Electrical Works(Cable Pulling,Termination and

Jointing)
Inspection Checklist
Project Name

KHABAT THERMAL POWER


PLANT UNITS 1&2

Owner Name

Ministry of Electricity (MOE) of Kurdistan


Regional Government

Contractor

POSCO ENGINEERING &


CONSTRUCTION CO., LTD.

Main Subcontractor

GAMA POWER SYSTEMS


ENGINEERING & CONTRACTING INC.

Area / Unit

SEE ATTACHED
DRAWING/CABLE LIST

Item Name / Item No


/ Description

ITP No

KP-00+++-CQ712-G0012

ITP Item

Report No

Date

Drawing No

Rev.

Approximate Date/Time of Related Activity:


No.

ITEM DESCRIPTION

Subcontractor

Cable route is ready for cable installation.

Correct type and size and undamaged cable is installed.

Cable glanding and termination are completed as per the cable lists with numbered tags.

Insulation resistance and continuity checkings are completed and recorded on the
attached checklist for cable insulation test results sheet after glanding&lugging are
completed.

High pot test is completed as per the related specifications and test results are recorded
on the attached sheet.

Bolt torque results are satisfactory.

Cable installation is completed properly.

Remarks / Comments

Subcontractor

GAMA

3rd Party / AI

POSCO

Name:

Name:

Name:

Name:

Date:

Date:

Date:

Date:

Sign:

Sign:

Sign:

Sign:

Doc. No: KP-00+++-CQ712-G0012-F01, Rev.1