DAFTAR HARGA SATUAN UPAH

DAFTAR HARGA SATUAN BAHAN


STANDART PEKERJAAN UMUM KAB. GIANYAR
PEKERJAAN : RSU ARI SANTHI
LOKASI
: JL MAS UBUD -GIANYAR

NO

DAFTAR TENAGA

1
2
3
4
5
6
7
8
9
10
11
12
13
14

Mandor
Kepala Tukang Besi
Kepala Tukang Batu
Kepala Tukang Kayu
Kepala Tukang Cat
Tukang Politur
Tukang Batu
Tukang Kayu
Tukang Besi
Tukang Cat
Tukang Gali
Pekerja
Tukang Stile bali
Kepala Tk. Stile Bali

HARGA SATUAN
Rp.
3
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

SATUAN

70,000.00
65,000.00
55,000.00
60,000.00
55,000.00
45,000.00
55,000.00
55,000.00
55,000.00
45,000.00
55,000.00
45,000.00
85,000.00
85,000.00

Mas, 18 Desember 2010


PT Ari Konsultan

Ir. I Wayan Arsania


Direktur Utama.

4
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH

DAFTAR HARGA SATUAN BAHAN


STANDART PEKERJAAN UMUM KAB. GIANYAR
No
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

2
3
4
5
5
6
7
8
9
10
11
12
13
1
2
3
4
5
6
7
8
9
10
11

JENIS BAHAN
2
BAHAN PASANGAN

SATUAN
3

HARGA ( Rp )
4

Bata Pasangan
Batu karang

bh
m3

Rp
Rp

950.00
110,000.00

Batako lubang kw I
Bata gosok ex tulikup
Batu karang bukit

bj
bj
m3

Rp
Rp
Rp

1,600.00
2,100.00
77,500.00

Pasir beton
Pasir pasang
Pasir urug
Tanah urug
Kerikil / koral

m3
m3
m3
m3
m3

Rp
Rp
Rp
Rp
Rp

150,000.00
160,000.00
150,000.00
85,000.00
110,000.00

Paras gosok ex Silakarang (kuning)


Paras ex Belayu
Paras ex Sarwagenep
Paras ex Gerana
paras palimanan 40 x 60 cm
batu alam abu-abu 20 x 40
Batu candi
Paras palimanan 20 x 40 cm
Paras palimanan 60 x 40 cm
Glass block
Grass block
semen Gersik 50 kg
semen Gersik 50 kg
Bata Ringan ex Habel
Paving Blok 20/20/8 ex Orien

bj
bj
bj
bj
m2
m2
bj
bj
bj
bj
m2
zak
kg
bj
m2

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

14,000.00
12,000.00
13,000.00
12,000.00
107,500.00
93,750.00
7,500.00
7,500.00
21,500.00
18,000.00
37,500.00
54,500.00
1,090.00
10,000.00
95,000.00

btg
btg
btg
btg
btg
btg
kg
kg

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

36,500.00
57,000.00
82,000.00
100,000.00
152,000.00
214,000.00
10,987.15
17,500.00

Baja profil WF

kg

Rp

14,250.00

Paku reng
Paku seng
Paku usuk

kg
kg
kg

Rp
Rp
Rp

17,000.00
32,000.00
17,000.00

Paku lis SQ

kg

Rp

17,000.00

BAHAN KAYU
Kayu begesting balok
Kayu begesting papan

m3
m3

Rp
Rp

2,000,000.00
2,200,000.00

Kayu bingkirai balok


Kayu bingkirai papan
Kayu kamper balok
Kayu kamper papan
Kayu kruing balok
Kayu kruing papan
Kayu meranti balok
Kayu meranti papan
Kayu Seseh

m3
m3
m3
m3
m3
m3
m3
m3
m'

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

5,200,000.00
5,500,000.00
7,500,000.00
7,800,000.00
4,100,000.00
4,300,000.00
2,000,000.00
2,500,000.00
26,250.00

BAHAN PESI
Besi beton 8"mm
Besi beton 10"mm
Besi beton 12"mm
Besi beton 13"mm
Besi beton 16"mm
Besi beton 19"mm
Besi beton
Kawat ikat beton

No
JENIS BAHAN
1
2
12 Kayu kamper USUK 5/7
13 Kayu kamper USUK 4/6
14 Kayu kruing USUK 5/7
15 Kayu kruing USUK 4/6
16 Kayu Reng Kamper
17 Kayu Reng Kruing

1
2

3
4

5
6

7
8

9
10

11
12

13
14

15
16

17
18
19
1

2
3

4
5

6
7

8
9

10
11

12
13

14
15

16
1
2

3
4

5
6

7
8

9
10

BAHAN LANTAI
Keramik Asia Tile 40x40 KW I (warna muda)
Keramik Asia Tile 30x30 KW.I (warna muda)
Keramik Asia Tile 30x30 KW.I (warna tua)
Keramik Asia Tile 20x20 KW.I (warna muda)
Keramik Asia Tile 20x20 KW.I (warna tua)
Keramik Asia Tile 20x25 KW.I (warna muda)
Keramik Asia Tile 20x25 KW.I (warna tua)
Keramik Asia Tile 10x30 KW I (warna muda)
Keramik Asia Tile 10x40 KW I (warna muda)
Keramik Innessa 30 x 30 (warna muda)
Keramik Innessa 10 x 40 (warna muda)
Keramik Asia Tile 20x20 KW.I (anti slip)
Marmer 60 x 60 cm (Citatah)
Marmer Plin 10 x 60 cm
Marmer 30 x 30 cm
Marmer plin 10 x 30 cm
Granit
Koral sikat
Paping blok orion 20x20x8 K 225
BAHAN FINISHING/CATX
Amplas
Cat dasar
Cat meni
Cat kayu (emco)
Cat tembok (vinilex)
Cat tembok (paragon)
Cat tembok (decolith)
Cat tembok (dulux)
Cat zyncromate
Ceillingteak (0,62 x 2,40)
Dempul impra
Impra wood filler
Minyak cat
Minyak thinner
Politur ultra
Politur vernis
BAHAN FLAPOND
Ceillingteak (0,62 x 2,40)
Plywood +aluminium jeruk
Teakwood 4mm (0,9x2,4)
Teakwood 4mm (1,2x2,4)
Teakblock
Plywood 3mm
Plywood 4mm
Plywood 6 mm
Megateak
Gypsum 12mm ex Jayaboard

SATUAN
3

HARGA ( Rp )
4

m3
M3
m3
m3
ikat
ikat

Rp
Rp
Rp
Rp
Rp
Rp

7,000,000.00
6,800,000.00
4,800,000.00
4,400,000.00
330,000.00
280,000.00

m2
m2
m2
m2
m2
m2
m2
m'
m'
m2
m'
m2
m2
m'
m2
m'
m2
zak
m2

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

42,000.00
27,000.00
30,000.00
37,000.00
37,000.00
38,000.00
40,000.00
6,000.00
6,500.00
164,800.00
16,480.00
41,000.00
245,000.00
29,500.00
147,500.00
15,500.00
1,250,000.00
36,000.00
95,000.00

lbr
kg
kg
kg
kg
kg
kg
kg
kg
lbr
kg
ltr
ltr
ltr
ltr
ltr

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

6,000.00
17,000.00
24,000.00
48,000.00
24,000.00
22,000.00
23,000.00
25,000.00
39,500.00
70,000.00
21,000.00
22,000.00
6,500.00
8,000.00
45,000.00
30,000.00

lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
M2

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

70,000.00
60,000.00
54,000.00
86,500.00
135,000.00
40,000.00
47,000.00
68,000.00
125,000.00
42,000.00

No
JENIS BAHAN
1
2
11 Gypsum 4mm ex Jayaboard
12

13
14

15
16

17
18

19
20
1

2
3

4
5

6
7

8
9

10
11
1

2
3

4
5
1

2
3

4
5

6
7

8
9

10
11

12
13

14
1
2

3
4

5
6

7
8

9
1

Kalsiboard 6 mm
Besi Hollow
Paku Ramset
Gantungan
Staping
GRC
Scrup
Compoun
Gedeg kulit kls. I

BAHAN ATAP
Genteng karang pilang bambe
Genteng karang pilang bambe (dicat)
Genteng bubungan bambe
Genteng press lokal
Genteng bubungan press lokal
Genteng metal KW I (gerard)
Genteng bubungan metal (plat sheet)
Genteng marigional (natural)
Genteng morigional (glazur)
Genteng bubungan marigional bulat (natural)
Genteng bubungan marigional bulat (glazur)
BAHAN KACA
Kaca bening 3 mm
Kaca bening 5 mm
Kaca bening 8 mm
Kaca bening 10 mm
Kaca 12 mm (Tempred)
BAHAN GANTUNGAN/ENGSEL
Kait angin biasa
Kait angin kuningan
Kait angin (silver)
Grendel barel bolt antik
Grendel barel bolt kuningan
Grendel tanam antik
Grendel tanam kuningan
Grendel ELT (jendela/ventilasi)
Engsel nylon (pintu)
Engsel nylon (jendela)
Engsel Vanessa (pintu)
Engsel Vanessa (jendela/ventilasi)
Kunci Cavel 2 slaag
Kunci vanesa 2 slaag
BAHAN SANITARE
Floor Drain (TOTO)
Wastafel (TOTO)
Shower dinding
Kloset duduk monoblok "American standart"
Kloset duduk duduk (TOTO)
Kran Buth Tub
Kloset jongkok "Amercan standart"
Kran biasa 1/2"
Jet Washer (TOTO)
BAHAN LAINYA
Minyak bekisting

SATUAN
3

HARGA ( Rp )
4

M2
M2
M'
Bh
Bh
Bh
M2
Bj
Kg
m2

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

26,000.00
45,000.00
23,000.00
3,000.00
7,500.00
250.00
32,000.00
200.00
15,000.00
13,500.00

bj
bj
bj
bj
bj
m2
lbr
pcs
pcs
pcs
pcs

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

2,800.00
3,675.00
10,000.00
600.00
1,800.00
135,000.00
120,000.00
6,750.00
8,250.00
7,800.00
15,000.00

m2
m2
m2
m2
m2

Rp
Rp
Rp
Rp
Rp

53,800.00
86,500.00
180,000.00
350,000.00
1,900,000.00

bh
bh
ps
bh
bh
bh
bh
bh
ps
ps
ps
ps
bh
bh

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

4,500.00
11,500.00
17,500.00
3,500.00
7,500.00
33,750.00
14,500.00
19,500.00
12,500.00
10,000.00
38,000.00
35,000.00
175,000.00
577,500.00

bh
bh
bh
bh
bh
bh
bh
bh
bh

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

185,000.00
1,325,000.00
475,000.00
950,000.00
2,325,000.00
825,000.00
175,000.00
52,500.00
280,000.00

ltr

Rp

22,000.00

No
1
2

3
4

JENIS BAHAN
2

Multiplek 9 mm
Water profing/membran
Water profing/semen base

SATUAN
3
lbr
m2
m2

Rp
Rp
Rp

HARGA ( Rp )
4

125,000.00
95,000.00
45,000.00

PERHITUNGAN ANALISA HARGA SATUAN DENGAN ACUAN STANDAR PU KAB. GIANYAR


PEMBANGUNAN RUMAH SAKIT ARI CANTHI MAS-UBUD
NO

URAIAN PEKERJAAN

2
Pekerjaan Tanah & Outsite
1 1 M1Pengukuran dan Pasangan Bowplank
0.007 M3 Kayu Meranti Papan
0.012 M3 Kayu Meranti Usuk 5/7
0.02 Kg Paku 2"-5"
0.100 OH Pekerja
0.100 OH Tukang kayu
0.010 OH Kep Tukang
0.005 OH Mandor
2 1 M3 Pekerjaan Galian Tanah Biasa Sedalam 1 M1
0.4 OH Pekerja
0.04 OH Mandor
3 1 M3 Pekerjaan Galian Tanah Biasa Sedalam 2 M1
0.526 OH Pekerja
0.0526 OH Mandor
4 1 M3 Pekerjaan Galian Tanah Biasa Sedalam 3 M1
0.735 OH Pekerja
0.0735 OH Mandor
5 1 M3 Pekerjaan Galian Foot Plat
1.00 OH Pekerja
0.10 OH Mandor

SATUAN
( Rp. )
2

UPAH
( Rp. )

BAHAN
( Rp. )
3

HARGA
( Rp. )
4

15,400.00
24,000.00
340.00

15,400.00
24,000.00
340.00
4,500.00
5,500.00
600.00
350.00
44,240.00

2,200,000.00
2,000,000.00
17,000.00
45,000.00
55,000.00
60,000.00
70,000.00
Jumlah

4,500.00
5,500.00
600.00
350.00
10,950.00

45,000.00
70,000.00
Jumlah

18,000.00
2,800.00
20,800.00

18,000.00
2,800.00
20,800.00

45,000.00
70,000.00
Jumlah

23,670.00
3,682.00
27,352.00

23,670.00
3,682.00
27,352.00

45,000.00
70,000.00
Jumlah

33,075.00
5,145.00
38,220.00

33,075.00
5,145.00
38,220.00

45,000.00
70,000.00
Jumlah

45,000.00
7,000.00
52,000.00

45,000.00
7,000.00
52,000.00

45,000.00
70,000.00
25,000.00
Jumlah

22,500.00
3,500.00
2,225.00
28,225.00

22,500.00
3,500.00
2,225.00
28,225.00

85,000.00
45,000.00
70,000.00
25,000.00
Jumlah

102,000.00
13,500.00
700.00
2,000.00
118,200.00

150,000.00
45,000.00
70,000.00
Jumlah

13,500.00
700.00
14,200.00

39,740.00

6 1 M3 Pekerjaan Pemadatan
0.500 OH Pekerja
0.050 OH Mandor
0.089 Jam Stamper
7 1 M3 Pekerjaan Urugan Tanah & Pemadatan
1.2 M3 Tanah Urug
0.3 OH Pekerja
0.01 OH Mandor
0.08 Jam Stamper
8 1 M3 Pekerjaan Urugan Pasir & Penyiraman
1.2 M3 Pasir Urug
0.3 OH Pekerja
0.01 OH Mandor
Pekerjaan Pasangan
9 1 M3 Pasangan Batu Kali Camp 1 : 5
1.1 M3 Batu Kali
2.92 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.544 M3 Pasir Pasang
0.6 OH Tukang Batu
0.06 OH Kepala Tukang Batu
1.5 OH Pekerja
0.075 OH Mandor
10 1 M3 Pekerjaan Urugan sirtu dan peninggian
1.2 M3 sirtu
0.3 OH Pekerja
0.03 OH Mandor
0.125 Jam Stamper
11 1 M3 Pekerjaan Beton cor struktur
0.970 M3 Kerikil Beton
336.0 kg Portland Cement 50 Kg (Indo Cement klas I)

102,000.00
180,000.00

110,000.00
54,500.00
90,000.00
50,000.00
55,000.00
45,000.00
70,000.00
Jumlah

30,000.00
3,300.00
67,500.00
5,250.00
106,050.00

150,000.00
45,000.00
70,000.00
25,000.00
Jumlah

13,500.00
2,100.00
3,125.00
18,725.00

110,000.00
1,090.00

102,000.00

180,000.00

121,000.00
159,140.00
48,960.00

329,100.00
180,000.00

102,000.00
13,500.00
700.00
2,000.00
118,200.00
180,000.00
13,500.00
700.00
194,200.00

121,000.00
159,140.00
48,960.00
30,000.00
3,300.00
67,500.00
5,250.00
435,150.00

180,000.00

180,000.00
13,500.00
2,100.00
3,125.00
195,600.00

106,700.00
366,240.00

106,700.00
366,240.00

NO

URAIAN PEKERJAAN

2
0.540
0.275
1.050
0.265
5.300
0.262

M3
OH
OH
OH
OH
OH

Pasir Beton
Tukang Batu
Tukang Besi
Kepala Tukang Batu
Pekerja
Mandor

12 1 M2 Pekerjaan Plesteran 1 : 1 tebal 15 mm


15.504 kg Portland Cement 50 Kg (Indo Cement klas I)
0.016 M3 Pasir Pasang
0.15 OH Tukang Batu
0.015 OH Kepala Tukang Batu
0.300 OH Pekerja
0.015 OH Mandor
13 1 M2 Pekerjaan Plesteran 1 : 2 tebal 15 mm
10.224 kg Portland Cement 50 Kg (Indo Cement klas I)
0.02 M3 Pasir Pasang
0.15 OH Tukang Batu
0.015 OH Kepala Tukang Batu
0.300 OH Pekerja
0.015 OH Mandor
14 1 M2 Pekerjaan Plesteran 1 : 5 tebal 15 mm
5.184 kg Portland Cement 50 Kg (Indo Cement klas I)
0.02 M3 Pasir Pasang
0.15 OH Tukang Batu
0.015 OH Kepala Tukang Batu
0.300 OH Pekerja
0.015 OH Mandor
15 1 M2 Pekerjaan Plesteran 1 : 5 tebal 15 mm
0.0864 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.022 M3 Pasir Pasang
0.15 OH Tukang Batu
0.015 OH Kepala Tukang Batu
0.2 OH Pekerja
0.01 OH Mandor
16 1 M2 Pekerjaan Plesteran 1 : 3
0.162 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.019 M3 Pasir Pasang
0.15 OH Tukang Batu
0.015 OH Kepala Tukang Batu
0.2 OH Pekerja
0.01 OH Mandor
17 1 M2 Pekerjaan Plesteran 1 : 2 tebal 2cm
0.1704 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.017 M3 Pasir Pasang
0.15 OH Tukang Batu
0.015 OH Kepala Tukang Batu
0.2 OH Pekerja
0.01 OH Mandor
18 1 M2 Pekerjaan spesi alas keramik 1 : 2 tebal 3cm
0.186 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.016 M3 Pasir Pasang
0.15 OH Tukang Batu
0.015 OH Kepala Tukang Batu
0.2 OH Pekerja
0.01 OH Mandor
19 1 M Pekerjaan Acian mortar
0.09896 Zak Mortar acian putih 25 kg

SATUAN
( Rp. )
2
150,000.00
55,000.00
55,000.00
55,000.00
45,000.00
70,000.00
Jumlah
1,090.00
160,000.00
55,000.00
55,000.00
45,000.00
70,000.00
Jumlah
1,090.00
160,000.00
55,000.00
45,000.00
55,000.00
70,000.00
Jumlah
1,090.00
160,000.00
55,000.00
45,000.00
55,000.00
70,000.00
Jumlah
54,500.00
160,000.00
55,000.00
55,000.00
45,000.00
70,000.00
Jumlah
54,500.00
160,000.00
55,000.00
55,000.00
45,000.00
70,000.00
Jumlah
54,500.00
160,000.00
55,000.00
55,000.00
45,000.00
70,000.00
Jumlah
54,500.00
160,000.00
55,000.00
55,000.00
45,000.00
70,000.00
Jumlah
163,000.00

UPAH
( Rp. )

BAHAN
( Rp. )
3

15,125.00
57,750.00
14,575.00
238,500.00
18,340.00
344,290.00

4
81,000.00

553,940.00
16,899.36
2,560.00

8,250.00
825.00
13,500.00
1,050.00
23,625.00

19,459.36
11,144.16
3,200.00

8,250.00
675.00
16,500.00
1,050.00
26,475.00

14,344.16
5,650.56
3,200.00

8,250.00
675.00
16,500.00
1,050.00
26,475.00

8,850.56
4,708.80
3,520.00

8,250.00
825.00
9,000.00
700.00
18,775.00

8,228.80
8,829.00
3,040.00

8,250.00
825.00
9,000.00
700.00
18,775.00

11,869.00
9,286.80
2,720.00

8,250.00
825.00
9,000.00
700.00
18,775.00

12,006.80
10,137.00
2,560.00

8,250.00
825.00
9,000.00
700.00
18,775.00

HARGA
( Rp. )
5
81,000.00
15,125.00
57,750.00
14,575.00
238,500.00
18,340.00
898,230.00
16,899.36
2,560.00
8,250.00
825.00
13,500.00
1,050.00
43,084.36
11,144.16
3,200.00
8,250.00
675.00
16,500.00
1,050.00
40,819.16
5,650.56
3,200.00
8,250.00
675.00
16,500.00
1,050.00
35,325.56
4,708.80
3,520.00
8,250.00
825.00
9,000.00
700.00
27,003.80
8,829.00
3,040.00
8,250.00
825.00
9,000.00
700.00
30,644.00
9,286.80
2,720.00
8,250.00
825.00
9,000.00
700.00
30,781.80

12,697.00

10,137.00
2,560.00
8,250.00
825.00
9,000.00
700.00
31,472.00

16,130.48

16,130.48

NO

URAIAN PEKERJAAN

2
0.04
0.002
0.04
0.08

OH
OH
OH
OH

Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor

20 1 M Pekerjaan Acian
3.25 kg Portland Cement 50 Kg (Indo Cement klas I)
0.1 OH Tukang Batu
0.01 OH Kepala Tukang Batu
0.2 OH Pekerja
0.01 OH Mandor
21 1 M3 Pekerjaan Beton
0.752 M3 Kerikil Beton
8.05 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.3854 M3 Pasir Beton
0.25 OH Tukang Batu
0.025 OH Kepala Tukang Batu
3.257 OH Pekerja
0.035 OH Mandor
1 M3 Beton
0.91 M3
0.54 M3
181.60 kg
0.20 Hr
0.02 Hr
1.20 Hr
0.06 Hr

rabat 1pc : 3ps : 5krl


Kerikil/batu pecah
Pasir beton
PC 50 kg
Tukang batu
Kepala tukang batu
Pekerja
Mandor

22 1 Kg Pekerjaan Besi beton


1 Kg Besi Beton
0.015 Kg Kawat Ikat Beton (Bendrat)
0.0019 OH Tukang Besi
0.0045 OH Kepala Tukang Besi
0.007 OH Pekerja
0.004 OH Mandor
Begisting
23 1 M2 Pekerjaan Begisting Beton Pondasi & Sloop
0.35 Lbr Multiplek 9 mm
0.045 M3 Kayu Meranti Usuk 4/6
0.300 Kg Paku 2"-5"-10"
0.260 OH Tukang Kayu
0.026 OH Kepala Tukang Kayu
0.520 OH Pekerja
0.026 OH Mandor
0.100 ltr Minyak bekisting
24 1 M2 Pekerjaan Begisting Praktis
0.35 Lbr Multiplek 9 mm
0.0144 M3 Kayu Meranti Usuk 4/6
0.2 Kg Paku 2"-5"
0.375 OH Tukang Kayu
0.0375 OH Kepala Tukang Kayu
0.35 OH Pekerja
0.00625 OH Mandor
25 1 M2 Pekerjaan Begisting Kolom
0.35 Lbr Multiplek 9 mm
0.03 M3 Kayu Meranti Usuk 4/6
0.04 M3 Kayu balok kruing
0.32 Kg Paku 2"-5"
0.39 OH Tukang Kayu
0.039 OH Kepala Tukang Kayu

SATUAN
( Rp. )
2
55,000.00
55,000.00
45,000.00
70,000.00
Jumlah
1,090.00
55,000.00
55,000.00
45,000.00
70,000.00
Jumlah
110,000.00
54,500.00
150,000.00
55,000.00
55,000.00
45,000.00
70,000.00
Jumlah
110,000.0
150,000.0
1,090.0
55,000.0
55,000.0
45,000.0
70,000.0

10,987.15
17,500.00
55,000.00
65,000.00
45,000.00
70,000.00
Jumlah

125,000.00
2,000,000.00
15,500.00
55,000.00
60,000.00
45,000.00
70,000.00
22,000.00
Jumlah
135,000.00
3,000,000.00
15,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
125,000.00
2,000,000.00
4,100,000.00
17,000.00
55,000.00
60,000.00

UPAH
( Rp. )
3
2,200.00
110.00
1,800.00
5,600.00
9,710.00

BAHAN
( Rp. )

HARGA
( Rp. )
4

16,130.48
3,542.50

5,500.00
550.00
9,000.00
700.00
15,750.00

57,810.00
13,750.00
1,375.00
146,565.00
2,450.00
221,950.00

3,542.50
82,720.00
438,725.00
57,810.00

579,255.00
100,100.0
81,000.0
197,944.0

11,000.0
1,100.0
54,000.0
4,200.0
70,300.0

379,044.0
10,987.15
262.50

104.50
292.50
315.00
280.00
992.00

11,249.65

43,750.00
90,000.00
4,650.00
14,300.00
1,560.00
23,400.00
1,820.00
41,080.00

2,200.00
138,400.00
47,250.00
43,200.00
3,100.00

18,750.00
2,062.50
12,950.00
406.25
34,168.75

93,550.00
43,750.00
60,000.00
164,000.00
5,440.00

21,450.00
2,340.00

5
2,200.00
110.00
1,800.00
5,600.00
25,840.48
3,542.50
5,500.00
550.00
9,000.00
700.00
19,292.50
82,720.00
438,725.00
57,810.00
13,750.00
1,375.00
146,565.00
2,450.00
743,395.00
100,100.0
81,000.0
197,944.0
11,000.0
1,100.0
54,000.0
4,200.0
449,344.0
10,987.15
262.50
104.50
292.50
315.00
280.00
12,241.65

43,750.00
90,000.00
4,650.00
14,300.00
1,560.00
23,400.00
1,820.00
2,200.00
181,680.00
47,250.00
43,200.00
3,100.00
18,750.00
2,062.50
12,950.00
406.25
127,718.75
43,750.00
60,000.00
164,000.00
5,440.00
21,450.00
2,340.00

NO

URAIAN PEKERJAAN

2
0.364 OH Pekerja
0.0065 OH Mandor

26 1 M2 Pekerjaan Begisting Balok & Plat Lantai


0.35 Lbr Multiplek 9 mm
0.032 M3 Kayu Meranti Usuk 4/6
0.045 M3 Kayu balok kruing
0.400 Kg Paku 2"-5"
0.405 OH Tukang Kayu
0.0405 OH Kepala Tukang Kayu
0.378 OH Pekerja
0.00675 OH Mandor
27 1 M2 Pekerjaan Begisting Dinding GWT
0.350 Lbr Multiplek 12 mm
0.030 M3 Kayu Meranti Usuk 4/6
0.045 M3 Kayu balok kruing
0.400 Kg Paku 2"-5"
0.375 OH Tukang Kayu
0.0375 OH Kepala Tukang Kayu
0.35 OH Pekerja
0.00625 OH Mandor

SATUAN
( Rp. )
2
45,000.00
70,000.00
Jumlah
125,000.00
2,000,000.00
4,100,000.00
17,000.00
55,000.00
60,000.00
45,000.00
70,000.00
Jumlah
125,000.00
2,000,000.00
4,100,000.00
17,000.00
55,000.00
60,000.00
45,000.00
70,000.00
Jumlah

UPAH
( Rp. )
3
16,380.00
455.00
40,625.00

BAHAN
( Rp. )

HARGA
( Rp. )
4

273,190.00
43,750.00
64,000.00
184,500.00
6,800.00

22,275.00
2,430.00
17,010.00
472.50
42,187.50

299,050.00
43,750.00
60,000.00
184,500.00
6,800.00

20,625.00
2,250.00
15,750.00
437.50
39,062.50

295,050.00

5
16,380.00
455.00
313,815.00
43,750.00
64,000.00
184,500.00
6,800.00
22,275.00
2,430.00
17,010.00
472.50
341,237.50
43,750.00
60,000.00
184,500.00
6,800.00
20,625.00
2,250.00
15,750.00
437.50
334,112.50

Beton Bertulang
28 1 M3 Pekerjaan Beton Bertulang Plat Dinding = 20 cm (dinding Pit lift)
1.000 M3 Beton Cor Ready Mix K-300
743,395.00
10.000 M2 Pekerjaan Begisting Plat Dinding
334,112.50
80.000 Kg Pekerjaan Besi beton
12,241.65
Jumlah

743,395.00
3,341,125.00
979,332.28
5,063,852.28

29 1 M3 Pekerjaan Beton Bertulang Plat Dinding = 20 cm (dinding groundtank)


1.00 M3 Beton Cor Ready Mix K-300
860,000.00
9.60 M2 Pekerjaan Begisting Plat Dinding
177,618.75
110.00 Kg Pekerjaan Besi beton
18,411.25
Jumlah

860,000.00
1,705,140.00
2,025,237.50
4,590,377.50

30 1 M3 Pekerjaan Beton Bertulang Plat Dinding = 25 cm (dinding groundtank)


1.00 M3 Beton Cor Ready Mix K-300
860,000.00
8.00 M2 Pekerjaan Begisting Plat Dinding
177,618.75
110.00 Kg Pekerjaan Besi beton
18,411.25
Jumlah

860,000.00
1,420,950.00
2,025,237.50
4,306,187.50

31 1 M3 Pekerjaan Beton Bertulang Plat Dinding = 30 cm (dinding groundtank)


1 M3 Beton Cor Ready Mix K-300
860,000.00
6.666667 M2 Pekerjaan Begisting Plat Dinding
177,618.75
110 Kg Pekerjaan Besi beton
18,411.25
Jumlah
32 1 M2 Pekerjaan Begisting Tangga
0.35 Lbr Multiplek 9 mm
135,000.00
0.025 M3 Kayu Meranti Usuk 4/6
3,000,000.00
0.4 Kg Paku 2"-5"
15,500.00
0.405 OH Tukang Kayu
50,000.00
0.0405 OH Kepala Tukang Kayu
55,000.00
0.378 OH Pekerja
37,000.00
0.00675 OH Mandor
65,000.00
Jumlah
33 1 M3 Pekerjaan Beton Bertulang Plat Tangga
1 M3 Beton Cor Ready Mix K-300
860,000.00
8 M2 Pekerjaan Begisting Plat Dinding
165,352.25
180 Kg Pekerjaan Besi beton
18,411.25
Jumlah
34 1 M3 Pekerjaan Beton Rabat t=10 cm. dg. Tul. M6.
1 M3 Beton Cor Ready Mix K-300
860,000.00
0.10582 Roll Wiremesh M6
5,550,000.00
1 Ls. Upah pekerjaan Wire Mesh
200,000.00

860,000.00
1,184,125.00
2,025,237.50
4,069,362.50
47,250.00
75,000.00
6,200.00
20,250.00
2,227.50
13,986.00
438.75
36,902.25

128,450.00

47,250.00
75,000.00
6,200.00
20,250.00
2,227.50
13,986.00
438.75
165,352.25
860,000.00
1,322,818.00
3,314,025.00
5,496,843.00

200,000.00

860,000.00
587,301.59
200,000.00

NO
1

URAIAN PEKERJAAN
2

Pekerjaan ATAP
35 1 Kg Pekerjaan Kuda-Kuda Baja
1.1 Kg Baja Profile
0.02 Kg Cat Metal ICI Dulux
0.00675 OH Pekerja
0.0675 OH Tukang Besi
0.00675 OH Kepala Tukang Besi
0.000675 OH Mandor
36 1 M2 Pek. Usuk
0.0156 M3 Kayu Kamper Samarida Usuk 5/7
0.25 Kg Paku 2"-5"
0.56 OH Tukang Kayu
0.12 OH Kepala Tukang Kayu
0.85 OH Pekerja
0.045 OH Mandor
36 1 M2 Pek. Reng
0.016 M3 Kayu Kamper Samarinda Reng 3/4
0.25 Kg Paku 2"-5"
0.56 OH Tukang Kayu
0.12 OH Kepala Tukang Kayu
0.85 OH Pekerja
0.045 OH Mandor
37 1 M2 Pekerjaan Pasang Atap Genteng
16.67 Bh Genteng Kodok produksi Goodyear
0.175 OH Tukang Batu
0.0175 OH Kepala Tukang Batu
0.35 OH Pekerja
0.0175 OH Mandor
38 1 M1 Pekerjaan Pasang Bubungan Genteng
3.5 Bh Bubungan Genteng Keramik Berglasur
0.036 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.032 M3 Pasir Pasang
0.3 OH Tukang Batu
0.03 OH Kepala Tukang Batu
0.6 OH Pekerja
0.03 OH Mandor
39 1 M1 Pekerjaan Papan List Plank
0.0135 M3 Kayu Kamper Samarinda Balok
0.25 Kg Paku 2"-5"
0.56 OH Tukang Kayu
0.12 OH Kepala Tukang Kayu
0.85 OH Pekerja
0.045 OH Mandor
40 1 M3 Pekerjaan Listplank Kayu Kamper
1.1 M3 Kayu Kamper Samarinda Balok
15 Kg Paku 2"-5"
0.15 Kg Paku Lis
24 OH Tukang Kayu
2.4 OH Kepala Tukang Kayu
8 OH Pekerja
0.4 OH Mandor
Pekerjaan Kaca mati
41 1 M2 Pekerjaan Pasang Kaca Mati 8 mm
1.00 M2 Kaca 8mm
0.12 OH Tukang Kayu
0.012 OH Kepala Tukang Kayu
0.0188 OH Pekerja

SATUAN
( Rp. )
2
Jumlah

15,000.00
180,000.00
37,000.00
50,000.00
50,000.00
65,000.00
Jumlah
7,000,000.00
15,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

UPAH
( Rp. )
3
200,000.00

249.75
3,375.00
337.50
43.88
4,006.13

28,000.00
6,600.00
31,450.00
2,925.00
68,975.00

28,000.00
6,600.00
31,450.00
2,925.00
68,975.00

3,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

8,750.00
962.50
12,950.00
1,137.50
23,800.00

7,800,000.00
15,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

HARGA
( Rp. )
4

5
1,647,301.59

16,500.00
3,600.00

16,500.00
3,600.00
249.75
3,375.00
337.50
43.88
24,106.13

20,100.00
109,200.00
3,875.00

6,000,000.00
15,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

16,500.00
49,000.00
90,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

BAHAN
( Rp. )

113,075.00
96,000.00
3,875.00

99,875.00
50,010.00

50,010.00
57,750.00
1,764.00
2,880.00

15,000.00
1,650.00
22,200.00
1,950.00
40,800.00

62,394.00
105,300.00
3,875.00

28,000.00
6,600.00
31,450.00
2,925.00
68,975.00

7,500,000.00
15,500.00
22,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

1,200,000.00
132,000.00
296,000.00
26,000.00
1,654,000.00

174,000.00
50,000.00
55,000.00
37,000.00

6,000.00
660.00
695.60

109,175.00
8,250,000.00
232,500.00
3,300.00

8,485,800.00

174,000.00

109,200.00
3,875.00
28,000.00
6,600.00
31,450.00
2,925.00
182,050.00
96,000.00
3,875.00
28,000.00
6,600.00
31,450.00
2,925.00
168,850.00
50,010.00
8,750.00
962.50
12,950.00
1,137.50
73,810.00
57,750.00
1,764.00
2,880.00
15,000.00
1,650.00
22,200.00
1,950.00
103,194.00
105,300.00
3,875.00
28,000.00
6,600.00
31,450.00
2,925.00
178,150.00
8,250,000.00
232,500.00
3,300.00
1,200,000.00
132,000.00
296,000.00
26,000.00
10,139,800.00

174,000.00
6,000.00
660.00
695.60

NO

URAIAN PEKERJAAN

2
0.032 OH Mandor

42 1 M2 Pekerjaan Pasang Kaca Mati 6 mm


1.00 M2 Kaca 6mm
0.12 OH Tukang Kayu
0.012 OH Kepala Tukang Kayu
0.0188 OH Pekerja
0.032 OH Mandor
43 1 M2 Pekerjaan Pasang Kaca Mati 5 mm
1.00 M2 Kaca 5mm
0.12 OH Tukang Kayu
0.012 OH Kepala Tukang Kayu
0.0188 OH Pekerja
0.032 OH Mandor
Pasangan Lantai keramik
44 1 M2 Pek. Pasangan keramik 30x30
1.200 m2 Keramik ex asia tile
10.00 kg Portland Cement 50 Kg (Indo Cement klas I)
0.045 M3 Pasir Pasang
1.5 kg Semen Naat AM 50 + am 55
0.7 OH Pekerja
0.35 OH Tukang Batu
0.035 OH Kepala Tukang batu
0.035 OH Mandor
45 1 M2 Pek. Pasangan keramik 20 x 20
1.1 m2 Keramik ex asia tile
10.4 kg Portland Cement 50 Kg (Indo Cement klas I)
0.045 M3 Pasir Pasang
1.62 kg Semen Naat AM 50 + am 55
0.7 OH Pekerja
0.35 OH Tukang Batu
0.035 OH Kepala Tukang batu
0.035 OH Mandor
46 1 M2 Pek. Pasangan keramik 30 x 60
1.2 m2 Keramik 60 x 60 Niro Granit ex roman
12.5 kg Portland Cement 50 Kg (Indo Cement klas I)
0.045 M3 Pasir Pasang
1.25 kg Semen Naat AM 50 + am 55
0.7 OH Pekerja
0.35 OH Tukang Batu
0.035 OH Kepala Tukang batu
0.035 OH Mandor
47 1 M2 Pek. Pasang Keramik Lantai 60x60 Niro Granit
1.05 Duz Keramik 60 x 60 Niro Granit ex roman
0.25 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.023 M3 Pasir Pasang
0.25 Kg Semen Naat AM 50 + am 55
0.495 OH Tukang Batu
0.0495 OH Kepala Tukang Batu
0.462 OH Pekerja
0.22 OH Mandor
48 1 M2 Pek. Pasang Keramik Lantai 33.3x33.3 Roman
1.05 Duz Keramik 33.3x33.3 roman
0.25 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.023 M3 Pasir Pasang
0.333333 Kg Semen Naat AM 50 + am 55
0.495 OH Tukang Batu
0.0495 OH Kepala Tukang Batu
0.462 OH Pekerja

SATUAN
( Rp. )
2
65,000.00
Jumlah

UPAH
( Rp. )
3
2,080.00
9,435.60

100,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

6,000.00
660.00
695.60
2,080.00
9,435.60

172,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

6,000.00
660.00
695.60
2,080.00
9,435.60

30,000.00
1,090.00
160,000.00
12,500.00
45,000.00
55,000.00
55,000.00
70,000.00
Jumlah
37,000.00
1,090.00
160,000.00
12,500.00
45,000.00
55,000.00
55,000.00
70,000.00
Jumlah
66,250.00
1,090.00
160,000.00
12,500.00
45,000.00
55,000.00
55,000.00
70,000.00
Jumlah
132,500.00
54,500.00
160,000.00
12,500.00
50,000.00
55,000.00
37,000.00
70,000.00
Jumlah
93,750.00
54,500.00
160,000.00
12,500.00
50,000.00
55,000.00
37,000.00

BAHAN
( Rp. )

HARGA
( Rp. )
4

174,000.00
100,000.00

100,000.00
172,500.00

172,500.00

36,000.00
10,900.00
7,200.00
18,750.00
31,500.00
19,250.00
1,925.00
2,450.00
55,125.00

72,850.00
40,700.00
11,336.00
7,200.00
20,250.00

31,500.00
19,250.00
1,925.00
2,450.00
55,125.00

15,625.00
31,500.00
19,250.00
1,925.00
2,450.00
70,750.00

79,486.00
79,500.00
13,625.00
7,200.00
15,625.00

115,950.00
139,125.00
13,625.00
3,680.00
3,125.00

24,750.00
2,722.50
17,094.00
15,400.00
59,966.50

159,555.00
98,437.50
13,625.00
3,680.00
4,166.67

24,750.00
2,722.50
17,094.00

5
2,080.00
183,435.60
100,000.00
6,000.00
660.00
695.60
2,080.00
109,435.60
172,500.00
6,000.00
660.00
695.60
2,080.00
181,935.60

36,000.00
10,900.00
7,200.00
18,750.00
31,500.00
19,250.00
1,925.00
2,450.00
127,975.00
40,700.00
11,336.00
7,200.00
20,250.00
31,500.00
19,250.00
1,925.00
2,450.00
134,611.00
79,500.00
13,625.00
7,200.00
15,625.00
31,500.00
19,250.00
1,925.00
2,450.00
171,075.00
139,125.00
13,625.00
3,680.00
3,125.00
24,750.00
2,722.50
17,094.00
15,400.00
219,521.50
98,437.50
13,625.00
3,680.00
4,166.67
24,750.00
2,722.50
17,094.00

NO

URAIAN PEKERJAAN

2
0.22 OH Mandor

49 1 M2 Pek. Pasang Keramik Lantai 25x33.3 Roman


1.05 Duz Keramik 25 x 33,3 Roman
0.25 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.023 M3 Pasir Pasang
0.5 Kg Semen Naat AM 50 + am 55
0.495 OH Tukang Batu
0.0495 OH Kepala Tukang Batu
0.462 OH Pekerja
0.22 OH Mandor

1 M1 Pek. Pasang Keramik border 7,5x25 Roman


0.0025 Duz Keramik 7,5 x25 Roman
0.025 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.0023 M3 Pasir Pasang
0.05 Kg Semen Naat AM 50 + am 55
0.049 OH Tukang Batu
0.0049 OH Kepala Tukang Batu
0.0462 OH Pekerja
0.022 OH Mandor

50 1 M2 Pek. Pasang Keramik Lantai 20/20


1.05 Duz Keramik 20 x 20 Roman
0.25 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.023 M3 Pasir Pasang
0.5 Kg Semen Naat AM 50 + am 55
0.045 OH Kepala Tukang Batu
0.48 OH Pekerja
0.03 OH Mandor
51 1 M1 Pek. Pasang Keramik Plint 10/60
1.05 M' Keramik Plint 10 x 60 ROMAN
0.031 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.02 M3 Pasir Pasang
0.033333 Kg Semen Naat AM 50 + am 55
0.05 OH Tukang Batu
0.005 OH Kepala Tukang Batu
0.15 OH Pekerja
0.006 OH Mandor
52 1 M1 Pek. Pasang Keramik Plint 10/20
1.05 M' Keramik Plint 10x20 ROMAN
0.031 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.02 M3 Pasir Pasang
0.066667 Kg Semen Naat AM 50 + am 55
0.06 OH Tukang Batu
0.005 OH Kepala Tukang Batu
0.18 OH Pekerja
0.006 OH Mandor
53 1 M1 Pek. Pasang Keramik Anti Slip 10/20
1.05 M' Keramik Anti Slip 10 x 20 Roman
0.031 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.02 M3 Pasir Pasang
1.5 Kg Semen Naat AM 50 + am 55
0.05 OH Tukang Batu
0.005 OH Kepala Tukang Batu
0.15 OH Pekerja
0.006 OH Mandor

SATUAN
( Rp. )
2
65,000.00
Jumlah
68,000.00
54,500.00
160,000.00
12,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

129,600.00
160,000.00
12,500.00
12,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

60,750.00
54,500.00
160,000.00
12,500.00
55,000.00
37,000.00
65,000.00
Jumlah
43,200.00
54,500.00
160,000.00
12,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
3,250.00
54,500.00
160,000.00
12,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
3,250.00
54,500.00
160,000.00
12,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

Pengecatan/Finishing
54 1 M2 Pekerjaan Cat Tembok 1x Plamur, 1x Dasar, 2x Cat Halus

UPAH
( Rp. )
3
14,300.00
58,866.50

BAHAN
( Rp. )

HARGA
( Rp. )
4

119,909.17
71,400.00
13,625.00
3,680.00
6,250.00

24,750.00
2,722.50
17,094.00
14,300.00
58,866.50

94,955.00

324.00
4,000.00
28.75
625.00
2,450.00
269.50
1,709.40
1,430.00
5,858.90

4,977.75

63,787.50
13,625.00
3,680.00
6,250.00
2,475.00
17,760.00
1,950.00
22,185.00

87,342.50
45,360.00
1,689.50
3,200.00
416.67

2,500.00
275.00
5,550.00
390.00
8,715.00

50,666.17
3,412.50
1,689.50
3,200.00
833.33

3,000.00
275.00
6,660.00
390.00
10,325.00

9,135.33
3,412.50
1,689.50
3,200.00
18,750.00

2,500.00
275.00
5,550.00
390.00
8,715.00

27,052.00

5
14,300.00
178,775.67
71,400.00
13,625.00
3,680.00
6,250.00
24,750.00
2,722.50
17,094.00
14,300.00
153,821.50

324.00
4,000.00
28.75
625.00
2,450.00
269.50
1,709.40
1,430.00
10,836.65

63,787.50
13,625.00
3,680.00
6,250.00
2,475.00
17,760.00
1,950.00
109,527.50
45,360.00
1,689.50
3,200.00
416.67
2,500.00
275.00
5,550.00
390.00
59,381.17
3,412.50
1,689.50
3,200.00
833.33
3,000.00
275.00
6,660.00
390.00
19,460.33
3,412.50
1,689.50
3,200.00
18,750.00
2,500.00
275.00
5,550.00
390.00
35,767.00

NO
1

URAIAN PEKERJAAN
2
Dinding Dalam
0.333 Lbr Amplas
0.12 Kg Cat Dasar
0.208 Kg Cat Dinding ICI Dulux
0.1 Kg Plamur Tembok
0.04095 OH Tukang Cat
0.004095 OH Kepala Tukang Cat
0.13 OH Pekerja
0.01625 OH Mandor

55

56

57

58

59

60

SATUAN
( Rp. )
2

3,000.00
21,500.00
125,000.00
6,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
1 M2 Pekerjaan Cat Tembok 1x Plamur, 1x Dasar, 2x Cat Halus
Dinding Luar
0.333 Lbr Amplas
3,000.00
0.12 Kg Cat Dasar
21,500.00
0.26 Kg Cat Dinding ICI Dulux Weathersield
168,500.00
0.1 Kg Plamur Tembok
6,000.00
0.04095 OH Tukang Cat
50,000.00
0.004095 OH Kepala Tukang Cat
55,000.00
0.13 OH Pekerja
37,000.00
0.01625 OH Mandor
65,000.00
Jumlah
1 M2 Pekerjaan Cat Tembok 1x Plamur, 1x Dasar, 2x Cat Halus (Cat Jotun)
0.333 Lbr Amplas
3,000.00
0.12 Kg Cat Dasar
21,500.00
0.26 Kg Cat Jotun
198,000.00
0.1 Kg Plamur Tembok
6,000.00
0.063 OH Tukang Cat
50,000.00
0.0063 OH Kepala Tukang Cat
55,000.00
0.2 OH Pekerja
37,000.00
0.025 OH Mandor
65,000.00
Jumlah
1 M2 Pekerjaan Cat Kayu 1x Cat Dasar, 2x Cat Halus
0.333 Lbr Amplas
3,000.00
0.12 Kg Cat Danapaints
160,000.00
0.26 Kg Cat Kayu ICI Dulux
170,000.00
0.1 Kg Dempul Kayu
18,000.00
0.018 OH Tukang Cat
50,000.00
0.012 OH Kepala Tukang Cat
55,000.00
0.14 OH Pekerja
37,000.00
0.005 OH Mandor
65,000.00
Jumlah
1 M Pekerjaan Tempelan Paras Palimanan
12.5 bj Batu Palimanan 20 x 40 cm
7,500.00
0.1 Zak Portland Cement 50 Kg (Indo Cement klas I)
54,500.00
0.65 OH Tukang Stile bali
85,000.00
0.065 OH Kepala Tk. Stile Bali
85,000.00
0.5625 OH Pekerja Stile Bali
50,000.00
0.065 OH Mandor
70,000.00
Jumlah
1 M Pekerjaan Pasang Batu Alam
1.1 M2 Batu Alam Abu-Abu/Hitam 20 x 40 cm
93,750.00
0.023 M3 Pasir Pasang
160,000.00
0.25 M3 Pasir Urug
150,000.00
0.65 OH Tukang Stile bali
85,000.00
0.065 OH Kepala Tk. Stile Bali
85,000.00
0.5625 OH Pekerja Stile Bali
50,000.00
0.065 OH Mandor
70,000.00
Jumlah
1 M Pekerjaan Pasang Batu Candi
12.5 M2 Batu Alam Abu-Abu/Hitam 20 x 40 cm
7,500.00
0.023 M3 Pasir Pasang
160,000.00
0.25 M3 Pasir Urug
150,000.00
0.65 OH Tukang Stile bali
85,000.00
0.065 OH Kepala Tk. Stile Bali
50,000.00
0.5625 OH Pekerja Stile Bali
70,000.00

UPAH
( Rp. )

BAHAN
( Rp. )
3

2,047.50
225.23
4,810.00
1,056.25
8,138.98

HARGA
( Rp. )
4

999.00
2,580.00
26,000.00
600.00

999.00
2,580.00
26,000.00
600.00
2,047.50
225.23
4,810.00
1,056.25
38,317.98

30,179.00

999.00
2,580.00
43,810.00
600.00
2,047.50
225.23
4,810.00
1,056.25
8,138.98

47,989.00
999.00
2,580.00
51,480.00
600.00

3,150.00
346.50
7,400.00
1,625.00
12,521.50

55,659.00
999.00
19,200.00
44,200.00
1,800.00

900.00
660.00
5,180.00
325.00
7,065.00

66,199.00
93,750.00
5,450.00

55,250.00
5,525.00
28,125.00
4,550.00
93,450.00

99,200.00
103,125.00
3,680.00
37,500.00

55,250.00
5,525.00
28,125.00
4,550.00
93,450.00

144,305.00
93,750.00
3,680.00
37,500.00

55,250.00
3,250.00
39,375.00

999.00
2,580.00
43,810.00
600.00
2,047.50
225.23
4,810.00
1,056.25
56,127.98
999.00
2,580.00
51,480.00
600.00
3,150.00
346.50
7,400.00
1,625.00
68,180.50
999.00
19,200.00
44,200.00
1,800.00
900.00
660.00
5,180.00
325.00
73,264.00
93,750.00
5,450.00
55,250.00
5,525.00
28,125.00
4,550.00
192,650.00
103,125.00
3,680.00
37,500.00
55,250.00
5,525.00
28,125.00
4,550.00
237,755.00
93,750.00
3,680.00
37,500.00
55,250.00
3,250.00
39,375.00

NO
1

URAIAN PEKERJAAN
2

0.065 OH Mandor
Pekerjaan Watterprofing
61 1 M2 Pekerjaan Waterproffing Semen base
0.635 Kg Waterproof semen base ex fosrox
0.400 OH Pekerja
0.040 OH Mandor
62 1 M2 Pekerjaan Waterproffing Membrane
1.100 m2 Waterproof membrane ex fosrox
0.400 OH Pekerja
0.040 OH Mandor
63 1 M Pekerjaan Acian 1 : 3
0.2096 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.04 OH Tukang Batu
0.002 OH Kepala Tukang Batu
0.04 OH Pekerja
0.08 OH Mandor
64 M3 Pekerjaan Beton 1 : 3 : 5 (rabatan lantai kerja)
0.87 M3 Kerikil Beton
4.666 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.344 M3 Pasir Beton
1.000 OH Tukang Batu
0.010 OH Kepala Tukang Batu
4.000 OH Pekerja
0.040 OH Mandor
Pekerjaan Plafond
65 1 M2 Pek. Rangka Plapond Besi Hollow
1.1 M' Besi Hollow
2.0833 Bh Gantungan
2.0833 Bh Paku Ramset
0.2 Bh Staping
1 Ls Ongkos Pasang
66 1 M2 Pek. Dinding Partisi GRC (Rangka Besi Hollow)
4 M' Rangka Partisi Besi Hollow
1.125 Bj Scrup
0.49 M2 GRC
0.7 Kg High Modulus Acetate Silicon Sealant 4200 Pol
1 m2. GlassWoll density 60 kg/m3.
0.42 Kg Compoun
1.2 Roll Textile Tape (plaster)
1 Ls Ongkos Pasang
67 1 M2 Pek. Plapond Calsiboard
1.1 M2 Kalsiboard 6 mm
14 Bj Paku Beton
1.4 Bj Scrup
0.25 Kg Compoun
0.055556 Roll Textile Tape (plaster)
1 Ls Ongkos Pasang
68 1 M2 Pekerjaan Paving
1.05 m2 Paving Blok
0.15 OH Tukang Batu
0.02 OH Kepala Tukang Batu
0.35 OH Pekerja
0.02 OH Mandor
Pasangan Bata
69 1 M2 Pekerjaan Pasangan Bata ringan( 7,5x20x60)
8.4 Bj Bata ringan
0.2874 Zak Perekat bata ringan MU (40 kg)

SATUAN
( Rp. )
2
Jumlah

UPAH
( Rp. )

BAHAN
( Rp. )

HARGA
( Rp. )

3
97,875.00

4
134,930.00

5
232,805.00

40,000.00
45,000.00
70,000.00
Jumlah

25,400.00
18,000.00
2,800.00
20,800.00

25,400.00
18,000.00
2,800.00
46,200.00

75,000.00
45,000.00
70,000.00
Jumlah

18,000.00
2,800.00
20,800.00

54,500.00
55,000.00
55,000.00
45,000.00
70,000.00
Jumlah

2,200.00
110.00
1,800.00
5,600.00
9,710.00

110,000.00
54,500.00
150,000.00
55,000.00
55,000.00
45,000.00
70,000.00
Jumlah

23,000.00
7,500.00
3,000.00
250.00
7,500.00
Jumlah
25,000.00
200.00
32,000.00
65,000.00
215,000.00
15,000.00
8,000.00
20,000.00
Jumlah

82,500.00

82,500.00
11,423.20

11,423.20
95,700.00
254,297.00
51,600.00

55,000.00
550.00
180,000.00
2,800.00
238,350.00

401,597.00

25,300.00
15,624.75
6,249.90
50.00
7,500.00
7,500.00

47,224.65
100,000.00
225.00
15,680.00
45,500.00
215,000.00
6,300.00
9,600.00

20,000.00
20,000.00

45,000.00
250.00
200.00
15,000.00
8,000.00
7,500.00
Jumlah

7,500.00
7,500.00

65,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

7,500.00
1,100.00
12,950.00
1,300.00
22,850.00

10,000.00
154,000.00

25,400.00

392,305.00
49,500.00
3,500.00
280.00
3,750.00
444.44
57,474.44
68,250.00

82,500.00
18,000.00
2,800.00
103,300.00
11,423.20
2,200.00
110.00
1,800.00
5,600.00
21,133.20
95,700.00
254,297.00
51,600.00
55,000.00
550.00
180,000.00
2,800.00
639,947.00

25,300.00
15,624.75
6,249.90
50.00
7,500.00
54,724.65
100,000.00
225.00
15,680.00
45,500.00
215,000.00
6,300.00
9,600.00
20,000.00
412,305.00
49,500.00
3,500.00
280.00
3,750.00
444.44
7,500.00
64,974.44

68,250.00

68,250.00
7,500.00
1,100.00
12,950.00
1,300.00
91,100.00

84,000.00
44,259.60

84,000.00
44,259.60

NO

URAIAN PEKERJAAN

2
0.11
0.011
0.352
0.0165

Oh
Oh
Oh
Oh

Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor

70 1 M2 Pekerjaan Pasangan Bata ringan( 10x20x60)


8.4 Bj Bata ringan
0.2874 Zak Perekat bata ringan MU (40 kg)
0.11 Oh Tukang Batu
0.011 Oh Kepala Tukang Batu
0.352 Oh Pekerja
0.0165 Oh Mandor
71 1 M2 Pekerjaan Pasangan Bata tebal 1/2 Bata 1 : 5
70.00 Bj Bata Merah
22.20 kg PC Semen Gresik (50 kg)
0.045 M3 Pasir Pasang
0.11 Oh Tukang Batu
0.011 Oh Kepala Tukang Batu
0.352 Oh Pekerja
0.0165 Oh Mandor
72 1 M2 Pekerjaan Pasangan Bata tebal 1 Bata 1 : 7
140.00 Bj Bata Merah 5x11x22 cm
43.5 kg PC Semen Gresik (50 kg)
0.085 M3 Pasir Pasang
0.21 Oh Tukang Batu
0.021 Oh Kepala Tukang Batu
0.652 Oh Pekerja
0.0365 Oh Mandor

73 Membuat 1 m3 Kusen Pintu & jendela Kayu


Klas I
1.1 M3 Kayu Balok Klas I
1.25 Kg Paku
1 kg Lem Kayu
7 OH Pekerja
21 OH Tukang Kayu
2.1 OH Kepala Tukang
0.35 OH Mandor
73 Membuat dan Memasang Kusen Pintu & jendela Kayu
Klas I
1.1 M3 Kayu Balok Klas II
1.25 Kg Paku
1 kg Lem Kayu
7 OH Pekerja
21 OH Tukang Kayu
2.1 OH Kepala Tukang
0.35 OH Mandor
1 M3 Pekerjaan kuzen
1.1 M3 Kayu kamper
18 OH Tukang kayu
1.8 OH Kepala tukang kayu
6 OH Pekerja
0.3 OH Mandor

1 M3 Beton rabat 1pc : 3ps : 5krl


0.91 M3 Kerikil/batu pecah
0.54 M3 Pasir beton
181.6 kg PC 50 kg
0.2 Hr Tukang batu

SATUAN
( Rp. )
2
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
12,500.00
154,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
950.00
1,090.00
160,000.00
55,000.00
55,000.00
45,000.00
70,000.00
Jumlah
950.00
1,090.00
160,000.00
55,000.00
55,000.00
45,000.00
70,000.00
Jumlah

UPAH
( Rp. )
3
5,500.00
605.00
13,024.00
1,072.50
20,201.50

BAHAN
( Rp. )

HARGA
( Rp. )
4

128,259.60
105,000.00
44,259.60

5,500.00
605.00
13,024.00
1,072.50
20,201.50

149,259.60
66,500.00
24,198.00
7,200.00

6,050.00
605.00
15,840.00
1,155.00
23,650.00

97,898.00
133,000.00
47,415.00
13,600.00

11,550.00
1,155.00
29,340.00
2,555.00
44,600.00

7,500,000.00
17,000.00
12,000.00
45,000.00
55,000.00
60,000.00
70,000.00
Jumlah

8,250,000.00
21,250.00
12,000.00

4,300,000.00
17,000.00
12,000.00
45,000.00
55,000.00
85,000.00
55,000.00
Jumlah

4,730,000.00
21,250.00
12,000.00

8,283,250.00

5
5,500.00
605.00
13,024.00
1,072.50
148,461.10
105,000.00
44,259.60
5,500.00
605.00
13,024.00
1,072.50
169,461.10
66,500.00
24,198.00
7,200.00
6,050.00
605.00
15,840.00
1,155.00
121,548.00

194,015.00

133,000.00
47,415.00
13,600.00
11,550.00
1,155.00
29,340.00
2,555.00
238,615.00

315,000.00
1,155,000.00
126,000.00
24,500.00
1,620,500.00

8,250,000.00
21,250.00
12,000.00
315,000.00
1,155,000.00
126,000.00
24,500.00
9,903,750.00

315,000.00
1,155,000.00
178,500.00
19,250.00
1,667,750.00

4,730,000.00
21,250.00
12,000.00
315,000.00
1,155,000.00
178,500.00
19,250.00
6,431,000.00

7,500,000.00
55,000.00
60,000.00
45,000.00
70,000.00
Jumlah

990,000.00
108,000.00
270,000.00
21,000.00
1,389,000.00

8,250,000.00

8,250,000.00

8,250,000.00
990,000.00
108,000.00
270,000.00
21,000.00
9,639,000.00

110,000.00
160,000.00
1,090.00
55,000.00

11,000.00

100,100.00
86,400.00
197,944.00
-

100,100.00
86,400.00
197,944.00
11,000.00

NO

URAIAN PEKERJAAN

2
0.02 Hr
1.2 Hr
0.06 Hr

Kepala tukang batu


Pekerja
Mandor

1 KG Pekerjaan kap baja


1 KG
Baja WF
0.023 OH Tukang besi / tukang baja
0.0023 OH Kep. tukang besi/kep. tukang baja
0.025 OH Pekerja
0.008 OH Mandor

1 M3 Pekerjaan Beton Ready Mix K-300


1 m3. Beton Cor Ready Mix K-300
1 m3. Ongkos Cor
1 m3, Alat-alat, dll.
1 ltr minyak begisting

1 M3 Pekerjaan Beton Ready Mix K-300


1 m3. Beton Cor Ready Mix K-300
1 m3. Ongkos Cor
1 m3, Alat-alat, dll.
1 ltr minyak begisting

1 M2 Pekerjaan polituran
0.1 Ltr Politur Ultra
0.15 Ltr Impra wood filler
0.2 Ltr
Thiner
0.5 Lbr Amplas
0.35 Hr Tukang cat
0.005 Hr Kepala tukang cat
0.5 Hr Pekerja
0.001 Hr Mandor

1 M2 Pek. Plapond Gybsum


1 M2 Gybsum jayaboard 9 mm
14 Bj Paku Beton
1.4 Bj Scrup
0.25 Kg Compoun
0.055556 Roll Textile Tape (plaster)
1 Ls Ongkos Pasang

1 M2 Pek. List Plafond


1 M2 Aluminium U t 0,025mm
14 Bj Paku Beton
1.4 Bj Scrup
1 Ls Ongkos Pasang

1m2 Kusen pintu dan Jendela Aluminium


1 m Aluminium indal powder coating 3"

1 M2 Pas. batako 1pc : 5ps


15 Bh Batako
9.8 Kg Semen Portland
0.125 M3 Pasir pasang
0.1 OH Tukang batu

SATUAN
( Rp. )
2
55,000.00
45,000.00
70,000.00

UPAH
( Rp. )

BAHAN
( Rp. )

HARGA
( Rp. )

3
1,100.00
54,000.00
4,200.00
70,300.00

4
384,444.00

5
1,100.00
54,000.00
4,200.00
454,744.00

14,250.00
55,000.00
65,000.00
45,000.00
70,000.00

149.50
1,125.00
560.00
1,834.50

14,250.00
1,265.00
15,515.00

14,250.00
1,265.00
149.50
1,125.00
560.00
17,349.50

625,000.00
90,000.00
45,000.00
22,000.00
Jumlah

625,000.00
90,000.00
45,000.00
22,000.00
782,000.00

625,000.00
90,000.00
45,000.00
22,000.00
782,000.00

660,000.00
90,000.00
45,000.00
22,000.00
Jumlah

90,000.00
45,000.00
22,000.00
157,000.00

660,000.00
90,000.00
45,000.00
22,000.00
817,000.00

35,000.00
35,000.00
15,000.00
3,000.00
55,000.00
45,000.00
45,000.00
70,000.00

3,500.00
5,250.00
3,000.00
1,500.00
19,250.00
225.00
22,500.00
70.00

3,500.00
5,250.00
3,000.00
1,500.00
19,250.00
225.00
22,500.00
70.00
55,295.00

55,000.00
250.00
200.00
15,000.00
8,000.00
7,500.00
Jumlah

55,000.00
3,500.00
280.00
3,750.00
444.44

55,000.00
3,500.00
280.00
3,750.00
444.44
7,500.00
70,474.44

12,500.00
250.00
200.00
7,500.00
Jumlah

7,500.00
7,500.00

12,500.00
3,500.00
280.00
7,500.00
7,500.00

80,000.00

2,100.00
1,090.00
160,000.00
55,000.00

62,974.44

16,280.00

12,500.00
3,500.00
280.00
7,500.00
23,780.00

80,000.00

80,000.00

31,500.00
10,682.00
20,000.00
5,500.00

31,500.00
10,682.00
20,000.00
5,500.00

NO
1

URAIAN PEKERJAAN

0.01 OH
Kepala tukang batu
0.3 OH Pekerja
0.015 OH Mandor

SATUAN
( Rp. )
2
55,000.00
45,000.00
70,000.00

1 M2 Pas. Bekisting batako 1pc : 5ps


19 Bh Batako
7.6 Kg Semen Portland
0.098 M3 Pasir pasang
0.019 OH Tukang batu
0.01 OH Kepala tukang batu
0.3 OH Pekerja
0.015 OH
Mandor

2,100.00
1,090.00
160,000.00
-

1 Kg Pekerjaan Besi beton


1.05 Kg Besi Beton
0.015 Kg
Kawat Ikat Beton (Bendrat)
0.0019 OH Tukang Besi
0.0045 OH Kepala Tukang Besi
0.007 OH Pekerja
0.004 OH Mandor

8,162.00
13,000.00
55,000.00
65,000.00
40,000.00
70,000.00
Jumlah

UPAH
( Rp. )

BAHAN
( Rp. )

3
550.00
13,500.00
1,050.00
15,100.00

104.50
292.50
280.00
280.00
957.00

HARGA
( Rp. )

4
67,682.00

5
550.00
13,500.00
1,050.00
82,782.00

39,900.00
8,284.00
15,680.00
63,864.00

39,900.00
8,284.00
15,680.00
63,864.00

8,570.10
195.00

8,570.10
195.00
104.50
292.50
280.00
280.00
9,722.10

8,765.10

pasangan kaca mati 5mm= 417600/m2

1080

336

0.0042

16.666666667

66,250.00

0.08
12.5
5600

9130

1.575

harga besi
19
16
13
12

Hrg besi 2/2/11 berat besi/batang


hgr/kg
218,000.00
26.70678
155,300.00
22.48992
100,800.00
18.27306
86,000.00
16.86744

250,048.14
182,287.90
122,727.67
106,240.93
*

8,162.72
6,905.32
5,516.32
5,098.58

9,362.72
8,105.32
6,716.32
6,298.58

0ngkos/kg
32,048.14
26,987.90
21,927.67
20,240.93

1200
1200
1200
1200
1200

PERHITUNGAN ANALISA HARGA SATUAN


PEMBANGUNAN RUMAH SAKIT ARI CANTHI MAS-UBUD
DAFTAR

NO
1

ANALISA

HARGA SATUAN
(RP)

HARGA
UPAH

( Rp)
BAHAN

3.0

4.0

1 1 M3 Galian tanah biasa


0.75 OH
Pekerja
0.03 OH
Mandor

50,000.0
60,000.0

37,500.0
1,500.0
39,000.0

2 1 M3 Urugan Tasirtu dipadatkan


1.20 M3
Tanah urug +pasir urug+batu
0.25 OH
Pekerja
0.01 OH
Mandor
1.00 Ls
Alat Pemadat

42,966.7
50,000.0
60,000.0
5,000.0

51,560.0
12,500.0
600.0
64,660.0

5,000.0
5,000.0

3,000.0
50,000.0
60,000.0

15,000.0
600.0
15,600.0

3,600.0
3,600.0

110,000.0
150,000.0
50,000.0
60,000.0
55,000.0
60,000.0

39,000.0
23,400.0
2,145.0
2,340.0
66,885.0

132,000.0
45,000.0
177,000.0

25,000.0
15,000.0
60,000.0
50,000.0
60,000.0
60,000.0

75,000.0
45,000.0
4,500.0
124,500.0

27,500.0
2,040,000.0
32,640.0
2,100,140.0

6 Beton bertulang
a Beton bertulang dengan mutu K300
371.00 Kg
Semen portland
0.65 M3
Pasir cor
0.65 M3
Kerikil
8.00 OH
Pekerja
0.28 OH
Tukang batu
0.03 OH
Kepala tukang batu
0.08 OH
Mandor

15,000.0
1,050.0
125,000.0
50,000.0
60,000.0
60,000.0

400,000.0
16,500.0
4,980.0
421,480.0

5,565,000.0
682.5
81,250.0
5,646,932.5

b Beton bertulang K 175 1pc:2psr:3krl


326.00 Kg
Semen portland
0.52 M3
Pasir cor
0.78 M3
Kerikil
1.65 OH
Pekerja
0.28 OH
Tukang batu
0.03 OH
Kepala tukang batu
0.08 OH
Mandor

15,000.0
1,050.0
125,000.0
50,000.0
60,000.0
60,000.0

82,500.0
16,500.0
4,980.0
103,980.0

4,890,000.0
546.0
97,500.0
4,988,046.0

2,500,000.0
10,000,000.0
50,000.0

350.0

2,625,000.0
150,000.0
-

1 M3 Urugan pasir
1.20 M3
Pasir urug
0.30 OH
Pekerja
0.01 OH
Mandor
1 M3 Pasangan batu kosong
1.20 M3
Batu karang
0.30 M3
Pasir urug
0.78 OH
Pekerja
0.39 OH
Tukang batu
0.04 OH
Kepala tukang batu
0.04 OH
Mandor
1 M3 Pasangan batu kali 1pc : 5ps (batu karang)
1.10 M3
Batu karang
136.00 kg
Semen portland
0.54 M3
Pasir pasang
1.50 OH
Pekerja
0.75 OH
Tukang batu
0.08 OH
Kepala tukang batu
0.08 OH
Mandor

1 Kg Pembesian dengan besi polos / ulir


1.05 Kg
Besi beton
0.02 Kg
Kawat ikat
0.01 Pekerja

5.0

0.01 tukang besi


0.00 Kepala tukang besi
0.00 Mandor
d 1 M2 Pasang bekisting untuk pondasi
0.04 M3
Kayu terentang
0.30 Kg
Paku usuk
0.10 ltr
Minyak bekisting
0.52 OH
Pekerja
0.26 OH
Tukang kayu
0.03 OH
Kep. Tukang kayu
0.03 OH
Mandor

55,000.0
60,000.0
60,000.0

385.0
42.0
18.0
795.0

2,775,000.0

12,000,000.0
115,000.0
10,000.0
50,000.0
65,000.0
60,000.0

26,000.0
16,900.0
1,560.0
44,460.0

480,000.0
34,500.0
1,000.0
515,500.0

12,000,000.0
115,000.0
10,000.0
50,000.0
65,000.0
60,000.0

26,000.0
16,900.0
1,560.0
44,460.0

540,000.0
34,500.0
1,000.0
575,500.0

12,000,000.0
115,000.0
10,000.0
12,000,000.0
17,000.0
2,750,000.0
50,000.0
65,000.0
60,000.0

33,000.0
21,450.0
1,980.0
56,430.0

480,000.0
46,000.0
2,000.0
180,000.0
5,950.0
5,500,000.0
6,213,950.0

12,000,000.0
115,000.0
10,000.0
12,000,000.0
17,000.0
2,750,000.0
50,000.0
65,000.0
60,000.0

16,000.0
21,450.0
360.0
37,810.0

480,000.0
46,000.0
2,000.0
216,000.0
5,950.0
5,500,000.0
6,249,950.0

1 M2 Pasang bekisting pondasi 2 x pasang


e 1 M2 Pasang bekisting untuk sloop
0.05 M3
Kayu terentang
0.30 Kg
Paku usuk
0.10 ltr
Minyak bekisting
0.52 OH
Pekerja
0.26 OH
Tukang kayu
0.03 OH
Kep. Tukang kayu
0.03 OH
Mandor
1 M2 Pas.bekisting sloop 2 x pakai
( 1xanalisaH86 +(analisa H86-G86))/2
f 1 M2 Pasang bekisting untuk kolom
0.04 M3
Kayu terentang
0.40 Kg
Paku usuk
0.20 ltr
Minyak bekisting
0.02 M3
Kayu usuk
0.35 Lbr
Plywood tebal 9 mm
2.00 Btg
Dolken kayu 8"-10"/4m
0.66 OH
Pekerja
0.33 OH
Tukang kayu
0.03 OH
Kep. Tukang kayu
0.03 OH
Mandor
1 M2 Pas.bekisting kolom 3 x pakai
( 1xanalisaH101 +2(analisa H101-G101))/3
g 1 M2 Pasang bekisting untuk ring
0.04 M3
Kayu terentang
0.40 Kg
Paku usuk
0.20 ltr
Minyak bekisting
0.02 M3
Kayu usuk
0.35 Lbr
Plywood tebal 9 mm
2.00 Btg
Dolken kayu 8"-10"/4m
0.32 OH
Pekerja
0.33 OH
Tukang kayu
0.03 OH
Kep. Tukang kayu
0.01 OH
Mandor
1 M2 Pas.bekisting ring 2 x pakai
( 1xanalisaH116 +1(analisa H116-G116))/2
h 1 M2 Pasang bekisting untuk balok
0.04 M3
Kayu terentang
0.40 Kg
Paku usuk
0.20 ltr
Minyak bekisting
0.02 M3
Kayu usuk
0.35 Lbr
Plywood tebal 9 mm
2.00 Btg
Dolken kayu 8"-10"/4m

12,000,000.0
115,000.0
10,000.0
12,000,000.0
17,000.0
2,750,000.0

480,000.0
46,000.0
2,000.0
216,000.0
5,950.0
5,500,000.0

0.66
0.33
0.03
0.03

OH
OH
OH
OH

Pekerja
Tukang kayu
Kep. Tukang kayu
Mandor

50,000.0
65,000.0
60,000.0

33,000.0
21,450.0
1,980.0
56,430.0

6,249,950.0

1 M2 Pas.bekisting ring 2 x pakai


( 1xanalisaH131 +1(analisa H131-G131))/2
i 1 M2 Pasang bekisting untuk lantai
0.04 M3
Kayu terentang
0.40 Kg
Paku usuk
0.20 ltr
Minyak bekisting
0.02 M3
Kayu usuk
0.35 Lbr
Plywood tebal 9 mm
6.00 Btg
Dolken kayu 8"-10"/4m
0.66 OH
Pekerja
0.33 OH
Tukang kayu
0.03 OH
Kep. Tukang kayu
0.03 OH
Mandor

12,000,000.0
115,000.0
10,000.0
12,000,000.0
17,000.0
2,750,000.0
50,000.0
65,000.0
60,000.0

33,000.0
21,450.0
1,980.0
56,430.0

480,000.0
46,000.0
2,000.0
180,000.0
5,950.0
16,500,000.0
17,213,950.0

1 M2 Pas.bekisting ring 2 x pakai


( 1xanalisaH146 +1(analisa H146-G146))/2
j 1 M2 Pasang bekisting untuk tangga
0.03 M3
Kayu terentang
0.40 Kg
Paku usuk
0.15 ltr
Minyak bekisting
0.02 M3
Kayu usuk
0.35 Lbr
Plywood tebal 9 mm
2.00 Btg
Dolken kayu 8"-10"/4m
0.66 OH
Pekerja
0.33 OH
Tukang kayu
0.03 OH
Kep. Tukang kayu
0.03 OH
Mandor

12,000,000.0
115,000.0
10,000.0
12,000,000.0
17,000.0
2,750,000.0
50,000.0
65,000.0
60,000.0

33,000.0
21,450.0
1,980.0
56,430.0

360,000.0
46,000.0
1,500.0
180,000.0
5,950.0
5,500,000.0
6,093,450.0

1 M2 Pas.bekisting tangga 2 x pakai


( 1xanalisaH161 +1(analisa H161-G161))/2
k 1 M2 Pasang bekisting untuk dinding
0.03 M3
Kayu terentang
0.40 Kg
Paku usuk
0.15 ltr
Minyak bekisting
0.02 M3
Kayu usuk
0.35 Lbr
Plywood tebal 9 mm
3.00 Btg
Dolken kayu 8"-10"/4m
0.66 OH
Pekerja
0.33 OH
Tukang kayu
0.03 OH
Kep. Tukang kayu
0.03 OH
Mandor

12,000,000.0
115,000.0
10,000.0
12,000,000.0
17,000.0
2,750,000.0
50,000.0
65,000.0
60,000.0

33,000.0
21,450.0
1,980.0
56,430.0

360,000.0
46,000.0
1,500.0
180,000.0
5,950.0
8,250,000.0
8,843,450.0

1 M2 Pas.bekisting dinding 2 x pakai


( 1xanalisaH176 +1(analisa H176-G176))/2
1.00
1.00
125.00
10.00
8
1.00
135.00
10.00
9
1.00
160.00
10.00
10
1.00
7

M3
M3
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3

Pek. Beton bertulang K300


Beton bertulang K300 pelat lt 2 dg besi 125 kg
Bahan besi beton
Bekisting
Beton bertulang K300 pelat lt 2 dg besi 135 kg
Bahan besi beton
Bekisting
Beton bertulang K300 pelat lt 2 dg besi 160 kg
Bahan besi beton
Bekisting
Beton bertulang sloop K300 dg besi 220kg

6,068,412.5
###
86,634,050.0
6,068,412.5
###
86,634,050.0
6,068,412.5
###
86,634,050.0
6,068,412.5

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30
31
32

220.00
10.00
1.00
190.00
10.00
1.00
190.00
10.00
1.00
265.00
10.00
1.00
185.00
10.00
1.00
205.00
10.00
1.00
210.00
10.00
1.00
225.00
10.00
1.00
220.00
10.00
1.00
320.00
10.00
1.00
330.00
10.00
1.00
425.00
10.00
1.00
275.00
10.00
1.00
150.00
10.00
1.00
180.00
10.00
1.00
210.00
10.00
1.00
100.00
10.00
1.00
100.00
10.00
1.00
120.00
10.00
1.00
170.00
10.00
1.00
130.00
1.00
160.00
1.00

Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
Kg
m2
M3
Kg
m3
Kg
m3

Bahan besi beton


Bekisting
Beton bertulang K300 ring dg besi 190kg
Bahan besi beton
Bekisting
Beton bertulang Balok K300 dg besi 190 kg
Bahan besi beton
Bekisting
Beton bertulang Balok K300 dg besi 265 kg
Bahan besi beton
Bekisting
Beton bertulang K300 kolom dg besi 185kg
Bahan besi beton
Bekisting
Beton bertulang K300 kolom dg besi 205kg
Bahan besi beton
Bekisting
Beton bertulang K300 kolom dg besi 210kg
Bahan besi beton
Bekisting
Beton bertulang K300 kolom dg besi 225kg
Bahan besi beton
Bekisting
Beton bertulang kolom K300 dg besi 220 kg
Bahan besi beton
Bekisting
Beton bertulang kolom K300 dg besi320 kg
Bahan besi beton
Bekisting
Beton bertulang kolom K300 dg besi330 kg
Bahan besi beton
Bekisting
Beton bertulang kolom K300 dg besi 425 kg
Bahan besi beton
Bekisting
Beton bertulang K300 kolom dg besi 275 kg
Bahan besi beton
Bekisting
Beton bertulang pondasi K300 dg besi 150 kg
Bahan besi beton
Bekisting batako
Beton bertulang pondasi K300 besi 180 kg
Bahan besi beton
Bekisting batako
Beton bertulang pondasi K300 besi 210 kg
Bahan besi beton
Bekisting batako
Beton bertulang tangga K300 besi 100 kg
Bahan besi beton
Bekisting
Beton bertulang dinding K300 besi 100kg
Bahan besi beton
Bekisting
Beton bertulang dinding K300 besi 120kg
Bahan besi beton
Bekisting
Beton bertulang dinding K300 besi 170kg
Bahan besi beton
Bekisting
Beton bertulang lantai K300 besi 130kg
Bahan besi beton
Beton bertulang lantai K300 besi 160kg
Bahan besi beton
Beton bertulang lantai K300 besi 160kg

###
3,322,100.0
6,068,412.5
###
31,627,850.0
6,068,412.5
###
31,814,050.0
6,068,412.5
###
31,814,050.0
6,068,412.5
###
21,277,466.7
6,068,412.5
###
21,277,466.7
6,068,412.5
###
21,277,466.7
6,068,412.5
###
21,277,466.7
6,068,412.5
###
21,277,466.7
6,068,412.5
###
21,277,466.7
6,068,412.5
###
21,277,466.7
6,068,412.5
###
21,277,466.7
6,068,412.5
###
21,277,466.7
6,068,412.5
###
564,660.0
6,068,412.5
###
564,660.0
6,068,412.5
###
564,660.0
6,068,412.5
###
31,031,550.0
6,068,412.5
###
44,781,550.0
6,068,412.5
###
44,781,550.0
6,068,412.5
###
44,781,550.0
6,068,412.5
###
6,068,412.5
###
5,092,026.0

160.00 Kg
33
a

34

35

36

37

38

Bahan besi beton

###

Beton tak bertulang


1 M3 Beton rabat 1pc : 3ps : 5krl
0.91 M3 Kerikil/batu pecah
0.54 M3 Pasir beton
181.60
kg PC 50 kg
0.20
Hr Tukang batu
0.02
Hr Kepala tukang batu
1.20
Hr Pekerja
0.06
Hr Mandor

125,000.0
1,050.0
15,000.0
60,000.0
50,000.0
60,000.0

12,000.0
60,000.0
3,600.0
75,600.0

113,750.0
567.0
2,724,000.0
2,838,317.0

1 M3 Pekerjaan beton cor 1pc : 2ps : 3krl


0.82 M3
Kerikil
0.54 M3
Pasir beton
325.60 kg
PC 50 kg
0.28
Hr Tukang batu
0.03
Hr Kepala tukang batu
1.65
Hr Pekerja
0.08
Hr Mandor

125,000.0
1,050.0
15,000.0
60,000.0
50,000.0
60,000.0

16,500.0
82,500.0
4,950.0
103,950.0

102,500.0
567.0
4,884,000.0
4,987,067.0

1 M2 Pas. batako 1pc : 5ps


15.00 Bh
Batako
4.80 Kg
Semen Portland
0.03 M3
Pasir pasang
0.10 OH
Tukang batu
0.01 OH
Kepala tukang batu
0.30 OH
Pekerja
0.02 OH
Mandor

1,700.0
1,070.0
157,200.0
60,000.0
50,000.0
60,000.0

15,000.0
900.0
15,900.0

25,500.0
5,136.0
3,930.0
6,000.0
40,566.0

1 M2 Pas. batu bata 1/2 bata 1pc : 5ps


70.00 Bh
Batu bata
9.60 Kg
Semen Portland
0.05 M3
Pasir pasang
0.10 OH
Tukang batu
0.01 OH
Kepala tukang batu
0.30 OH
Pekerja
0.02 OH
Mandor

1,000.0
1,070.0
157,200.0
55,000.0
65,000.0
40,000.0
70,000.0

650.0
12,000.0
1,050.0
13,700.0

70,000.0
10,272.0
7,074.0
5,500.0
92,846.0

1 M2 Pas. batu bata 1/2 bata 1pc : 3ps


70.00 Bh
Batu bata
14.37 Kg
Semen Portland
0.04 M3
Pasir pasang
0.10 OH
Tukang batu
0.01 OH
Kepala tukang batu
0.30 OH
Pekerja
0.02 OH
Mandor

1,000.0
1,070.0
157,200.0
55,000.0
65,000.0
40,000.0
60,000.0

5,500.0
650.0
12,000.0
900.0
19,050.0

70,000.0
15,375.9
6,288.0
91,663.9

1 M2 Plesteran tembok 1 : 5 tebal 15 mm


5.18 Kg
Semen Portland
0.03 M3
Pasir pasang
0.30 OH
Pekerja
0.15 OH
Tukang batu
0.02 OH
Kepala tukang batu
0.02 OH
Mandor

1,070.0
157,200.0
40,000.0
55,000.0
65,000.0
60,000.0

5,546.9
4,087.2
9,634.1

12,000.0
8,250.0
975.0
900.0
22,125.0

1 M2 Plesteran tembok 1pc : 2ps tebal 15 mm


10.22 Kg
Semen Portland
0.02 M3
Pasir pasang
0.30 OH
Pekerja
0.15 OH
Tukang batu
0.02 OH
Kepala tukang batu
0.02 OH
Mandor

1,070.0
157,200.0
40,000.0
55,000.0
65,000.0
60,000.0

12,000.0
8,250.0
975.0
900.0
22,125.0

10,939.7
3,144.0
14,083.7

39 1 M2 Pasangan water profing


1.00 M2 Water profing
0.20
Hr Tukang cat
0.02
Hr Kepala tukang cat
0.05
Hr Pekerja
0.00
Hr Mandor

39

18

1 M2 Plesteran tembok 1pc : 3ps tebal 15 mm


7.78 Kg
Semen Portland
0.02 M3
0.30 OH

Pasir pasang
Pekerja

0.15 OH
0.02 OH
0.02 OH

1,070.0

11,600.0
1,200.0
2,500.0
150.0
15,450.0

12,000.0

Tukang batu
Kepala tukang batu

55,000.0
65,000.0

8,250.0
975.0

Mandor

60,000.0

900.0
22,125.0

11,935.9

10,000,000.0
65,000.0

1,170,000.0

11,000,000.0
-

Kayu merbau
Tukang kayu

1.80 OH
6.00 OH

Kepala tukang kayu


Pekerja

50,000.0

300,000.0

0.30 OH

Mandor

60,000.0

18,000.0
1,488,000.0
1,488,000.0

1 M2 Pekerjaan acian dengan PC


7.00
kg
PC 50 Kg

7,650,000.0

15,000.0

11,000,000.0
8,415,000.0
105,000.0

Tukang cat
Kepala tukang cat

58,000.0
60,000.0

8,120.0
900.0

0.20 OH
0.00 OH

Pekerja
Mandor

50,000.0
60,000.0

10,000.0
120.0

105,000.0

1 M2 Pekerjaan acian dengan mil


0.10
1.00

Zak
kg

Mil
PC 50 Kg

17,000.0
15,000.0

0.08 OH
0.01 OH

Tukang cat
Kepala tukang cat

58,000.0
60,000.0

4,350.0
420.0

0.10 OH
0.01 OH

Pekerja
Mandor

50,000.0
60,000.0

5,000.0
600.0
10,370.0

16,700.0

70,000.0
65,000.0

162,500.0

2,800.0
-

1 M2 Pek. daun pintu/jendela ( panel )


0.04
M3 Papan jati
2.50
Hr
Tukang kayu

1,700.0
15,000.0
-

0.25
1.00

Hr
Hr

Kepala tukang kayu


Pekerja

50,000.0

50,000.0

0.05

Hr

Mandor

60,000.0

3,000.0
215,500.0

2,800.0

250,000.0

215,500.0

10,000.0

Kayu kamper papan

22

3,615.6
-

0.14 OH
0.02 OH

19,140.0

21

8,320.3

157,200.0
40,000.0

Kayu kamper balok

20

135,000.0
135,000.0

1 M3 Pekerjaan kuzen
1.10
M3
18.00 OH

19

135,000.0
58,000.0
60,000.0
50,000.0
60,000.0

1 M2 Pasangan keramik 30x30 camp. 1pc : 2psr


11.87
M2 Keramik 30x30

3,454.5

41,005.5

10.00
0.05

Kg
M3

Semen portland
Pasir pasang

15,000.0
60,000.0

150,000.0
2,700.0

1.50
0.13

Kg
Hr

Semen warna
Tukang batu

15,000.0
60,000.0

7,800.0

0.01
0.27
0.01

Hr
Hr
Hr

Kepala tukang batu


Pekerja
Mandor

50,000.0
60,000.0

13,500.0
780.0

38,000.0

22,080.0
22,080.0

1 M2 Keramik 20x20 (warna muda) Asia Til

22,500.0
216,205.5
213,200.0

1 M2 Keramik 20x20 (warna tua) Asia tile


1 M2 Keramik 20x25 (warna muda) Asia tile

39,000.0
38,000.0

22,080.0
22,080.0

214,200.0
213,200.0

1 M2 Keramik 20x25 (warna tua) Asia tile


1 M2 Keramik 40x40 (warna muda) Asia tile
1 M2 Keramik 40x40 (warna tua) Asia tile

40,000.0
41,000.0
45,000.0

22,080.0
22,080.0
22,080.0

215,200.0
216,200.0
220,200.0

165,000.0
125,000.0

22,080.0
22,080.0

356,700.0
300,200.0

1M2
1M2
23

Esensa 40x40
Nero Granit 40 x40

1 M' Pasangan plin keramik 10x30 camp. 1pc : 2psr


3.33
Bh Keramik 10x30 (warna muda)

1,151.5

3,834.5

1.65
0.00
0.10

Kg
M3
Kg

Semen portland
Pasir pasang
Semen warna

15,000.0
60,000.0
15,000.0

24,750.0
192.0
1,500.0

0.03
0.00

Hr
Hr

Tukang batu
Kepala tukang batu

60,000.0
-

1,800.0
-

0.06
0.00

Hr
Hr

Pekerja
Mandor

50,000.0
60,000.0

3,000.0
180.0

4,980.0
24

2.50
1.65
0.00

Bh
Kg
M3

Keramik 10x40 (warna muda)


Semen portland
Pasir pasang

1,875.0
15,000.0
60,000.0

0.10
0.03

Kg
Hr

Semen warna
Tukang batu

15,000.0
60,000.0

1,800.0

0.00
0.06

Hr
Hr

Kepala tukang batu


Pekerja

50,000.0

3,000.0

0.00

Hr

Mandor

60,000.0

180.0
4,980.0
4,980.0

Kramik Isensa

37

6,500.0

4,687.5
24,750.0
192.0
1,500.0
31,129.5
42,692.0

1 M2 Pek. Mengecat tembok 1x plamir, 2 x mengecat


0.10
0.26
0.10

Kg
Kg
Kg

cat dasar
Cat tembok vinilek
Plamur tembok

33,750.0
6,000.0
-

0.06
0.01

Hr
Hr

Tukang cat
Kepala tukang cat

58,000.0
60,000.0

3,654.0
378.0

0.02
0.03

Hr
Hr

Pekerja
Mandor

50,000.0
60,000.0

1,000.0
1,500.0

53,800.0

6,532.0
6,532.0

4,935.0
19,368.0

280,000.0

6,532.0

100,800.0

Cat Dulux
Decolith

16

30,276.5

1 M' Pasangan plin keramik 10x40 camp. 1pc : 2psr

1 M2 Pekerjaan batu Laparok


0.38 M3
Batu Laparok

7,500.0

1.75 KG
0.06 M3
1.20 OH

PC 50 kg
Pasir pasang
Tukang batu

15,000.0
60,000.0
60,000.0

72,000.0

0.85 OH
0.12 OH

Pekerja
Kep. tukang batu

50,000.0
-

42,500.0
-

0.06 OH

Mandor

60,000.0

3,600.0
118,100.0

3,375.0
1,560.0
-

2,850.0
26,250.0
3,600.0
32,700.0

1 M3 Pekerjaan Kuda-Kuda kayu Kamper


1.10
M3 Balok kamper
15.00
0.80

Kg
Kg

12.00 OH
1.20 OH
4.00 OH
0.20 OH
a
b

Besi strip
Paku biasa 1/2"-1"

6,750.0
115,000.0

101,250.0
92,000.0

Tukang kayu
Kepala tukang kayu

65,000.0
-

780,000.0
-

Pekerja
Mandor

50,000.0
60,000.0

200,000.0
12,000.0
992,000.0

193,250.0

1,240,000.0
1,240,000.0

193,250.0
193,250.0

Balok kruing
Balok kamper diketam

c
Balok jati diketam
1 M2 Pekerjaan usuk kamper 5/7

1,240,000.0

0.01
M3
0.10
Kg
0.06 OH

Usuk kamper
Paku usuk
Tukang kayu

80,000.0
65,000.0

3,711.5

0.01 OH
0.06 OH

Kepala tukang kayu


Pekerja

50,000.0

2,855.0

0.00 OH

Mandor

60,000.0

168.0
6,734.5

8,000.0

8,418.1
6,734.5

8,000.0
-

a
b

Usuk kamper diketam


Usuk kruing

c
Usuk kruing diketam
d
Usuk jati
1 M2 Pekerjaan usuk expose
0.01
0.15

M3
Kg

10,522.7
6,734.5

Usuk Kayu Kamper


Kg Paku usuk

80,000.0

0.11 OH
0.01 OH

Tukang Kayu
Kepala Tukang Kayu

65,000.0
-

6,825.0
-

0.11 OH
0.03 OH

Pekerja
Mandor

50,000.0
60,000.0

5,250.0
1,890.0
13,965.0

12,000.0

13,965.0
13,965.0

12,000.0
12,000.0

Usuk kruing
Usuk jati
1 M2 Pekerjaan reng kamper untuk genteng
0.01
M3 Reng kayu kamper

8,000.0
-

0.15
Kg
0.04 OH

Paku reng
Tukang kayu

80,000.0
65,000.0

2,782.0

0.00 OH
0.04 OH
0.00 OH

Kepala tukang kayu


Pekerja
Mandor

50,000.0
60,000.0

2,140.0
126.0

12,000.0
-

12,000.0
-

5,048.0

12,000.0

5,048.0
5,048.0

12,000.0

1 M2 Pek.reng kamper 3/5 untuk genteng


0.01
m3 reng kayu kamper
1 M2 Pek.reng jati 3/5 untuk genteng

1 M2 Pasangan teakwood 4 mm diatas usuk expose profil


0.39
Lbr Teakwood 4 mm

Kg
OH
OH

Paku reng
Tukang kayu
Kepala tukang kayu

OH
OH

Pekerja
Mandor

Bedeg kulit

Lambersering kayu kamper

1 M2 Pekerjaan plafond plywood 4 mm


0.39
0.02

Lbr
M3

Plywood 4 mm
Usuk kruing

0.06
Kg
0.40 OH

Paku usuk
Tukang kayu

80,000.0
65,000.0

26,000.0

0.04 OH
0.27 OH

Kepala tukang kayu


Pekerja

50,000.0

13,500.0

0.01 OH

Mandor

60,000.0

1 M2 Pekerjaan plafond plywood 6 mm

810.0
40,310.0
40,310.0

4,800.0
4,800.0

1 M2 Pek.plafond cellingteak
1 M2 Plafond Calciboard 6 mm

40,310.0
40,310.0

4,800.0
4,800.0

1 M' Pasang list plafond kayu profil


1.05
M'
Kayu profil 3/5 kamper

0.00
Kg
0.02 OH
0.00 OH

Paku list
Tukang kayu
Kepala tukang kayu

19,000.0
65,000.0
-

1,365.0
-

0.02 OH
0.00 OH

Pekerja
Mandor

50,000.0
60,000.0

1,050.0
63.0
2,415.0

1 M2 Pek. papan lisplank kamper (papan rambu)


0.03
M3 Papan kamper
0.10
Kg Paku reng

80,000.0

4,800.0
-

19.0
19.0

8,000.0

0.80 OH
0.08 OH

Tukang kayu
Kepala tukang kayu

65,000.0
-

52,000.0
-

0.28 OH
0.01 OH

Pekerja
Mandor

50,000.0
60,000.0

14,000.0
840.0

papan jati

66,840.0
66,840.0

8,000.0
8,000.0

Papan jati diukir

66,840.0

8,000.0

56,000.0
-

1 M2 Pasang atap genteng kodok bambe


20.00
Bh
0.06 OH

Genteng kodok bambe


Tukang kayu

2,800.0
65,000.0

3,900.0

0.01 OH
0.15 OH

Kepala tukang kayu


Pekerja

50,000.0

7,500.0

0.01 OH

Mandor

60,000.0

480.0
11,880.0
11,880.0

Genteng spandek

1 M1 Pasang bubungan bambe


3.50
Bh Bubungan bambe

56,000.0
-

10,000.0

35,000.0

Semen portland
Pasir pasang

15,000.0
60,000.0

120,000.0
1,920.0

0.20 OH
0.02 OH
0.40 OH

Tukang kayu
Kepala tukang kayu
Pekerja

65,000.0
50,000.0

13,000.0
20,000.0

0.02 OH

Mandor

60,000.0

1,200.0
34,200.0

8.00
0.03

Kg
M3

Bubungan spandek

34,200.0

156,920.0
-

44

45

1 M' Pasangan plin keramik 10x40 camp. 1pc : 2psr


2.50
Bh Keramik 10x40 (warna muda)

1.65
0.00

Kg
M3

Semen portland
Pasir pasang

0.10
0.03

Kg
Hr

Semen warna
Tukang batu

0.00
0.06
0.00

Hr
Hr
Hr

Kepala tukang batu


Pekerja
Mandor

1 M2 Pasang atap genteng kodok bambe


20.00
0.06

Bh
Hr

Genteng kodok bambe


Tukang kayu

0.01
0.15

Hr
Hr

Kepala tukang kayu


Pekerja

0.01

Hr

Mandor

Genteng spandek
46

1 M1 Pasang bubungan bambe


3.50
Bh Bubungan bambe

8.00
0.03

Kg
M3

Semen portland
Pasir pasang

0.20
0.02
0.40

Hr
Hr
Hr

Tukang kayu
Kepala tukang kayu
Pekerja

0.02

Hr

Mandor

Bubungan spandek
47

1 M2 Pek. papan lisplank kamper (papan rambu)


0.03
M3 Papan kamper
0.10
Kg Paku reng
0.80
0.08

Hr
Hr

Tukang kayu
Kepala tukang kayu

0.28
0.01

Hr
Hr

Pekerja
Mandor

papan jati
48

49

1 M2 Pekerjaan papan talang


0.03
M3 Kayu kruing papan
0.20
Bh Paku usuk
0.80
0.08

Hr
Hr

Tukang kayu
Kepala tukang kayu

0.25
0.01

Hr
Hr

Pekerja
Mandor

1 M2 Memvernis
0.37
Ltr Vernis

50

0.50
0.12

Lbr
Hr

Amplas
Tukang cat

0.13
0.15
0.02

Hr
Hr
Hr

Kepala tukang cat


Pekerja
Mandor

Batu bata
Semen Portland

0.04 M3
0.10 OH
0.01 OH

Pasir pasang
Tukang batu
Kepala tukang batu

0.32 OH
0.02 OH

Pekerja
Mandor

Batu bata
Semen Portland

0.04 M3
0.10 OH
0.01 OH

Pasir pasang
Tukang batu
Kepala tukang batu

0.32 OH
0.02 OH

Pekerja
Mandor

Galian tanah
Pasir urug
Beton cor

Plesteran 1 pc : 3 ps
Acian

Pas. Bata merah 1 pc : 3 ps


Pek. Beton bertulang

1 M2 Pas. batu bata 1/2 bata 1pc : 5ps


70.00 Bh
11.50 Kg

51

1 M2 Pas. batu bata 1/2 bata 1pc : 3ps


70.00 Bh
14.37 Kg

52 1 Unit Pek. Septik tank 1 x 2 x 1.5


5.80 M3
0.16 M3
0.26 M3
14.64 M2
14.64 M2
1.46 M3
0.37 M3

53 1 Unit Pek. Peresapan 1 x 1 x 1.5

54

1.00 M2
1.50 M3

Ijuk
Galian tanah

0.50 M3
0.06 M3

Pasir urug
Beton cor

0.50 M2
0.60 M3

Kerikil
Pas. Bata merah 1 pc : 3 ps

1 M2 Pekerjaan polituran
0.10
Ltr
Politur Ultra

0.15
0.20

Ltr
Ltr

Impra wood filler


Thiner

0.50
0.35

Lbr
Hr

Amplas
Tukang cat

0.01
0.50
0.00

Hr
Hr
Hr

Kepala tukang cat


Pekerja
Mandor

55

1 M3 Pekerjaan kuzen
1.20
18.00

M3
Hr

Balok jati
Tukang kayu

54,000.0
58,000.0

2.00
6.00

Hr
Hr

Kepala tukang kayu


Pekerja

0.30

Hr

Mandor

Kayu kamper balok

57

135,000.0

1,044,000.0
1,044,000.0

0.02
0.03

M3
Kg

Papan kamper
Paku 1/2"-1"

250,000.0
-

0.30
1.00
2.00

Ltr
Lbr
Hr

Lem kayu
Teakwood
Tukang kayu

15,000.0
65,000.0

130,000.0

0.20
0.60

Hr
Hr

Kepala tukang kayu


Pekerja

50,000.0

30,000.0

0.03

Hr

Mandor

60,000.0

1,800.0
161,800.0

1 M2 Pek. daun pintu teakwood + aluminium kulit jeruk


0.02
M3 Papan jati
0.39
Lbr Teakwood

161,800.0

50

64,800.0
162,000.0

4,900.0
4,500.0
9,400.0
-

1,050.0
-

1,875.0

0.39
0.13

Lbr
Kg

Aluminium kulit jeruk


Lem Aica Aibon

15,000.0

0.10
3.00

Kg
Hr

Paku list
Tukang kayu

58,000.0

174,000.0

0.30
1.25
0.06

Hr
Hr
Hr

Kepala tukang kayu


Pekerja
Mandor

50,000.0
60,000.0

62,500.0
3,750.0

2,925.0

1 M2 Pekerjaan daun pintu/jendela kamper kaca polos 5 mm


0.02
0.80

M3
M2

Kayu jati papan


Kaca bening 5 mm

0.10
6.00
0.60

Kg
Hr
Hr

Paku list
Tukang kayu
Kepala tukang kayu

2.00
0.10

Hr
Hr

Pekerja
Mandor

Kaca 3 mm
49

70,000.0
-

240,250.0
48

64,800.0
-

1 M2 Pek. daun pintu teakwood rangkap rangka kayu kamper

Plywood 4 mm
58

1,044,000.0

1 Buah engsel untuk jendela


1.00
Bh Engsel jendela
0.10
0.01
0.01

Hr
Hr
Hr

Tukang besi
Kepala tukang besi
Pekerja

0.00

Hr

Mandor

1 Buah engsel untuk pintu


1.00
Bh Engsel pintu
0.15
0.02
0.02

Hr
Hr
Hr

Tukang besi
Kepala tukang besi
Pekerja

70,000.0
4,100,000.0

7,650,000.0
17,500.0
46,000.0
55,000.0
-

11,500.0
46,000.0
55,000.0
-

1,050.0
3,280,000.0

3,281,050.0
3,394,750.0

17,500.0

4,600.0
550.0
5,150.0
6,900.0
825.0
-

17,500.0
11,500.0
-

0.00
51

52

53

54

55

56

Hr

Mandor

1 Buah pasangan grendel jendela/ventilasi


1.00
Bh Grendel kuningan
0.15
Hr
Tukang besi
0.02
0.02

Hr
Hr

Kepala tukang besi


Pekerja

0.00

Hr

Mandor

1 Buah pasangan espanolet


1.00
Bh Espanolet
0.15
Hr
Tukang besi
0.02
0.02

Hr
Hr

Kepala tukang besi


Pekerja

0.00

Hr

Mandor

1 Buah pasangan kunci tanam besar (2 x putar)


1.00
Bh Kunci tanam
0.60
0.06
0.06

Hr
Hr
Hr

Tukang besi
Kepala tukang besi
Pekerja

0.00

Hr

Mandor

7,725.0

11,500.0

5,500,000.0
46,000.0

6,900.0

5,500,000.0
-

55,000.0
-

825.0
-

7,725.0

58

59

5,500,000.0

46,000.0

6,900.0

55,000.0
-

825.0
-

7,725.0

30,000.0
46,000.0
55,000.0
-

27,600.0
3,300.0
-

30,000.0
-

30,900.0

30,000.0

23,000.0
2,750.0

85,000.0
-

1 Buah pasangan kunci tombol/silinder


1.00
0.50
0.05

Bh
Hr
Hr

Kunci silinder
Tukang besi
Kepala tukang besi

0.05
0.00

Hr
Hr

Pekerja
Mandor

85,000.0
46,000.0
55,000.0
-

25,750.0

85,000.0

6,900.0
825.0

6,500.0
-

1 Buah pasangan kait angin


1.00
0.15
0.02

Bh
Hr
Hr

Kait angin
Tukang besi
Kepala tukang besi

0.02
0.00

Hr
Hr

Pekerja
Mandor

6,500.0
46,000.0
55,000.0
-

7,725.0

6,500.0

950,000.0
46,000.0

27,600.0

950,000.0
-

55,000.0
-

3,300.0
-

1 Buah pasangan rel pintu dorong


1.00
0.60

Bh
Hr

Rel pintu dorong


Tukang besi

0.06
0.06
0.00

Hr
Hr
Hr

Kepala tukang besi


Pekerja
Mandor

30,900.0
57

950,000.0

Memasang 1 buah kloset duduk


1.00
1.00

Bh
Ls

Kloset duduk
Perelengkapan (6%)

1.10
0.00
3.30

Hr
Hr
Hr

Tukang batu
Kepala tukang batu
Pekerja

0.16

Hr

Mandor

Memasang 1 buah kloset jongkok


1.00
Bh Kloset jongkok

8,000.0
480.0
55,000.0
-

60,500.0
60,500.0

8,000.0
480.0
8,480.0

60,000.0

60,000.0

6.00
0.01

Kg
M3

Semen portland
Pasir pasang

300.0
60,000.0

1,800.0
600.0

1.50
1.50
1.00

Hr
Hr
Hr

Tukang batu
Kepala tukang batu
Pekerja

55,000.0
-

0.16

Hr

Mandor

Memasang 1 buah wastafel


1.00
Bh Wastafel

82,500.0
82,500.0
-

62,400.0
-

1.00
6.00

Ls
Kg

Perlengkapan (12%)
Semen portland

0.01
1.45
0.15

M3
Hr
Hr

Pasir pasang
Tukang batu
Kepala tukang batu

1.20
0.10

Hr
Hr

Pekerja
Mandor

300.0
60,000.0
55,000.0
-

79,750.0
79,750.0

60

61

62

1,800.0
600.0
2,400.0

Memasang 1 buah urinoir


1.00
1.00
6.00

Bh
Ls
Kg

Urinoir
Perlengkapan (30%)
Semen portland

0.01
1.00

M3
Hr

Pasir pasang
Tukang batu

0.10
1.00

Hr
Hr

Kepala tukang batu


Pekerja

0.10

Hr

Mandor

Memasang 1 buah floor drain


1.00
Bh floor drain
0.10
Hr
Tukang batu

1,125,000.0
337,500.0
300.0
60,000.0
55,000.0

12,000.0
55,000.0

0.01
0.01

Hr
Hr

Kepala tukang batu


Pekerja

0.01

Hr

Mandor

Memasang 1 buah bak mandi


1.00
Bh Bak mandi
1.00
Ls
Perlengkapan ( 18 % )
2.70
0.54

Hr
Hr

Tukang batu
Kepala tukang batu

1.80
0.11

Hr
Hr

Pekerja
Mandor

175,000.0
31,500.0
55,000.0
-

55,000.0
-

0.01 M3
0.15 OH

Papan jati
Tukang besi

0.02 OH
0.02 OH
0.00 OH

Kep. tukang besi


Pekerja
Mandor
Kaca 3 mm

Kaca 6 mm
65 1 M' Pasangan keramik stop nose camp 1pc : 2ps
5.00
Bj
Keramik stop nose 6 x 20 cm
0.03
Zak PC 50 kg
0.00
M3 Pasir pasang
0.05
Hr
Tukang batu
0.01
Hr
Kepala tukang batu
0.10
Hr
Pekerja
0.01
Hr
Mandor

600.0
-

55,000.0

1,464,900.0

5,500.0

12,000.0
-

5,500.0
148,500.0
148,500.0

64 1 M2 Pekerjaan kaca mati 5 mm


1.10 M2
Kaca 5 mm

1,125,000.0
337,500.0
1,800.0

12,000.0
175,000.0
31,500.0
206,500.0

4,100,000.0

4,510,000.0

70,000.0
-

350.0
-

7,650,000.0

4,510,350.0
8,415,350.0

4,300,000.0

4,730,350.0

12,500.0
15,000.0
60,000.0
55,000.0
45,000.0
55,000.0

2,750.0
4,500.0
550.0
7,800.0

62,500.0
375.0
120.0
62,995.0

64 1 M2 Pasangan grass block


1.00 M2
Grass block
0.06 M3
Pasir
0.05 M3
Tanah urug
0.50 M2
Rumput
0.28 OH
Tukang batu
0.13 OH
Kep. tukang batu
0.23 OH
Pekerja
0.02 OH
Mandor

56,700.0
3,000.0
900.0
20,000.0
55,000.0
45,000.0
55,000.0

15,125.0
10,125.0
825.0
26,075.0

56,700.0
180.0
43.2
10,000.0
66,923.2

65 Biaya Menggilas per bulan


30.00 OH
Masinis
30.00 OH
Karnet
30.00 OH
Sewa walles
30.00 Ltr
Olie
600.00 Ltr
Bahan bakar solar

45,000.0
35,000.0
220,000.0
22,000.0
5,500.0

1,350,000.0
1,050,000.0
6,600,000.0
9,000,000.0

660,000.0
3,300,000.0
3,960,000.0

66 1 M2 Aspal Pecing
0.09 Ton
Aspal AC
0.25 OH
Pekerja
0.02 OH
Mandor
0.05 Biaya Gilas

900,000.0
45,000.0
55,000.0
129,600.0

11,250.0
825.0
5,832.0
12,075.0

81,810.0
1.0
2.0
81,811.0

67 1 M2 Aspal AC t = 4 cm
0.09 Ton
Aspal AC
0.25 OH
Pekerja
0.02 OH
Mandor
0.05 Biaya Gilas

900,000.0
45,000.0
55,000.0
129,600.0

11,250.0
825.0
5,832.0
12,075.0

81,810.0
1.0
2.0
81,811.0

68 1 M2 Aspal Send Sheet


0.04 Ton
Aspal Send Sheet
0.25 OH
Pekerja
0.02 OH
Mandor
0.05 Biaya Gilas

900,000.0
45,000.0
55,000.0
129,600.0

11,250.0
825.0
5,832.0
12,075.0

32,130.0
1.0
2.0
32,131.0

69 1 M2 Pek. Lapis perekat


0.80 Kg
Aspal emulsi
0.25 OH
Pekerja
0.02 OH
Mandor

6,000.0
45,000.0
55,000.0

11,250.0
825.0
12,075.0

4,800.0
1.0
4,801.0

70 1 M2 Pek. Cat Marka Jalan


4.00 Kg
Cat Termoplastik
1.00 Kg
Glass bead
0.55 Kg
Tabung Gas Elpiji
0.13 OH
Tukang cat
0.07 OH
Kep. tukang cat
0.23 OH
Pekerja
0.02 OH
Mandor

11,000.0
12,500.0
2,500.0
48,000.0
55,000.0
45,000.0
55,000.0

6,096.0
3,575.0
10,125.0
935.0
20,731.0

44,000.0
12,500.0
1,375.0
57,875.0

71 1 M3 Urugan tanah
1.00 M3
0.25 OH
0.01 OH

1,000.0
45,000.0
55,000.0

11,250.0
550.0
11,800.0

1,000.0
1,000.0

85,000.0
45,000.0
55,000.0

11,250.0
550.0
550.0

85,000.0
85,000.0

subur
Tanah subur
Pekerja
Mandor

72 1 M3 penebaran pupuk kandang


1.00 M3
Pupuk kandang
0.25 OH
Pekerja
0.01 OH
Mandor
73 Pemasangan tiang khusus 7 m
1.00 Bh
Tiang
0.32 M3
Galian Tanah

1,618,000.0
-

1,618,000.0
-

0.47
2.45
0.25
2.00
0.10

M3
M2
OH
OH
OH

Beton 1 : 2 : 3
Plesteran 1 : 2
Tukang Listrik
Pekerja / Pekerja tak terlatih
Mandor Lapangan

74 Pemasangan 1 bh lampu mercury 125 watt


1.00 Bh
Lampu Mercury 125 Watt
7.00 M
Kabel NYY 2 x 2,5 mm
2.00 Bh
Presing Clem
1.00 Ls
Ongkos Pemasangan Lampu
75 1 M2 Pasang batu tabas
20.00 Bj
batu tabas
0.15 Zak
PC 50 kg
2.00 OH
Tukang style Bali
0.40 OH
Kep. tukang style Bali
2.00 OH
Pekerja
0.10 OH
Mandor

15,375.9

11,250.0
90,000.0
5,500.0
106,750.0

7,195.9
#VALUE!
#VALUE!

1,557,600.0
9,600.0
31,000.0
200,000.0

200,000.0
200,000.0

1,557,600.0
67,200.0
62,000.0
1,686,800.0

20,000.0
15,000.0
42,000.0
45,000.0
55,000.0

84,000.0
90,000.0
5,500.0
179,500.0

400,000.0
2,175.0
402,175.0

45,000.0
45,000.0
55,000.0

76 1 M2 Bongkar Genteng
0.02

OH

Pekerja

45,000.0

900.0

0.01

OH

Mandor

55,000.0

550.0

1,450.0

77 1 M2 Bongkar Plafond
0.03

OH

Tukang Kayu

0.03

OH

Kepala Tukang kayu

0.05

OH

Pekerja

45,000.0

2,250.0

0.01

OH

Mandor

55,000.0

275.0

2,525.0

78 1 M2 Pek. Bongkar Usuk


0.10

OH

Pekerja

45,000.0

4,500.0

0.01

OH

Mandor

55,000.0

275.0

4,775.0

JML HARGA (Rp)


6.0

37,500.0
1,500.0
39,000.0
51,560.0
12,500.0
600.0
5,000.0
69,660.0
3,600.0
15,000.0
600.0
19,200.0
132,000.0
45,000.0
39,000.0
23,400.0
2,145.0
2,340.0
243,885.0
27,500.0
2,040,000.0
32,640.0
75,000.0
45,000.0
4,500.0
2,224,640.0

5,565,000.0
682.5
81,250.0
400,000.0
16,500.0
4,980.0
6,068,412.5
4,890,000.0
546.0
97,500.0
82,500.0
16,500.0
4,980.0
5,092,026.0
2,625,000.0
150,000.0
350.0

385.0
42.0
18.0
2,775,795.0
480,000.0
34,500.0
1,000.0
26,000.0
16,900.0
1,560.0
559,960.0
302,210.0

540,000.0
34,500.0
1,000.0
26,000.0
16,900.0
1,560.0
619,960.0
332,210.0

480,000.0
46,000.0
2,000.0
180,000.0
5,950.0
5,500,000.0
33,000.0
21,450.0
1,980.0
6,270,380.0
2,127,746.7

480,000.0
46,000.0
2,000.0
216,000.0
5,950.0
5,500,000.0
16,000.0
21,450.0
360.0
6,287,760.0
3,162,785.0

480,000.0
46,000.0
2,000.0
216,000.0
5,950.0
5,500,000.0

###

33,000.0
21,450.0
1,980.0
6,306,380.0
3,181,405.0

480,000.0
46,000.0
2,000.0
180,000.0
5,950.0
16,500,000.0
33,000.0
21,450.0
1,980.0
17,270,380.0
8,663,405.0

360,000.0
46,000.0
1,500.0
180,000.0
5,950.0
5,500,000.0
33,000.0
21,450.0
1,980.0
6,149,880.0
3,103,155.0

360,000.0
46,000.0
1,500.0
180,000.0
5,950.0
8,250,000.0
33,000.0
21,450.0
1,980.0
8,899,880.0
4,478,155.0

439,676,837.5

467,434,787.5

536,829,662.5

620,065,412.5

565,097,312.5

565,283,512.5

773,468,137.5

540,867,954.2

596,383,854.2

610,262,829.2

651,899,754.2

638,020,779.2

915,600,279.2

943,358,229.2

###

790,689,504.2

423,002,322.5

506,276,172.5

589,550,022.5

314,679,462.5

328,429,462.5

383,945,362.5

522,735,112.5
366,921,762.5
450,195,612.5

449,219,226.0

113,750.0
567.0
2,724,000.0
12,000.0
60,000.0
3,600.0
2,913,917.0
102,500.0
567.0
4,884,000.0
16,500.0
82,500.0
4,950.0
5,091,017.0
25,500.0
5,136.0
3,930.0
6,000.0
15,000.0
900.0
56,466.0
70,000.0
10,272.0
7,074.0
5,500.0
650.0
12,000.0
1,050.0
106,546.0
70,000.0
15,375.9
6,288.0
5,500.0
650.0
12,000.0
900.0
110,713.9
5,546.9
4,087.2
12,000.0
8,250.0
975.0
900.0
31,759.1
10,939.7
3,144.0
12,000.0
8,250.0
975.0
900.0
36,208.7

135,000.0
11,600.0
1,200.0
2,500.0
150.0
150,450.0

8,320.3
3,615.6
12,000.0
8,250.0
975.0
900.0
34,060.9
11,000,000.0
1,170,000.0
300,000.0
18,000.0
12,488,000.0
9,903,000.0
105,000.0
8,120.0
900.0
10,000.0
120.0
124,140.0

1,700.0
15,000.0
4,350.0
420.0
5,000.0
600.0
27,070.0

2,800.0
162,500.0
50,000.0
3,000.0
218,300.0
225,500.0

41,005.5
150,000.0
2,700.0
22,500.0
7,800.0
13,500.0
780.0
238,285.5
235,280.0

236,280.0
235,280.0
237,280.0
238,280.0
242,280.0
378,780.0
322,280.0
3,834.5
24,750.0
192.0
1,500.0
1,800.0
3,000.0
180.0
35,256.5
4,687.5
24,750.0
192.0
1,500.0
1,800.0
3,000.0
180.0
36,109.5
47,672.0

3,375.0
1,560.0
3,654.0
378.0
1,000.0
1,500.0
11,467.0
25,900.0
107,332.0

2,850.0
26,250.0
3,600.0
72,000.0
42,500.0
3,600.0
150,800.0

101,250.0
92,000.0
780,000.0
200,000.0
12,000.0
1,185,250.0
1,433,250.0
1,433,250.0
1,240,000.0
8,000.0
3,711.5
2,855.0
168.0
14,734.5
16,418.1
6,734.5
10,522.7
6,734.5
12,000.0
6,825.0
5,250.0
1,890.0
25,965.0
25,965.0
25,965.0
12,000.0
2,782.0
2,140.0
126.0
17,048.0
5,048.0
17,048.0

4,800.0
26,000.0
13,500.0
810.0
45,110.0
45,110.0
45,110.0
45,110.0
19.0
1,365.0
1,050.0
63.0
2,497.0

8,000.0
52,000.0
14,000.0
840.0
74,840.0
74,840.0
74,840.0

56,000.0
3,900.0
7,500.0
480.0
67,880.0
11,880.0

35,000.0
120,000.0
1,920.0
13,000.0
20,000.0
1,200.0
191,120.0
34,200.0

64,800.0
1,044,000.0
1,108,800.0
1,206,000.0

4,900.0
4,500.0
130,000.0
30,000.0
1,800.0
171,200.0
161,800.0

1,050.0
1,875.0
174,000.0
62,500.0
3,750.0
243,175.0
1,050.0
3,280,000.0
3,281,050.0
3,394,750.0
17,500.0
4,600.0
550.0
22,650.0
11,500.0
6,900.0
825.0
-

19,225.0
5,500,000.0
6,900.0
825.0
5,507,725.0
6,900.0
825.0
7,725.0
30,000.0
27,600.0
3,300.0
60,900.0

85,000.0
23,000.0
2,750.0
110,750.0
6,500.0
6,900.0
825.0
14,225.0
950,000.0
27,600.0
3,300.0
980,900.0
8,000.0
480.0
60,500.0
68,980.0
60,000.0
1,800.0
600.0
82,500.0
144,900.0
-

1,800.0
600.0
79,750.0
82,150.0
1,125,000.0
337,500.0
1,800.0
600.0
55,000.0
1,519,900.0
12,000.0
5,500.0
17,500.0
175,000.0
31,500.0
148,500.0
355,000.0

4,510,000.0
350.0
4,510,350.0
8,415,350.0
4,730,350.0
62,500.0
375.0
120.0
2,750.0
4,500.0
550.0
70,795.0

56,700.0
180.0
43.2
10,000.0
15,125.0
10,125.0
825.0
92,998.2

1,350,000.0
1,050,000.0
6,600,000.0
660,000.0
3,300,000.0
12,960,000.0
81,810.0
11,250.0
825.0
5,832.0
93,885.0
81,810.0
11,250.0
825.0
5,832.0
93,885.0
32,130.0
11,250.0
825.0
5,832.0
44,205.0
4,800.0
11,250.0
825.0
16,875.0
44,000.0
12,500.0
1,375.0
6,096.0
3,575.0
10,125.0
935.0
78,606.0
1,000.0
11,250.0
550.0
12,800.0
85,000.0
11,250.0
550.0
96,800.0
1,618,000.0
-

7,195.9
#VALUE!
11,250.0
90,000.0
5,500.0
#VALUE!
1,557,600.0
67,200.0
62,000.0
200,000.0
1,886,800.0
400,000.0
2,175.0
84,000.0
90,000.0
5,500.0
581,675.0

900.0
550.0
1,450.0

2,250.0
275.0
2,525.0

4,500.0
275.0
4,775.0

PERHITUNGAN ANALISA HARGA SATUAN per tanggal 25 April 2011


PEMBANGUNAN RUMAH SAKIT ARI CANTHI MAS-UBUD
URAIAN PEKERJAAN

NO

SATUAN
( Rp. )
2

UPAH
( Rp. )

BAHAN
( Rp. )
3

HARGA
( Rp. )
4

22,000.00
7,560.00
1,550.00

22,000.00
7,560.00
1,550.00
55,000.00
86,110.00

Bouplank & Pek. Tanah


1 1 M1 Pasangan Bowplank
0.005 M3 Kayu Meranti Papan
0.003 M3 Kayu Meranti Usuk 4/6
0.1 Kg Paku 2"-5"
1 Ls Upah

2 1 M3 Pekerjaan Galian Tanah Biasa Sedalam 1 M1


0.75 OH Pekerja
0.075 OH Mandor
3 1 M3 Pekerjaan Galian Tanah Biasa Sedalam 2 M1
0.9953 OH Pekerja
0.0926 OH Mandor
4 1 M3 Pekerjaan Galian Tanah Biasa Sedalam 3 M1
1.735 OH Pekerja
0.1735 OH Mandor
5 1 M3 Pekerjaan Galian Foot Plat
1 OH Pekerja
0.1 OH Mandor
6 1 M3 Pekerjaan Urugan Kembali & Pemadatan
0.3 OH Pekerja
0.01 OH Mandor
0.08 Jam Stamper
7 1 M3 Pekerjaan Urugan Tanah & Pemadatan
1.2 M3 Tanah Urug
0.3 OH Pekerja
0.01 OH Mandor
0.08 Jam Stamper

8 1 M3 Pekerjaan Urugan Pasir & Penyiraman


1.2 M3 Pasir Urug
0.3 OH Pekerja
0.01 OH Mandor

1 M3 Pekerjaan Urugan Pasir batu (sirtu ) dipadatkan


1.2 M3 Pasir Urug
0.3 OH Pekerja
0.01 OH Mandor
1 bh Stemper

4,400,000.00
2,520,000.00
15,500.00
55,000.00
Jumlah

3,000.00
3,000.00

40,000.00
70,000.00
Jumlah

30,000.00
5,250.00
35,250.00

30,000.00
5,250.00
35,250.00

40,000.00
70,000.00
Jumlah

39,810.40
6,482.00
46,292.40

39,810.40
6,482.00
46,292.40

40,000.00
70,000.00
Jumlah

69,400.00
12,145.00
81,545.00

69,400.00
12,145.00
81,545.00

40,000.00
70,000.00
Jumlah

40,000.00
7,000.00
47,000.00

40,000.00
7,000.00
47,000.00

40,000.00
70,000.00
27,500.00
Jumlah

12,000.00
700.00
2,200.00
14,900.00

12,000.00
700.00
2,200.00
14,900.00

85,000.00
40,000.00
70,000.00
27,500.00
Jumlah

102,000.00
12,000.00
700.00
2,200.00
116,900.00

105,000.00
40,000.00
70,000.00
Jumlah

12,000.00
700.00
12,700.00

105,000.00
40,000.00
55,000.00
30,000.00
Jumlah

12,000.00
550.00
30,000.00
12,550.00

126,000.00

126,000.00
12,000.00
550.00
30,000.00
168,550.00

2,200.0
1,070.0
157,200.0
55,000.0
65,000.0

6,500.0

33,000.0
5,136.0
3,930.0
5,500.0
-

33,000.0
5,136.0
3,930.0
5,500.0
6,500.0

31,110.00

102,000.00

102,000.00

126,000.00

126,000.00

126,000.00

102,000.00
12,000.00
700.00
2,200.00
116,900.00

126,000.00
12,000.00
700.00
138,700.00

Pasangan Dinding Plester - Acian


1 M2 Pas.
### Bh
4.80 Kg
0.03 M3
0.10 OH
0.10 OH

batako 1pc : 5ps


Batako
Semen Portland
Pasir pasang
Tukang batu
Kepala tukang batu

0.30 OH Pekerja
0.02 OH Mandor
9 1 M3 Pasangan Batu Kali Camp 1 : 5
1.1 M3 Batu Kali
2.92 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.544 M3 Pasir Pasang
0.6 OH Tukang Batu
0.06 OH Kepala Tukang Batu
1.5 OH Pekerja
0.075 OH Mandor
10 1 M2 Pekerjaan Pasangan HEBEL Tebal 10 cm
9.163 Bj HEBEL t = 10 cm
0.2874 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.043 M3 Pasir Pasang
0.1 OH Tukang Batu
0.01 OH Kepala Tukang Batu
0.32 OH Pekerja
0.015 OH Mandor
11 1 M2 Pekerjaan Pasangan HEBEL Tebal 12 cm
9.163 Bj HEBEL t = 12 cm
0.23 Zak Mortar perekat bata ringan
0.1 OH Tukang Batu
0.01 OH Kepala Tukang Batu
0.32 OH Pekerja
0.015 OH Mandor

12 1 M2 Pekerjaan Pasangan HEBEL Tebal 7.5 cm


9.163 Bj HEBEL t = 7.5 cm
0.183 Zak Mortar perekat bata ringan
0.1 OH Tukang Batu
0.01 OH Kepala Tukang Batu
0.32 OH Pekerja
0.015 OH Mandor
13 1 M2 Pekerjaan Pasangan HEBEL Tebal 7.5 cm
9.163 Bj HEBEL t = 7.5 cm
0.2874 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.043 M3 Pasir Pasang
0.1 OH Tukang Batu
0.01 OH Kepala Tukang Batu
0.32 OH Pekerja
0.015 OH Mandor
14 1 M2 Pekerjaan Plesteran 1 : 5
0.0864 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.022 M3 Pasir Pasang
0.15 OH Tukang Batu
0.015 OH Kepala Tukang Batu
0.2 OH Pekerja
0.01 OH Mandor
15 1 M2 Pekerjaan Plesteran Mortar
0.12 Zak Mortar plesteran beton tebal 1 cm
0.15 OH Tukang Batu
0.015 OH Kepala Tukang Batu
0.2 OH Pekerja
0.01 OH Mandor
16 1 M2 Pekerjaan Plesteran 1 : 2 tebal 2cm
0.1704 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.017 M3 Pasir Pasang

40,000.0
70,000.0

135,000.00
53,500.00
157,200.00
55,000.00
65,000.00
40,000.00
70,000.00
Jumlah
14,772.73
53,500.00
157,200.00
55,000.00
65,000.00
40,000.00
70,000.00
Jumlah
11,800.00
154,000.00
50,000.00
55,000.00
40,000.00
65,000.00
Jumlah

12,745.10
154,000.00
50,000.00
55,000.00
40,000.00
70,000.00
Jumlah

12,000.0
1,050.0
19,550.0

33,000.00
3,900.00
60,000.00
5,250.00
102,150.00

5,500.00
650.00
12,800.00
1,050.00
20,000.00

148,500.00
156,220.00
85,516.80

148,500.00
156,220.00
85,516.80
33,000.00
3,900.00
60,000.00
5,250.00
492,386.80

390,236.80

157,498.00
108,123.40
35,420.00

5,000.00
550.00
12,800.00
975.00
19,325.00

143,543.40

116,783.33
28,182.00
5,000.00
550.00
12,800.00
1,050.00
19,400.00

5,500.00
550.00
12,800.00
1,050.00
19,900.00

53,500.00
90,000.00
50,000.00
55,000.00
40,000.00
65,000.00
Jumlah

4,622.40
1,980.00
7,500.00
825.00
8,000.00
650.00
23,577.40

53,500.00
90,000.00

12,000.0
1,050.0
67,116.0

135,362.50
15,375.90
6,759.60

12,745.10
53,500.00
157,200.00
55,000.00
55,000.00
40,000.00
70,000.00
Jumlah

150,000.00
50,000.00
55,000.00
40,000.00
65,000.00
Jumlah

47,566.0

144,965.33
116,783.33
15,375.90
6,759.60

138,918.83
4,622.40
1,980.00

6,602.40
18,000.00

825.00
8,000.00
650.00
9,475.00

135,362.50
15,375.90
6,759.60
5,500.00
650.00
12,800.00
1,050.00
177,498.00
108,123.40
35,420.00
5,000.00
550.00
12,800.00
975.00
162,868.40

116,783.33
28,182.00
5,000.00
550.00
12,800.00
1,050.00
164,365.33
116,783.33
15,375.90
6,759.60
5,500.00
550.00
12,800.00
1,050.00
158,818.83
4,622.40
1,980.00
7,500.00
825.00
8,000.00
650.00
23,577.40

18,000.00

18,000.00
7,500.00
825.00
8,000.00
650.00
34,975.00

9,116.40
1,530.00

9,116.40
1,530.00

0.15
0.015
0.2
0.01

OH
OH
OH
OH

Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor

17 1 M2 Pekerjaan Acian Mortar tebal 2.5mm


0.186 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.016 M3 Pasir Pasang
0.15 OH Tukang Batu
0.015 OH Kepala Tukang Batu
0.2 OH Pekerja
0.01 OH Mandor

18 1 M3 Pekerjaan Beton K-300


0.97 M3 Kerikil Beton
7.25 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.3854 M3 Pasir Beton
0.95 OH Tukang Batu
0.095 OH Kepala Tukang Batu
5.7 OH Pekerja
0.285 OH Mandor

50,000.00
55,000.00
40,000.00
65,000.00
Jumlah
53,500.00
90,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

7,500.00
825.00
8,000.00
650.00
16,975.00

10,646.40
9,951.00
1,440.00

7,500.00
825.00
7,400.00
650.00
16,375.00

11,391.00

145,500.00
387,875.00
52,414.40

7,500.00
825.00
8,000.00
650.00
27,621.40
9,951.00
1,440.00
7,500.00
825.00
7,400.00
650.00
27,766.00

150,000.00
53,500.00
136,000.00
55,000.00
65,000.00
40,000.00
70,000.00
Jumlah

52,250.00
6,175.00
228,000.00
19,950.00
306,375.00

752,000.00
100,000.00
25,000.00
18,500.00
Jumlah

752,000.00
100,000.00
25,000.00
18,500.00
895,500.00

752,000.00
100,000.00
25,000.00
18,500.00
895,500.00

752,000.00
90,000.00
45,000.00
22,000.00
Jumlah

90,000.00
45,000.00
22,000.00
157,000.00

752,000.00
90,000.00
45,000.00
22,000.00
909,000.00

585,789.40

145,500.00
387,875.00
52,414.40
52,250.00
6,175.00
228,000.00
19,950.00
892,164.40

Beton Ready Mix & Pembesian


19 1 M3 Pekerjaan Beton Ready Mix K-300
1 m3. Beton Cor Ready Mix K-300
1 m3. Ongkos Cor
1 m3, Alat-alat, dll.
1 ltr minyak begisting

20 1 M3 Pekerjaan Beton Ready Mix K-300


1 m3. Beton Cor Ready Mix K-300
1 m3. Ongkos Cor
1 m3, Alat-alat, dll.
1 ltr minyak begisting

21 1 Kg Pekerjaan Besi beton


1.05 Kg Besi Beton
0.01 Kg Kawat Ikat Beton (Bendrat)
0.0067 OH Tukang Besi
0.0078 OH Kepala Tukang Besi
0.0099 OH Pekerja
0.0006 OH Mandor

8,745.30
17,000.00
55,000.00
65,000.00
40,000.00
70,000.00
Jumlah

9,182.56
170.00
368.50
507.00
396.00
44.10
1,315.60

9,352.56

9,182.56
170.00
368.50
507.00
396.00
44.10
10,668.16

Begisting
22 1 M2 Pekerjaan Begisting Beton Pondasi & Sloop
0.35 Lbr Multiplek 9 mm
0.028 M3 Kayu Meranti Usuk 4/6
0.2 Kg Paku 2"-5"
0.4 ltr Minyak Begisting
0.375 OH Tukang Kayu
0.0375 OH Kepala Tukang Kayu
0.35 OH Pekerja
0.0063 OH Mandor

23 1 M2 Pekerjaan Begisting Praktis


0.35 Lbr Multiplek 9 mm
0.0144 M3 Kayu Meranti Usuk 4/6
0.2 Kg Paku 2"-5"
0.375 OH Tukang Kayu
0.0375 OH Kepala Tukang Kayu
0.35 OH Pekerja

140,000.00
2,520,000.00
15,500.00
17,000.00
50,000.00
55,000.00
40,000.00
65,000.00
Jumlah

140,000.00
2,520,000.00
15,500.00
50,000.00
55,000.00
40,000.00

49,000.00
70,560.00
3,100.00
6,800.00
18,750.00
2,062.50
14,000.00
406.25
35,218.75

129,460.00

49,000.00
36,288.00
3,100.00
18,750.00
2,062.50
14,000.00

49,000.00
70,560.00
3,100.00
6,800.00
18,750.00
2,062.50
14,000.00
406.25
164,678.75

49,000.00
36,288.00
3,100.00
18,750.00
2,062.50
14,000.00

0.0063 OH Mandor

24 1 M2 Pekerjaan Begisting Kolom


0.35 Lbr Multiplek 9 mm
0.03 M3 Kayu Meranti Usuk 4/6
0.015 M3 Kayu Balok kruing
0.4 ltr Minyak Begisting
0.32 Kg Paku 2"-5"
0.39 OH Tukang Kayu
0.039 OH Kepala Tukang Kayu
0.364 OH Pekerja
0.0065 OH Mandor

25 1 M2 Pekerjaan Begisting Balok & Plat Lantai


0.35 Lbr Multiplek 9 mm
0.032 M3 Kayu Meranti Usuk 4/6
0.015 M3 Kayu Balok kruing
0.4 ltr Minyak Begisting
0.4 Kg Paku 2"-5"
0.405 OH Tukang Kayu
0.0405 OH Kepala Tukang Kayu
0.378 OH Pekerja
0.0068 OH Mandor

65,000.00
Jumlah

140,000.00
2,520,000.00
5,400,000.00
17,000.00
15,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

140,000.00
2,520,000.00
5,400,000.00
17,000.00
15,500.00
55,000.00
65,000.00
40,000.00
70,000.00
Jumlah

406.25
35,218.75

88,388.00

49,000.00
75,600.00
81,000.00
6,800.00
4,960.00
19,500.00
2,145.00
13,468.00
422.50
35,535.50

217,360.00

49,000.00
80,640.00
81,000.00
6,800.00
6,200.00
22,275.00
2,632.50
15,120.00
472.50
40,500.00

223,640.00

406.25
123,606.75

49,000.00
75,600.00
81,000.00
6,800.00
4,960.00
19,500.00
2,145.00
13,468.00
422.50
252,895.50

49,000.00
80,640.00
81,000.00
6,800.00
6,200.00
22,275.00
2,632.50
15,120.00
472.50
264,140.00

Beton Bertulang
26 1 M3 Pekerjaan Beton Bertulang Pondasi Telapak
1 M3 Pekerjaan Beton K-300
3.168 M2 Pekerjaan Begisting Beton Pondasi
180 Kg Pekerjaan Besi beton

895,500.00
168,518.75
10,668.16
Jumlah

895,500.00
533,867.40
1,920,269.17

895,500.00
533,867.40
1,920,269.17
3,349,636.57

895,500.00
168,518.75
10,668.16
Jumlah

895,500.00
667,334.25
1,920,269.17

895,500.00
667,334.25
1,920,269.17
3,483,103.42

895,500.00
168,518.75
10,668.16
Jumlah

895,500.00
1,572,841.67
1,920,269.17

895,500.00
1,572,841.67
1,920,269.17
4,388,610.84

895,500.00
264,140.00
10,668.16
Jumlah

895,500.00
2,113,120.00
2,240,314.03

895,500.00
2,113,120.00
2,240,314.03
5,248,934.03

895,500.00
186,352.25
10,668.16
30,000.00
Jumlah
31 1 M3 Pekerjaan Beton Bertulang Plat Atas = 20 cm (groundtank plat atas)
1 M3 Beton Cor Ready Mix K-300
895,500.00
5.55 M2 Pekerjaan Begisting Plat Lantai
186,352.25
210 Kg Pekerjaan Besi beton
10,668.16
2.5 ltr Watterprofing integral Fx fosroc
30,000.00
Jumlah
32 1 M3 Pekerjaan Beton Bertulang Plat Lantai = 25 cm (dasar pit lift)
1 M3 Beton Cor Ready Mix K-300
895,500.00
4.8 M2 Pekerjaan Begisting Plat Lantai
186,352.25
210 Kg Pekerjaan Besi beton
10,668.16
2.5 ltr Watterprofing integral Fx fosroc
30,000.00

895,500.00
1,863,522.50
1,760,246.74
75,000.00

895,500.00
1,863,522.50
1,760,246.74
75,000.00
4,594,269.24

895,500.00
1,034,254.99
2,240,314.03
75,000.00

895,500.00
1,034,254.99
2,240,314.03
75,000.00
4,245,069.02

895,500.00
894,490.80
2,240,314.03
75,000.00

895,500.00
894,490.80
2,240,314.03
75,000.00

27 1 M3 Pekerjaan Beton Bertulang Pondasi Telapak pile cap


1 M3 Pekerjaan Beton K-300
3.96 M2 Pekerjaan Begisting Beton Pondasi
180 Kg Pekerjaan Besi beton
28 1 M3 Pekerjaan Beton Bertulang Sloof 30/60
1 M3 Pekerjaan Beton K-300
9.3333 M2 Pekerjaan Begisting Beton Sloop
180 Kg Pekerjaan Besi beton
29 1 M3 Pekerjaan Beton Bertulang Kolom 50/50
1 M3 Pekerjaan Beton K-300
8 M2 Pekerjaan Begisting Kolom
210 Kg Pekerjaan Besi beton
30 1 M3 Pekerjaan Beton Bertulang Plat Lantai = 12 cm
1 M3 Beton Cor Ready Mix K-300
10 M2 Pekerjaan Begisting Plat Lantai
165 Kg Pekerjaan Besi beton
2.5 ltr Watterprofing integral Fx fosroc

Jumlah
33 1 M3 Pekerjaan Beton Bertulang Plat Atas = 25 cm (sawage treatment plant)
1 M3 Beton Cor Ready Mix K-300
895,500.00
4.8 M2 Pekerjaan Begisting Plat Lantai
186,352.25
210 Kg Pekerjaan Besi beton
10,668.16
2.5 ltr Watterprofing integral Fx fosroc
30,000.00
Jumlah
34 1 M3 Pekerjaan Beton Bertulang Plat Lantai = 30 cm (grountank plat dasar)
1 M3 Beton Cor Ready Mix K-300
895,500.00
3 M2 Pekerjaan Begisting Plat Lantai
186,352.25
220 Kg Pekerjaan Besi beton
10,668.16
2.5 ltr Watterprofing integral Fx fosroc
30,000.00
Jumlah
35 1 M2 Pekerjaan Begisting Dinding
0.35 Lbr Multiplek 9 mm
140,000.00
0.03 M3 Kayu Meranti Usuk 4/6
2,520,000.00
0.4 Kg Paku 2"-5"
17,500.00
0.375 OH Tukang Kayu
50,000.00
0.0375 OH Kepala Tukang Kayu
55,000.00
0.35 OH Pekerja
40,000.00
0.0063 OH Mandor
65,000.00
Jumlah
36 1 M3 Pekerjaan Beton Bertulang Plat Dinding = 20 cm (dinding Pit lift)
1 M3 Beton Cor Ready Mix K-300
909,000.00
10 M2 Pekerjaan Begisting Plat Dinding
166,818.75
2.5 ltr Watterprofing integral Fx fosroc
30,000.00
180 Kg Pekerjaan Besi beton
10,668.16
Jumlah
37 1 M3 Pekerjaan Beton Bertulang Plat Dinding = 25 cm (dinding groundtank)
1 M3 Beton Cor Ready Mix K-300
909,000.00
10 M2 Pekerjaan Begisting Plat Dinding
166,818.75
2.5 ltr Watterprofing integral Fx fosroc
30,000.00
210 Kg Pekerjaan Besi beton
10,668.16
Jumlah
38 1 M3 Pekerjaan Beton Bertulang Plat Dinding = 30 cm (dinding groundtank)
1 M3 Beton Cor Ready Mix K-300
909,000.00
10 M2 Pekerjaan Begisting Plat Dinding
166,818.75
2.5 ltr Watterprofing integral Fx fosroc
30,000.00
220 Kg Pekerjaan Besi beton
10,668.16
Jumlah

4,105,304.83

18,750.00
2,062.50
14,000.00
406.25
35,218.75

42 1 M3 Pekerjaan Beton Bertulang Plat Tangga


1 M3 Beton Cor Ready Mix K-300

135,000.00
2,520,000.00
15,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
895,500.00

895,500.00
894,490.80
2,240,314.03
75,000.00
4,105,304.83

895,500.00
559,056.75
2,346,995.65
75,000.00

895,500.00
559,056.75
2,346,995.65
75,000.00
3,876,552.40

49,000.00
75,600.00
7,000.00

49,000.00
75,600.00
7,000.00
18,750.00
2,062.50
14,000.00
406.25
166,818.75

131,600.00
909,000.00
1,668,187.50
75,000.00
2,652,187.50

39 1 M3 Pekerjaan Beton Bertulang Plat Dinding = 25 cm (dinding groundtank)


1 M3 Beton Cor Ready Mix K-300
909,000.00
10 M2 Pekerjaan Begisting Plat Dinding
166,818.75
2.5 ltr Watterprofing integral Fx fosroc
30,000.00
210 Kg Pekerjaan Besi beton
10,668.16
Jumlah
40 1 M3 Pekerjaan Beton Bertulang Plat Dinding = 30 cm (dinding groundtank)
1 M3 Beton Cor Ready Mix K-300
909,000.00
10 M2 Pekerjaan Begisting Plat Dinding
166,818.75
2.5 ltr Watterprofing integral Fx fosroc
30,000.00
220 Kg Pekerjaan Besi beton
10,668.16
Jumlah
41 1 M2 Pekerjaan Begisting Tangga
0.35 Lbr Multiplek 9 mm
0.025 M3 Kayu Meranti Usuk 4/6
0.4 Kg Paku 2"-5"
0.405 OH Tukang Kayu
0.0405 OH Kepala Tukang Kayu
0.378 OH Pekerja
0.0068 OH Mandor

895,500.00
894,490.80
2,240,314.03
75,000.00

909,000.00
1,668,187.50
75,000.00
1,920,269.17
4,572,456.67

909,000.00
1,668,187.50
75,000.00

909,000.00
1,668,187.50
75,000.00
2,240,314.03
4,892,501.53

909,000.00
1,668,187.50
75,000.00

909,000.00
1,668,187.50
75,000.00
2,346,995.65
4,999,183.15

909,000.00
1,668,187.50
75,000.00

909,000.00
1,668,187.50
75,000.00
2,240,314.03
4,892,501.53

909,000.00
1,668,187.50
75,000.00

909,000.00
1,668,187.50
75,000.00
2,346,995.65
4,999,183.15

47,250.00
63,000.00
6,200.00

47,250.00
63,000.00
6,200.00
20,250.00
2,227.50
13,986.00
438.75
153,352.25

895,500.00

895,500.00

20,250.00
2,227.50
13,986.00
438.75
36,902.25

8 M2 Pekerjaan Begisting Plat Dinding


180 Kg Pekerjaan Besi beton
43 1 M3 Pekerjaan Beton Rabat t=10 cm. dg. Tul. M6.
1 M3 Beton Cor Ready Mix K-300
0.1058 Roll Wiremesh M6
1 Ls. Upah pekerjaan Wire Mesh

44 1 M3 Beton rabat 1pc : 3ps : 5krl


0.91 M3 Kerikil/batu pecah
0.54 M3 Pasir beton
181.6 kg PC 50 kg
0.2 Hr Tukang batu
0.02 Hr Kepala tukang batu
1.2 Hr Pekerja
0.06 Hr Mandor

153,352.25
10,668.16
Jumlah
895,500.00
5,550,000.00
200,000.00
Jumlah

150,000.00
136,000.00
1,070.00
55,000.00
65,000.00
40,000.00
70,000.00

1,226,818.00
1,920,269.17

895,500.00
587,301.59
200,000.00
1,682,801.59

200,000.00
200,000.00

136,500.00
73,440.00
194,312.00
11,000.00
1,300.00
48,000.00
4,200.00

1,226,818.00
1,920,269.17
4,042,587.17

136,500.00
73,440.00
194,312.00
11,000.00
1,300.00
48,000.00
4,200.00
468,752.00

55 1 Kg Pekerjaan Kuda-Kuda Baja


1.1 Kg Baja Profile
0.02 Kg Cat Metal ICI Dulux
0.0068 OH Pekerja
0.0675 OH Tukang Besi
0.0068 OH Kepala Tukang Besi
0.0007 OH Mandor
56 1 M2 Pek. Usuk
0.014 M3 Kayu Kamper Samarida Usuk 5/7
0.15 Kg Paku 2"-5"
0.26 OH Tukang Kayu
0.12 OH Kepala Tukang Kayu
0.28 OH Pekerja
0.045 OH Mandor
57 1 M2 Pek. Reng
0.006 M3 Kayu Kamper Samarinda Reng 3/4
0.15 Kg Paku 2"-5"
0.2 OH Tukang Kayu
0.035 OH Kepala Tukang Kayu
0.15 OH Pekerja
0.035 OH Mandor
58 1 M2 Pekerjaan Pasang Atap Genteng
14 Bh Genteng Kodok produksi Goodyear
0.175 OH Tukang Batu
0.0175 OH Kepala Tukang Batu
0.35 OH Pekerja
0.0175 OH Mandor
59 1 M1 Pekerjaan Pasang Bubungan Genteng
3.5 Bh Bubungan Genteng Keramik Berglasur
0.036 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.032 M3 Pasir Pasang
0.3 OH Tukang Batu
0.03 OH Kepala Tukang Batu
0.6 OH Pekerja
0.03 OH Mandor
60 1 M1 Pekerjaan Papan List Plank
0.035 M3 Kayu Kamper Samarinda Balok
0.1 Kg Paku 2"-5"
0.8 OH Tukang Kayu
0.08 OH Kepala Tukang Kayu
0.28 OH Pekerja
0.018 OH Mandor
61 1 M3 Pekerjaan Listplank Kayu Kamper
1.1 M3 Kayu Kamper Samarinda Balok
15 Kg Paku 2"-5"
0.15 Kg Paku Lis
24 OH Tukang Kayu
2.4 OH Kepala Tukang Kayu
8 OH Pekerja

15,000.00
180,000.00
37,000.00
50,000.00
50,000.00
65,000.00
Jumlah
6,000,000.00
15,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

16,500.00
3,600.00
249.75
3,375.00
337.50
43.88
4,006.13

84,000.00
2,325.00
13,000.00
6,600.00
10,360.00
2,925.00
32,885.00

5,500,000.00
15,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

10,000.00
1,925.00
5,550.00
2,275.00
19,750.00

3,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

8,750.00
962.50
12,950.00
1,137.50
23,800.00

16,500.00
49,000.00
90,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
7,500,000.00
15,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
7,500,000.00
15,500.00
22,000.00
50,000.00
55,000.00
37,000.00

20,100.00

86,325.00
33,000.00
2,325.00

35,325.00
42,000.00

42,000.00
57,750.00
1,764.00
2,880.00

15,000.00
1,650.00
22,200.00
1,950.00
40,800.00

62,394.00
262,500.00
1,550.00

40,000.00
4,400.00
10,360.00
1,170.00
55,930.00

264,050.00
8,250,000.00
232,500.00
3,300.00

1,200,000.00
132,000.00
296,000.00

16,500.00
3,600.00
249.75
3,375.00
337.50
43.88
24,106.13
84,000.00
2,325.00
13,000.00
6,600.00
10,360.00
2,925.00
119,210.00
33,000.00
2,325.00
10,000.00
1,925.00
5,550.00
2,275.00
55,075.00
42,000.00
8,750.00
962.50
12,950.00
1,137.50
65,800.00
57,750.00
1,764.00
2,880.00
15,000.00
1,650.00
22,200.00
1,950.00
103,194.00
262,500.00
1,550.00
40,000.00
4,400.00
10,360.00
1,170.00
319,980.00
8,250,000.00
232,500.00
3,300.00
1,200,000.00
132,000.00
296,000.00

0.4 OH Mandor
62 1 M2 Pekerjaan Pasang Kaca Mati 8 mm
1 M2 Kaca 8mm
0.12 OH Tukang Kayu
0.012 OH Kepala Tukang Kayu
0.0188 OH Pekerja
0.032 OH Mandor
63 1 M2 Pekerjaan Pasang Kaca Mati 6 mm
1 M2 Kaca 6mm
0.12 OH Tukang Kayu
0.012 OH Kepala Tukang Kayu
0.0188 OH Pekerja
0.032 OH Mandor
64 1 M2 Pekerjaan Pasang Kaca Mati 5 mm
1 M2 Kaca 5mm
0.12 OH Tukang Kayu
0.012 OH Kepala Tukang Kayu
0.0188 OH Pekerja
0.032 OH Mandor
65 1 M2 Pek. Pasang Keramik Lantai 60x60 Niro Granit
1.05 Duz Keramik 60 x 60 Niro Granit
0.25 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.023 M3 Pasir Pasang
0.25 Kg Semen Naat AM 50 + am 55
0.495 OH Tukang Batu
0.0495 OH Kepala Tukang Batu
0.462 OH Pekerja
0.22 OH Mandor
66 1 M2 Pek. Pasang Keramik Lantai 40/40 essenza
1.05 Duz Keramik 40 x 40 Niro Granit
0.25 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.023 M3 Pasir Pasang
0.3333 Kg Semen Naat AM 50 + am 55
0.495 OH Tukang Batu
0.0495 OH Kepala Tukang Batu
0.462 OH Pekerja
0.22 OH Mandor
67 1 M2 Pek. Pasang Keramik Lantai 33/33 Roman
1.05 Duz Keramik 33 x 33 ex roman
0.25 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.023 M3 Pasir Pasang
0.5 Kg Semen Naat AM 50 + am 55
0.495 OH Tukang Batu
0.0495 OH Kepala Tukang Batu
0.462 OH Pekerja
0.22 OH Mandor
68 1 M2 Pek. Pasang Keramik Lantai 20/20
1.05 Duz Keramik 20 x 20 Roman
0.25 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.023 M3 Pasir Pasang
0.5 Kg Semen Naat AM 50 + am 55
0.045 OH Kepala Tukang Batu
0.48 OH Pekerja
0.03 OH Mandor
69 1 M1 Pek. Pasang Keramik Plint 10/60
1.05 M' Keramik Plint 10 x 60 Niro Granit
0.031 Zak Portland Cement 50 Kg (Indo Cement klas I)

65,000.00
Jumlah

26,000.00
1,654,000.00

174,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

6,000.00
660.00
695.60
2,080.00
9,435.60

100,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

6,000.00
660.00
695.60
2,080.00
9,435.60

172,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

6,000.00
660.00
695.60
2,080.00
9,435.60

252,000.00
49,000.00
90,000.00
12,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
257,654.50
49,000.00
90,000.00
12,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
93,750.00
53,500.00
157,200.00
17,500.00
55,000.00
55,000.00
40,000.00
70,000.00
Jumlah
88,500.00
49,000.00
90,000.00
12,500.00
55,000.00
37,000.00
65,000.00
Jumlah
57,500.00
49,000.00

8,485,800.00
174,000.00

174,000.00
100,000.00

100,000.00
172,500.00

172,500.00
264,600.00
12,250.00
2,070.00
3,125.00

24,750.00
2,722.50
17,094.00
14,300.00
58,866.50

282,045.00
270,537.23
12,250.00
2,070.00
4,166.67

24,750.00
2,722.50
17,094.00
14,300.00
58,866.50

289,023.89
98,437.50
13,375.00
3,615.60
8,750.00

27,225.00
2,722.50
18,480.00
15,400.00
63,827.50

124,178.10
92,925.00
12,250.00
2,070.00
6,250.00

2,475.00
17,760.00
1,950.00
22,185.00

26,000.00
10,139,800.00
174,000.00
6,000.00
660.00
695.60
2,080.00
183,435.60
100,000.00
6,000.00
660.00
695.60
2,080.00
109,435.60
172,500.00
6,000.00
660.00
695.60
2,080.00
181,935.60
264,600.00
12,250.00
2,070.00
3,125.00
24,750.00
2,722.50
17,094.00
14,300.00
340,911.50
270,537.23
12,250.00
2,070.00
4,166.67
24,750.00
2,722.50
17,094.00
14,300.00
347,890.39
98,437.50
13,375.00
3,615.60
8,750.00
27,225.00
2,722.50
18,480.00
15,400.00
188,005.60

113,495.00

92,925.00
12,250.00
2,070.00
6,250.00
2,475.00
17,760.00
1,950.00
135,680.00

60,375.00
1,519.00

60,375.00
1,519.00

0.02
0.0333
0.05
0.005
0.15
0.006

M3
Kg
OH
OH
OH
OH

Pasir Pasang
Semen Naat AM 50 + am 55
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor

70 1 M1 Pek. Pasang Keramik Plint 10/40


1.05 M' Keramik Plint 10 x 40 Niro Granit
0.031 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.02 M3 Pasir Pasang
0.0667 Kg Semen Naat AM 50 + am 55
0.06 OH Tukang Batu
0.005 OH Kepala Tukang Batu
0.18 OH Pekerja
0.006 OH Mandor
71 1 M1 Pek. Pasang Keramik 10/30
1.05 M' Keramik Plint 10 x 30 Niro Granit
0.031 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.02 M3 Pasir Pasang
1.5 Kg Semen Naat AM 50 + am 55
0.05 OH Tukang Batu
0.005 OH Kepala Tukang Batu
0.15 OH Pekerja
0.006 OH Mandor
72 1 M1 Pek. Pasang Keramik Anti Slip 10/20
1.05 M' Keramik Anti Slip 10 x 20 Roman
0.031 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.02 M3 Pasir Pasang
1.5 Kg Semen Naat AM 50 + am 55
0.05 OH Tukang Batu
0.005 OH Kepala Tukang Batu
0.15 OH Pekerja
0.006 OH Mandor

90,000.00
12,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
41,500.00
49,000.00
90,000.00
12,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
25,000.00
49,000.00
90,000.00
12,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

13,250.00
49,000.00
90,000.00
12,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
73 1 M2 Pekerjaan Cat Tembok 1x Plamur, 1x Dasar, 2x Cat Halus
Dinding Dalam
0.333 Lbr Amplas
3,000.00
0.12 Kg Cat Dasar
21,500.00
0.208 Kg Cat Dinding ICI Dulux
165,000.00
0.1 Kg Plamur Tembok
6,000.00
0.041 OH Tukang Cat
50,000.00
0.0041 OH Kepala Tukang Cat
55,000.00
0.13 OH Pekerja
37,000.00
0.0163 OH Mandor
65,000.00
Jumlah
74 1 M2 Pekerjaan Cat Tembok 1x Plamur, 1x Dasar, 2x Cat Halus
Dinding Luar
0.333 Lbr Amplas
3,000.00
0.12 Kg Cat Dasar
21,500.00
0.26 Kg Cat Dinding ICI Dulux Weathersield
168,500.00
0.1 Kg Plamur Tembok
6,000.00
0.041 OH Tukang Cat
50,000.00
0.0041 OH Kepala Tukang Cat
55,000.00
0.13 OH Pekerja
37,000.00
0.0163 OH Mandor
65,000.00
Jumlah
75 1 M2 Pekerjaan Cat Tembok 1x Plamur, 1x Dasar, 2x Cat Halus (Cat Jotun)
0.333 Lbr Amplas
3,000.00
0.12 Kg Cat Dasar
21,500.00
0.26 Kg Cat Jotun
198,000.00
0.1 Kg Plamur Tembok
6,000.00
0.063 OH Tukang Cat
50,000.00

1,800.00
416.67
2,500.00
275.00
5,550.00
390.00
8,715.00

64,110.67
43,575.00
1,519.00
1,800.00
833.33

3,000.00
275.00
6,660.00
390.00
10,325.00

47,727.33
26,250.00
1,519.00
1,800.00
18,750.00

2,500.00
275.00
5,550.00
390.00
8,715.00

48,319.00
13,912.50
1,519.00
1,800.00
18,750.00

2,500.00
275.00
5,550.00
390.00
8,715.00

35,981.50

999.00
2,580.00
34,320.00
600.00
2,047.50
225.23
4,810.00
1,056.25
8,138.98

38,499.00

999.00
2,580.00
43,810.00
600.00
2,047.50
225.23
4,810.00
1,056.25
8,138.98

47,989.00
999.00
2,580.00
51,480.00
600.00

3,150.00

1,800.00
416.67
2,500.00
275.00
5,550.00
390.00
72,825.67
43,575.00
1,519.00
1,800.00
833.33
3,000.00
275.00
6,660.00
390.00
58,052.33
26,250.00
1,519.00
1,800.00
18,750.00
2,500.00
275.00
5,550.00
390.00
57,034.00
13,912.50
1,519.00
1,800.00
18,750.00
2,500.00
275.00
5,550.00
390.00
44,696.50

999.00
2,580.00
34,320.00
600.00
2,047.50
225.23
4,810.00
1,056.25
46,637.98

999.00
2,580.00
43,810.00
600.00
2,047.50
225.23
4,810.00
1,056.25
56,127.98
999.00
2,580.00
51,480.00
600.00
3,150.00

0.0063 OH Kepala Tukang Cat


0.2 OH Pekerja
0.025 OH Mandor
76 1 M2 Pekerjaan Cat Kayu 1x Cat Dasar, 2x Cat Halus
0.333 Lbr Amplas
0.12 Kg Cat Danapaints
0.26 Kg Cat Kayu ICI Dulux
0.1 Kg Dempul Kayu
0.018 OH Tukang Cat
0.012 OH Kepala Tukang Cat
0.14 OH Pekerja
0.005 OH Mandor
77 1 M Pekerjaan Tempelan Paras Palimanan
1.1 M2 Batu Palimanan 40 x 60 cm
0.1 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.65 OH Tukang Stile bali
0.165 OH Kepala Tk. Stile Bali
0.5625 OH Pekerja Stile Bali
0.165 OH Mandor
78 1 M Pekerjaan Pasang Batu Alam
1.1 M2 Batu Alam Abu-Abu/Hitam 20 x 40 cm
0.023 M3 Pasir Pasang
0.25 M3 Pasir Urug
0.65 OH Tukang Stile bali
0.165 OH Kepala Tk. Stile Bali
0.5625 OH Pekerja Stile Bali
0.165 OH Mandor
79 1 M2 Pekerjaan Waterproffing
1 Kg Waterproof Viscocrete-10 ex SIKA
0.4 OH Pekerja
0.04 OH Mandor
80 1 M Pekerjaan Acian 1 : 3
0.2096 Zak Portland Cement 50 Kg (Indo Cement klas I)
0 M3 Pasir Pasang
0.04 OH Tukang Batu
0.002 OH Kepala Tukang Batu
0.04 OH Pekerja
0.08 OH Mandor
81 M3 Pekerjaan Beton 1 : 3 : 5 (rabatan lantai kerja)
0.97 M3 Kerikil Beton
5.665 Zak Portland Cement 50 Kg (Indo Cement klas I)
0.544 M3 Pasir Beton
1 OH Tukang Batu
0.1 OH Kepala Tukang Batu
4 OH Pekerja
0.4 OH Mandor
82 1 M2 Pek. Rangka Plapond Besi Hollow
1.1 M' Besi Hollow
2.0833 Bh Gantungan
2.0833 Bh Paku Ramset
0.2 Bh Staping
1 Ls Ongkos Pasang

55,000.00
37,000.00
65,000.00
Jumlah
3,000.00
160,000.00
170,000.00
18,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
235,000.00
49,000.00
70,000.00
80,000.00
50,000.00
65,000.00
Jumlah

346.50
7,400.00
1,625.00
12,521.50

999.00
19,200.00
44,200.00
1,800.00
900.00
660.00
5,180.00
325.00
7,065.00

45,500.00
13,200.00
28,125.00
10,725.00
97,550.00

45,500.00
13,200.00
28,125.00
10,725.00
97,550.00

45,000.00
37,000.00
65,000.00
Jumlah

14,800.00
2,600.00
17,400.00

106,000.00
49,000.00
80,300.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
23,000.00
7,500.00
3,000.00
250.00
7,500.00
Jumlah

83 1 M2 Pek. Dinding Partisi GRC (Rangka Besi Hollow)


4 M' Rangka Partisi Besi Hollow
1.125 Bj Scrup
0.49 M2 GRC
0.7 Kg High Modulus Acetate Silicon Sealant 4200 Poly

25,000.00
200.00
32,000.00
65,000.00

66,199.00
258,500.00
4,900.00

255,000.00
90,000.00
75,000.00
70,000.00
80,000.00
50,000.00
65,000.00
Jumlah

49,000.00
90,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

55,659.00

263,400.00
280,500.00
2,070.00
18,750.00

301,320.00
45,000.00

45,000.00
10,270.40

2,000.00
110.00
1,480.00
5,200.00
8,790.00

10,270.40
102,820.00
277,585.00
43,683.20

50,000.00
5,500.00
148,000.00
26,000.00
229,500.00

424,088.20
25,300.00
15,624.75
6,249.90
50.00

7,500.00
7,500.00

346.50
7,400.00
1,625.00
68,180.50
999.00
19,200.00
44,200.00
1,800.00
900.00
660.00
5,180.00
325.00
73,264.00
258,500.00
4,900.00
45,500.00
13,200.00
28,125.00
10,725.00
360,950.00
280,500.00
2,070.00
18,750.00
45,500.00
13,200.00
28,125.00
10,725.00
398,870.00
45,000.00
14,800.00
2,600.00
62,400.00
10,270.40
2,000.00
110.00
1,480.00
5,200.00
19,060.40
102,820.00
277,585.00
43,683.20
50,000.00
5,500.00
148,000.00
26,000.00
653,588.20

47,224.65

25,300.00
15,624.75
6,249.90
50.00
7,500.00
54,724.65

100,000.00
225.00
15,680.00
45,500.00

100,000.00
225.00
15,680.00
45,500.00

1
0.42
1.2
1

m2.
Kg
Roll
Ls

GlassWoll density 60 kg/m3.


Compoun
Textile Tape (plaster)
Ongkos Pasang

84 1 M2 Pek. Plapond Calsiboard


1.1 M2 Kalsiboard 6 mm
14 Bj Paku Beton
1.4 Bj Scrup
0.25 Kg Compoun
0.0556 Roll Textile Tape (plaster)
1 Ls Ongkos Pasang

215,000.00
15,000.00
8,000.00
20,000.00
Jumlah
45,000.00
250.00
200.00
15,000.00
8,000.00
7,500.00
Jumlah

85 1 M2 Pek. Plapond GRC


1.1 M2 GRC
32,000.00
0.575 Kg High Modulus Acetate Silicon Sealant 4200 Poly
65,000.00
1.4 Bj Scrup
200.00
0.21 Kg Compoun
15,000.00
0.125 Roll Textile Tape (plaster)
8,000.00
1 Ls Ongkos Pasang
7,500.00
Jumlah
86 1 M2 Pekerjaan Paving
1.05 M3 Paving Blok
58,000.00
0.1 Zak Portland Cement 50 Kg (Indo Cement klas I)
49,000.00
0.1 M3 Pasir Pasang
90,000.00
0.25 OH Tukang Batu
50,000.00
0.04 OH Kepala Tukang Batu
55,000.00
0.35 OH Pekerja
37,000.00
0.02 OH Mandor
65,000.00
Jumlah
87 1 M2 Pekerjaan Waterproffing
1 Kg Waterproof Viscocrete-10 ex SIKA
45,000.00
0.4 OH Pekerja
37,000.00
0.04 OH Mandor
65,000.00
Jumlah
89 1 M2 Pek. Granito 60x60
1.05 M2 Granito 60/60 Diamond
285,560.00
0.25 Zak Portland Cement 50 Kg (Indo Cement klas I)
49,000.00
0.023 M3 Pasir Pasang
90,000.00
0.25 Kg Semen Naat AM 50 + am 55
12,500.00
0.675 OH Tukang Batu
50,000.00
0.0675 OH Kepala Tukang Batu
55,000.00
0.63 OH Pekerja
37,000.00
0.3 OH Mandor
65,000.00
Jumlah
90 1 M2 Pek. Granito 40x40
1.05 M2 Granito 40/40 Diamond
237,160.00
0.25 Zak Portland Cement 50 Kg (Indo Cement klas I)
49,000.00
0.023 M3 Pasir Pasang
90,000.00
0.25 Kg Semen Naat AM 50 + am 55
12,500.00
0.675 OH Tukang Batu
50,000.00
0.0675 OH Kepala Tukang Batu
55,000.00
0.63 OH Pekerja
37,000.00
0.3 OH Mandor
65,000.00
Jumlah
91 1 M2 Pek. Granito 30x30
1.05 M2 Granito 30/30 Diamond
179,080.00
0.25 Zak Portland Cement 50 Kg (Indo Cement klas I)
49,000.00
0.023 M3 Pasir Pasang
90,000.00
0.25 Kg Semen Naat AM 50 + am 55
12,500.00
0.675 OH Tukang Batu
50,000.00
0.0675 OH Kepala Tukang Batu
55,000.00
0.63 OH Pekerja
37,000.00
0.3 OH Mandor
65,000.00
Jumlah

215,000.00
6,300.00
9,600.00
20,000.00
20,000.00

392,305.00
49,500.00
3,500.00
280.00
3,750.00
444.44

7,500.00
7,500.00

57,474.44
35,200.00
37,375.00
280.00
3,150.00
1,000.00

7,500.00
7,500.00

77,005.00
60,900.00
4,900.00
9,000.00

12,500.00
2,200.00
12,950.00
1,300.00
28,950.00

74,800.00
45,000.00

14,800.00
2,600.00
17,400.00

45,000.00
299,838.00
12,250.00
2,070.00
3,125.00

33,750.00
3,712.50
23,310.00
19,500.00
80,272.50

317,283.00
249,018.00
12,250.00
2,070.00
3,125.00

33,750.00
3,712.50
23,310.00
19,500.00
80,272.50

266,463.00
188,034.00
12,250.00
2,070.00
3,125.00

33,750.00
3,712.50
23,310.00
19,500.00
80,272.50

205,479.00

215,000.00
6,300.00
9,600.00
20,000.00
412,305.00
49,500.00
3,500.00
280.00
3,750.00
444.44
7,500.00
64,974.44
35,200.00
37,375.00
280.00
3,150.00
1,000.00
7,500.00
84,505.00
60,900.00
4,900.00
9,000.00
12,500.00
2,200.00
12,950.00
1,300.00
103,750.00
45,000.00
14,800.00
2,600.00
62,400.00
299,838.00
12,250.00
2,070.00
3,125.00
33,750.00
3,712.50
23,310.00
19,500.00
397,555.50
249,018.00
12,250.00
2,070.00
3,125.00
33,750.00
3,712.50
23,310.00
19,500.00
346,735.50
188,034.00
12,250.00
2,070.00
3,125.00
33,750.00
3,712.50
23,310.00
19,500.00
285,751.50

92 1 M2 Pekerjaan Pasangan Batu Bata 1 : 5


70 Bj Bata Merah
0.2336 Zak PC Semen Gresik (50 kg)
0.045 M3 Pasir Pasang
0.11 Oh Tukang Batu
0.011 Oh Kepala Tukang Batu
0.352 Oh Pekerja
0.0165 Oh Mandor
93 1 M2 Pekerjaan Pasangan Bata ringan( 7,5x20x60)
8.4 Bj Bata ringan
0.2874 Zak Perekat bata ringan MU (40 kg)
0.11 Oh Tukang Batu
0.011 Oh Kepala Tukang Batu
0.352 Oh Pekerja
0.0165 Oh Mandor
93 1 M2 Pekerjaan Pasangan Bata ringan( 10x20x60)
8.4 Bj Bata ringan
0.2874 Zak Perekat bata ringan MU (40 kg)
0.11 Oh Tukang Batu
0.011 Oh Kepala Tukang Batu
0.352 Oh Pekerja
0.0165 Oh Mandor

950.00
49,000.00
90,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
10,000.00
154,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
12,500.00
154,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

66,500.00
11,446.40
4,050.00
5,500.00
605.00
13,024.00
1,072.50
20,201.50

81,996.40
84,000.00
44,259.60

5,500.00
605.00
13,024.00
1,072.50
20,201.50

128,259.60
105,000.00
44,259.60

5,500.00
605.00
13,024.00
1,072.50
20,201.50

149,259.60

0.012
83.333333333

10,560.00

880,000.00

66,500.00
11,446.40
4,050.00
5,500.00
605.00
13,024.00
1,072.50
102,197.90
84,000.00
44,259.60
5,500.00
605.00
13,024.00
1,072.50
148,461.10
105,000.00
44,259.60
5,500.00
605.00
13,024.00
1,072.50
169,461.10

DAFTAR HARGA SATUAN BAHAN


Kegiatan : Perluasan RSU ARI CANTY
Pekerjaan: Pembangunan Gedung Perluasan RSU Ari Canty
Lokasi
: Jln Raya Mas Ubud
NO

URAIAN

SATUAN

HARGA SATUAN (Rp.)

BESI

besi beton 19mm Hanil (HJ)


besi beton 16mm Hanil (HJ)
besi beton 13mm Hanil (HJ)
besi beton 10mm Hanil (HJ)
besi beton 8mm Hanil (HJ)
Besi beton hanil (HJ)
besi beton 10mm
besi beton 12mm
besi beton ulir 16mm
besi beton ulir 19mm (SNI)

10

Baja Profile

11

Kawat ikat

12
13
14
15
16

Wiremesh M6
Paku 2"-5"
Paku Lis
Paku Reng
Paku Usuk

1
2
3
4
5
6
6
7
8

btg
btg
btg
btg
btg
Kg
btg
btg
btg
btg
Kg
kg
Roll
Kg
Kg
Kg
Kg

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

214,000.00
136,000.00
99,000.00
53,000.00
32,000.00
8,745.30
47,000.00
71,000.00
123,000.00
177,500.00
15,000.00
17,000.00
5,550,000.00
15,500.00
22,000.00
17,500.00
17,500.00

M3
M3
M3
M3
M3

Rp
Rp
Rp
Rp
Rp

525,000.00
625,000.00
752,000.00
775,000.00
412,000.00

M3
M3
M3
M3
M3
M3
M3
M3
M3

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

85,000.00
135,000.00
136,000.00
157,200.00
207,000.00
105,000.00
150,000.00
121,500.00
135,000.00

BETON

II
1
2
3
4
5

Beton Cor Ready Mix K-175


Beton Cor Ready Mix K-225
Beton Cor Ready Mix K-300 ex Hakadikon
Beton Cor Ready Mix K-300 ex SBP
Beton rabat site mix

Pekerjaan urug

III
1
2
3
4
5
6
7
8
10

Tanah Urug
Batu Kali
Pasir Beton
Pasir Pasang
Pasir Super
Pasir Urug
Kerikil Beton
Kerikil Biasa
Batu kosong

Watterprofing

IV
1
2
3
4
5
6
7

Waterproof Integreted ex POSROX


Waterproof semen base ex POSROX
Waterproof membran ITLS
Waterproof sealent/odol ex POSROX
Waterproof membran Ultrachan
Waterproof watterstop PVC
Waterproof watterstop Ultrachan

ltr
m2
m2
m1
m2
m2
m2

Rp
Rp
Rp
Rp
Rp
Rp
Rp

30,000.00
40,000.00
135,000.00
72,500.00
95,000.00
80,000.00
75,000.00

M3
M3
M3
M3
M3
ikat
m3
m3
m3
M3
M3

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

7,800,000.00
7,000,001.00
4,400,000.00
2,520,000.00
4,800,000.00
280,000.00
5,400,000.00
5,400,000.00
4,800,000.00
8,000,000.00
9,000,000.00

Lbr
Lbr
Lbr
Lbr
Lbr

Rp
Rp
Rp
Rp
Rp

140,000.00
106,000.00
42,000.00
65,000.00
85,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,250.00
60,750.00
132,500.00
175,000.00
66,375.00
68,000.00
22,666.67
93,750.00
93,750.00
93,750.00
93,750.00
68,000.00
93,750.00
93,750.00

KAYU

V
17
18
19
20
21
22
23
24
25
33
34

Kayu Kamper Samarinda Balok


Kayu Kamper Surabaya Balok
Kayu Meranti Papan
Kayu Meranti Usuk 4/6
kayu kamper 4/6
kayu reng kamper
Kayu kruing balok 8/12
Kayu kruing balok 6/12
Kayu kruing usuk 5/7
Papan Kamper Skirting 1,2 x 10 cm
Papan Kamper 2/20 x 400 cm

Playwood /Multiplek

VI
39
40
41
42
43

Ply Wood 9mm


Ply Wood 6 mm
Ply Wood 3mm
Ply Wood 4mm
Ply Wood 8 mm

Keramik

VII
1
2
3
4
5
6
7
8
9

Keramik Anti Slip 10 x 20 Roman


Keramik 20 x 20 Roman kw1
Keramik 60 x 60 Niro Granit (kream)
Keramik 60 x 60 Niro Granit (hitam)
Keramik 33.3 x 33.3 roman (W30652)
Keramik 25 x 33,3 roman (W30612)
Keramik 25x7.5 roman (listtello)
Keramik 33.3 x 33.3 roman (G 367001)
Keramik 33.3 x 33.3 roman (G 367000)

bj
Duz
Duz
Duz
Duz
Duz
Duz
Duz
Duz

10
11
12
13
14

Keramik 33.3 x 33.3 roman (G 3

Duz
Duz
Duz
Duz
Duz

Keramik 33.3 x 33.3 roman (G 360407)


Keramik 33.3 x 50 roman (W50514)
Keramik 33.3 x 30 roman (torello)
Keramik 33.3 x 33.3 roman (G365028)

15
17
18

Keramik 33.3 x 33.3 roman (G365029)


Keramik 10x60 border roman (cph 60335)
Keramik 30x60 border roman (cph 60000)

Duz
m1
m1

Rp
Rp
Rp

68,000.00
43,200.00
129,600.00

285,000.00
39,500.00
185,500.00
25,500.00

Marmer

VIII
19

Marmer 60 x 60 cm (Citatah)

m2

20
21
22

Marmer Plin 10 x 60 cm

m'
m2
m'

Rp
Rp
Rp
Rp

m2
m2
m2
M2

Rp
Rp
Rp
Rp

75,000.00
82,500.00
95,000.00
85,500.00

Kg
zak
zak
zak
zak
zak

Rp
Rp
Rp
Rp
Rp
Rp

17,500.00
53,500.00
42,800.00
52,500.00
42,000.00
15,500.00

zak
zak
zak
zak
zak
kg

Rp
Rp
Rp
Rp
Rp
Rp

150,000.00
154,000.00
163,000.00
205,000.00
146,000.00
11,500.00

bj
bj
bj
m3
bj
bj
m3
bj

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,000.00
950.00
2,200.00
1,300,000.00
14,772.73
11,800.00
1,300,000.00
12,745.10

Kg
Kg
Kg
Kg

Rp
Rp
Rp
Rp

60,000.00
65,000.00
68,500.00
98,000.00

Marmer 30 x 30 cm
Marmer plin 10 x 30 cm

Paping blok Orion

IX
1
2
3
4

Paving Blok stdr 20x20x8 K 225


Paving Blok stdr 20x20x6 K 175
Paving Blok stdr 20x20x8 K 400
Paving Blok stdr 20x20x8 K 300

Semen

X
1
2
3
4
5
6

Semen Naat AM 50 + am 55
Semen Gersik 50 kg
Semen Gersik 40 kg
Semen Tiga roda 50 kg
Semen Tiga roda 40 kg
Mill

Material ACIAN dan Plesteran

XI
1
2
3
4
5
6

Mortar Plesteran 40 kg
Mortar Perekat Bata ringan 40 kg
Mortar acian putih 25 kg
Mortar perekat keramik lantai 40 kg
Mortar perekat keramik dinding 25 kg
Mortar pengisi nat

Material Dinding

XII
1
2
3
4
5
6
7
8

Bata merah ex keramas


Bata merah ex Negara
Batako press ex kintamani
Bata ringan ex Citikon tebal 10 m
Bata ringan ex Citikon tebal 10 m
Bata ringan ex Citikon tebal 12 m
Bata ringan ex Citikon tebal 7.5 m
Bata ringan ex Citikon tebal 7.5 m

Pengecatan

XIII
1
2
3
4

Cat Danapaints
Cat Dinding ICI Dulux
Cat Dinding ICI Dulux Weathersield
Cat Jotun

5
6
7
8
10
11
12
13

Cat Kayu ICI Dulux


Cat Metal ICI Dulux
Cat Dinding ICI Dulux
Cat Dinding ICI Dulux Weathersield
Alkali Duluk cat dalam
Alkali Duluk cat luar
Cat besi metal prim chicromate
ICI super gross

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

70,000.00
80,000.00
835,000.00
1,322,000.00
659,000.00
726,500.00
106,500.00
89,000.00

M2
M2
M2
M2
M2
M2
Kg
M2

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

72,500.00
174,000.00
550,000.00
600,000.00
250,000.00
125,000.00
15,000.00
100,000.00

m1
m1
set
2 daun

Rp
Rp
Rp
Rp

80,000.00
125,000.00
275,000.00
1,800,000.00

M3
M3
M3
M3
M3
M3
M3
M3

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

65,000.00
110,000.00
80,300.00
90,000.00
115,000.00
75,000.00
106,000.00
75,000.00

Rp
Rp
Rp
Rp
Rp
Rp

571,250.00
218,760.00
187,500.00
187,500.00
325,000.00
1,490,010.00

Rp
Rp

2,850,000.00
290,000.00

Kg
Kg
pil
pil
pil
pil
kg
ltr

Pekerjaan Kaca, jendela/pintu

XIV
1
2
3
4
5
6
7
8

Kaca 5mm
Kaca 8mm
Kaca Cermin 50 x 80 cm
Kaca Cermin 5mm
Kaca Tempered 12mm
Kaca Tempered 6mm
High Modulus Acetate Silicon Sealant 4200 P
Kaca 6mm

Aluminium dan Kaca

XV
1
2
3
4

Kusen indal powder coating 3"


Rangka jendela casment
asesoris casment
Rangka jendela casment, kaca 6mm, (67,5x1

Pekerjaan urug

XVI
1
2
3
4
5
6
7
8

Tanah Urug
Batu Kali
Pasir Beton
Pasir Pasang
Pasir Super
Pasir Urug
Kerikil Beton
Kerikil Biasa

Kunci Dan Gantungan

XVII
A
1
2
3
4
5

Floor hinge (G3225D)


Kunci Bawah
partch fitting atas
partch fitting bawah
tarikan pintu (handle)
B

1
2

Hardwere Pintu koridor fremless (A)


set
pcs
pcs
pcs
pcs

Hardwere Pintu baja/ r.tindakan (B)


Panic bar GMT
Engsel 4"

set
set

Door closer
C

1
2
3
4

1
2
3
4
XVIII
1
2
3
4
5
6
7
8
9
10
11

Rp
Rp

468,750.00
3,608,750.00

set
set
set
set

Rp
Rp
Rp
Rp
Rp

200,000.00
135,000.00
468,750.00
105,000.00
908,750.00

set
set
set
set

Rp
Rp
Rp
Rp
Rp

55,000.00
105,000.00
135,000.00
110,000.00
405,000.00

bj

Rp

3,200.00

bj

Rp

12,250.00

bj
bj
bj
bj
bj
m2
lbr
pcs
pcs

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

2,800.00
3,675.00
10,000.00
850.00
1,800.00
135,000.00
120,000.00
6,750.00
8,250.00

Hardwere Pintu Rawat inap (C )


Kunci swing
handle
Door closer
Engsel 4"

set

Hardwere window/jendela ( D )
Flush ring
Engsel 4"
Grendel tanam
dead bolt

Atap genteng
Genteng Godyear
Genteng bubungan Godyear
Genteng karang pilang bambe
Genteng karang pilang bambe (d
Genteng bubungan bambe
Genteng press lokal
Genteng bubungan press lokal
Genteng metal KW I (gerard)
Genteng bubungan metal (plat s
Genteng marigional (natural)
Genteng morigional (glazur)

8,745.30

135,714.29
135,714.29
157,142.86
207,142.86
100,000.00
150,000.00
121,428.57

Rp

1,070.00
1050

14772.7272727273

Rp

politure
imfra

12,745.10

35000
35000

DAFTAR HARGA SATUAN UPAH


PROYEK
PEKERJAAN
LOKASI

:
:
:

RSU ARI SANTHI


RSU ARI SANTHI
JL MAS UBUD -GIANYAR

NO

DAFTAR TENAGA

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Mandor
Kepala Tukang Besi
Kepala Tukang Batu
Kepala Tukang Kayu
Kepala Tukang Cat
Tukang Politur
Tukang Batu
Tukang Kayu
Tukang Besi
Tukang Cat
Tukang Gali
Pekerja
Tukang Stile bali
Kepala Tk. Stile Bali
Pekerja Stile Bali

HARGA SATUAN
Rp.
3
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

70,000.00
65,000.00
65,000.00
65,000.00
65,000.00
55,000.00
55,000.00
55,000.00
55,000.00
50,000.00
50,000.00
40,000.00
100,000.00
125,000.00
50,000.00

Mas, 18 Oktober 2010


PT Ari Kontraktor

Ir. I Wayan Arsania


Direktur Utama.

SATUAN
4
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH
OH

PERHITUNGAN ANALISA HARGA SATUAN


PEMBANGUNAN RUMAH SAKIT ARI CANTHI MAS-UBUD
NO
URAIAN PEKERJAAN
1

2
PEKERJAAN PASANGAN DINDING
1 1 M2 Pekerjaan Pasangan Batu Bata 1 : 5
82.64 Bj
Bata Merah
0.2336 Zak PC Semen Gresik (50 kg)
0.045 M3 Pasir Pasang
0.11 Oh Tukang Batu
0.011 Oh Kepala Tukang Batu
0.352 Oh Pekerja
0.0165 Oh Mandor
2 1 M2 Pekerjaan Pasangan Bata ringan( 7,5x20x60)
8.4 Bj
Bata ringan
0.2874 Zak Perekat bata ringan MU (40 kg)
0.11 Oh Tukang Batu
0.011 Oh Kepala Tukang Batu
0.352 Oh Pekerja
0.0165 Oh Mandor
3 1 M2 Pekerjaan Pasangan Bata ringan( 10x20x60)
8.4 Bj
Bata ringan
0.2874 Zak Perekat bata ringan MU (40 kg)
0.11 Oh Tukang Batu
0.011 Oh Kepala Tukang Batu
0.352 Oh Pekerja
0.0165 Oh Mandor
5 1 M2 Pekerjaan Plesteran Mortar
0.0864 Zak Mortar utama 200 (40 kg)
0.022 M3 Pasir Pasang
0.15 OH Tukang Batu
0.015 OH Kepala Tukang Batu
0.2 OH Pekerja
0.01 OH Mandor
6 1 M2 Pekerjaan Plesteran 1 : 3
0.162 Zak Portland Cement 50 Kg (Indo Cement klas I
0.019 M3 Pasir Pasang
0.15 OH Tukang Batu
0.015 OH Kepala Tukang Batu
0.2 OH Pekerja
0.01 OH Mandor
7 1 M2 Pekerjaan Plesteran 1 : 2 tebal 2cm
0.1704 Zak Portland Cement 50 Kg (Indo Cement klas I
0.017 M3 Pasir Pasang
0.15 OH Tukang Batu
0.015 OH Kepala Tukang Batu
0.2 OH Pekerja
0.01 OH Mandor

SATUAN
( Rp. )
2

1,000.00
49,000.00
90,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
10,000.00
154,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

UPAH
( Rp. )

BAHAN
( Rp. )
3

82,640.00
11,446.40
4,050.00
5,500.00
605.00
13,024.00
1,072.50
20,201.50

98,136.40
84,000.00
44,259.60

5,500.00
605.00
13,024.00
1,072.50
20,201.50

128,259.60

12,500.00
154,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

105,000.00
44,259.60
5,500.00
605.00
13,024.00
1,072.50
20,201.50

165,500.00
90,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

14,299.20
1,980.00
7,500.00
825.00
7,400.00
650.00
32,654.20

14,299.20
1,980.00

49,000.00
90,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

7,938.00
1,710.00
7,500.00
825.00
7,400.00
650.00
26,023.00

7,938.00
1,710.00

49,000.00
90,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

8,349.60
1,530.00
7,500.00
825.00
7,400.00
650.00
26,254.60

8,349.60
1,530.00

149,259.60

16,279.20

9,648.00

9,879.60

8 1 M Pekerjaan Acian Mortar Utama


0.2096 Zak MU 250 (Produksi Mortar utama 40 kg)
0.04 OH Tukang Batu
0.002 OH Kepala Tukang Batu
0.04 OH Pekerja
0.08 OH Mandor

9 1 M Pekerjaan Acian 1 : 3
0.2096 Zak Portland Cement 50 Kg (Indo Cement klas I
0.04 OH Tukang Batu
0.002 OH Kepala Tukang Batu
0.04 OH Pekerja
0.08 OH Mandor
PASANGAN KERAMIK
10 1 M2 Pek. Pasang Keramik Lantai 60x60 Niro Granit
1.05 Duz Keramik 60 x 60 Niro Granit
0.25 Zak Portland Cement 50 Kg (Indo Cement klas I
0.023 M3 Pasir Pasang
0.25 Kg Semen Naat AM 50 + am 55
0.495 OH Tukang Batu
0.0495 OH Kepala Tukang Batu
0.462 OH Pekerja
0.22 OH Mandor

11 1 M2 Pek. Pasang Keramik Lantai 40/40 essenza


1.05 Duz Keramik 40 x 40 Niro Granit
0.25 Zak Portland Cement 50 Kg (Indo Cement klas I
0.023 M3 Pasir Pasang
0.33333 Kg Semen Naat AM 50 + am 55
0.495 OH Tukang Batu
0.0495 OH Kepala Tukang Batu
0.462 OH Pekerja
0.22 OH Mandor
12 1 M2 Pek. Pasang Keramik Lantai 30/30 essenza
1.05 Duz Keramik 30 x 30 Niro Granit
0.25 Zak Portland Cement 50 Kg (Indo Cement klas I
0.023 M3 Pasir Pasang
0.5 Kg Semen Naat AM 50 + am 55
0.495 OH Tukang Batu
0.0495 OH Kepala Tukang Batu
0.462 OH Pekerja
0.22 OH Mandor
13 1 M2 Pek. Pasang Keramik Lantai 20/20
1.05 Duz Keramik 20 x 20 Roman
0.25 Zak Portland Cement 50 Kg (Indo Cement klas I
0.023 M3 Pasir Pasang
0.5 Kg Semen Naat AM 50 + am 55
0.045 OH Kepala Tukang Batu
0.48 OH Pekerja
0.03 OH Mandor

163,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

2,000.00
110.00
1,480.00
5,200.00
8,790.00

49,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

2,000.00
110.00
1,480.00
5,200.00
8,790.00

252,000.00
49,000.00
90,000.00
12,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

257,654.50
49,000.00
90,000.00
12,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
198,224.50
49,000.00
90,000.00
12,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
88,500.00
49,000.00
90,000.00
12,500.00
55,000.00
37,000.00
65,000.00
Jumlah

34,164.80

34,164.80

10,270.40

10,270.40

264,600.00
12,250.00
2,070.00
3,125.00
24,750.00
2,722.50
17,094.00
14,300.00
58,866.50

282,045.00

270,537.23
12,250.00
2,070.00
4,166.67
24,750.00
2,722.50
17,094.00
14,300.00
58,866.50

289,023.89
208,135.73
12,250.00
2,070.00
6,250.00

24,750.00
2,722.50
17,094.00
14,300.00
58,866.50

228,705.73
92,925.00
12,250.00
2,070.00
6,250.00

2,475.00
17,760.00
1,950.00
22,185.00

113,495.00

14 1 M1 Pek. Pasang Keramik Plint 10/60


1.05 M'
Keramik Plint 10 x 60 Niro Granit
0.031 Zak Portland Cement 50 Kg (Indo Cement klas I
0.02 M3 Pasir Pasang
0.03333 Kg Semen Naat AM 50 + am 55
0.05 OH Tukang Batu
0.005 OH Kepala Tukang Batu
0.15 OH Pekerja
0.006 OH Mandor
15 1 M1 Pek. Pasang Keramik Plint 10/40
1.05 M'
Keramik Plint 10 x 40 Niro Granit
0.031 Zak Portland Cement 50 Kg (Indo Cement klas I
0.02 M3 Pasir Pasang
0.06667 Kg Semen Naat AM 50 + am 55
0.06 OH Tukang Batu
0.005 OH Kepala Tukang Batu
0.18 OH Pekerja
0.006 OH Mandor
16 1 M1 Pek. Pasang Keramik 10/30
1.05 M'
Keramik Plint 10 x 30 Niro Granit
0.031 Zak Portland Cement 50 Kg (Indo Cement klas I
0.02 M3 Pasir Pasang
1.5 Kg Semen Naat AM 50 + am 55
0.05 OH Tukang Batu
0.005 OH Kepala Tukang Batu
0.15 OH Pekerja
0.006 OH Mandor
17 1 M1 Pek. Pasang Keramik Anti Slip 10/20
1.05 M'
Keramik Anti Slip 10 x 20 Roman
0.031 Zak Portland Cement 50 Kg (Indo Cement klas I
0.02 M3 Pasir Pasang
1.5 Kg Semen Naat AM 50 + am 55
0.05 OH Tukang Batu
0.005 OH Kepala Tukang Batu
0.15 OH Pekerja
0.006 OH Mandor

57,500.00
49,000.00
90,000.00
12,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
41,500.00
49,000.00
90,000.00
12,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
25,000.00
49,000.00
90,000.00
12,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
13,250.00
49,000.00
90,000.00
12,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

60,375.00
1,519.00
1,800.00
416.67
2,500.00
275.00
5,550.00
390.00
8,715.00

64,110.67
43,575.00
1,519.00
1,800.00
833.33

3,000.00
275.00
6,660.00
390.00
10,325.00

47,727.33
26,250.00
1,519.00
1,800.00
18,750.00

2,500.00
275.00
5,550.00
390.00
8,715.00

48,319.00
13,912.50
1,519.00
1,800.00
18,750.00

2,500.00
275.00
5,550.00
390.00
8,715.00

35,981.50

PEKERJAAN ATAP
18 1 Kg Pekerjaan Kuda-Kuda Baja
1.1 Kg Baja Profile
0.02 Kg Cat Metal ICI Dulux
0.00675 OH Pekerja
0.0675 OH Tukang Besi
0.00675 OH Kepala Tukang Besi
0.00068 OH Mandor
19 1 M2 Pek. Usuk
0.014 M3 Kayu Kamper Samarida Usuk 5/7
0.15 Kg Paku 2"-5"
0.26 OH Tukang Kayu
0.12 OH Kepala Tukang Kayu
0.28 OH Pekerja

15,000.00
180,000.00
37,000.00
50,000.00
50,000.00
65,000.00
Jumlah
7,000,000.00
15,500.00
50,000.00
55,000.00
37,000.00

16,500.00
3,600.00
249.75
3,375.00
337.50
43.88
4,006.13

20,100.00
98,000.00
2,325.00

13,000.00
6,600.00
10,360.00

0.045 OH

Mandor

20 1 M2 Pek. Reng
0.006 M3 Kayu Kamper Samarinda Reng 3/4
0.15 Kg Paku 2"-5"
0.2 OH Tukang Kayu
0.035 OH Kepala Tukang Kayu
0.15 OH Pekerja
0.035 OH Mandor
21 1 M2 Pekerjaan Pasang Atap Genteng
14 Bh Genteng Kodok produksi Goodyear
0.175 OH Tukang Batu
0.0175 OH Kepala Tukang Batu
0.35 OH Pekerja
0.0175 OH Mandor
22 1 M1 Pekerjaan Pasang Bubungan Genteng
3.5 Bh Bubungan Genteng Keramik Berglasur
0.036 Zak Portland Cement 50 Kg (Indo Cement klas I
0.032 M3 Pasir Pasang
0.3 OH Tukang Batu
0.03 OH Kepala Tukang Batu
0.6 OH Pekerja
0.03 OH Mandor
23 1 M1 Pekerjaan Papan List Plank
0.035 M3 Kayu Kamper Samarinda Balok
0.1 Kg Paku 2"-5"
0.8 OH Tukang Kayu
0.08 OH Kepala Tukang Kayu
0.28 OH Pekerja
0.018 OH Mandor
24 1 M3 Pekerjaan Listplank Kayu Kamper
1.1 M3 Kayu Kamper Samarinda Balok
15 Kg Paku 2"-5"
0.15 Kg Paku Lis
24 OH Tukang Kayu
2.4 OH Kepala Tukang Kayu
8 OH Pekerja
0.4 OH Mandor

65,000.00
Jumlah

2,925.00
32,885.00

6,000,000.00
15,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

10,000.00
1,925.00
5,550.00
2,275.00
19,750.00

4,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

8,750.00
962.50
12,950.00
1,137.50
23,800.00

4,000.00
49,000.00
90,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
7,500,000.00
15,500.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah
7,500,000.00
15,500.00
22,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

100,325.00
36,000.00
2,325.00

38,325.00
63,000.00

63,000.00
14,000.00
1,764.00
2,880.00

15,000.00
1,650.00
22,200.00
1,950.00
40,800.00

18,644.00
262,500.00
1,550.00

40,000.00
4,400.00
10,360.00
1,170.00
55,930.00

264,050.00
8,250,000.00
232,500.00
3,300.00

1,200,000.00
132,000.00
296,000.00
26,000.00
1,654,000.00

8,485,800.00

PEKERJAAN PENGECATAN
25 1 M2 Pekerjaan Cat Tembok 1x Plamur, 1x Dasar, 2x Cat Halus
Dinding Dalam
0.333 Lbr Amplas
3,000.00
0.12 Kg Cat Dasar
21,500.00
0.208 Kg Cat Dinding vinilex ICI
135,800.00
0.1 Kg Plamur Tembok
6,000.00
0.04095 OH Tukang Cat
50,000.00
0.0041 OH Kepala Tukang Cat
55,000.00
0.13 OH Pekerja
37,000.00
0.01625 OH Mandor
65,000.00
Jumlah

999.00
2,580.00
28,246.40
600.00
2,047.50
225.23
4,810.00
1,056.25
8,138.98

32,425.40

26 1 M2 Pekerjaan Cat Tembok 1x Plamur, 1x Dasar, 2x Cat Halus


Dinding Luar
0.333 Lbr Amplas
3,000.00
0.12 Kg Cat Dasar
21,500.00
0.26 Kg Cat Dinding ICI Dulux Weathersield
168,500.00
0.1 Kg Plamur Tembok
6,000.00
0.04095 OH Tukang Cat
50,000.00
0.0041 OH Kepala Tukang Cat
55,000.00
0.13 OH Pekerja
37,000.00
0.01625 OH Mandor
65,000.00
Jumlah
27 1 M2 Pekerjaan Cat Tembok 1x Plamur, 1x Dasar, 2x Cat Halus (Cat Jotun)
0.333 Lbr Amplas
3,000.00
0.12 Kg Cat Dasar
21,500.00
0.26 Kg Cat Jotun
198,000.00
0.1 Kg Plamur Tembok
6,000.00
0.063 OH Tukang Cat
50,000.00
0.0063 OH Kepala Tukang Cat
55,000.00
0.2 OH Pekerja
37,000.00
0.025 OH Mandor
65,000.00
Jumlah
28 1 M2 Pekerjaan Cat Kayu 1x Cat Dasar, 2x Cat Halus
0.333 Lbr Amplas
3,000.00
0.12 Kg Cat Danapaints
160,000.00
0.26 Kg Cat Kayu ICI Dulux
170,000.00
0.1 Kg Dempul Kayu
18,000.00
0.018 OH Tukang Cat
50,000.00
0.012 OH Kepala Tukang Cat
55,000.00
0.14 OH Pekerja
37,000.00
0.005 OH Mandor
65,000.00
Jumlah
PEKERJAAN PLAFOND
29 1 M2 Pek. Rangka Plapond Besi Hollow
1.1 M'
Besi Hollow
23,000.00
2.0833 Bh Gantungan
7,500.00
2.0833 Bh Paku Ramset
3,000.00
0.2 Bh Staping
250.00
1 Ls Ongkos Pasang
7,500.00
Jumlah
30 1 M2 Pek. Dinding Partisi GRC (Rangka Besi Hollow)
4 M'
Rangka Partisi Besi Hollow
25,000.00
1.125 Bj
Scrup
200.00
0.49 M2 GRC
32,000.00
0.7 Kg High Modulus Acetate Silicon Sealant 4200 P
65,000.00
1 m2. GlassWoll density 60 kg/m3.
215,000.00
0.42 Kg Compoun
15,000.00
1.2 Roll Textile Tape (plaster)
8,000.00
1 Ls Ongkos Pasang
20,000.00
Jumlah
31 1 M2 Pek. Plapond Calsiboard
1.1 M2 Kalsiboard 6 mm
45,000.00
14 Bj
Paku Beton
250.00
1.4 Bj
Scrup
200.00
0.25 Kg Compoun
15,000.00
0.05556 Roll Textile Tape (plaster)
8,000.00
1 Ls Ongkos Pasang
7,500.00

999.00
2,580.00
43,810.00
600.00
2,047.50
225.23
4,810.00
1,056.25
8,138.98

47,989.00
999.00
2,580.00
51,480.00
600.00

3,150.00
346.50
7,400.00
1,625.00
12,521.50

55,659.00
999.00
19,200.00
44,200.00
1,800.00

900.00
660.00
5,180.00
325.00
7,065.00

66,199.00

25,300.00
15,624.75
6,249.90
50.00
7,500.00
7,500.00

47,224.65
100,000.00
225.00
15,680.00
45,500.00
215,000.00
6,300.00
9,600.00

20,000.00
20,000.00

392,305.00
49,500.00
3,500.00
280.00
3,750.00
444.44

7,500.00

Jumlah
32 1 M2 Pek. Plapond GRC
1.1 M2 GRC
32,000.00
0.575 Kg High Modulus Acetate Silicon Sealant 4200 P
65,000.00
1.4 Bj
Scrup
200.00
0.21 Kg Compoun
15,000.00
0.125 Roll Textile Tape (plaster)
8,000.00
1 Ls Ongkos Pasang
7,500.00
Jumlah
33 1 M2 Pek. Plapond Gybsum
1 M2 Gybsum jayaboard 9 mm
14 Bj
Paku Beton
1.4 Bj
Scrup
0.25 Kg Compoun
0.05556 Roll Textile Tape (plaster)
1 Ls Ongkos Pasang

33 1 M2 Pek. List Plafond


1 M2 Aluminium U t 0,025mm
14 Bj
Paku Beton
1.4 Bj
Scrup
1 Ls Ongkos Pasang
PEKERJAAN PAPING BLOK
86 1 M2 Pekerjaan Paving
1.05 M3 Paving Blok ORION t= 8cm
0.1 Zak Portland Cement 50 Kg (Indo Cement klas I
0.1 M3 Pasir Pasang
0.25 OH Tukang Batu
0.04 OH Kepala Tukang Batu
0.35 OH Pekerja
0.02 OH Mandor

1 M2 Pekerjaan Paving
1.05 M3 Paving Blok Standart t=6cm
0.1 Zak Portland Cement 50 Kg (Indo Cement klas I
0.1 M3 Pasir Pasang
0.25 OH Tukang Batu
0.04 OH Kepala Tukang Batu
0.35 OH Pekerja
0.02 OH Mandor

87 1 M2 Pekerjaan Waterproffing
1 Kg Waterproof Viscocrete-10 ex SIKA
0.4 OH Pekerja
0.04 OH Mandor

55,000.00
250.00
200.00
15,000.00
8,000.00
7,500.00
Jumlah

12,500.00
250.00
200.00
7,500.00
Jumlah

58,000.00
49,000.00
90,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

7,500.00

57,474.44
35,200.00
37,375.00
280.00
3,150.00
1,000.00

7,500.00
7,500.00

77,005.00

55,000.00
3,500.00
280.00
3,750.00
444.44
7,500.00
7,500.00

62,974.44

12,500.00
3,500.00
280.00
7,500.00
7,500.00

16,280.00

60,900.00
4,900.00
9,000.00
12,500.00
2,200.00
12,950.00
1,300.00
28,950.00

35,000.00
49,000.00
90,000.00
50,000.00
55,000.00
37,000.00
65,000.00
Jumlah

12,500.00
2,200.00
12,950.00
1,300.00
28,950.00

45,000.00
37,000.00
65,000.00
Jumlah

14,800.00
2,600.00
17,400.00

74,800.00

36,750.00
4,900.00
9,000.00

50,650.00

45,000.00

45,000.00

HARGA
( Rp. )
5

82,640.00
11,446.40
4,050.00
5,500.00
605.00
13,024.00
1,072.50
118,337.90
84,000.00
44,259.60
5,500.00
605.00
13,024.00
1,072.50
148,461.10
105,000.00
44,259.60
5,500.00
605.00
13,024.00
1,072.50
169,461.10
14,299.20
1,980.00
7,500.00
825.00
7,400.00
650.00
32,654.20
7,938.00
1,710.00
7,500.00
825.00
7,400.00
650.00
26,023.00
8,349.60
1,530.00
7,500.00
825.00
7,400.00
650.00
26,254.60

34,164.80
2,000.00
110.00
1,480.00
5,200.00
42,954.80

10,270.40
2,000.00
110.00
1,480.00
5,200.00
19,060.40

264,600.00
12,250.00
2,070.00
3,125.00
24,750.00
2,722.50
17,094.00
14,300.00
340,911.50

270,537.23
12,250.00
2,070.00
4,166.67
24,750.00
2,722.50
17,094.00
14,300.00
347,890.39
208,135.73
12,250.00
2,070.00
6,250.00
24,750.00
2,722.50
17,094.00
14,300.00
287,572.23
92,925.00
12,250.00
2,070.00
6,250.00
2,475.00
17,760.00
1,950.00
135,680.00

60,375.00
1,519.00
1,800.00
416.67
2,500.00
275.00
5,550.00
390.00
72,825.67
43,575.00
1,519.00
1,800.00
833.33
3,000.00
275.00
6,660.00
390.00
58,052.33
26,250.00
1,519.00
1,800.00
18,750.00
2,500.00
275.00
5,550.00
390.00
57,034.00
13,912.50
1,519.00
1,800.00
18,750.00
2,500.00
275.00
5,550.00
390.00
44,696.50

16,500.00
3,600.00
249.75
3,375.00
337.50
43.88
24,106.13
98,000.00
2,325.00
13,000.00
6,600.00
10,360.00

2,925.00
133,210.00
36,000.00
2,325.00
10,000.00
1,925.00
5,550.00
2,275.00
58,075.00
63,000.00
8,750.00
962.50
12,950.00
1,137.50
86,800.00
14,000.00
1,764.00
2,880.00
15,000.00
1,650.00
22,200.00
1,950.00
59,444.00
262,500.00
1,550.00
40,000.00
4,400.00
10,360.00
1,170.00
319,980.00
8,250,000.00
232,500.00
3,300.00
1,200,000.00
132,000.00
296,000.00
26,000.00
10,139,800.00

999.00
2,580.00
28,246.40
600.00
2,047.50
225.23
4,810.00
1,056.25
40,564.38

999.00
2,580.00
43,810.00
600.00
2,047.50
225.23
4,810.00
1,056.25
56,127.98
999.00
2,580.00
51,480.00
600.00
3,150.00
346.50
7,400.00
1,625.00
68,180.50
999.00
19,200.00
44,200.00
1,800.00
900.00
660.00
5,180.00
325.00
73,264.00

25,300.00
15,624.75
6,249.90
50.00
7,500.00
54,724.65
100,000.00
225.00
15,680.00
45,500.00
215,000.00
6,300.00
9,600.00
20,000.00
412,305.00
49,500.00
3,500.00
280.00
3,750.00
444.44
7,500.00

64,974.44
35,200.00
37,375.00
280.00
3,150.00
1,000.00
7,500.00
84,505.00

55,000.00
3,500.00
280.00
3,750.00
444.44
7,500.00
70,474.44

12,500.00
3,500.00
280.00
7,500.00
23,780.00

60,900.00
4,900.00
9,000.00
12,500.00
2,200.00
12,950.00
1,300.00
103,750.00

36,750.00
4,900.00
9,000.00
12,500.00
2,200.00
12,950.00
1,300.00
79,600.00

45,000.00
14,800.00
2,600.00
62,400.00

PERHITUNGAN ANALISA HARGA SATUAN


PEMBANGUNAN RUMAH SAKIT ARI CANTHI MAS-UBUD
NO
1

URAIAN PEKERJAAN
2
1 1 M1 Pasangan Bowplank
0.005 M3 Kayu Meranti Papan
0.003 M3 Kayu Meranti Usuk 4/6
0.1 Kg Paku 2"-5"
1 Ls Upah
2 1 M3 Pekerjaan Galian Tanah Biasa Sedalam 1 M1
0.4 OH Pekerja
0.04 OH Mandor
3 1 M3 Pekerjaan Galian Tanah Biasa Sedalam 2 M1
0.526 OH Pekerja
0.053 OH Mandor
4 1 M3 Pekerjaan Galian Tanah Biasa Sedalam 3 M1
0.735 OH Pekerja
0.074 OH Mandor
5 1 M3 Pekerjaan Galian Foot Plat
1 OH Pekerja
0.1 OH Mandor

6 1 M3 Pekerjaan Urugan Kembali & Pemadatan


0.3 OH Pekerja
0.01 OH Mandor
0.08 Jam Stamper

7 1 M3 Pekerjaan Urugan Tanah & Pemadatan


1.2 M3 Tanah Urug
0.3 OH Pekerja
0.01 OH Mandor
0.08 Jam Stamper

SATUAN
( Rp. )
2

UPAH
( Rp. )

BAHAN
( Rp. )
3

HARGA
( Rp. )
4

22,000.00
9,000.00
1,550.00

22,000.00
9,000.00
1,550.00
3,000.00
35,550.00

4,400,000.00
3,000,000.00
15,500.00
3000
Jumlah

3,000.00
3,000.00

37,000.00
65000
Jumlah

14,800.00
2,600.00
17,400.00

14,800.00
2,600.00
17,400.00

37,000.00
65000
Jumlah

19,462.00
3,419.00
22,881.00

19,462.00
3,419.00
22,881.00

37,000.00
65000
Jumlah

27,195.00
4,777.50
31,972.50

27,195.00
4,777.50
31,972.50

37,000.00
65000
Jumlah

37,000.00
6,500.00
43,500.00

37,000.00
6,500.00
43,500.00

37,000.00
65000
25,000.00
Jumlah

11,100.00
650.00
2,000.00
13,750.00

11,100.00
650.00
2,000.00
13,750.00

165000
37,000.00
65,000.00
25,000.00
Jumlah

198,000.00
11,100.00
650.00
2,000.00
211,750.00

198,000.00

75,000.00
37,000.00
65000

90,000.00
11,100.00
650.00

90,000.00

90,000.00
11,100.00
650.00
101,750.00

121,000.00
143,080.00
48,960.00

121,000.00
143,080.00
48,960.00
30,000.00
3,300.00
55,500.00
4,875.00
406,715.00

8 1 M3 Pekerjaan Urugan Pasir & Penyiraman


1.2 M3 Pasir Urug
0.3 OH Pekerja
0.01 OH Mandor
9 1 M3 Pasangan Batu Kali Camp 1 : 5
1.1 M3 Batu Kali
2.92 Zak Portland Cement 50 Kg (Indo Cement klas
0.544 M3 Pasir Pasang
0.6 OH Tukang Batu
0.06 OH Kepala Tukang Batu
1.5 OH Pekerja
0.075 OH Mandor

110,000.00
49000
90,000.00
50,000.00
55,000.00
37000
65,000.00

10 1 M2 Pekerjaan Pasangan HEBEL 1 : 5 Tebal 10 cm


9.163 Bj HEBEL t = 10 cm
16192.076831
0.23 Zak Portland Cement 50 Kg (Indo Cement klas
49,000.00
0.043 M3 Pasir Pasang
90,000.00
0.1 OH Tukang Batu
50,000.00
0.01 OH Kepala Tukang Batu
55000
0.32 OH Pekerja
37,000.00
0.015 OH Mandor
65,000.00
Jumlah
11 1 M2 Pekerjaan Pasangan HEBEL 1 : 3 Tebal 10 cm
9.163 Bj HEBEL t = 10 cm
16,192.08
0.287 Zak Portland Cement 50 Kg (Indo Cement klas
49,000.00

30,000.00
3,300.00
55,500.00
4,875.00
93,675.00

32,550.00

198,000.00

313,040.00
148,368.00
11,270.00
3,870.00

5,000.00
550.00
11,840.00
975.00
18,365.00

198,000.00
11,100.00
650.00
2,000.00
211,750.00

163,508.00

148,368.00
11,270.00
3,870.00
5,000.00
550.00
11,840.00
975.00
181,873.00

148,368.00
14,082.60

148,368.00
14,082.60

NO

URAIAN PEKERJAAN

1
0.04
0.1
0.01
0.32
0.015

M3
OH
OH
OH
OH

2
Pasir Pasang
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor

SATUAN
( Rp. )
2
90,000.00
50000
55,000.00
37,000.00
65,000.00
Jumlah

12 1 M2 Pekerjaan Plesteran 1 : 5
0.086 Zak Portland Cement 50 Kg (Indo Cement klas
49,000.00
0.022 M3 Pasir Pasang
90,000.00
0.15 OH Tukang Batu
50000
0.015 OH Kepala Tukang Batu
55,000.00
0.2 OH Pekerja
37,000.00
0.01 OH Mandor
65,000.00
Jumlah
13 1 M2 Pekerjaan Plesteran 1 : 3
0.162 Zak Portland Cement 50 Kg (Indo Cement klas
49,000.00
0.019 M3 Pasir Pasang
90,000.00
0.15 OH Tukang Batu
50000
0.015 OH Kepala Tukang Batu
55,000.00
0.2 OH Pekerja
37,000.00
0.01 OH Mandor
65,000.00
Jumlah
14 1 M2 Pekerjaan Plesteran 1 : 2 tebal 2cm
0.17 Zak Portland Cement 50 Kg (Indo Cement klas
49,000.00
0.017 M3 Pasir Pasang
90,000.00
0.15 OH Tukang Batu
50000
0.015 OH Kepala Tukang Batu
55,000.00
0.2 OH Pekerja
37,000.00
0.01 OH Mandor
65,000.00
Jumlah
15 1 M2 Pekerjaan Plesteran 1 : 2 tebal 3cm
0.186 Zak Portland Cement 50 Kg (Indo Cement klas
49,000.00
0.016 M3 Pasir Pasang
90,000.00
0.15 OH Tukang Batu
50000
0.015 OH Kepala Tukang Batu
55,000.00
0.2 OH Pekerja
37,000.00
0.01 OH Mandor
65,000.00
Jumlah
16 1 M3 Pekerjaan Beton K-300
0.97 M3 Kerikil Beton
106,000.00
8.5 Zak Portland Cement 50 Kg (Indo Cement klas
49,000.00
0.385 M3 Pasir Beton
80300
0.95 OH Tukang Batu
50,000.00
0.095 OH Kepala Tukang Batu
55,000.00
5.7 OH Pekerja
37,000.00
0.285 OH Mandor
65000
Jumlah
17 1 M3 Pekerjaan Beton Ready Mix K-300
1 m3. Beton Cor Ready Mix K-300
625000
1 m3. Ongkos Cor
55,000.00
1 m3, Alat-alat, dll.
30,000.00
Jumlah
18 1 Kg Pekerjaan Besi beton
1.05 Kg Besi Beton
15,300.00
0.025 Kg Kawat Ikat Beton (Bendrat)
13,840.00
0.019 OH Tukang Besi
50,000.00
0.006 OH Kepala Tukang Besi
50000
0.019 OH Pekerja
37,000.00
0.001 OH Mandor
65,000.00
Jumlah
19 1 M2 Pekerjaan Begisting Beton Pondasi & Sloop
0.35 Lbr Multiplek 9 mm
135,000.00
0.028 M3 Kayu Meranti Usuk 4/6
3,000,000.00
0.2 Kg Paku 2"-5"
15,500.00
0.375 OH Tukang Kayu
50000

UPAH
( Rp. )

BAHAN
( Rp. )
3

5,000.00
550.00
11,840.00
975.00
18,365.00

4
3,600.00

166,050.60
4,233.60
1,980.00

7,500.00
825.00
7,400.00
650.00
16,375.00

6,213.60
7,938.00
1,710.00

7,500.00
825.00
7,400.00
650.00
16,375.00

9,648.00
8,349.60
1,530.00

7,500.00
825.00
7,400.00
650.00
16,375.00

9,879.60
9,114.00
1,440.00

7,500.00
825.00
7,400.00
650.00
16,375.00

10,554.00
102,820.00
416,500.00
30,947.62

47,500.00
5,225.00
210,900.00
18,525.00
282,150.00

550,267.62

4,233.60
1,980.00
7,500.00
825.00
7,400.00
650.00
22,588.60
7,938.00
1,710.00
7,500.00
825.00
7,400.00
650.00
26,023.00
8,349.60
1,530.00
7,500.00
825.00
7,400.00
650.00
26,254.60
9,114.00
1,440.00
7,500.00
825.00
7,400.00
650.00
26,929.00
102,820.00
416,500.00
30,947.62
47,500.00
5,225.00
210,900.00
18,525.00
832,417.62
687,500.00
55,000.00
30,000.00
772,500.00

16,065.00
346.00

16,065.00
346.00
945.00
315.00
699.30
40.95
18,411.25

16,411.00
47,250.00
84,000.00
3,100.00

18,750.00

5
3,600.00
5,000.00
550.00
11,840.00
975.00
184,415.60

625,000.00
55,000.00
30,000.00
85,000.00

945.00
315.00
699.30
40.95
2,000.25

HARGA
( Rp. )

47,250.00
84,000.00
3,100.00
18,750.00

NO
1

URAIAN PEKERJAAN
2
0.038 OH Kepala Tukang Kayu
0.35 OH Pekerja
0.006 OH Mandor

20 1 M2 Pekerjaan Begisting Praktis


0.35 Lbr Multiplek 9 mm
0.014 M3 Kayu Meranti Usuk 4/6
0.2 Kg Paku 2"-5"
0.375 OH Tukang Kayu
0.038 OH Kepala Tukang Kayu
0.35 OH Pekerja
0.006 OH Mandor
21 1 M2 Pekerjaan Begisting Kolom
0.35 Lbr Multiplek 9 mm
0.03 M3 Kayu Meranti Usuk 4/6
0.32 Kg Paku 2"-5"
0.39 OH Tukang Kayu
0.039 OH Kepala Tukang Kayu
0.364 OH Pekerja
0.007 OH Mandor

SATUAN
( Rp. )
2
55,000.00
37,000.00
65,000.00
Jumlah
135,000.00
3,000,000.00
15500
50,000.00
55,000.00
37,000.00
65000
Jumlah
135,000.00
3000000
15,500.00
50,000.00
55,000.00
37000
65,000.00
Jumlah

22 1 M2 Pekerjaan Begisting Balok & Plat Lantai


0.35 Lbr Multiplek 9 mm
0.032 M3 Kayu Meranti Usuk 4/6
0.4 Kg Paku 2"-5"
0.405 OH Tukang Kayu
0.041 OH Kepala Tukang Kayu
0.378 OH Pekerja
0.007 OH Mandor
23

24

25

26

27

135000
3,000,000.00
15,500.00
50,000.00
55000
37,000.00
65,000.00
Jumlah
1 M3 Pekerjaan Beton Bertulang Pondasi Telapak tipe 1
1 M3 Pekerjaan Beton K-300
832,417.62
3.168 M2 Pekerjaan Begisting Beton Pondasi
168,518.75
100 Kg Pekerjaan Besi beton
18,411.25
Jumlah
1 M3 Pekerjaan Beton Bertulang Pondasi Telapak tipe 2
1 M3 Pekerjaan Beton K-300
832,417.62
3.96 M2 Pekerjaan Begisting Beton Pondasi
168,518.75
240 Kg Pekerjaan Besi beton
18411.25
Jumlah
1 M3 Pekerjaan Beton Bertulang Pondasi Telapak tipe 3
1 M3 Pekerjaan Beton K-300
832,417.62
6.316 M2 Pekerjaan Begisting Beton Pondasi
168518.75
145 Kg Pekerjaan Besi beton
18,411.25
Jumlah
1 M3 Pekerjaan Beton Bertulang Sloof 30/60
1 M3 Pekerjaan Beton K-300
832417.62
9.333 M2 Pekerjaan Begisting Beton Sloop
168,518.75
200 Kg Pekerjaan Besi beton
18,411.25
Jumlah
1 M3 Pekerjaan Beton Bertulang Sloof 35/70
1 M3 Pekerjaan Beton K-300
832,417.62
7.837 M2 Pekerjaan Begisting Betton Sloop
168,518.75
180 Kg Pekerjaan Besi beton
18,411.25

UPAH
( Rp. )
3
2,062.50
12,950.00
406.25
34,168.75

BAHAN
( Rp. )

HARGA
( Rp. )
4

134,350.00
47,250.00
43,200.00
3,100.00

18,750.00
2,062.50
12,950.00
406.25
34,168.75

93,550.00
47,250.00
90,000.00
4,960.00

19,500.00
2,145.00
13,468.00
422.50
35,535.50

142,210.00
47,250.00
96,000.00
6,200.00

20,250.00
2,227.50
13,986.00
438.75
36,902.25

149,450.00

Kolom 50/50 K-300 :


Pembesian 250 Kg
Pembesian 300 Kg

832,417.62
177,745.50
18411.25
Jumlah

47,250.00
43,200.00
3,100.00
18,750.00
2,062.50
12,950.00
406.25
127,718.75
47,250.00
90,000.00
4,960.00
19,500.00
2,145.00
13,468.00
422.50
177,745.50
47,250.00
96,000.00
6,200.00
20,250.00
2,227.50
13,986.00
438.75
186,352.25

832,417.62
533,867.40
1,841,125.00

832,417.62
533,867.40
1,841,125.00
3,207,410.02

832,417.62
667,334.25
4,418,700.00

832,417.62
667,334.25
4,418,700.00
5,918,451.87

832,417.62
1,064,323.98
2,669,631.25

832,417.62
1,064,323.98
2,669,631.25
4,566,372.85

832,417.62
1,572,841.67
3,682,250.00

832,417.62
1,572,841.67
3,682,250.00
6,087,509.29

832,417.62
1,320,636.73
3,314,025.00

832,417.62
1,320,636.73
3,314,025.00

Jumlah
28 1 M3 Pekerjaan Beton Bertulang Kolom 50/50
1 M3 Pekerjaan Beton K-300
8 M2 Pekerjaan Begisting Kolom
150 Kg Pekerjaan Besi beton

5
2,062.50
12,950.00
406.25
168,518.75

5,467,079.35
832,417.62
1,421,964.00
2,761,687.50

832,417.62
1,421,964.00
2,761,687.50
5,016,069.12

NO

URAIAN PEKERJAAN

2
Pembesian 350 Kg
29 1 M3 Pekerjaan Beton Bertulang Kolom 40/40
1 M3 Pekerjaan Beton K-300
7.429 M2 Pekerjaan Begisting Kolom
250 Kg Pekerjaan Besi beton
Kolom 60/70 K-300 :
Pembesian 180 Kg
Pembesian 200 Kg
30 1 M3 Pekerjaan Beton Bertulang Kolom L 15/30
1 M3 Pekerjaan Beton K-300
21.33 M2 Pekerjaan Begisting Praktis
350 Kg Pekerjaan Besi beton

31 1 M3 Pekerjaan Beton Bertulang Kolom 25/25


1 M3 Pekerjaan Beton K-300
16 M2 Pekerjaan Begisting Kolom
150 Kg Pekerjaan Besi beton
32 1 M3 Pekerjaan Beton Bertulang Kolom 40/40
1 M3 Pekerjaan Beton K-300
10 M2 Pekerjaan Begisting Kolom
200 Kg Pekerjaan Besi beton
33 1 M3 Pekerjaan Beton Bertulang Balok 30/40
1 M3 Beton Cor Ready Mix K-300
11 M2 Pekerjaan Begisting Balok
250 Kg Pekerjaan Besi beton
Balok 30/40 K-300 :
Pembesian 300 Kg
34 1 M3 Pekerjaan Beton Bertulang Balok 30/60
1 M3 Beton Cor Ready Mix K-300
10 M2 Pekerjaan Begisting Balok
150 Kg Pekerjaan Besi beton
Balok 30/60 K-300 :
Pembesian 180 Kg
Pembesian 200 Kg
Pembesian 250 Kg
35 1 M3 Pekerjaan Beton Bertulang Balok 40/65
1 M3 Beton Cor Ready Mix K-300
7.846 M2 Pekerjaan Begisting Balok
150 Kg Pekerjaan Besi beton
Balok 40/65 K-300 :
Pembesian 180 Kg
Pembesian 200 Kg
Pembesian 250 Kg
36 1 M3 Pekerjaan Beton Bertulang Balok 45/65
1 M3 Beton Cor Ready Mix K-300
7.179 M2 Pekerjaan Begisting Balok
150 Kg Pekerjaan Besi beton
Balok 40/65 K-300 :
Pembesian 180 Kg
Pembesian 200 Kg
Pembesian 250 Kg
37 1 M3 Pekerjaan Beton Bertulang Balok 60/40
1 M3 Beton Cor Ready Mix K-300
7 M2 Pekerjaan Begisting Balok
180 Kg Pekerjaan Besi beton
Balok 60/40 K-300 :

SATUAN
( Rp. )
2

UPAH
( Rp. )

BAHAN
( Rp. )
3

HARGA
( Rp. )
4

832,417.62
177745.5
18,411.25
Jumlah

832,417.62
1,320,395.14
4,602,812.50

832,417.62
1,320,395.14
4,602,812.50
6,755,625.26

832,417.62
127718.75
18,411.25
Jumlah

832,417.62
2,724,666.67
6,443,937.50

832,417.62
2,724,666.67
6,443,937.50
10,001,021.79

832417.62
177,745.50
18,411.25
Jumlah

832,417.62
2,843,928.00
2,761,687.50

832,417.62
2,843,928.00
2,761,687.50
6,438,033.12

832,417.62
177,745.50
18,411.25
Jumlah

832,417.62
1,777,455.00
3,682,250.00

832,417.62
1,777,455.00
3,682,250.00
6,292,122.62

860,000.00
186,352.25
18411.25
Jumlah

860,000.00
2,049,874.75
4,602,812.50

860,000.00
2,049,874.75
4,602,812.50
7,512,687.25

860,000.00
186,352.25
18,411.25
Jumlah

860,000.00
1,863,522.50
2,761,687.50

860,000.00
1,863,522.50
2,761,687.50
5,485,210.00

860,000.00
186,352.25
18411.25
Jumlah

860,000.00
1,462,148.42
2,761,687.50

860,000.00
1,462,148.42
2,761,687.50

860,000.00
186352.25
18,411.25
Jumlah

860,000.00
1,337,913.59
2,761,687.50

860,000.00
1,337,913.59
2,761,687.50
4,959,601.09

860000
186,352.25
18,411.25
Jumlah

860,000.00
1,304,465.75
3,314,025.00

860,000.00
1,304,465.75
3,314,025.00
5,478,490.75

NO
1

URAIAN PEKERJAAN
2
Pembesian 250 Kg
Pembesian 300 Kg

38 1 M3 Pekerjaan Beton Bertulang Balok 60/15


1 M3 Beton Cor Ready Mix K-300
16.5 M2 Pekerjaan Begisting Balok
180 Kg Pekerjaan Besi beton
Balok 15/60 K-300 :
Pembesian 250 Kg
Pembesian 300 Kg
39 1 M3 Pekerjaan Beton Bertulang Balok 40/25
1 M3 Beton Cor Ready Mix K-300
11.55 M2 Pekerjaan Begisting Balok
200 Kg Pekerjaan Besi beton
40 1 M3 Pekerjaan Beton Bertulang Balok 80/25
1 M3 Beton Cor Ready Mix K-300
10.18 M2 Pekerjaan Begisting Balok
300 Kg Pekerjaan Besi beton
41 1 M3 Pekerjaan Beton Bertulang Plat Lantai = 12 cm
1 M3 Beton Cor Ready Mix K-300
8.333 M2 Pekerjaan Begisting Plat Lantai
150 Kg Pekerjaan Besi beton
42

43

44

45

46

47

48

SATUAN
( Rp. )
2

UPAH
( Rp. )

BAHAN
( Rp. )
3

HARGA
( Rp. )
4

860,000.00
186,352.25
18,411.25
Jumlah

860,000.00
3,074,812.13
3,314,025.00

860,000.00
3,074,812.13
3,314,025.00
7,248,837.13

860,000.00
186,352.25
18411.25
Jumlah

860,000.00
2,152,368.49
3,682,250.00

860,000.00
2,152,368.49
3,682,250.00
6,694,618.49

860,000.00
186352.25
18,411.25
Jumlah

860,000.00
1,896,134.14
5,523,375.00

860,000.00
1,896,134.14
5,523,375.00
8,279,509.14

860,000.00
1,552,935.42
2,761,687.50

860,000.00
1,552,935.42
2,761,687.50
5,174,622.92

860,000.00
1,490,818.00
2,761,687.50

860,000.00
1,490,818.00
2,761,687.50
5,112,505.50

860,000.00
1,118,113.50
2,761,687.50

860,000.00
1,118,113.50
2,761,687.50
4,739,801.00

860,000.00
894,490.80
1,472,900.00

860,000.00
894,490.80
1,472,900.00
3,227,390.80

860,000.00
894,490.80
2,761,687.50

860,000.00
894,490.80
2,761,687.50
4,516,178.30

860,000.00
559,056.75
2,025,237.50

860,000.00
559,056.75
2,025,237.50
3,444,294.25

47,250.00
90,000.00
6,200.00

47,250.00
90,000.00
6,200.00
18,750.00
2,062.50
12,950.00
406.25
177,618.75

860000
186,352.25
18,411.25
Jumlah
1 M3 Pekerjaan Beton Bertulang Plat Lantai = 15 cm (man hole)
1 M3 Beton Cor Ready Mix K-300
860,000.00
8 M2 Pekerjaan Begisting Plat Lantai
186,352.25
150 Kg Pekerjaan Besi beton
18,411.25
Jumlah
1 M3 Pekerjaan Beton Bertulang Plat Atas = 20 cm (groundtank plat atas)
1 M3 Beton Cor Ready Mix K-300
860,000.00
6 M2 Pekerjaan Begisting Plat Lantai
186,352.25
150 Kg Pekerjaan Besi beton
18411.25
Jumlah
1 M3 Pekerjaan Beton Bertulang Plat Lantai = 25 cm (dasar pit lift)
1 M3 Beton Cor Ready Mix K-300
860,000.00
4.8 M2 Pekerjaan Begisting Plat Lantai
186352.25
80 Kg Pekerjaan Besi beton
18,411.25
Jumlah
1 M3 Pekerjaan Beton Bertulang Plat Atas = 25 cm (sawage treatment plant)
1 M3 Beton Cor Ready Mix K-300
860000
4.8 M2 Pekerjaan Begisting Plat Lantai
186,352.25
150 Kg Pekerjaan Besi beton
18,411.25
Jumlah
1 M3 Pekerjaan Beton Bertulang Plat Lantai = 40 cm (grountank plat dasar)
1 M3 Beton Cor Ready Mix K-300
860,000.00
3 M2 Pekerjaan Begisting Plat Lantai
186,352.25
110 Kg Pekerjaan Besi beton
18,411.25
Jumlah
1 M2 Pekerjaan Begisting Dinding
0.35 Lbr Multiplek 9 mm
135,000.00
0.03 M3 Kayu Meranti Usuk 4/6
3,000,000.00
0.4 Kg Paku 2"-5"
15500
0.375 OH Tukang Kayu
50,000.00
18,750.00
0.038 OH Kepala Tukang Kayu
55,000.00
2,062.50
0.35 OH Pekerja
37,000.00
12,950.00
0.006 OH Mandor
65000
406.25
Jumlah
34,168.75
1 M3 Pekerjaan Beton Bertulang Plat Dinding = 20 cm (dinding Pit lift)
1 M3 Beton Cor Ready Mix K-300
860,000.00
10 M2 Pekerjaan Begisting Plat Dinding
177618.75
80 Kg Pekerjaan Besi beton
18,411.25
Jumlah

143,450.00
860,000.00
1,776,187.50
1,472,900.00

860,000.00
1,776,187.50
1,472,900.00
4,109,087.50

NO
1
49

50

51

52

53

54

55

56

57

58

URAIAN PEKERJAAN

SATUAN
UPAH
( Rp. )
( Rp. )
2
2
3
1 M3 Pekerjaan Beton Bertulang Plat Dinding = 20 cm (dinding groundtank)
1 M3 Beton Cor Ready Mix K-300
860000
9.6 M2 Pekerjaan Begisting Plat Dinding
177,618.75
110 Kg Pekerjaan Besi beton
18,411.25
Jumlah
1 M3 Pekerjaan Beton Bertulang Plat Dinding = 25 cm (dinding groundtank)
1 M3 Beton Cor Ready Mix K-300
860,000.00
8 M2 Pekerjaan Begisting Plat Dinding
177,618.75
110 Kg Pekerjaan Besi beton
18,411.25
Jumlah
1 M3 Pekerjaan Beton Bertulang Plat Dinding = 30 cm (dinding groundtank)
1 M3 Beton Cor Ready Mix K-300
860,000.00
6.667 M2 Pekerjaan Begisting Plat Dinding
177,618.75
110 Kg Pekerjaan Besi beton
18411.25
Jumlah
1 M2 Pekerjaan Begisting Tangga
0.35 Lbr Multiplek 9 mm
135,000.00
0.025 M3 Kayu Meranti Usuk 4/6
3000000
0.4 Kg Paku 2"-5"
15,500.00
0.405 OH Tukang Kayu
50,000.00
20,250.00
0.041 OH Kepala Tukang Kayu
55,000.00
2,227.50
0.378 OH Pekerja
37000
13,986.00
0.007 OH Mandor
65,000.00
438.75
Jumlah
36,902.25
1 M3 Pekerjaan Beton Bertulang Plat Tangga
1 M3 Beton Cor Ready Mix K-300
860000
8 M2 Pekerjaan Begisting Plat Dinding
165,352.25
180 Kg Pekerjaan Besi beton
18,411.25
Jumlah
1 M3 Pekerjaan Beton Rabat t=10 cm. dg. Tul. M6.
1 M3 Beton Cor Ready Mix K-300
860,000.00
0.106 Roll Wiremesh M6
5,550,000.00
1 Ls. Upah pekerjaan Wire Mesh
200,000.00
200,000.00
Jumlah
200,000.00
1 Kg Pekerjaan Kuda-Kuda Baja
1.1 Kg Baja Profile
15,000.00
0.02 Kg Cat Metal ICI Dulux
180,000.00
0.007 OH Pekerja
37000
249.75
0.068 OH Tukang Besi
50,000.00
3,375.00
0.007 OH Kepala Tukang Besi
50,000.00
337.50
0.001 OH Mandor
65,000.00
43.88
Jumlah
4,006.13
1 M2 Pek. Usuk
0.014 M3 Kayu Kamper Samarida Usuk 5/7
6,000,000.00
0.15 Kg Paku 2"-5"
15,500.00
0.26 OH Tukang Kayu
50000
13,000.00
0.12 OH Kepala Tukang Kayu
55,000.00
6,600.00
0.28 OH Pekerja
37,000.00
10,360.00
0.045 OH Mandor
65,000.00
2,925.00
Jumlah
32,885.00
1 M2 Pek. Reng
0.006 M3 Kayu Kamper Samarinda Reng 3/4
5,500,000.00
0.15 Kg Paku 2"-5"
15,500.00
0.2 OH Tukang Kayu
50000
10,000.00
0.035 OH Kepala Tukang Kayu
55,000.00
1,925.00
0.15 OH Pekerja
37,000.00
5,550.00
0.035 OH Mandor
65,000.00
2,275.00
Jumlah
19,750.00
1 M2 Pekerjaan Pasang Atap Genteng
14 Bh Genteng Kodok produksi Goodyear
3,000.00
0.175 OH Tukang Batu
50,000.00
8,750.00
0.018 OH Kepala Tukang Batu
55000
962.50
0.35 OH Pekerja
37,000.00
12,950.00
0.018 OH Mandor
65,000.00
1,137.50
Jumlah
23,800.00

BAHAN
( Rp. )

HARGA
( Rp. )
4

860,000.00
1,705,140.00
2,025,237.50

860,000.00
1,705,140.00
2,025,237.50
4,590,377.50

860,000.00
1,420,950.00
2,025,237.50

860,000.00
1,420,950.00
2,025,237.50
4,306,187.50
860,000.00
1,184,125.00
2,025,237.50
4,069,362.50

47,250.00
75,000.00
6,200.00

128,450.00

860,000.00
1,322,818.00
3,314,025.00

47,250.00
75,000.00
6,200.00
20,250.00
2,227.50
13,986.00
438.75
165,352.25
860,000.00
1,322,818.00
3,314,025.00
5,496,843.00
860,000.00
587,301.59
200,000.00
1,647,301.59

16,500.00
3,600.00

20,100.00
84,000.00
2,325.00

86,325.00
33,000.00
2,325.00

35,325.00
42,000.00

42,000.00

16,500.00
3,600.00
249.75
3,375.00
337.50
43.88
24,106.13
84,000.00
2,325.00
13,000.00
6,600.00
10,360.00
2,925.00
119,210.00
33,000.00
2,325.00
10,000.00
1,925.00
5,550.00
2,275.00
55,075.00
42,000.00
8,750.00
962.50
12,950.00
1,137.50
65,800.00

NO

URAIAN PEKERJAAN

SATUAN
( Rp. )
2

UPAH
( Rp. )

1
2
3
59 1 M1 Pekerjaan Pasang Bubungan Genteng
3.5 Bh Bubungan Genteng Keramik Berglasur
16,500.00
0.036 Zak Portland Cement 50 Kg (Indo Cement klas
49,000.00
0.032 M3 Pasir Pasang
90,000.00
0.3 OH Tukang Batu
50000
15,000.00
0.03 OH Kepala Tukang Batu
55,000.00
1,650.00
0.6 OH Pekerja
37,000.00
22,200.00
0.03 OH Mandor
65,000.00
1,950.00
Jumlah
40,800.00
60 1 M1 Pekerjaan Papan List Plank
0.035 M3 Kayu Kamper Samarinda Balok
7,500,000.00
0.1 Kg Paku 2"-5"
15,500.00
0.8 OH Tukang Kayu
50000
40,000.00
0.08 OH Kepala Tukang Kayu
55,000.00
4,400.00
0.28 OH Pekerja
37,000.00
10,360.00
0.018 OH Mandor
65,000.00
1,170.00
Jumlah
55,930.00
61 1 M3 Pekerjaan Listplank Kayu Kamper
1.1 M3 Kayu Kamper Samarinda Balok
7,500,000.00
15 Kg Paku 2"-5"
15,500.00
0.15 Kg Paku Lis
22000
24 OH Tukang Kayu
50,000.00 1,200,000.00
2.4 OH Kepala Tukang Kayu
55,000.00
132,000.00
8 OH Pekerja
37,000.00
296,000.00
0.4 OH Mandor
65000
26,000.00
Jumlah
1,654,000.00
62 1 M2 Pekerjaan Pasang Kaca Mati 8 mm
1 M2 Kaca 8mm
174,000.00
0.12 OH Tukang Kayu
50000
6,000.00
0.012 OH Kepala Tukang Kayu
55,000.00
660.00
0.019 OH Pekerja
37,000.00
695.60
0.032 OH Mandor
65,000.00
2,080.00
Jumlah
9,435.60
63 1 M2 Pekerjaan Pasang Kaca Mati 6 mm
1 M2 Kaca 6mm
100,000.00
0.12 OH Tukang Kayu
50,000.00
6,000.00
0.012 OH Kepala Tukang Kayu
55000
660.00
0.019 OH Pekerja
37,000.00
695.60
0.032 OH Mandor
65,000.00
2,080.00
Jumlah
9,435.60
64 1 M2 Pekerjaan Pasang Kaca Mati 5 mm
1 M2 Kaca 5mm
172,500.00
0.12 OH Tukang Kayu
50,000.00
6,000.00
0.012 OH Kepala Tukang Kayu
55,000.00
660.00
0.019 OH Pekerja
37000
695.60
0.032 OH Mandor
65,000.00
2,080.00
Jumlah
9,435.60
65 1 M2 Pek. Pasang Keramik Lantai 60x60 Niro Granit
1.05 Duz Keramik 60 x 60 Niro Granit
252000
0.25 Zak Portland Cement 50 Kg (Indo Cement klas
49,000.00
0.023 M3 Pasir Pasang
90,000.00
0.25 Kg Semen Naat AM 50 + am 55
12,500.00
0.495 OH Tukang Batu
50000
24,750.00
0.05 OH Kepala Tukang Batu
55,000.00
2,722.50
0.462 OH Pekerja
37,000.00
17,094.00
0.22 OH Mandor
65,000.00
14,300.00
Jumlah
58,866.50
66 1 M2 Pek. Pasang Keramik Lantai 40/40 essenza
1.05 Duz Keramik 40 x 40 Niro Granit
257,654.50
0.25 Zak Portland Cement 50 Kg (Indo Cement klas
49,000.00
0.023 M3 Pasir Pasang
90000
0.333 Kg Semen Naat AM 50 + am 55
12,500.00
0.495 OH Tukang Batu
50,000.00
0.05 OH Kepala Tukang Batu
55,000.00

BAHAN
( Rp. )

HARGA
( Rp. )
4

57,750.00
1,764.00
2,880.00

57,750.00
1,764.00
2,880.00
15,000.00
1,650.00
22,200.00
1,950.00
103,194.00

62,394.00
262,500.00
1,550.00

264,050.00
8,250,000.00
232,500.00
3,300.00

8,485,800.00
174,000.00

174,000.00
100,000.00

100,000.00
172,500.00

172,500.00
264,600.00
12,250.00
2,070.00
3,125.00

282,045.00

270,537.23
12,250.00
2,070.00
4,166.67
24,750.00
2,722.50

262,500.00
1,550.00
40,000.00
4,400.00
10,360.00
1,170.00
319,980.00
8,250,000.00
232,500.00
3,300.00
1,200,000.00
132,000.00
296,000.00
26,000.00
10,139,800.00
174,000.00
6,000.00
660.00
695.60
2,080.00
183,435.60
100,000.00
6,000.00
660.00
695.60
2,080.00
109,435.60
172,500.00
6,000.00
660.00
695.60
2,080.00
181,935.60
264,600.00
12,250.00
2,070.00
3,125.00
24,750.00
2,722.50
17,094.00
14,300.00
340,911.50

270,537.23
12,250.00
2,070.00
4,166.67
24,750.00
2,722.50

NO

URAIAN PEKERJAAN

2
0.462 OH Pekerja
0.22 OH Mandor

SATUAN
( Rp. )
2
37000
65,000.00
Jumlah

67 1 M2 Pek. Pasang Keramik Lantai 30/30 essenza


1.05 Duz Keramik 30 x 30 Niro Granit
198224.5
0.25 Zak Portland Cement 50 Kg (Indo Cement klas
49,000.00
0.023 M3 Pasir Pasang
90,000.00
0.5 Kg Semen Naat AM 50 + am 55
12,500.00
0.495 OH Tukang Batu
50000
0.05 OH Kepala Tukang Batu
55,000.00
0.462 OH Pekerja
37,000.00
0.22 OH Mandor
65,000.00
Jumlah
68 1 M2 Pek. Pasang Keramik Lantai 20/20
1.05 Duz Keramik 20 x 20 Roman
88,500.00
0.25 Zak Portland Cement 50 Kg (Indo Cement klas
49,000.00
0.023 M3 Pasir Pasang
90000
0.5 Kg Semen Naat AM 50 + am 55
12,500.00
0.045 OH Kepala Tukang Batu
55,000.00
0.48 OH Pekerja
37,000.00
0.03 OH Mandor
65000
Jumlah
69 1 M1 Pek. Pasang Keramik Plint 10/60
1.05 M' Keramik Plint 10 x 60 Niro Granit
57,500.00
0.031 Zak Portland Cement 50 Kg (Indo Cement klas
49000
0.02 M3 Pasir Pasang
90,000.00
0.033 Kg Semen Naat AM 50 + am 55
12,500.00
0.05 OH Tukang Batu
50,000.00
0.005 OH Kepala Tukang Batu
55000
0.15 OH Pekerja
37,000.00
0.006 OH Mandor
65,000.00
Jumlah
70 1 M1 Pek. Pasang Keramik Plint 10/40
1.05 M' Keramik Plint 10 x 40 Niro Granit
41,500.00
0.031 Zak Portland Cement 50 Kg (Indo Cement klas
49,000.00
0.02 M3 Pasir Pasang
90,000.00
0.067 Kg Semen Naat AM 50 + am 55
12500
0.06 OH Tukang Batu
50,000.00
0.005 OH Kepala Tukang Batu
55,000.00
0.18 OH Pekerja
37,000.00
0.006 OH Mandor
65000
Jumlah
71 1 M1 Pek. Pasang Keramik 10/30
1.05 M' Keramik Plint 10 x 30 Niro Granit
25,000.00
0.031 Zak Portland Cement 50 Kg (Indo Cement klas
49000
0.02 M3 Pasir Pasang
90,000.00
1.5 Kg Semen Naat AM 50 + am 55
12,500.00
0.05 OH Tukang Batu
50,000.00
0.005 OH Kepala Tukang Batu
55000
0.15 OH Pekerja
37,000.00
0.006 OH Mandor
65,000.00
Jumlah
72 1 M1 Pek. Pasang Keramik Anti Slip 10/20
1.05 M' Keramik Anti Slip 10 x 20 Roman
13,250.00
0.031 Zak Portland Cement 50 Kg (Indo Cement klas
49,000.00
0.02 M3 Pasir Pasang
90,000.00
1.5 Kg Semen Naat AM 50 + am 55
12500
0.05 OH Tukang Batu
50,000.00
0.005 OH Kepala Tukang Batu
55,000.00
0.15 OH Pekerja
37,000.00
0.006 OH Mandor
65000
Jumlah
73 1 M2 Pekerjaan Cat Tembok 1x Plamur, 1x Dasar, 2x Cat Halus
Dinding Dalam Vinilex ICI weathersield

UPAH
( Rp. )
3
17,094.00
14,300.00
58,866.50

BAHAN
( Rp. )

HARGA
( Rp. )
4

289,023.89

208,135.73
12,250.00
2,070.00
6,250.00
24,750.00
2,722.50
17,094.00
14,300.00
58,866.50

228,705.73
92,925.00
12,250.00
2,070.00
6,250.00

2,475.00
17,760.00
1,950.00
22,185.00

113,495.00
60,375.00
1,519.00
1,800.00
416.67

2,500.00
275.00
5,550.00
390.00
8,715.00

64,110.67
43,575.00
1,519.00
1,800.00
833.33

3,000.00
275.00
6,660.00
390.00
10,325.00

47,727.33
26,250.00
1,519.00
1,800.00
18,750.00

2,500.00
275.00
5,550.00
390.00
8,715.00

48,319.00
13,912.50
1,519.00
1,800.00
18,750.00

2,500.00
275.00
5,550.00
390.00
8,715.00

35,981.50

5
17,094.00
14,300.00
347,890.39

208,135.73
12,250.00
2,070.00
6,250.00
24,750.00
2,722.50
17,094.00
14,300.00
287,572.23
92,925.00
12,250.00
2,070.00
6,250.00
2,475.00
17,760.00
1,950.00
135,680.00
60,375.00
1,519.00
1,800.00
416.67
2,500.00
275.00
5,550.00
390.00
72,825.67
43,575.00
1,519.00
1,800.00
833.33
3,000.00
275.00
6,660.00
390.00
58,052.33
26,250.00
1,519.00
1,800.00
18,750.00
2,500.00
275.00
5,550.00
390.00
57,034.00
13,912.50
1,519.00
1,800.00
18,750.00
2,500.00
275.00
5,550.00
390.00
44,696.50

NO
1

74

75

76

77

78

79

80

URAIAN PEKERJAAN

SATUAN
UPAH
( Rp. )
( Rp. )
2
2
3
0.333 Lbr Amplas
3000
0.12 Kg Cat Dasar
21,500.00
0.208 Kg Cat Dinding ICI Vinilex
165,000.00
0.1 Kg Plamur Tembok
6,000.00
0.041 OH Tukang Cat
50000
2,047.50
0.004 OH Kepala Tukang Cat
55,000.00
225.23
0.13 OH Pekerja
37,000.00
4,810.00
0.016 OH Mandor
65,000.00
1,056.25
Jumlah
8,138.98
1 M2 Pekerjaan Cat Tembok 1x Plamur, 1x Dasar, 2x Cat Halus
Dinding Luar
0.333 Lbr Amplas
3,000.00
0.12 Kg Cat Dasar
21500
0.26 Kg Cat Dinding ICI Dulux Weathersield
168,500.00
0.1 Kg Plamur Tembok
6,000.00
0.041 OH Tukang Cat
50,000.00
2,047.50
0.004 OH Kepala Tukang Cat
55000
225.23
0.13 OH Pekerja
37,000.00
4,810.00
0.016 OH Mandor
65,000.00
1,056.25
Jumlah
8,138.98
1 M2 Pekerjaan Cat Tembok 1x Plamur, 1x Dasar, 2x Cat Halus (Cat Jotun)
0.333 Lbr Amplas
3,000.00
0.12 Kg Cat Dasar
21,500.00
0.26 Kg Cat Jotun
198,000.00
0.1 Kg Plamur Tembok
6000
0.063 OH Tukang Cat
50,000.00
3,150.00
0.006 OH Kepala Tukang Cat
55,000.00
346.50
0.2 OH Pekerja
37,000.00
7,400.00
0.025 OH Mandor
65000
1,625.00
Jumlah
12,521.50
1 M2 Pekerjaan Cat Kayu 1x Cat Dasar, 2x Cat Halus
0.333 Lbr Amplas
3,000.00
0.12 Kg Cat Danapaints
160000
0.26 Kg Cat Kayu ICI Dulux
170,000.00
0.1 Kg Dempul Kayu
18,000.00
0.018 OH Tukang Cat
50,000.00
900.00
0.012 OH Kepala Tukang Cat
55000
660.00
0.14 OH Pekerja
37,000.00
5,180.00
0.005 OH Mandor
65,000.00
325.00
Jumlah
7,065.00
1 M Pekerjaan Tempelan Paras Palimanan
1.1 M2 Batu Palimanan 40 x 60 cm
235,000.00
0.1 Zak Portland Cement 50 Kg (Indo Cement klas
49,000.00
0.65 OH Tukang Stile bali
70,000.00
45,500.00
0.165 OH Kepala Tk. Stile Bali
80000
13,200.00
0.563 OH Pekerja Stile Bali
50,000.00
28,125.00
0.165 OH Mandor
65,000.00
10,725.00
Jumlah
97,550.00
1 M Pekerjaan Pasang Batu Alam
1.1 M2 Batu Alam Abu-Abu/Hitam 20 x 40 cm
255,000.00
0.023 M3 Pasir Pasang
90,000.00
0.25 M3 Pasir Urug
75,000.00
0.65 OH Tukang Stile bali
70000
45,500.00
0.165 OH Kepala Tk. Stile Bali
80,000.00
13,200.00
0.563 OH Pekerja Stile Bali
50,000.00
28,125.00
0.165 OH Mandor
65,000.00
10,725.00
Jumlah
97,550.00
1 M2 Pekerjaan Waterproffing
1 Kg Waterproof Viscocrete-10 ex SIKA
45,000.00
0.4 OH Pekerja
37,000.00
14,800.00
0.04 OH Mandor
65000
2,600.00
Jumlah
17,400.00
1 M Pekerjaan Acian 1 : 3
0.21 Zak Portland Cement 50 Kg (Indo Cement klas
49,000.00
0 M3 Pasir Pasang
90000

BAHAN
( Rp. )
4
999.00
2,580.00
34,320.00
600.00

38,499.00

999.00
2,580.00
43,810.00
600.00

47,989.00
999.00
2,580.00
51,480.00
600.00

55,659.00
999.00
19,200.00
44,200.00
1,800.00

66,199.00
258,500.00
4,900.00

263,400.00
280,500.00
2,070.00
18,750.00

301,320.00
45,000.00

45,000.00
10,270.40

HARGA
( Rp. )
5
999.00
2,580.00
34,320.00
600.00
2,047.50
225.23
4,810.00
1,056.25
46,637.98

999.00
2,580.00
43,810.00
600.00
2,047.50
225.23
4,810.00
1,056.25
56,127.98
999.00
2,580.00
51,480.00
600.00
3,150.00
346.50
7,400.00
1,625.00
68,180.50
999.00
19,200.00
44,200.00
1,800.00
900.00
660.00
5,180.00
325.00
73,264.00
258,500.00
4,900.00
45,500.00
13,200.00
28,125.00
10,725.00
360,950.00
280,500.00
2,070.00
18,750.00
45,500.00
13,200.00
28,125.00
10,725.00
398,870.00
45,000.00
14,800.00
2,600.00
62,400.00
10,270.40
-

NO

URAIAN PEKERJAAN

1
0.04
0.002
0.04
0.08

OH
OH
OH
OH

2
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor

SATUAN
( Rp. )
2
50,000.00
55,000.00
37,000.00
65000
Jumlah

81 M3 Pekerjaan Beton 1 : 3 : 5 (rabatan lantai kerja)


0.97 M3 Kerikil Beton
106,000.00
5.665 Zak Portland Cement 50 Kg (Indo Cement klas
49000
0.544 M3 Pasir Beton
80,300.00
1 OH Tukang Batu
50,000.00
0.1 OH Kepala Tukang Batu
55,000.00
4 OH Pekerja
37000
0.4 OH Mandor
65,000.00
Jumlah
82 1 M2 Pek. Rangka Plapond Besi Hollow
1.1 M' Besi Hollow
23000
2.083 Bh Gantungan
7,500.00
2.083 Bh Paku Ramset
3,000.00
0.2 Bh Staping
250.00
1 Ls Ongkos Pasang
7500
Jumlah
83 1 M2 Pek. Dinding Partisi GRC (Rangka Besi Hollow)
4 M' Rangka Partisi Besi Hollow
25,000.00
1.125 Bj Scrup
200
0.49 M2 GRC
32,000.00
0.7 Kg High Modulus Acetate Silicon Sealant 420
65,000.00
1 m2. GlassWoll density 60 kg/m3.
215,000.00
0.42 Kg Compoun
15000
1.2 Roll Textile Tape (plaster)
8,000.00
1 Ls Ongkos Pasang
20,000.00
Jumlah
84 1 M2 Pek. Plapond Calsiboard
1.1 M2 Kalsiboard 6 mm
45,000.00
14 Bj Paku Beton
250.00
1.4 Bj Scrup
200.00
0.25 Kg Compoun
15000
0.056 Roll Textile Tape (plaster)
8,000.00
1 Ls Ongkos Pasang
7,500.00
Jumlah
85 1 M2 Pek. Plapond GRC
1.1 M2 GRC
32,000.00
0.575 Kg High Modulus Acetate Silicon Sealant 420
65,000.00
1.4 Bj Scrup
200.00
0.21 Kg Compoun
15000
0.125 Roll Textile Tape (plaster)
8,000.00
1 Ls Ongkos Pasang
7,500.00
Jumlah
86 1 M2 Pekerjaan Paving
1.05 M3 Paving Blok
58,000.00
0.1 Zak Portland Cement 50 Kg (Indo Cement klas
49,000.00
0.1 M3 Pasir Pasang
90,000.00
0.25 OH Tukang Batu
50000
0.04 OH Kepala Tukang Batu
55,000.00
0.35 OH Pekerja
37,000.00
0.02 OH Mandor
65,000.00
Jumlah
87 1 M2 Pekerjaan Waterproffing
1 Kg Waterproof Viscocrete-10 ex SIKA
45,000.00
0.4 OH Pekerja
37,000.00
0.04 OH Mandor
65000
Jumlah
89 1 M2 Pek. Granito 60x60
1.05 M2 Granito 60/60 Diamond
285,560.00
0.25 Zak Portland Cement 50 Kg (Indo Cement klas
49000
0.023 M3 Pasir Pasang
90,000.00

UPAH
( Rp. )
3
2,000.00
110.00
1,480.00
5,200.00
8,790.00

BAHAN
( Rp. )

HARGA
( Rp. )
4

10,270.40
102,820.00
277,585.00
43,683.20

50,000.00
5,500.00
148,000.00
26,000.00
229,500.00

424,088.20
25,300.00
15,624.75
6,249.90
50.00

7,500.00
7,500.00

47,224.65
100,000.00
225.00
15,680.00
45,500.00
215,000.00
6,300.00
9,600.00

20,000.00
20,000.00

392,305.00
49,500.00
3,500.00
280.00
3,750.00
444.44

7,500.00
7,500.00

57,474.44
35,200.00
37,375.00
280.00
3,150.00
1,000.00

7,500.00
7,500.00

77,005.00
60,900.00
4,900.00
9,000.00

12,500.00
2,200.00
12,950.00
1,300.00
28,950.00

74,800.00
45,000.00

14,800.00
2,600.00
17,400.00

5
2,000.00
110.00
1,480.00
5,200.00
19,060.40
102,820.00
277,585.00
43,683.20
50,000.00
5,500.00
148,000.00
26,000.00
653,588.20
25,300.00
15,624.75
6,249.90
50.00
7,500.00
54,724.65
100,000.00
225.00
15,680.00
45,500.00
215,000.00
6,300.00
9,600.00
20,000.00
412,305.00
49,500.00
3,500.00
280.00
3,750.00
444.44
7,500.00
64,974.44
35,200.00
37,375.00
280.00
3,150.00
1,000.00
7,500.00
84,505.00
60,900.00
4,900.00
9,000.00
12,500.00
2,200.00
12,950.00
1,300.00
103,750.00

45,000.00

45,000.00
14,800.00
2,600.00
62,400.00

299,838.00
12,250.00
2,070.00

299,838.00
12,250.00
2,070.00

NO

URAIAN PEKERJAAN

1
0.25
0.675
0.068
0.63
0.3

Kg
OH
OH
OH
OH

2
Semen Naat AM 50 + am 55
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor

SATUAN
( Rp. )
2
12,500.00
50,000.00
55000
37,000.00
65,000.00
Jumlah

90 1 M2 Pek. Granito 40x40


1.05 M2 Granito 40/40 Diamond
237,160.00
0.25 Zak Portland Cement 50 Kg (Indo Cement klas
49,000.00
0.023 M3 Pasir Pasang
90,000.00
0.25 Kg Semen Naat AM 50 + am 55
12500
0.675 OH Tukang Batu
50,000.00
0.068 OH Kepala Tukang Batu
55,000.00
0.63 OH Pekerja
37,000.00
0.3 OH Mandor
65000
Jumlah
91 1 M2 Pek. Granito 30x30
1.05 M2 Granito 30/30 Diamond
179,080.00
0.25 Zak Portland Cement 50 Kg (Indo Cement klas
49000
0.023 M3 Pasir Pasang
90,000.00
0.25 Kg Semen Naat AM 50 + am 55
12,500.00
0.675 OH Tukang Batu
50,000.00
0.068 OH Kepala Tukang Batu
55000
0.63 OH Pekerja
37,000.00
0.3 OH Mandor
65,000.00
Jumlah
92 1 M2 Pekerjaan Pasangan Batu Bata 1 : 5
70 Bj Bata Merah
950.00
0.234 Zak PC Semen Gresik (50 kg)
49,000.00
0.045 M3 Pasir Pasang
90,000.00
0.11 Oh Tukang Batu
50000
0.011 Oh Kepala Tukang Batu
55,000.00
0.352 Oh Pekerja
37,000.00
0.017 Oh Mandor
65,000.00
Jumlah
93 1 M2 Pekerjaan Pasangan Bata ringan( 7,5x20x60)
8.4 Bj Bata ringan
10,000.00
0.287 Zak Perekat bata ringan MU (40 kg)
154,000.00
0.11 Oh Tukang Batu
50000
0.011 Oh Kepala Tukang Batu
55,000.00
0.352 Oh Pekerja
37,000.00
0.017 Oh Mandor
65,000.00
Jumlah
93 1 M2 Pekerjaan Pasangan Bata ringan( 10x20x60)
8.4 Bj Bata ringan
12,500.00
0.287 Zak Perekat bata ringan MU (40 kg)
154,000.00
0.11 Oh Tukang Batu
50000
0.011 Oh Kepala Tukang Batu
55,000.00
0.352 Oh Pekerja
37,000.00
0.017 Oh Mandor
65,000.00
Jumlah

Catatan :
1. Harga - harga belum termasuk PPn 10 %;
2. Harga - harga hanya sebagai pedoman / pendukung
dalam perhitungan konstruksi ( tidak mengikat ).

UPAH
( Rp. )

BAHAN
( Rp. )
3

33,750.00
3,712.50
23,310.00
19,500.00
80,272.50

4
3,125.00

317,283.00
249,018.00
12,250.00
2,070.00
3,125.00

33,750.00
3,712.50
23,310.00
19,500.00
80,272.50

266,463.00
188,034.00
12,250.00
2,070.00
3,125.00

33,750.00
3,712.50
23,310.00
19,500.00
80,272.50

205,479.00
66,500.00
11,446.40
4,050.00

5,500.00
605.00
13,024.00
1,072.50
20,201.50

81,996.40
84,000.00
44,259.60

5,500.00
605.00
13,024.00
1,072.50
20,201.50

128,259.60
105,000.00
44,259.60

5,500.00
605.00
13,024.00
1,072.50
20,201.50

149,259.60

HARGA
( Rp. )
5
3,125.00
33,750.00
3,712.50
23,310.00
19,500.00
397,555.50
249,018.00
12,250.00
2,070.00
3,125.00
33,750.00
3,712.50
23,310.00
19,500.00
346,735.50
188,034.00
12,250.00
2,070.00
3,125.00
33,750.00
3,712.50
23,310.00
19,500.00
285,751.50
66,500.00
11,446.40
4,050.00
5,500.00
605.00
13,024.00
1,072.50
102,197.90
84,000.00
44,259.60
5,500.00
605.00
13,024.00
1,072.50
148,461.10
105,000.00
44,259.60
5,500.00
605.00
13,024.00
1,072.50
169,461.10

NO
1

URAIAN PEKERJAAN
2

SATUAN
( Rp. )
2

UPAH
( Rp. )

BAHAN
( Rp. )
3

HARGA
( Rp. )
4

0.012
83.333333333

10,560.00

880,000.00

687,500.00

DAFTAR HARGA SATUAN BAHAN


Kegiatan
Pekerjaan
Lokasi

RSU ARI SANTHI


RSU ARI SANTHI
JL RAYA MAS UBUD-GIANYAR

NO

URAIAN

SATUAN

Ambalan tipe TX 705 AES


Baja Profile
Basin TX 101 LB-TOTO Standard
HEBEL t = 10 cm
Batu Alam Abu-Abu/Hitam 20 x 40 cm
Batu Palimanan 40 x 60 cm
Besi Beton
Beton Cor Ready Mix K-175
Beton Cor Ready Mix K-225
Beton Cor Ready Mix K-300
Cat Danapaints
Cat Dinding ICI Dulux
Cat Dinding ICI Dulux Weathersield
Cat Jotun
Cat Kayu ICI Dulux
Cat Metal ICI Dulux
Closet CW 420 J/SW 420 JP-TOTO Standard
Dispenser Tipe TX 703 AC-TOTO Standard
Floorwaste tipe TX 1 BN-TOTO Standard
Genteng Keramik Berglasur KIA, M-Class
Glass Shelf TX 703 AES-TOTO Standard
Gypsum 12mm ex Jayaboard
Gypsum 4mm ex Jayaboard
Gypsum 9mm ex Jayaboard
Handbasin LW 211 CJ-TOTO Standard
Handbasin LW 236 CJ-TOTO Standard
High Modulus Acetate Silicon Sealant 4200 Polysulfide
Kaca 5mm
Kaca 8mm
Kaca Cermin 50 x 80 cm
Kaca Cermin 5mm
Kaca Tempered 12mm
Kaca Tempered 6mm
Kawat Ikat Beton (Bendrat)
Kayu Kamper Samarinda Balok
Kayu Kamper Singkai Balok
Kayu Meranti Papan
Kayu Meranti Usuk 4/6
Keramik Anti Slip 10 x 20 Roman
Keramik 20 x 20 Roman

Bh
Kg
Bh
Bj
M2
M2
Kg
M3
M3
M3
Kg
Kg
Kg
Kg
Kg
Kg
Set
Bh
Bh
Bh
Bh
M2
M2
M2
Bh
Bh
Kg
M2
M2
M2
M2
M2
M2
Kg
M3
M3
M3
M3
M'
Duz

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

HARGA SATUAN
(Rp.)
4
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
40,000.00
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522

41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90

Keramik 30 x 30 Essenza
Keramik 40 x 40 Essenza
Keramik 60 x 60 Essenza
Keramik Border 15 x 30 Essenza
Keramik Plint 10 x 30 Essenza
Keramik Plint 10 x 40 Essenza
Keramik Plint 10 x 60 Essenza
Kerikil Beton
Kerikil Biasa
Marmer
Multiplek 9 mm
Paku 2"-5"
Paku Lis
Paku Reng
Paku Usuk
Papan Kamper Skirting 1,2 x 10 cm
Pasir Beton
Pasir Pasang
Pasir Super
Pasir Urug
Paving Blok
Ply Wood 12mm
Ply Wood 15mm
Ply Wood 3mm
Ply Wood 4mm
Ply Wood 9mm
Portland Cement 50 Kg (Indo Cement klas I)
Robe Hook Clothing (Gantungan Baju) S 1131-FJORD
Robe Hook tipe S 1130-FJORDECO
Semen Naat AM 50 + am 55
Seng Gelombang
Waterproof Viscocrete-10 ex SIKA
Shower Grabrail tipe TGB 015-FJORDECO
Shower Sliding Rail tipe TX 721 AEN-TOTO Standard
Shower tipe THX 19N / TX 472 SESVI-TOTO Standard
Soap Holder tipe S 6 N-TOTO Standard
Spray Nozzle tipe TB 19 CSNCR-TOTO Standard
Tanah Urug
Toilet Grabrail tipe TGB 004-FJORDECO
Top Set Basin (Kran) tipe TX 109 LD-TOTO Standard
Top Set Shower (Kran) tipe TX 405 SO-TOTO Standard
Towel Rail tipe S 1501-FJORDECO
Urinal tipe UW 447HJT1M-TOTO Standard
Waterproof Viscocrete-10 ex SIKA
Wiremesh M6
Bubungan Genteng Keramik Berglasur
Plamur Tembok
Cat Dasar
Amplas
Dempul Kayu

Duz
Duz
Duz
M'
M'
M'
M'
M3
M3
M2
Lbr
Kg
Kg
Kg
Kg
M3
M3
M3
M3
M3
M3
Lbr
Lbr
Lbr
Lbr
Lbr
Zak
Bh
Bh
Kg
Lbr
Kg
Bh
Bh
Bh
Bh
Bh
M3
Bh
Bh
Bh
Bh
Set
M2
Roll
Bh
Kg
Kg
Lbr
Kg

96,250.00
148,500.00
389,500.00
18,000.00
22,000.00
24,000.00
56,000.00
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522

91
92
93
94
95
96
97
98
99
100
101
102
103
104

Besi Hollow
Paku Ramset
Gantungan
Staping
GRC
Kayu Kamper Samarida Usuk 5/7
Kayu Kamper Samarinda Reng 3/4
Batu Kali
Kaca 6mm
Paku Beton
Scrup
Compoun
Textile Tape (plaster)
GlassWoll density 60 kg/m3.

M'
Bh
Bh
Bh
M2
M3
M3
M3
M2
Bj
Bj
Kg
Roll
Kg

Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522

105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133

KUNCI setara GRIFF


Bottom Patch () GRIFF 9711-SS
Corner Lock (Kunci Pojok) GRIFF 9721-SS
Cylinder (Silinder) GRIFF 3301.24-N Half
Cylinder (Silinder) GRIFF 3301.60-N
Cylinder (Silinder) GRIFF 3301.70-N
Door Closer (Penutup Pintu Otomatis) GRIFF 983 SA
Engsel GRIFF 1902-SS BB
Engsel Simon Werk K05/ 13
Esculcheon () GRIFF 2511-F1
Floor Hinges (Engsel Lantai) GRIFF 9701-SS
Flush Bolt () GRIFF 1610-SS
Flush Ring () GRIFF 4206-SS
Friction Saty 16"
Handleset (Gagang Pintu) GRIFF 1227/2051.30-F1
Handleset (Gagang Pintu) GRIFF 1227/2051-F1
Indica or Bolt () GRIFF 1616-SS
Lockcase (Kunci Utama) GRIFF 2201-SS
Lockcase (Kunci Utama) GRIFF 2202.04
Lockcase (Kunci Utama) GRIFF 2403.00-SS
Lockcase Peluru (Kunci Utama) GRIFF 2206-SS
Panic Bar Corbin () GRIFF PFG-05
Pull Handle on Backplate (Gagang Tarik Pada Backplat
Push Plate (Gagang Dorong Datar) GRIFF 2310-F1 (ins
Push Plate (Gagang Dorong Datar) GRIFF 2310-F1 (out
Rambuncis Non Lock
Security Bolt () GRIFF 1617-SS
Top Patch () GRIFF 9712-SS
Tubular Handle (Handel Bulat) GRIFF 2336-SS(0,5mm)
Tubular Handle (Handel Bulat) GRIFF 2336-SS(1mm)

Set
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Set
Set
Set
Set
Set
Set
Bh
Bh
Bh
Bh
Set
Set
Set

Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522
Err:522

312.5

You might also like