Professional Documents
Culture Documents
Process Flow
Diagrams
Factory and
Office Layouts
Electrical &
Schematic
Air Conditioning
& Building
Services
cad@adup.com.au
cad@adup.com.au
S.T.
By
FOR REVIEW
Description
Rev
Date
18.5.07
Drawn By
Project
Principal
DOG GONE
33 POUCH PDE
BOGVILLE 2311
Ph 0345 820 338 , 02 5843 2785
DATE
DRAWN
CHECKED
SCALE
18.05.07
ADUP
M.C.
1:50 @ A2
D2194-1
DRAWING NUMBER
Title
SCALE 1 : 100
ing
ce
SCALE 1 : 100
in
adjo
en
d
i
s
re
ing
ce
in
adjo
en
d
i
s
re
cad@adup.com.au
BUSINESS NAME
S.T.
By
FOR REVIEW
Description
Rev
Date
18.5.07
Drawn By
Project
Principal
DOG GONE
33 POUCH PDE
BOGVILLE 2311
Ph 0345 820 338 , 02 5843 2785
DATE
DRAWN
CHECKED
SCALE
18.05.07
ADUP
M.C.
1:50 @ A2
D2194-2
DRAWING NUMBER
Title
cad@adup.com.au
DP
ramp
STORE ROOM
MALE TOIL.
FEMALE TOIL.
STAFF PARKING
2.
Selected Colorbond
Box Gutter
RL 00.28
TIMBER DECKING
45.59 sqm
1.
ramp
STORE ROOM
MALE TOIL.
DP
TIMBER
DECKING
C.L.
1.
2.
3.
1.
2.
3.
covered
portico
Fence Posts @
2300mm Centres
VISITORS PARKING
covered
portico
VISITORS PARKING
DP
RL 00.00
Fence Posts @
2300mm Centres or
as Required
PROPOSED ELEVATION 2
DP
Metal Roof
G
STIN
Description
By
S.T.
FOR REVIEW
Rev
S.T.
FOR ISSUE
Date
24.9.07
10.10.07
RL 00.00
Existing Floor
Level RL 00.33
EXI
RL 00.00
Fence Posts @
2150mm Centres
EXISTING ELEVATION 2
RL 00.00
PROPOSED ELEVATION 1
Existing Floor
Level RL 0.33
EXISTING ELEVATION 1
C.O.S.
C.O.S.
Drawn By
Boun
dary
SMOKING AREA
Project
dary
Proposed Decking
/Smoking Area
Boun
DATE
DRAWN
CKD
SCALE
Title
24.9.07
ADUP
R.B.
AS SHOWN
Entry
CANCER WARD
PICTORIAL
DECKING - DETAIL
galvanised metal
chairs with pad
timber boards
s/s screws
A01
DRAWING NUMBER
PROJECT NUMBER
dary
150mm Colorbond
Downpipe
PROPOSED DECKING/SMOKERS
AREA
Outline of Awning
Above
C.L.
Fence Posts @
2150mm Centres
STORE
Part of Existing
Wall to be
Demolished
RL 00.33
HALL
exit
BILLIARDS ROOM
STORE
Part of Existing
Wall to be
Demolished
RL 00.33
HALL
exit
BILLIARDS ROOM
exit
exit
EXISTING
FEMALE TOIL.
Boun
B
STREET
COOK
FOR ISSUE
Description
Rev
CARPARKING
CONCRETE PATH
By
X.X.
Date
8.7.09
AREA
RAMP UP
OFFICE
& SICK
BAY
(13m)
Drawn By
ENTRY
(12m)
STAFF
TOILET/
LAUNDRY
LOCKERS
STORAGE
Client
3-5 YEARS
GAMES ROOM
(61m)
(36m)
KITCHEN
(7.5m)
cad@adup.com.au
STAFF/PARENT ROOM
(16m)
STORE ROOM
CRAFT PREP
KIT
SERVERY
WASTE
DISPOSAL
UNDER
AWING OVER
2-3 YEARS
(31m)
4xINFANT WC's
Project
KIDS
WC
1600 LONG
HAND TROUGH
1m WIDE
NAPPY CHANGE TABLE
DATE
DRAWN
CKD
SCALE
8.7.09
ADUP
J.S
1:100
BUILDING PLAN
Title
SHADED AREA
D1956-2
DRAWING NUMBER
\Documents and Settings\Steve Turner.OFFICE\My Documents\Samples\Mixed Class.dwg, Model, 16/10/2002 04:58:28 PM, ADUP p/l -Project Drafting ph:02 9579 3604 E: cad@adup.com.au,Project Drafting-Mechanical Services-Dangerous Goods