WORK TURNED OUT BY LABOUR PER DAY (residential)

Sl
No.
1

Particulars of Item

Unit

Quantity per
person per day

Earth Work & Excavation

1.1

For soft & ordinary soil

Cum

3.0

1.2

For hard soil

Cum

2.0

1.3

Backfilling

Cum

4.0

2.1.1 1:4:8

Cum

2.0

2.1.2 1:3:6

Cum

1.5

2.1.3 1:2:4

Cum

1.5

2.2.1 1:4:8

Cum

2.0

2.2.2 1:3:6

Cum

2.0

2.2.3 1:2:4

Cum

2.0

2
2.1

2.2

Plain Cement Concrete


For Foundation

For Flooring

Reinforcement Cement Concrete in

3.1

Footings

Cum

1.5

3.2

Column

Cum

1.0

3.3

Slabs

Cum

2.0

3.4

Beams

Cum

1.0

3.5

Staircase

Cum

1.0

Steel Reinforcement Work

4.1

Footings

Kg

190.0

4.2

Column

Kg

200.0

4.3

Slabs

Kg

175.0

4.4

Beams

Kg

173.0

4.5

Staircase

Kg

173.0

4.6

Lintels

Kg

100.0

4.7

Stirrups, spacers & links

Kg

150.0

Page 1 of 5

WORK TURNED OUT BY LABOUR PER DAY (residential)


Sl
No.
5

Particulars of Item

Unit

Quantity per
person per day

Shuttering Works

5.1

Footings

Sqm

7.7

5.2

Column

Sqm

4.0

5.3

Slabs

Sqm

4.3

5.4

Beams

Sqm

3.3

5.5

Staircase

Sqm

3.3

6.1.1 In foundation

Cum

1.5

6.1.2 In superstructure

Cum

2.0

6.2.1 9" Brick Wall

Cum

1.8

6.2.2 4.5" Brick wall

Sqm

2.0

6.3.1 8" Solid Block

Sqm

8.0

6.3.2 6" Solid Block

Sqm

8.0

3.3.3 4" Solid Block

Sqm

8.5

6.4.1 8" Hallow Block

Sqm

9.0

6.4.2 6" Hallow Block

Sqm

9.0

7.1.1 Doors

Cum

1.3

7.1.2 Windows

Cum

1.0

7.2.1 Doors

Sqm

0.8

7.2.2 Windows

Sqm

0.5

6
6.1

6.2

6.3

6.4

Masonry Works
Size Stone Masonry

Burnt Brick Masonry

Solid Block masonry

Hallow Block Masonry

Joinery Works

7.1

Wood works for

7.2

Aluminum Works for

Plastering Works

Page 2 of 5

WORK TURNED OUT BY LABOUR PER DAY (residential)


Sl
No.

Particulars of Item

Unit

Quantity per
person per day

8.1

Internal

Sqm

10.0

8.2

External

Sqm

8.0

Page 3 of 5

WORK TURNED OUT BY LABOUR PER DAY (residential)


Sl
No.
9

Particulars of Item

Unit

Quantity per
person per day

Flooring Works

9.1

Mosaic Flooring

Sqm

7.0

9.2

Ceramic Flooring

Sqm

7.0

9.3

Vitrified Flooring

Sqm

10.0

9.4

Granite Flooring

Sqm

5.0

9.5

Marble Flooring

Sqm

5.0

9.6

Glazed tile dadoing

Sqm

8.0

9.7

Tandoor Flooring

Sqm

7.0

9.8

Kota Flooring

Sqm

7.0

9.9

Cudappa Flooring

Sqm

7.0

9.10 Eurocon Flooring

Sqm

6.0

9.11 Clay tile Flooring

Sqm

10.0

9.12 Interlock Paver Block

Sqm

10.0

9.13 PVC flooring

Sqm

9.14 Wooden Flooring

Sqm

10
10.1
10.1.
1
10.1.
2
10.1.
3
10.1.
3
10.2
10.2.
1
10.2.
2
10.2.
3
11

Painting Works
Internal
OBD

Sqm

12.0

Emulsion

Sqm

12.0

Texture

Sqm

10.0

Enamel

Sqm

8.0

Snowcem

Sqm

20.0

Exterior Emulsion

Sqm

7.0

Texture

Sqm

5.0

Water proofing works

Sqm

5.0

12

Structural steel works

Kg

80.0

13

Structural Glazing Works

Sqm

3.0

External

Page 4 of 5

WORK TURNED OUT BY LABOUR PER DAY (residential)


Sl
No.

Particulars of Item

Unit

Page 5 of 5

Quantity per
person per day