You are on page 1of 1

URAIAN ANALISA ALAT

No.

URAIAN

KODE

KOEF.

SATUAN

A.
1.
2.
3.
4.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
:
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat

Pw
Cp
A
W
B

EXCAVATOR 80-140 HP
133,0
HP
0,93
M3
5,0
Tahun
2.000,0
Jam
754.000.000
Rupiah

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

75.400.000

i x (1 + i)A
(1 + i)A - 1

0,26380

(B-C)xD
W

89.506,49

Rupiah

0,00

Rupiah

89.506,49

Rupiah

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

0,002

Biaya Pasti per Jam


C.

x B
W

(E+F)

KET.

Rupiah
-

Tingkat Suku
bunga I = 10%

Asuransi p = 0,2%

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

191.520,00

Rupiah

12,0%

2.

Pelumas

159.600,00

Rupiah

2,50%

32.988

Rupiah

6,25%

(12,5 % - 17,5 %) x B
W

0,01

Rupiah

12,50%

= ( 1 Orang / Jam ) x U1
= ( 1 Orang / Jam ) x U2

L
M

13.839,00
10.615,50

Rupiah
Rupiah

408.562,01

Rupiah

498.068,50

Rupiah

= (2.5%-3%) x Pw x Mp

Biaya bengkel

3.

Perawatan dan
perbaikan =

4.
5.

Operator
Pembantu Operator

(6.25% dan 8.75%) x B


W

Biaya Operasi per Jam

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

i
U1
U2
Mb
Ms
Mp

10,00 % / Tahun
13.839,00 Rp./Jam
10.615,50 Rp./Jam
6.500,00
Liter
12.000,00
Liter
48.000,00
Liter

You might also like