Professional Documents
Culture Documents
1202800104
1202800067
SHAILESH YADAV
1202800098
1202800091
VIKRAM YADAV
1202800107
Sewer system
INTRODUCTION
POPULATION FORECASTING
courses
No. of
No. of
No. of
120
seats
120
seats
BBA
seats
120
BCA
120
120
120
MCA
120
120
120
MBA
120
120
BFAD
120
120
120
120
B.ARCH
120
120
120
120
B.TECH
COURSE
C.E.
120
120
120
120
M.E.
120
120
120
120
C.S.
120
120
120
120
I.T.
120
120
120
120
E.C.
120
120
120
120
E.E
120
120
120
120
Chem.
120
120
120
120
Aeron.
120
120
120
120
DIPLOMA(Branch
name)
C.E.
120
120
120
M.E.
120
120
120
C.S.
120
120
120
I.T.
120
120
120
E.C.
120
120
120
E.E
120
120
120
M.TECH(branch name)
C.E.
120
120
M.E.
120
120
C.S.
120
120
I.T.
120
120
E.C.
120
120
E.E
120
120
Chem.
120
120
Aeron.
120
120
WATER
CONSUMPTION
S.
No. Description
No. Of
build.
AND
Pop.SEWERAGE
Of
consump. GENERATED
Total water
Waste water
each buid.
rate
(lpcd)
45
45
45
45
45
135
70/seat
45
45
15
340/bed
135
15
135
135
45
1
2
3
4
5
6
7
8
9
10
11
12
A block
C block
1
1
1
1
5
2
1
1
1
1
1
1320
480
600
3840
480
1000
50
100
100
2000
100
40
13
14
15
16
Stadium
1
13
1
1
1000
80
150
75
D block
E block
F block
Hostel
Restaurant
Reception
Computer central & lib.
Auditorium
Hospital
Nursing home &
medical quarter
Faculty quarter
Staff quarter
Bank
consumed
(cumec)
6.875x10-4
generated
(cumec)
5.5x10-4
2.5x10-4
2x10-4
3.125x10-4
2.5x10-4
2x10-3
1.6x10-3
2.5x10-4
2x10-4
1.56x10-3
1.24x10-3
4.05x10-5
3.24x10-5
5.2x10-5
4.16x10-5
5.2x10-5
4.16x10-5
3.47x10-4
2.77x10-4
3.93x10-4
3.15x10-4
6.25x10-5
5x10-5
1.8x10-4
1.38x10-4
1.25x10-4
10-4
2.34x10-4
1.87x10-4
3.9x10-5
3.12*10-5
LINE
LOCATION
MANHOLE
FROM
TO
GROUND
LEVEL OF
STARTING
MANHOLE
LENGTH
(m)
PREV
BANK
14
13
100
120
75
3.12X10-5
RECEPTION
R 13.1
13
100
120
100
4.16X10-5
1.022X10-5
A BLOCK
L 13.1
13
100
120
1320
5.5X10-4
2.357X10-4
C BLOCK
L 12.1
12
100
120
480
2X10-4
1.844X10-3
D BLOCK
R 12.1
12
100
120
600
2.5X10-4
2.502X10-3
E BLOCK
11
10
100
120
3850
1.6X10-3
3.26X10-3
LINE
GROUND
PEAK FLOW
WATER
(m3/s)
INFILTRATIO
N
(m3/s)
DIAMETER
(mm)
SLOPE
QFULL
(m3/s)
q
(m3/s)
2.89X106
1.0227X104
150
0.008
1.354X102
1.023X104
2.89X106
2.357 X104
150
0.008
1.354X102
2.357 X104
2.89X106
1.894 X103
150
0.008
1.354X102
1.844 X103
2.89X106
2.502 X103
150
0.008
1.354X102
2.502 X103
2.89X106
3.260 X103
150
0.008
1.354X102
3.26 X103
2.89X106
8.068 X103
200
0.008
2.932X102
8.068 X103
LINE
q/QFULL
d/D
V/VFULL
V
(m3/s)
FALL
(m)
INVERT
ELEVATION
UPPER
LEVEL
LOWER
LEVEL
0.0075
0.08
0.22
0.168
0.96
99
98.04
0.0174
0.1
0.3
0.2298
0.96
98.04
97.08
0.140
0.3
0.6
0.459
0.96
98.04
97.08
0.185
0.34
0.64
0.490
0.96
97.04
96.12
0.240
0.39
0.68
0.520
0.96
99
98.04
0.275
0.41
0.71
0.66
0.96
98.04
97.08
LINE
LOCATION
MANHOLE
FROM
TO
GROUND
LEVEL OF
STARTING
MANHOLE
LENGTH POPULATION
SEWER FLOW
(m3/s)
ADDT
PREV
GIRLS
HOSTEL -1
L 11.1
11
100
120
1000
1.25 X10--3
8.06 X10--4
GIRLS
HOSTEL -2
L 11.2
11
100
120
1000
1.25 X10--3
0.011823
RESTAURAN 10
T
100
120
50
3.24 X10--5
0.0155
10
COMPUTER
LAB & LIB.
100
120
100
4.16 X105
0.01560
11
AUDITORIU
M
100
120
2000
2.77 X10--4
0.015733
12
RESTAURAN R 7.1
T
100
120
50
3.24 X10--5
0.016574
LINE
GROUND
PEAK FLOW
WATER
(m3/s)
INFILTRATION
(m3/s)
DIAMETER
(mm)
SLOPE
QFULL
(m3/s)
q
(m3/s)
2.89X106
0.011825
200
0.008
2.932X102
0.011825
2.89X106
0.015578
200
0.008
2.932X102
0.015510
2.89X106
0.01560
200
0.008
2.932X102
0.01560
10
2.89X106
0.015733
200
0.008
2.932X102
0.01573
11
2.89X106
0.016574
200
0.008
2.932X102
0.016574
12
2.89X106
0.016679
200
0.008
2.932X102
0.016679
LINE
q/QFULL
d/D
V/VFULL
V
(m3/s)
FALL
(m)
INVERT
ELEVATION
UPPER
LEVEL
LOWER
LEVEL
0.403
0.49
0.79
0.737
0.96
97.08
96.12
0.529
0.57
0.82
0.765
0.96
97.08
96.12
0.532
0.58
0.86
0.80
0.96
97.08
96.12
10
0.5364
0.59
0.86
0.80
0.96
99
98.04
11
0.565
0.6
0.87
0.81
0.96
98.04
97.08
12
0.568
0.61
0.88
0.82
0.96
98.04
97.08
LINE
LOCATION
MANHOLE
GROUND
LEVEL OF
STARTING
MANHOLE
LENGTH
FROM
TO
AERONAUTICAL
ENGG.
HOSPITAL
L 6.1
100
120
L 6.2
100
15
STAFF
QUARTER
L 6.3
16
STADIUM
R 5.1
17
BOYS
HOSTEL-1
18
BOYS
HOSTEL-2
13
14
POPULATION
SEWER FLOW
(m3/s)
ADDT
PREV
480
2 X104
0.016679
120
100
3.15 X104
0.01728
100
120
40
5 X105
0.01823
100
120
1000
1.38 X104
0.018388
R 4.1
100
120
1000
1.25 X104
0.018813
R 3.1
100
120
1000
1.25 X104
0.01919
LINE
DIAMETER
(mm)
SLOPE
QFULL
(m3/s)
q
(m3/s)
13
2.89X106
0.01728
200
0.008
2.932X102
0.01728
14
2.89X106
0.01823
200
0.008
2.932X102
0.01823
15
2.89X106
0.018388
200
0.008
2.932X102
0.018388
16
2.89X106
0.018813
200
0.008
2.932X102
0.018813
17
2.89X106
0.01919
200
0.008
2.932X102
0.01919
18
2.89X106
0.01957
200
0.008
2.932X102
0.01957
LINE
q/QFULL
d/D
V/VFULL
V
(m3/s)
FALL
(m)
INVERT
ELEVATION
UPPER
LEVEL
LOWER
LEVEL
13
0.5893
0.62
0.89
0.83
0.96
99
98.04
14
0.62175
0.65
0.91
0.85
0.96
99
98.04
15
0.627
0.65
0.91
0.84
0.96
99
98.04
16
0.641
0.66
0.92
0.85
0.96
98.04
97.08
17
0.6545
0.67
0.923
0.86
0.96
97.08
96.12
18
0.667
0.68
0.94
0.87
0.96
97.08
96.12
DESIGN OF MANHOLE
53
900-1800
EXCAVATON COST
Total length of main line = 1622 m
Total length of branch line = 3564 m
TREATMENT PLANT
RAW SEWAGE
SCREEN
GRIT CHAMBER
LAGOON WITH AERATORS
EFFLUENT
Design of basin
The quantity of sewage treated per day = no. of persons x
sewage generated by each person
= 5000 120
= 600000 liters
= 0.6 ML
Assuming organic loading = 300 kg / hac. / day
BOD5 = 300 mg / litre
BOD content / day = 0.6 300 = 180 kg / day
Now surface area = 180 300 = 0.6 hac. = 6000 m2
Now assume the ratio between length to width = 2
Then 2 B B =6000
B = 17.5 m
And L = 35 m
assume depth of tank = 1.2 m
Now provided capacity = 35 m 17.5 m 1.2m
= 735 m3
Detention time = capacity sewages flow/day
= 735 600 = 1.5 days or 2 days
AERATORS
Six aerators are used.
Each of the aerator covers 125 sq. m area.
REMOVAL MECHANISM
DESIGN FORMULAE
Mannings formula
V = (R2/3 S1/2). 1/n
Hazen williams formula
V = 0.85 CH R0.63 S0.54
PRELIMINARY TREATMENT
PRIMARY TREATMENT
SECONDARY TREATMENT
Screening
Grit chamber
Skimming tank
Activated sludge
Aerated lagoon
Aerobic granulation
TERTIARY TREATMENT
Trickling filter
WHATS IN SEWAGE
WATER
URINE
TOXIC CHEMICALS
TOILET PAPER
ORGANIC WASTES
SOAP
FOOD WASTE
PRIMARY
-MOSTLY MECHANCAL
-REMOVES BIG STUFF
SECONDARY
-PHYSICA AND BIOLOGICAL
-DECOMPOSE OF ORGANIC MATTER
TERTIARY
-MOSTLY CHEMICAL AND PHYSICAL
-KILLS PATHOGENS
-TRIES TO REMOVE TOXIC CHEMICALS
PRELIMINARY PROCESS
MANNUALY OPERATED
AUTOMATICALLY OPERATED
COARSE SCREEN(BAR RACKS)
FINE SCREEN
MICRO SCREEN
GRIT CHAMBER
PRIMARY PROCESS
SEDIMENTATION TANK
MORE STABLE
INLET ZONES
SETTLING ZONES
OUTLET ZONES
SLUDGE ZONES
2.
3.
4.
5.
6.
7.
ADVANTAGES OF SEWER
TREATMENT
(a)
(b)
(c)
(d)
(e)
(f)
(g)
THANKY
OU