You are on page 1of 8

Strict enforcement of the laws

Delineate the unsafe, safer and controlled zones based on


hazards using the best available scientific information
Priority Mitigation and Prevention actions based on hazard
information
Preparedness interventions based on hazard information
Massive IEC based on Multi hazard: Emphasis on the
consideration of other hazards i.e. SS+LS+Flood+Active

Faults and Tsunami


Scorecard on Hazard Level

Guide for Delineation based on Storm Surge


and Geohazard
Level
Category Recommendati
on
3M Easement based on Unsafe, No Build
Art 51 of PD 1067
Zone
(Water Code)
3 - 4 M inundation
(Purple and Red) 2014
DOST SS Map

Unsafe, Build
Zone

Environmental Protection
i.e. Mangrove and Beach
Forest; Crab Production;
Fisheries
Construction of Protection
Dikes and other similar
interventions; Right
Zoning, IEC
Reengineering
interventions, EWS, Right
Zoning, IEC

1 - 2m inundation (dark Controlled, Build


yellow) 2014 DOST SS
Zone
Map + Landslide Maps
+ UnActive Faults
0.1 to 1 m inundation
Safer, Build Zone Reengineering
(light yellow) 2014
interventions, EWS, Right
DOST SS Map +
Zoning, Preemptive

You might also like