You are on page 1of 3

PARK ONE

COMMERCIAL & LUXURY APARTMENTS

Daily Construction Report


WEATHER
TEMPERATURE: 21oC

CONDITIONS:
Snow

sunny

Partly Cloudy

Cloudy

Windy

WORKMEN/EQUIPMENT
WORKERS
Contract #01
Bukhari (piling
sub-contractor)

Mgt staff: 1
Labors:

TOTAL

Contract #05

Ch Zulfiqar
(excavation)

Mgt staff: 1

TESTS/INSPECTIONS
Contract #02
Sabz ali
(pile head
cutting)

11

TOTAL

17

TOTAL

12

Nazar(rental
excavator)

Mgt staff: 1

Mgt staff: 1

10

TOTAL

TOTAL

14
15

Mgt staff: 1
Labors :
TOTAL

Contract #07

Azam (concrete
mobile pump)

TOTAL

Labors:

Labors :

Labors:

Mgt staff: 1

Mgt staff:

16

Contract #06

4
5

Contract #10

Mgt staff: 1

Labors:

Labors:

14

TOTAL

TOTAL

15

Contract #11

Mgt staff:1

Mgt staff: 1

10

Deepwell (piling
sub-contractor)

Majid cont
(plastering)

TOTAL

Contract #08

Al-wahab
(mobile crane)

Labors: 3

1. Concrete compressive strength test


2. Pile load test (in process)

Royal
geotech(piling
sub -contractor)

Labors:

Abbot
Construction
(Plastering)

Contract #04

Ishaq butt
(steel fixer)

Mgt staff: 1

Labors:

Contract #09

Contract #03

Labors: 9
TOTAL

21

This legend shows the contractors working on a particular day.

Rain

EQUIPMENTS AVAILABLE AT SITE

REMARKS

REMARKS

EQUIPMENT AVAILABLE AT SITE

1. Auger machine

8.concrete mobile pump


9. Tractor

2. Excavator
3. Dewatering pumps

10. Mobile crane


11.Batching plant
12. Compressive testing machine
13.Plate compactor

4. Air compressor

01m

5. Welding plant
6. Dumper
7. Concrete mixer

SAFETY NOTE
Nil

KEY ACTIVITIES
Activity
1.steel cage fabrication

Qty
9

Unit
#

Total
-

2.de watering

Occurring (Quantity not available)

3.pile concreting

948

4.levelling and spreading

5.pile boring/drilling

6.Slush removal

Occurring (Quantity not available)

Activity detail
1.Pile concreting
Zone
1

Pile concreted
(particular
day )
-

Pile
concreted to
date
186

2
3

6
3

449
322

Total piles

Pile No

Total Concrete
used (M)

186

79

466
1039,636,678,677,631,629
405
800,779,778
Total pile concreted=957

2.Concrete compressive strength test for piles


Sample No of
Concrete
Pile No
#
days
Purchased
from
1
28
Sarwar
468,469,348,349,418,999,982,1010,691,692,324,340
2

ICL

Remarks

131,334,1038,355,595,1037,272,614,271,666,335

Strength
achieved (psi)
4622
3360

Required
strength
(28 days)
4000

Remarks
Passed
Passed

3.Pile cutting and excavation:


Pile cap

Grid

Zone

PC 17

C~5

Completed

Pile head cutting


Previous
This day
To date
17

PC 8

C~5

Completed

Completed

PC 156

F~8

In process

32

10

42

Partially cut

4.Steel fixing :
Pile cap
PC12B
PC8
5.Plastering:
Location
Main office
Mustafa tower side

Excavation

Grid
C~4-5

Status
Completed

C~5

Completed

Grid
1~6
1~2,5~6

Completion status
Completed
Completed

6.Concrete compressive strength test for pile caps:


Pile Cap
Grid
7.Pile load test result:
Pile no 554 grid H~14

Strength achieved
-

Remarks
Completed

Remarks
Bottom and top reinforcement
placed
SOG steel placed
Remarks

Strength Required
-

Remarks
-

(pile load test platform formation in process)

8. Dewatering was occurring.


9. Slush removal occurring.
10.Excavation of raft (B~E) Road side occurring.

MATERIAL DELIVERIES
Items
DIESEL

DATE

26-04-2016

QTY

SOURCE/VENDOR
CALTEX

200

Signature

UNIT
LTRS

REMARKS
-