80 cm
Kaca Cermin 5mm
Kaca Tempered 12mm
Kaca Tempered 6mm
High Modulus Acetate Silicon Sealant 4200 P
Kaca 6mm
XV
1
2
3
4
Pekerjaan urug
XVI
1
2
3
4
5
6
7
8
Tanah Urug
Batu Kali
Pasir Beton
Pasir Pasang
Pasir Super
Pasir Urug
Kerikil Beton
Kerikil Biasa
XVII
A
1
2
3
4
5
1
2
set
set
Door closer
C
1
2
3
4
1
2
3
4
XVIII
1
2
3
4
5
6
7
8
9
10
11
Rp
Rp
468,750.00
3,608,750.00
set
set
set
set
Rp
Rp
Rp
Rp
Rp
200,000.00
135,000.00
468,750.00
105,000.00
908,750.00
set
set
set
set
Rp
Rp
Rp
Rp
Rp
55,000.00
105,000.00
135,000.00
110,000.00
405,000.00
bj
Rp
3,200.00
bj
Rp
12,250.00
bj
bj
bj
bj
bj
m2
lbr
pcs
pcs
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
2,800.00
3,675.00
10,000.00
850.00
1,800.00
135,000.00
120,000.00
6,750.00
8,250.00
set
Hardwere window/jendela ( D )
Flush ring
Engsel 4"
Grendel tanam
dead bolt
Atap genteng
Genteng Godyear
Genteng bubungan Godyear
Genteng karang pilang bambe
Genteng karang pilang bambe (d
Genteng bubungan bambe
Genteng press lokal
Genteng bubungan press lokal
Genteng metal KW I (gerard)
Genteng bubungan metal (plat s
Genteng marigional (natural)
Genteng morigional (glazur)
8,745.30
135,714.29
135,714.29
157,142.86
207,142.86
100,000.00
150,000.00
121,428.57
Rp
1,070.00
1050
14772.7272727273
Rp
politure
imfra
12,745.10
35000
35000
:
:
:
NO
DAFTAR TENAGA
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Mandor
Kepala Tukang Besi
Kepala Tukang Batu
Kepala Tukang Kayu
Kepala Tukang Cat
Tukang Politur
Tukang Batu
Tukang Kayu
Tukang Besi
Tukang Cat
Tukang Gali
Pekerja
Tukang Stile bali
Kepala Tk. Stile Bali
Pekerja Stile Bali
HARGA SATUAN
Rp.
3
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
70,000.00
65,000.00
65,000.00
65,000.00
65,000.00
55,000.00
55,000.00
55,000.00
55,000.00
50,000.00
50,000.00
40,000.00
100,000.00
125,000.00
50,000.00
SATUAN
4
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
2
PEKERJAAN PASANGAN DINDING
1 1 M2 Pekerjaan Pasangan Batu Bata 1 : 5
82.64 Bj
Bata Merah
0.2336 Zak PC Semen Gresik (50 kg)
0.045 M3 Pasir Pasang
0.11 Oh Tukang Batu
0.011 Oh Kepala Tukang Batu
0.352 Oh Pekerja
0.0165 Oh Mandor
2 1 M2 Pekerjaan Pasangan Bata ringan( 7,5x20x60)
8.4 Bj
Bata ringan
0.2874 Zak Perekat bata ringan MU (40 kg)
0.11 Oh Tukang Batu
0.011 Oh Kepala Tukang Batu
0.352 Oh Pekerja
0.0165 Oh Mandor
3 1 M2 Pekerjaan Pasangan Bata ringan( 10x20x60)
8.4 Bj
Bata ringan
0.2874 Zak Perekat bata ringan MU (40 kg)
0.11 Oh Tukang Batu
0.011 Oh Kepala Tukang Batu
0.352 Oh Pekerja
0.0165 Oh Mandor
5 1 M2 Pekerjaan Plesteran Mortar
0.0864 Zak Mortar utama 200 (40 kg)
0.022 M3 Pasir Pasang
0.15 OH Tukang Batu
0.015 OH Kepala Tukang Batu
0.2 OH Pekerja
0.01 OH Mandor
6 1 M2 Pekerjaan Plesteran 1 : 3
0.162 Zak Portland Cement 50 Kg (Indo Cement klas I
0.019 M3 Pasir Pasang
0.15 OH Tukang Batu
0.015 OH Kepala Tukang Batu
0.2 OH Pekerja
0.01 OH Mandor
7 1 M2 Pekerjaan Plesteran 1 : 2 tebal 2cm
0.1704 Zak Portland Cement 50 Kg (Indo Cement klas I
0.017 M3 Pasir Pasang
0.15 OH Tukang Batu
0.015 OH Kepala Tukang Batu
0.2 OH Pekerja
0.01 OH Mandor
SATUAN
( Rp. )
2
1,000.00
49,000.00
90,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
10,000.00
154,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
UPAH
( Rp. )
BAHAN
( Rp. )
3
82,640.00
11,446.40
4,050.00
5,500.00
605.00
13,024.00
1,072.50
20,201.50
98,136.40
84,000.00
44,259.60
5,500.00
605.00
13,024.00
1,072.50
20,201.50
128,259.60
12,500.00
154,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
105,000.00
44,259.60
5,500.00
605.00
13,024.00
1,072.50
20,201.50
165,500.00
90,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
14,299.20
1,980.00
7,500.00
825.00
7,400.00
650.00
32,654.20
14,299.20
1,980.00
49,000.00
90,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
7,938.00
1,710.00
7,500.00
825.00
7,400.00
650.00
26,023.00
7,938.00
1,710.00
49,000.00
90,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
8,349.60
1,530.00
7,500.00
825.00
7,400.00
650.00
26,254.60
8,349.60
1,530.00
149,259.60
16,279.20
9,648.00
9,879.60
9 1 M Pekerjaan Acian 1 : 3
0.2096 Zak Portland Cement 50 Kg (Indo Cement klas I
0.04 OH Tukang Batu
0.002 OH Kepala Tukang Batu
0.04 OH Pekerja
0.08 OH Mandor
PASANGAN KERAMIK
10 1 M2 Pek. Pasang Keramik Lantai 60x60 Niro Granit
1.05 Duz Keramik 60 x 60 Niro Granit
0.25 Zak Portland Cement 50 Kg (Indo Cement klas I
0.023 M3 Pasir Pasang
0.25 Kg Semen Naat AM 50 + am 55
0.495 OH Tukang Batu
0.0495 OH Kepala Tukang Batu
0.462 OH Pekerja
0.22 OH Mandor
163,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
2,000.00
110.00
1,480.00
5,200.00
8,790.00
49,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
2,000.00
110.00
1,480.00
5,200.00
8,790.00
252,000.00
49,000.00
90,000.00
12,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
257,654.50
49,000.00
90,000.00
12,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
198,224.50
49,000.00
90,000.00
12,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
88,500.00
49,000.00
90,000.00
12,500.00
55,000.00
37,000.00
65,000.00
Jumlah
34,164.80
34,164.80
10,270.40
10,270.40
264,600.00
12,250.00
2,070.00
3,125.00
24,750.00
2,722.50
17,094.00
14,300.00
58,866.50
282,045.00
270,537.23
12,250.00
2,070.00
4,166.67
24,750.00
2,722.50
17,094.00
14,300.00
58,866.50
289,023.89
208,135.73
12,250.00
2,070.00
6,250.00
24,750.00
2,722.50
17,094.00
14,300.00
58,866.50
228,705.73
92,925.00
12,250.00
2,070.00
6,250.00
2,475.00
17,760.00
1,950.00
22,185.00
113,495.00
57,500.00
49,000.00
90,000.00
12,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
41,500.00
49,000.00
90,000.00
12,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
25,000.00
49,000.00
90,000.00
12,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
13,250.00
49,000.00
90,000.00
12,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
60,375.00
1,519.00
1,800.00
416.67
2,500.00
275.00
5,550.00
390.00
8,715.00
64,110.67
43,575.00
1,519.00
1,800.00
833.33
3,000.00
275.00
6,660.00
390.00
10,325.00
47,727.33
26,250.00
1,519.00
1,800.00
18,750.00
2,500.00
275.00
5,550.00
390.00
8,715.00
48,319.00
13,912.50
1,519.00
1,800.00
18,750.00
2,500.00
275.00
5,550.00
390.00
8,715.00
35,981.50
PEKERJAAN ATAP
18 1 Kg Pekerjaan Kuda-Kuda Baja
1.1 Kg Baja Profile
0.02 Kg Cat Metal ICI Dulux
0.00675 OH Pekerja
0.0675 OH Tukang Besi
0.00675 OH Kepala Tukang Besi
0.00068 OH Mandor
19 1 M2 Pek. Usuk
0.014 M3 Kayu Kamper Samarida Usuk 5/7
0.15 Kg Paku 2"-5"
0.26 OH Tukang Kayu
0.12 OH Kepala Tukang Kayu
0.28 OH Pekerja
15,000.00
180,000.00
37,000.00
50,000.00
50,000.00
65,000.00
Jumlah
7,000,000.00
15,500.00
50,000.00
55,000.00
37,000.00
16,500.00
3,600.00
249.75
3,375.00
337.50
43.88
4,006.13
20,100.00
98,000.00
2,325.00
13,000.00
6,600.00
10,360.00
0.045 OH
Mandor
20 1 M2 Pek. Reng
0.006 M3 Kayu Kamper Samarinda Reng 3/4
0.15 Kg Paku 2"-5"
0.2 OH Tukang Kayu
0.035 OH Kepala Tukang Kayu
0.15 OH Pekerja
0.035 OH Mandor
21 1 M2 Pekerjaan Pasang Atap Genteng
14 Bh Genteng Kodok produksi Goodyear
0.175 OH Tukang Batu
0.0175 OH Kepala Tukang Batu
0.35 OH Pekerja
0.0175 OH Mandor
22 1 M1 Pekerjaan Pasang Bubungan Genteng
3.5 Bh Bubungan Genteng Keramik Berglasur
0.036 Zak Portland Cement 50 Kg (Indo Cement klas I
0.032 M3 Pasir Pasang
0.3 OH Tukang Batu
0.03 OH Kepala Tukang Batu
0.6 OH Pekerja
0.03 OH Mandor
23 1 M1 Pekerjaan Papan List Plank
0.035 M3 Kayu Kamper Samarinda Balok
0.1 Kg Paku 2"-5"
0.8 OH Tukang Kayu
0.08 OH Kepala Tukang Kayu
0.28 OH Pekerja
0.018 OH Mandor
24 1 M3 Pekerjaan Listplank Kayu Kamper
1.1 M3 Kayu Kamper Samarinda Balok
15 Kg Paku 2"-5"
0.15 Kg Paku Lis
24 OH Tukang Kayu
2.4 OH Kepala Tukang Kayu
8 OH Pekerja
0.4 OH Mandor
65,000.00
Jumlah
2,925.00
32,885.00
6,000,000.00
15,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
10,000.00
1,925.00
5,550.00
2,275.00
19,750.00
4,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
8,750.00
962.50
12,950.00
1,137.50
23,800.00
4,000.00
49,000.00
90,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
7,500,000.00
15,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
7,500,000.00
15,500.00
22,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
100,325.00
36,000.00
2,325.00
38,325.00
63,000.00
63,000.00
14,000.00
1,764.00
2,880.00
15,000.00
1,650.00
22,200.00
1,950.00
40,800.00
18,644.00
262,500.00
1,550.00
40,000.00
4,400.00
10,360.00
1,170.00
55,930.00
264,050.00
8,250,000.00
232,500.00
3,300.00
1,200,000.00
132,000.00
296,000.00
26,000.00
1,654,000.00
8,485,800.00
PEKERJAAN PENGECATAN
25 1 M2 Pekerjaan Cat Tembok 1x Plamur, 1x Dasar, 2x Cat Halus
Dinding Dalam
0.333 Lbr Amplas
3,000.00
0.12 Kg Cat Dasar
21,500.00
0.208 Kg Cat Dinding vinilex ICI
135,800.00
0.1 Kg Plamur Tembok
6,000.00
0.04095 OH Tukang Cat
50,000.00
0.0041 OH Kepala Tukang Cat
55,000.00
0.13 OH Pekerja
37,000.00
0.01625 OH Mandor
65,000.00
Jumlah
999.00
2,580.00
28,246.40
600.00
2,047.50
225.23
4,810.00
1,056.25
8,138.98
32,425.40
999.00
2,580.00
43,810.00
600.00
2,047.50
225.23
4,810.00
1,056.25
8,138.98
47,989.00
999.00
2,580.00
51,480.00
600.00
3,150.00
346.50
7,400.00
1,625.00
12,521.50
55,659.00
999.00
19,200.00
44,200.00
1,800.00
900.00
660.00
5,180.00
325.00
7,065.00
66,199.00
25,300.00
15,624.75
6,249.90
50.00
7,500.00
7,500.00
47,224.65
100,000.00
225.00
15,680.00
45,500.00
215,000.00
6,300.00
9,600.00
20,000.00
20,000.00
392,305.00
49,500.00
3,500.00
280.00
3,750.00
444.44
7,500.00
Jumlah
32 1 M2 Pek. Plapond GRC
1.1 M2 GRC
32,000.00
0.575 Kg High Modulus Acetate Silicon Sealant 4200 P
65,000.00
1.4 Bj
Scrup
200.00
0.21 Kg Compoun
15,000.00
0.125 Roll Textile Tape (plaster)
8,000.00
1 Ls Ongkos Pasang
7,500.00
Jumlah
33 1 M2 Pek. Plapond Gybsum
1 M2 Gybsum jayaboard 9 mm
14 Bj
Paku Beton
1.4 Bj
Scrup
0.25 Kg Compoun
0.05556 Roll Textile Tape (plaster)
1 Ls Ongkos Pasang
1 M2 Pekerjaan Paving
1.05 M3 Paving Blok Standart t=6cm
0.1 Zak Portland Cement 50 Kg (Indo Cement klas I
0.1 M3 Pasir Pasang
0.25 OH Tukang Batu
0.04 OH Kepala Tukang Batu
0.35 OH Pekerja
0.02 OH Mandor
87 1 M2 Pekerjaan Waterproffing
1 Kg Waterproof Viscocrete-10 ex SIKA
0.4 OH Pekerja
0.04 OH Mandor
55,000.00
250.00
200.00
15,000.00
8,000.00
7,500.00
Jumlah
12,500.00
250.00
200.00
7,500.00
Jumlah
58,000.00
49,000.00
90,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
7,500.00
57,474.44
35,200.00
37,375.00
280.00
3,150.00
1,000.00
7,500.00
7,500.00
77,005.00
55,000.00
3,500.00
280.00
3,750.00
444.44
7,500.00
7,500.00
62,974.44
12,500.00
3,500.00
280.00
7,500.00
7,500.00
16,280.00
60,900.00
4,900.00
9,000.00
12,500.00
2,200.00
12,950.00
1,300.00
28,950.00
35,000.00
49,000.00
90,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
12,500.00
2,200.00
12,950.00
1,300.00
28,950.00
45,000.00
37,000.00
65,000.00
Jumlah
14,800.00
2,600.00
17,400.00
74,800.00
36,750.00
4,900.00
9,000.00
50,650.00
45,000.00
45,000.00
HARGA
( Rp. )
5
82,640.00
11,446.40
4,050.00
5,500.00
605.00
13,024.00
1,072.50
118,337.90
84,000.00
44,259.60
5,500.00
605.00
13,024.00
1,072.50
148,461.10
105,000.00
44,259.60
5,500.00
605.00
13,024.00
1,072.50
169,461.10
14,299.20
1,980.00
7,500.00
825.00
7,400.00
650.00
32,654.20
7,938.00
1,710.00
7,500.00
825.00
7,400.00
650.00
26,023.00
8,349.60
1,530.00
7,500.00
825.00
7,400.00
650.00
26,254.60
34,164.80
2,000.00
110.00
1,480.00
5,200.00
42,954.80
10,270.40
2,000.00
110.00
1,480.00
5,200.00
19,060.40
264,600.00
12,250.00
2,070.00
3,125.00
24,750.00
2,722.50
17,094.00
14,300.00
340,911.50
270,537.23
12,250.00
2,070.00
4,166.67
24,750.00
2,722.50
17,094.00
14,300.00
347,890.39
208,135.73
12,250.00
2,070.00
6,250.00
24,750.00
2,722.50
17,094.00
14,300.00
287,572.23
92,925.00
12,250.00
2,070.00
6,250.00
2,475.00
17,760.00
1,950.00
135,680.00
60,375.00
1,519.00
1,800.00
416.67
2,500.00
275.00
5,550.00
390.00
72,825.67
43,575.00
1,519.00
1,800.00
833.33
3,000.00
275.00
6,660.00
390.00
58,052.33
26,250.00
1,519.00
1,800.00
18,750.00
2,500.00
275.00
5,550.00
390.00
57,034.00
13,912.50
1,519.00
1,800.00
18,750.00
2,500.00
275.00
5,550.00
390.00
44,696.50
16,500.00
3,600.00
249.75
3,375.00
337.50
43.88
24,106.13
98,000.00
2,325.00
13,000.00
6,600.00
10,360.00
2,925.00
133,210.00
36,000.00
2,325.00
10,000.00
1,925.00
5,550.00
2,275.00
58,075.00
63,000.00
8,750.00
962.50
12,950.00
1,137.50
86,800.00
14,000.00
1,764.00
2,880.00
15,000.00
1,650.00
22,200.00
1,950.00
59,444.00
262,500.00
1,550.00
40,000.00
4,400.00
10,360.00
1,170.00
319,980.00
8,250,000.00
232,500.00
3,300.00
1,200,000.00
132,000.00
296,000.00
26,000.00
10,139,800.00
999.00
2,580.00
28,246.40
600.00
2,047.50
225.23
4,810.00
1,056.25
40,564.38
999.00
2,580.00
43,810.00
600.00
2,047.50
225.23
4,810.00
1,056.25
56,127.98
999.00
2,580.00
51,480.00
600.00
3,150.00
346.50
7,400.00
1,625.00
68,180.50
999.00
19,200.00
44,200.00
1,800.00
900.00
660.00
5,180.00
325.00
73,264.00
25,300.00
15,624.75
6,249.90
50.00
7,500.00
54,724.65
100,000.00
225.00
15,680.00
45,500.00
215,000.00
6,300.00
9,600.00
20,000.00
412,305.00
49,500.00
3,500.00
280.00
3,750.00
444.44
7,500.00
64,974.44
35,200.00
37,375.00
280.00
3,150.00
1,000.00
7,500.00
84,505.00
55,000.00
3,500.00
280.00
3,750.00
444.44
7,500.00
70,474.44
12,500.00
3,500.00
280.00
7,500.00
23,780.00
60,900.00
4,900.00
9,000.00
12,500.00
2,200.00
12,950.00
1,300.00
103,750.00
36,750.00
4,900.00
9,000.00
12,500.00
2,200.00
12,950.00
1,300.00
79,600.00
45,000.00
14,800.00
2,600.00
62,400.00
URAIAN PEKERJAAN
2
1 1 M1 Pasangan Bowplank
0.005 M3 Kayu Meranti Papan
0.003 M3 Kayu Meranti Usuk 4/6
0.1 Kg Paku 2"-5"
1 Ls Upah
2 1 M3 Pekerjaan Galian Tanah Biasa Sedalam 1 M1
0.4 OH Pekerja
0.04 OH Mandor
3 1 M3 Pekerjaan Galian Tanah Biasa Sedalam 2 M1
0.526 OH Pekerja
0.053 OH Mandor
4 1 M3 Pekerjaan Galian Tanah Biasa Sedalam 3 M1
0.735 OH Pekerja
0.074 OH Mandor
5 1 M3 Pekerjaan Galian Foot Plat
1 OH Pekerja
0.1 OH Mandor
SATUAN
( Rp. )
2
UPAH
( Rp. )
BAHAN
( Rp. )
3
HARGA
( Rp. )
4
22,000.00
9,000.00
1,550.00
22,000.00
9,000.00
1,550.00
3,000.00
35,550.00
4,400,000.00
3,000,000.00
15,500.00
3000
Jumlah
3,000.00
3,000.00
37,000.00
65000
Jumlah
14,800.00
2,600.00
17,400.00
14,800.00
2,600.00
17,400.00
37,000.00
65000
Jumlah
19,462.00
3,419.00
22,881.00
19,462.00
3,419.00
22,881.00
37,000.00
65000
Jumlah
27,195.00
4,777.50
31,972.50
27,195.00
4,777.50
31,972.50
37,000.00
65000
Jumlah
37,000.00
6,500.00
43,500.00
37,000.00
6,500.00
43,500.00
37,000.00
65000
25,000.00
Jumlah
11,100.00
650.00
2,000.00
13,750.00
11,100.00
650.00
2,000.00
13,750.00
165000
37,000.00
65,000.00
25,000.00
Jumlah
198,000.00
11,100.00
650.00
2,000.00
211,750.00
198,000.00
75,000.00
37,000.00
65000
90,000.00
11,100.00
650.00
90,000.00
90,000.00
11,100.00
650.00
101,750.00
121,000.00
143,080.00
48,960.00
121,000.00
143,080.00
48,960.00
30,000.00
3,300.00
55,500.00
4,875.00
406,715.00
110,000.00
49000
90,000.00
50,000.00
55,000.00
37000
65,000.00
30,000.00
3,300.00
55,500.00
4,875.00
93,675.00
32,550.00
198,000.00
313,040.00
148,368.00
11,270.00
3,870.00
5,000.00
550.00
11,840.00
975.00
18,365.00
198,000.00
11,100.00
650.00
2,000.00
211,750.00
163,508.00
148,368.00
11,270.00
3,870.00
5,000.00
550.00
11,840.00
975.00
181,873.00
148,368.00
14,082.60
148,368.00
14,082.60
NO
URAIAN PEKERJAAN
1
0.04
0.1
0.01
0.32
0.015
M3
OH
OH
OH
OH
2
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor
SATUAN
( Rp. )
2
90,000.00
50000
55,000.00
37,000.00
65,000.00
Jumlah
12 1 M2 Pekerjaan Plesteran 1 : 5
0.086 Zak Portland Cement 50 Kg (Indo Cement klas
49,000.00
0.022 M3 Pasir Pasang
90,000.00
0.15 OH Tukang Batu
50000
0.015 OH Kepala Tukang Batu
55,000.00
0.2 OH Pekerja
37,000.00
0.01 OH Mandor
65,000.00
Jumlah
13 1 M2 Pekerjaan Plesteran 1 : 3
0.162 Zak Portland Cement 50 Kg (Indo Cement klas
49,000.00
0.019 M3 Pasir Pasang
90,000.00
0.15 OH Tukang Batu
50000
0.015 OH Kepala Tukang Batu
55,000.00
0.2 OH Pekerja
37,000.00
0.01 OH Mandor
65,000.00
Jumlah
14 1 M2 Pekerjaan Plesteran 1 : 2 tebal 2cm
0.17 Zak Portland Cement 50 Kg (Indo Cement klas
49,000.00
0.017 M3 Pasir Pasang
90,000.00
0.15 OH Tukang Batu
50000
0.015 OH Kepala Tukang Batu
55,000.00
0.2 OH Pekerja
37,000.00
0.01 OH Mandor
65,000.00
Jumlah
15 1 M2 Pekerjaan Plesteran 1 : 2 tebal 3cm
0.186 Zak Portland Cement 50 Kg (Indo Cement klas
49,000.00
0.016 M3 Pasir Pasang
90,000.00
0.15 OH Tukang Batu
50000
0.015 OH Kepala Tukang Batu
55,000.00
0.2 OH Pekerja
37,000.00
0.01 OH Mandor
65,000.00
Jumlah
16 1 M3 Pekerjaan Beton K-300
0.97 M3 Kerikil Beton
106,000.00
8.5 Zak Portland Cement 50 Kg (Indo Cement klas
49,000.00
0.385 M3 Pasir Beton
80300
0.95 OH Tukang Batu
50,000.00
0.095 OH Kepala Tukang Batu
55,000.00
5.7 OH Pekerja
37,000.00
0.285 OH Mandor
65000
Jumlah
17 1 M3 Pekerjaan Beton Ready Mix K-300
1 m3. Beton Cor Ready Mix K-300
625000
1 m3. Ongkos Cor
55,000.00
1 m3, Alat-alat, dll.
30,000.00
Jumlah
18 1 Kg Pekerjaan Besi beton
1.05 Kg Besi Beton
15,300.00
0.025 Kg Kawat Ikat Beton (Bendrat)
13,840.00
0.019 OH Tukang Besi
50,000.00
0.006 OH Kepala Tukang Besi
50000
0.019 OH Pekerja
37,000.00
0.001 OH Mandor
65,000.00
Jumlah
19 1 M2 Pekerjaan Begisting Beton Pondasi & Sloop
0.35 Lbr Multiplek 9 mm
135,000.00
0.028 M3 Kayu Meranti Usuk 4/6
3,000,000.00
0.2 Kg Paku 2"-5"
15,500.00
0.375 OH Tukang Kayu
50000
UPAH
( Rp. )
BAHAN
( Rp. )
3
5,000.00
550.00
11,840.00
975.00
18,365.00
4
3,600.00
166,050.60
4,233.60
1,980.00
7,500.00
825.00
7,400.00
650.00
16,375.00
6,213.60
7,938.00
1,710.00
7,500.00
825.00
7,400.00
650.00
16,375.00
9,648.00
8,349.60
1,530.00
7,500.00
825.00
7,400.00
650.00
16,375.00
9,879.60
9,114.00
1,440.00
7,500.00
825.00
7,400.00
650.00
16,375.00
10,554.00
102,820.00
416,500.00
30,947.62
47,500.00
5,225.00
210,900.00
18,525.00
282,150.00
550,267.62
4,233.60
1,980.00
7,500.00
825.00
7,400.00
650.00
22,588.60
7,938.00
1,710.00
7,500.00
825.00
7,400.00
650.00
26,023.00
8,349.60
1,530.00
7,500.00
825.00
7,400.00
650.00
26,254.60
9,114.00
1,440.00
7,500.00
825.00
7,400.00
650.00
26,929.00
102,820.00
416,500.00
30,947.62
47,500.00
5,225.00
210,900.00
18,525.00
832,417.62
687,500.00
55,000.00
30,000.00
772,500.00
16,065.00
346.00
16,065.00
346.00
945.00
315.00
699.30
40.95
18,411.25
16,411.00
47,250.00
84,000.00
3,100.00
18,750.00
5
3,600.00
5,000.00
550.00
11,840.00
975.00
184,415.60
625,000.00
55,000.00
30,000.00
85,000.00
945.00
315.00
699.30
40.95
2,000.25
HARGA
( Rp. )
47,250.00
84,000.00
3,100.00
18,750.00
NO
1
URAIAN PEKERJAAN
2
0.038 OH Kepala Tukang Kayu
0.35 OH Pekerja
0.006 OH Mandor
SATUAN
( Rp. )
2
55,000.00
37,000.00
65,000.00
Jumlah
135,000.00
3,000,000.00
15500
50,000.00
55,000.00
37,000.00
65000
Jumlah
135,000.00
3000000
15,500.00
50,000.00
55,000.00
37000
65,000.00
Jumlah
24
25
26
27
135000
3,000,000.00
15,500.00
50,000.00
55000
37,000.00
65,000.00
Jumlah
1 M3 Pekerjaan Beton Bertulang Pondasi Telapak tipe 1
1 M3 Pekerjaan Beton K-300
832,417.62
3.168 M2 Pekerjaan Begisting Beton Pondasi
168,518.75
100 Kg Pekerjaan Besi beton
18,411.25
Jumlah
1 M3 Pekerjaan Beton Bertulang Pondasi Telapak tipe 2
1 M3 Pekerjaan Beton K-300
832,417.62
3.96 M2 Pekerjaan Begisting Beton Pondasi
168,518.75
240 Kg Pekerjaan Besi beton
18411.25
Jumlah
1 M3 Pekerjaan Beton Bertulang Pondasi Telapak tipe 3
1 M3 Pekerjaan Beton K-300
832,417.62
6.316 M2 Pekerjaan Begisting Beton Pondasi
168518.75
145 Kg Pekerjaan Besi beton
18,411.25
Jumlah
1 M3 Pekerjaan Beton Bertulang Sloof 30/60
1 M3 Pekerjaan Beton K-300
832417.62
9.333 M2 Pekerjaan Begisting Beton Sloop
168,518.75
200 Kg Pekerjaan Besi beton
18,411.25
Jumlah
1 M3 Pekerjaan Beton Bertulang Sloof 35/70
1 M3 Pekerjaan Beton K-300
832,417.62
7.837 M2 Pekerjaan Begisting Betton Sloop
168,518.75
180 Kg Pekerjaan Besi beton
18,411.25
UPAH
( Rp. )
3
2,062.50
12,950.00
406.25
34,168.75
BAHAN
( Rp. )
HARGA
( Rp. )
4
134,350.00
47,250.00
43,200.00
3,100.00
18,750.00
2,062.50
12,950.00
406.25
34,168.75
93,550.00
47,250.00
90,000.00
4,960.00
19,500.00
2,145.00
13,468.00
422.50
35,535.50
142,210.00
47,250.00
96,000.00
6,200.00
20,250.00
2,227.50
13,986.00
438.75
36,902.25
149,450.00
832,417.62
177,745.50
18411.25
Jumlah
47,250.00
43,200.00
3,100.00
18,750.00
2,062.50
12,950.00
406.25
127,718.75
47,250.00
90,000.00
4,960.00
19,500.00
2,145.00
13,468.00
422.50
177,745.50
47,250.00
96,000.00
6,200.00
20,250.00
2,227.50
13,986.00
438.75
186,352.25
832,417.62
533,867.40
1,841,125.00
832,417.62
533,867.40
1,841,125.00
3,207,410.02
832,417.62
667,334.25
4,418,700.00
832,417.62
667,334.25
4,418,700.00
5,918,451.87
832,417.62
1,064,323.98
2,669,631.25
832,417.62
1,064,323.98
2,669,631.25
4,566,372.85
832,417.62
1,572,841.67
3,682,250.00
832,417.62
1,572,841.67
3,682,250.00
6,087,509.29
832,417.62
1,320,636.73
3,314,025.00
832,417.62
1,320,636.73
3,314,025.00
Jumlah
28 1 M3 Pekerjaan Beton Bertulang Kolom 50/50
1 M3 Pekerjaan Beton K-300
8 M2 Pekerjaan Begisting Kolom
150 Kg Pekerjaan Besi beton
5
2,062.50
12,950.00
406.25
168,518.75
5,467,079.35
832,417.62
1,421,964.00
2,761,687.50
832,417.62
1,421,964.00
2,761,687.50
5,016,069.12
NO
URAIAN PEKERJAAN
2
Pembesian 350 Kg
29 1 M3 Pekerjaan Beton Bertulang Kolom 40/40
1 M3 Pekerjaan Beton K-300
7.429 M2 Pekerjaan Begisting Kolom
250 Kg Pekerjaan Besi beton
Kolom 60/70 K-300 :
Pembesian 180 Kg
Pembesian 200 Kg
30 1 M3 Pekerjaan Beton Bertulang Kolom L 15/30
1 M3 Pekerjaan Beton K-300
21.33 M2 Pekerjaan Begisting Praktis
350 Kg Pekerjaan Besi beton
SATUAN
( Rp. )
2
UPAH
( Rp. )
BAHAN
( Rp. )
3
HARGA
( Rp. )
4
832,417.62
177745.5
18,411.25
Jumlah
832,417.62
1,320,395.14
4,602,812.50
832,417.62
1,320,395.14
4,602,812.50
6,755,625.26
832,417.62
127718.75
18,411.25
Jumlah
832,417.62
2,724,666.67
6,443,937.50
832,417.62
2,724,666.67
6,443,937.50
10,001,021.79
832417.62
177,745.50
18,411.25
Jumlah
832,417.62
2,843,928.00
2,761,687.50
832,417.62
2,843,928.00
2,761,687.50
6,438,033.12
832,417.62
177,745.50
18,411.25
Jumlah
832,417.62
1,777,455.00
3,682,250.00
832,417.62
1,777,455.00
3,682,250.00
6,292,122.62
860,000.00
186,352.25
18411.25
Jumlah
860,000.00
2,049,874.75
4,602,812.50
860,000.00
2,049,874.75
4,602,812.50
7,512,687.25
860,000.00
186,352.25
18,411.25
Jumlah
860,000.00
1,863,522.50
2,761,687.50
860,000.00
1,863,522.50
2,761,687.50
5,485,210.00
860,000.00
186,352.25
18411.25
Jumlah
860,000.00
1,462,148.42
2,761,687.50
860,000.00
1,462,148.42
2,761,687.50
860,000.00
186352.25
18,411.25
Jumlah
860,000.00
1,337,913.59
2,761,687.50
860,000.00
1,337,913.59
2,761,687.50
4,959,601.09
860000
186,352.25
18,411.25
Jumlah
860,000.00
1,304,465.75
3,314,025.00
860,000.00
1,304,465.75
3,314,025.00
5,478,490.75
NO
1
URAIAN PEKERJAAN
2
Pembesian 250 Kg
Pembesian 300 Kg
43
44
45
46
47
48
SATUAN
( Rp. )
2
UPAH
( Rp. )
BAHAN
( Rp. )
3
HARGA
( Rp. )
4
860,000.00
186,352.25
18,411.25
Jumlah
860,000.00
3,074,812.13
3,314,025.00
860,000.00
3,074,812.13
3,314,025.00
7,248,837.13
860,000.00
186,352.25
18411.25
Jumlah
860,000.00
2,152,368.49
3,682,250.00
860,000.00
2,152,368.49
3,682,250.00
6,694,618.49
860,000.00
186352.25
18,411.25
Jumlah
860,000.00
1,896,134.14
5,523,375.00
860,000.00
1,896,134.14
5,523,375.00
8,279,509.14
860,000.00
1,552,935.42
2,761,687.50
860,000.00
1,552,935.42
2,761,687.50
5,174,622.92
860,000.00
1,490,818.00
2,761,687.50
860,000.00
1,490,818.00
2,761,687.50
5,112,505.50
860,000.00
1,118,113.50
2,761,687.50
860,000.00
1,118,113.50
2,761,687.50
4,739,801.00
860,000.00
894,490.80
1,472,900.00
860,000.00
894,490.80
1,472,900.00
3,227,390.80
860,000.00
894,490.80
2,761,687.50
860,000.00
894,490.80
2,761,687.50
4,516,178.30
860,000.00
559,056.75
2,025,237.50
860,000.00
559,056.75
2,025,237.50
3,444,294.25
47,250.00
90,000.00
6,200.00
47,250.00
90,000.00
6,200.00
18,750.00
2,062.50
12,950.00
406.25
177,618.75
860000
186,352.25
18,411.25
Jumlah
1 M3 Pekerjaan Beton Bertulang Plat Lantai = 15 cm (man hole)
1 M3 Beton Cor Ready Mix K-300
860,000.00
8 M2 Pekerjaan Begisting Plat Lantai
186,352.25
150 Kg Pekerjaan Besi beton
18,411.25
Jumlah
1 M3 Pekerjaan Beton Bertulang Plat Atas = 20 cm (groundtank plat atas)
1 M3 Beton Cor Ready Mix K-300
860,000.00
6 M2 Pekerjaan Begisting Plat Lantai
186,352.25
150 Kg Pekerjaan Besi beton
18411.25
Jumlah
1 M3 Pekerjaan Beton Bertulang Plat Lantai = 25 cm (dasar pit lift)
1 M3 Beton Cor Ready Mix K-300
860,000.00
4.8 M2 Pekerjaan Begisting Plat Lantai
186352.25
80 Kg Pekerjaan Besi beton
18,411.25
Jumlah
1 M3 Pekerjaan Beton Bertulang Plat Atas = 25 cm (sawage treatment plant)
1 M3 Beton Cor Ready Mix K-300
860000
4.8 M2 Pekerjaan Begisting Plat Lantai
186,352.25
150 Kg Pekerjaan Besi beton
18,411.25
Jumlah
1 M3 Pekerjaan Beton Bertulang Plat Lantai = 40 cm (grountank plat dasar)
1 M3 Beton Cor Ready Mix K-300
860,000.00
3 M2 Pekerjaan Begisting Plat Lantai
186,352.25
110 Kg Pekerjaan Besi beton
18,411.25
Jumlah
1 M2 Pekerjaan Begisting Dinding
0.35 Lbr Multiplek 9 mm
135,000.00
0.03 M3 Kayu Meranti Usuk 4/6
3,000,000.00
0.4 Kg Paku 2"-5"
15500
0.375 OH Tukang Kayu
50,000.00
18,750.00
0.038 OH Kepala Tukang Kayu
55,000.00
2,062.50
0.35 OH Pekerja
37,000.00
12,950.00
0.006 OH Mandor
65000
406.25
Jumlah
34,168.75
1 M3 Pekerjaan Beton Bertulang Plat Dinding = 20 cm (dinding Pit lift)
1 M3 Beton Cor Ready Mix K-300
860,000.00
10 M2 Pekerjaan Begisting Plat Dinding
177618.75
80 Kg Pekerjaan Besi beton
18,411.25
Jumlah
143,450.00
860,000.00
1,776,187.50
1,472,900.00
860,000.00
1,776,187.50
1,472,900.00
4,109,087.50
NO
1
49
50
51
52
53
54
55
56
57
58
URAIAN PEKERJAAN
SATUAN
UPAH
( Rp. )
( Rp. )
2
2
3
1 M3 Pekerjaan Beton Bertulang Plat Dinding = 20 cm (dinding groundtank)
1 M3 Beton Cor Ready Mix K-300
860000
9.6 M2 Pekerjaan Begisting Plat Dinding
177,618.75
110 Kg Pekerjaan Besi beton
18,411.25
Jumlah
1 M3 Pekerjaan Beton Bertulang Plat Dinding = 25 cm (dinding groundtank)
1 M3 Beton Cor Ready Mix K-300
860,000.00
8 M2 Pekerjaan Begisting Plat Dinding
177,618.75
110 Kg Pekerjaan Besi beton
18,411.25
Jumlah
1 M3 Pekerjaan Beton Bertulang Plat Dinding = 30 cm (dinding groundtank)
1 M3 Beton Cor Ready Mix K-300
860,000.00
6.667 M2 Pekerjaan Begisting Plat Dinding
177,618.75
110 Kg Pekerjaan Besi beton
18411.25
Jumlah
1 M2 Pekerjaan Begisting Tangga
0.35 Lbr Multiplek 9 mm
135,000.00
0.025 M3 Kayu Meranti Usuk 4/6
3000000
0.4 Kg Paku 2"-5"
15,500.00
0.405 OH Tukang Kayu
50,000.00
20,250.00
0.041 OH Kepala Tukang Kayu
55,000.00
2,227.50
0.378 OH Pekerja
37000
13,986.00
0.007 OH Mandor
65,000.00
438.75
Jumlah
36,902.25
1 M3 Pekerjaan Beton Bertulang Plat Tangga
1 M3 Beton Cor Ready Mix K-300
860000
8 M2 Pekerjaan Begisting Plat Dinding
165,352.25
180 Kg Pekerjaan Besi beton
18,411.25
Jumlah
1 M3 Pekerjaan Beton Rabat t=10 cm. dg. Tul. M6.
1 M3 Beton Cor Ready Mix K-300
860,000.00
0.106 Roll Wiremesh M6
5,550,000.00
1 Ls. Upah pekerjaan Wire Mesh
200,000.00
200,000.00
Jumlah
200,000.00
1 Kg Pekerjaan Kuda-Kuda Baja
1.1 Kg Baja Profile
15,000.00
0.02 Kg Cat Metal ICI Dulux
180,000.00
0.007 OH Pekerja
37000
249.75
0.068 OH Tukang Besi
50,000.00
3,375.00
0.007 OH Kepala Tukang Besi
50,000.00
337.50
0.001 OH Mandor
65,000.00
43.88
Jumlah
4,006.13
1 M2 Pek. Usuk
0.014 M3 Kayu Kamper Samarida Usuk 5/7
6,000,000.00
0.15 Kg Paku 2"-5"
15,500.00
0.26 OH Tukang Kayu
50000
13,000.00
0.12 OH Kepala Tukang Kayu
55,000.00
6,600.00
0.28 OH Pekerja
37,000.00
10,360.00
0.045 OH Mandor
65,000.00
2,925.00
Jumlah
32,885.00
1 M2 Pek. Reng
0.006 M3 Kayu Kamper Samarinda Reng 3/4
5,500,000.00
0.15 Kg Paku 2"-5"
15,500.00
0.2 OH Tukang Kayu
50000
10,000.00
0.035 OH Kepala Tukang Kayu
55,000.00
1,925.00
0.15 OH Pekerja
37,000.00
5,550.00
0.035 OH Mandor
65,000.00
2,275.00
Jumlah
19,750.00
1 M2 Pekerjaan Pasang Atap Genteng
14 Bh Genteng Kodok produksi Goodyear
3,000.00
0.175 OH Tukang Batu
50,000.00
8,750.00
0.018 OH Kepala Tukang Batu
55000
962.50
0.35 OH Pekerja
37,000.00
12,950.00
0.018 OH Mandor
65,000.00
1,137.50
Jumlah
23,800.00
BAHAN
( Rp. )
HARGA
( Rp. )
4
860,000.00
1,705,140.00
2,025,237.50
860,000.00
1,705,140.00
2,025,237.50
4,590,377.50
860,000.00
1,420,950.00
2,025,237.50
860,000.00
1,420,950.00
2,025,237.50
4,306,187.50
860,000.00
1,184,125.00
2,025,237.50
4,069,362.50
47,250.00
75,000.00
6,200.00
128,450.00
860,000.00
1,322,818.00
3,314,025.00
47,250.00
75,000.00
6,200.00
20,250.00
2,227.50
13,986.00
438.75
165,352.25
860,000.00
1,322,818.00
3,314,025.00
5,496,843.00
860,000.00
587,301.59
200,000.00
1,647,301.59
16,500.00
3,600.00
20,100.00
84,000.00
2,325.00
86,325.00
33,000.00
2,325.00
35,325.00
42,000.00
42,000.00
16,500.00
3,600.00
249.75
3,375.00
337.50
43.88
24,106.13
84,000.00
2,325.00
13,000.00
6,600.00
10,360.00
2,925.00
119,210.00
33,000.00
2,325.00
10,000.00
1,925.00
5,550.00
2,275.00
55,075.00
42,000.00
8,750.00
962.50
12,950.00
1,137.50
65,800.00
NO
URAIAN PEKERJAAN
SATUAN
( Rp. )
2
UPAH
( Rp. )
1
2
3
59 1 M1 Pekerjaan Pasang Bubungan Genteng
3.5 Bh Bubungan Genteng Keramik Berglasur
16,500.00
0.036 Zak Portland Cement 50 Kg (Indo Cement klas
49,000.00
0.032 M3 Pasir Pasang
90,000.00
0.3 OH Tukang Batu
50000
15,000.00
0.03 OH Kepala Tukang Batu
55,000.00
1,650.00
0.6 OH Pekerja
37,000.00
22,200.00
0.03 OH Mandor
65,000.00
1,950.00
Jumlah
40,800.00
60 1 M1 Pekerjaan Papan List Plank
0.035 M3 Kayu Kamper Samarinda Balok
7,500,000.00
0.1 Kg Paku 2"-5"
15,500.00
0.8 OH Tukang Kayu
50000
40,000.00
0.08 OH Kepala Tukang Kayu
55,000.00
4,400.00
0.28 OH Pekerja
37,000.00
10,360.00
0.018 OH Mandor
65,000.00
1,170.00
Jumlah
55,930.00
61 1 M3 Pekerjaan Listplank Kayu Kamper
1.1 M3 Kayu Kamper Samarinda Balok
7,500,000.00
15 Kg Paku 2"-5"
15,500.00
0.15 Kg Paku Lis
22000
24 OH Tukang Kayu
50,000.00 1,200,000.00
2.4 OH Kepala Tukang Kayu
55,000.00
132,000.00
8 OH Pekerja
37,000.00
296,000.00
0.4 OH Mandor
65000
26,000.00
Jumlah
1,654,000.00
62 1 M2 Pekerjaan Pasang Kaca Mati 8 mm
1 M2 Kaca 8mm
174,000.00
0.12 OH Tukang Kayu
50000
6,000.00
0.012 OH Kepala Tukang Kayu
55,000.00
660.00
0.019 OH Pekerja
37,000.00
695.60
0.032 OH Mandor
65,000.00
2,080.00
Jumlah
9,435.60
63 1 M2 Pekerjaan Pasang Kaca Mati 6 mm
1 M2 Kaca 6mm
100,000.00
0.12 OH Tukang Kayu
50,000.00
6,000.00
0.012 OH Kepala Tukang Kayu
55000
660.00
0.019 OH Pekerja
37,000.00
695.60
0.032 OH Mandor
65,000.00
2,080.00
Jumlah
9,435.60
64 1 M2 Pekerjaan Pasang Kaca Mati 5 mm
1 M2 Kaca 5mm
172,500.00
0.12 OH Tukang Kayu
50,000.00
6,000.00
0.012 OH Kepala Tukang Kayu
55,000.00
660.00
0.019 OH Pekerja
37000
695.60
0.032 OH Mandor
65,000.00
2,080.00
Jumlah
9,435.60
65 1 M2 Pek. Pasang Keramik Lantai 60x60 Niro Granit
1.05 Duz Keramik 60 x 60 Niro Granit
252000
0.25 Zak Portland Cement 50 Kg (Indo Cement klas
49,000.00
0.023 M3 Pasir Pasang
90,000.00
0.25 Kg Semen Naat AM 50 + am 55
12,500.00
0.495 OH Tukang Batu
50000
24,750.00
0.05 OH Kepala Tukang Batu
55,000.00
2,722.50
0.462 OH Pekerja
37,000.00
17,094.00
0.22 OH Mandor
65,000.00
14,300.00
Jumlah
58,866.50
66 1 M2 Pek. Pasang Keramik Lantai 40/40 essenza
1.05 Duz Keramik 40 x 40 Niro Granit
257,654.50
0.25 Zak Portland Cement 50 Kg (Indo Cement klas
49,000.00
0.023 M3 Pasir Pasang
90000
0.333 Kg Semen Naat AM 50 + am 55
12,500.00
0.495 OH Tukang Batu
50,000.00
0.05 OH Kepala Tukang Batu
55,000.00
BAHAN
( Rp. )
HARGA
( Rp. )
4
57,750.00
1,764.00
2,880.00
57,750.00
1,764.00
2,880.00
15,000.00
1,650.00
22,200.00
1,950.00
103,194.00
62,394.00
262,500.00
1,550.00
264,050.00
8,250,000.00
232,500.00
3,300.00
8,485,800.00
174,000.00
174,000.00
100,000.00
100,000.00
172,500.00
172,500.00
264,600.00
12,250.00
2,070.00
3,125.00
282,045.00
270,537.23
12,250.00
2,070.00
4,166.67
24,750.00
2,722.50
262,500.00
1,550.00
40,000.00
4,400.00
10,360.00
1,170.00
319,980.00
8,250,000.00
232,500.00
3,300.00
1,200,000.00
132,000.00
296,000.00
26,000.00
10,139,800.00
174,000.00
6,000.00
660.00
695.60
2,080.00
183,435.60
100,000.00
6,000.00
660.00
695.60
2,080.00
109,435.60
172,500.00
6,000.00
660.00
695.60
2,080.00
181,935.60
264,600.00
12,250.00
2,070.00
3,125.00
24,750.00
2,722.50
17,094.00
14,300.00
340,911.50
270,537.23
12,250.00
2,070.00
4,166.67
24,750.00
2,722.50
NO
URAIAN PEKERJAAN
2
0.462 OH Pekerja
0.22 OH Mandor
SATUAN
( Rp. )
2
37000
65,000.00
Jumlah
UPAH
( Rp. )
3
17,094.00
14,300.00
58,866.50
BAHAN
( Rp. )
HARGA
( Rp. )
4
289,023.89
208,135.73
12,250.00
2,070.00
6,250.00
24,750.00
2,722.50
17,094.00
14,300.00
58,866.50
228,705.73
92,925.00
12,250.00
2,070.00
6,250.00
2,475.00
17,760.00
1,950.00
22,185.00
113,495.00
60,375.00
1,519.00
1,800.00
416.67
2,500.00
275.00
5,550.00
390.00
8,715.00
64,110.67
43,575.00
1,519.00
1,800.00
833.33
3,000.00
275.00
6,660.00
390.00
10,325.00
47,727.33
26,250.00
1,519.00
1,800.00
18,750.00
2,500.00
275.00
5,550.00
390.00
8,715.00
48,319.00
13,912.50
1,519.00
1,800.00
18,750.00
2,500.00
275.00
5,550.00
390.00
8,715.00
35,981.50
5
17,094.00
14,300.00
347,890.39
208,135.73
12,250.00
2,070.00
6,250.00
24,750.00
2,722.50
17,094.00
14,300.00
287,572.23
92,925.00
12,250.00
2,070.00
6,250.00
2,475.00
17,760.00
1,950.00
135,680.00
60,375.00
1,519.00
1,800.00
416.67
2,500.00
275.00
5,550.00
390.00
72,825.67
43,575.00
1,519.00
1,800.00
833.33
3,000.00
275.00
6,660.00
390.00
58,052.33
26,250.00
1,519.00
1,800.00
18,750.00
2,500.00
275.00
5,550.00
390.00
57,034.00
13,912.50
1,519.00
1,800.00
18,750.00
2,500.00
275.00
5,550.00
390.00
44,696.50
NO
1
74
75
76
77
78
79
80
URAIAN PEKERJAAN
SATUAN
UPAH
( Rp. )
( Rp. )
2
2
3
0.333 Lbr Amplas
3000
0.12 Kg Cat Dasar
21,500.00
0.208 Kg Cat Dinding ICI Vinilex
165,000.00
0.1 Kg Plamur Tembok
6,000.00
0.041 OH Tukang Cat
50000
2,047.50
0.004 OH Kepala Tukang Cat
55,000.00
225.23
0.13 OH Pekerja
37,000.00
4,810.00
0.016 OH Mandor
65,000.00
1,056.25
Jumlah
8,138.98
1 M2 Pekerjaan Cat Tembok 1x Plamur, 1x Dasar, 2x Cat Halus
Dinding Luar
0.333 Lbr Amplas
3,000.00
0.12 Kg Cat Dasar
21500
0.26 Kg Cat Dinding ICI Dulux Weathersield
168,500.00
0.1 Kg Plamur Tembok
6,000.00
0.041 OH Tukang Cat
50,000.00
2,047.50
0.004 OH Kepala Tukang Cat
55000
225.23
0.13 OH Pekerja
37,000.00
4,810.00
0.016 OH Mandor
65,000.00
1,056.25
Jumlah
8,138.98
1 M2 Pekerjaan Cat Tembok 1x Plamur, 1x Dasar, 2x Cat Halus (Cat Jotun)
0.333 Lbr Amplas
3,000.00
0.12 Kg Cat Dasar
21,500.00
0.26 Kg Cat Jotun
198,000.00
0.1 Kg Plamur Tembok
6000
0.063 OH Tukang Cat
50,000.00
3,150.00
0.006 OH Kepala Tukang Cat
55,000.00
346.50
0.2 OH Pekerja
37,000.00
7,400.00
0.025 OH Mandor
65000
1,625.00
Jumlah
12,521.50
1 M2 Pekerjaan Cat Kayu 1x Cat Dasar, 2x Cat Halus
0.333 Lbr Amplas
3,000.00
0.12 Kg Cat Danapaints
160000
0.26 Kg Cat Kayu ICI Dulux
170,000.00
0.1 Kg Dempul Kayu
18,000.00
0.018 OH Tukang Cat
50,000.00
900.00
0.012 OH Kepala Tukang Cat
55000
660.00
0.14 OH Pekerja
37,000.00
5,180.00
0.005 OH Mandor
65,000.00
325.00
Jumlah
7,065.00
1 M Pekerjaan Tempelan Paras Palimanan
1.1 M2 Batu Palimanan 40 x 60 cm
235,000.00
0.1 Zak Portland Cement 50 Kg (Indo Cement klas
49,000.00
0.65 OH Tukang Stile bali
70,000.00
45,500.00
0.165 OH Kepala Tk. Stile Bali
80000
13,200.00
0.563 OH Pekerja Stile Bali
50,000.00
28,125.00
0.165 OH Mandor
65,000.00
10,725.00
Jumlah
97,550.00
1 M Pekerjaan Pasang Batu Alam
1.1 M2 Batu Alam Abu-Abu/Hitam 20 x 40 cm
255,000.00
0.023 M3 Pasir Pasang
90,000.00
0.25 M3 Pasir Urug
75,000.00
0.65 OH Tukang Stile bali
70000
45,500.00
0.165 OH Kepala Tk. Stile Bali
80,000.00
13,200.00
0.563 OH Pekerja Stile Bali
50,000.00
28,125.00
0.165 OH Mandor
65,000.00
10,725.00
Jumlah
97,550.00
1 M2 Pekerjaan Waterproffing
1 Kg Waterproof Viscocrete-10 ex SIKA
45,000.00
0.4 OH Pekerja
37,000.00
14,800.00
0.04 OH Mandor
65000
2,600.00
Jumlah
17,400.00
1 M Pekerjaan Acian 1 : 3
0.21 Zak Portland Cement 50 Kg (Indo Cement klas
49,000.00
0 M3 Pasir Pasang
90000
BAHAN
( Rp. )
4
999.00
2,580.00
34,320.00
600.00
38,499.00
999.00
2,580.00
43,810.00
600.00
47,989.00
999.00
2,580.00
51,480.00
600.00
55,659.00
999.00
19,200.00
44,200.00
1,800.00
66,199.00
258,500.00
4,900.00
263,400.00
280,500.00
2,070.00
18,750.00
301,320.00
45,000.00
45,000.00
10,270.40
HARGA
( Rp. )
5
999.00
2,580.00
34,320.00
600.00
2,047.50
225.23
4,810.00
1,056.25
46,637.98
999.00
2,580.00
43,810.00
600.00
2,047.50
225.23
4,810.00
1,056.25
56,127.98
999.00
2,580.00
51,480.00
600.00
3,150.00
346.50
7,400.00
1,625.00
68,180.50
999.00
19,200.00
44,200.00
1,800.00
900.00
660.00
5,180.00
325.00
73,264.00
258,500.00
4,900.00
45,500.00
13,200.00
28,125.00
10,725.00
360,950.00
280,500.00
2,070.00
18,750.00
45,500.00
13,200.00
28,125.00
10,725.00
398,870.00
45,000.00
14,800.00
2,600.00
62,400.00
10,270.40
-
NO
URAIAN PEKERJAAN
1
0.04
0.002
0.04
0.08
OH
OH
OH
OH
2
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor
SATUAN
( Rp. )
2
50,000.00
55,000.00
37,000.00
65000
Jumlah
UPAH
( Rp. )
3
2,000.00
110.00
1,480.00
5,200.00
8,790.00
BAHAN
( Rp. )
HARGA
( Rp. )
4
10,270.40
102,820.00
277,585.00
43,683.20
50,000.00
5,500.00
148,000.00
26,000.00
229,500.00
424,088.20
25,300.00
15,624.75
6,249.90
50.00
7,500.00
7,500.00
47,224.65
100,000.00
225.00
15,680.00
45,500.00
215,000.00
6,300.00
9,600.00
20,000.00
20,000.00
392,305.00
49,500.00
3,500.00
280.00
3,750.00
444.44
7,500.00
7,500.00
57,474.44
35,200.00
37,375.00
280.00
3,150.00
1,000.00
7,500.00
7,500.00
77,005.00
60,900.00
4,900.00
9,000.00
12,500.00
2,200.00
12,950.00
1,300.00
28,950.00
74,800.00
45,000.00
14,800.00
2,600.00
17,400.00
5
2,000.00
110.00
1,480.00
5,200.00
19,060.40
102,820.00
277,585.00
43,683.20
50,000.00
5,500.00
148,000.00
26,000.00
653,588.20
25,300.00
15,624.75
6,249.90
50.00
7,500.00
54,724.65
100,000.00
225.00
15,680.00
45,500.00
215,000.00
6,300.00
9,600.00
20,000.00
412,305.00
49,500.00
3,500.00
280.00
3,750.00
444.44
7,500.00
64,974.44
35,200.00
37,375.00
280.00
3,150.00
1,000.00
7,500.00
84,505.00
60,900.00
4,900.00
9,000.00
12,500.00
2,200.00
12,950.00
1,300.00
103,750.00
45,000.00
45,000.00
14,800.00
2,600.00
62,400.00
299,838.00
12,250.00
2,070.00
299,838.00
12,250.00
2,070.00
NO
URAIAN PEKERJAAN
1
0.25
0.675
0.068
0.63
0.3
Kg
OH
OH
OH
OH
2
Semen Naat AM 50 + am 55
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor
SATUAN
( Rp. )
2
12,500.00
50,000.00
55000
37,000.00
65,000.00
Jumlah
Catatan :
1. Harga - harga belum termasuk PPn 10 %;
2. Harga - harga hanya sebagai pedoman / pendukung
dalam perhitungan konstruksi ( tidak mengikat ).
UPAH
( Rp. )
BAHAN
( Rp. )
3
33,750.00
3,712.50
23,310.00
19,500.00
80,272.50
4
3,125.00
317,283.00
249,018.00
12,250.00
2,070.00
3,125.00
33,750.00
3,712.50
23,310.00
19,500.00
80,272.50
266,463.00
188,034.00
12,250.00
2,070.00
3,125.00
33,750.00
3,712.50
23,310.00
19,500.00
80,272.50
205,479.00
66,500.00
11,446.40
4,050.00
5,500.00
605.00
13,024.00
1,072.50
20,201.50
81,996.40
84,000.00
44,259.60
5,500.00
605.00
13,024.00
1,072.50
20,201.50
128,259.60
105,000.00
44,259.60
5,500.00
605.00
13,024.00
1,072.50
20,201.50
149,259.60
HARGA
( Rp. )
5
3,125.00
33,750.00
3,712.50
23,310.00
19,500.00
397,555.50
249,018.00
12,250.00
2,070.00
3,125.00
33,750.00
3,712.50
23,310.00
19,500.00
346,735.50
188,034.00
12,250.00
2,070.00
3,125.00
33,750.00
3,712.50
23,310.00
19,500.00
285,751.50
66,500.00
11,446.40
4,050.00
5,500.00
605.00
13,024.00
1,072.50
102,197.90
84,000.00
44,259.60
5,500.00
605.00
13,024.00
1,072.50
148,461.10
105,000.00
44,259.60
5,500.00
605.00
13,024.00
1,072.50
169,461.10
NO
1
URAIAN PEKERJAAN
2
SATUAN
( Rp. )
2
UPAH
( Rp. )
BAHAN
( Rp. )
3
HARGA
( Rp. )
4
0.012
83.333333333
10,560.00
880,000.00
687,500.00
NO
URAIAN
SATUAN
Bh
Kg
Bh
Bj
M2
M2
Kg
M3
M3
M3
Kg
Kg
Kg
Kg
Kg
Kg
Set
Bh
Bh
Bh
Bh
M2
M2
M2
Bh
Bh
Kg
M2
M2
M2
M2
M2
M2
Kg
M3
M3
M3
M3
M'
Duz
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
HARGA SATUAN
(Rp.)
4
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
40,000.00
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
Keramik 30 x 30 Essenza
Keramik 40 x 40 Essenza
Keramik 60 x 60 Essenza
Keramik Border 15 x 30 Essenza
Keramik Plint 10 x 30 Essenza
Keramik Plint 10 x 40 Essenza
Keramik Plint 10 x 60 Essenza
Kerikil Beton
Kerikil Biasa
Marmer
Multiplek 9 mm
Paku 2"-5"
Paku Lis
Paku Reng
Paku Usuk
Papan Kamper Skirting 1,2 x 10 cm
Pasir Beton
Pasir Pasang
Pasir Super
Pasir Urug
Paving Blok
Ply Wood 12mm
Ply Wood 15mm
Ply Wood 3mm
Ply Wood 4mm
Ply Wood 9mm
Portland Cement 50 Kg (Indo Cement klas I)
Robe Hook Clothing (Gantungan Baju) S 1131-FJORD
Robe Hook tipe S 1130-FJORDECO
Semen Naat AM 50 + am 55
Seng Gelombang
Waterproof Viscocrete-10 ex SIKA
Shower Grabrail tipe TGB 015-FJORDECO
Shower Sliding Rail tipe TX 721 AEN-TOTO Standard
Shower tipe THX 19N / TX 472 SESVI-TOTO Standard
Soap Holder tipe S 6 N-TOTO Standard
Spray Nozzle tipe TB 19 CSNCR-TOTO Standard
Tanah Urug
Toilet Grabrail tipe TGB 004-FJORDECO
Top Set Basin (Kran) tipe TX 109 LD-TOTO Standard
Top Set Shower (Kran) tipe TX 405 SO-TOTO Standard
Towel Rail tipe S 1501-FJORDECO
Urinal tipe UW 447HJT1M-TOTO Standard
Waterproof Viscocrete-10 ex SIKA
Wiremesh M6
Bubungan Genteng Keramik Berglasur
Plamur Tembok
Cat Dasar
Amplas
Dempul Kayu
Duz
Duz
Duz
M'
M'
M'
M'
M3
M3
M2
Lbr
Kg
Kg
Kg
Kg
M3
M3
M3
M3
M3
M3
Lbr
Lbr
Lbr
Lbr
Lbr
Zak
Bh
Bh
Kg
Lbr
Kg
Bh
Bh
Bh
Bh
Bh
M3
Bh
Bh
Bh
Bh
Set
M2
Roll
Bh
Kg
Kg
Lbr
Kg
96,250.00
148,500.00
389,500.00
18,000.00
22,000.00
24,000.00
56,000.00
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
91
92
93
94
95
96
97
98
99
100
101
102
103
104
Besi Hollow
Paku Ramset
Gantungan
Staping
GRC
Kayu Kamper Samarida Usuk 5/7
Kayu Kamper Samarinda Reng 3/4
Batu Kali
Kaca 6mm
Paku Beton
Scrup
Compoun
Textile Tape (plaster)
GlassWoll density 60 kg/m3.
M'
Bh
Bh
Bh
M2
M3
M3
M3
M2
Bj
Bj
Kg
Roll
Kg
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
Set
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Set
Set
Set
Set
Set
Set
Bh
Bh
Bh
Bh
Set
Set
Set
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
312.5