CONDITIONS:
Snow
sunny
Partly Cloudy
Cloudy
Windy
WORKMEN/EQUIPMENT
WORKERS
Contract #01
Bukhari (piling
sub-contractor)
Mgt staff: 1
Labors:
TOTAL
Contract #05
Ch Zulfiqar
(excavation)
Mgt staff: 1
TESTS/INSPECTIONS
Contract #02
Sabz ali
(pile head
cutting)
11
TOTAL
17
TOTAL
12
Nazar(rental
excavator)
Mgt staff: 1
Mgt staff: 1
10
TOTAL
TOTAL
14
15
Mgt staff: 1
Labors :
TOTAL
Contract #07
Azam (concrete
mobile pump)
TOTAL
Labors:
Labors :
Labors:
Mgt staff: 1
Mgt staff:
16
Contract #06
4
5
Contract #10
Mgt staff: 1
Labors:
Labors:
14
TOTAL
TOTAL
15
Contract #11
Mgt staff:1
Mgt staff: 1
10
Deepwell (piling
sub-contractor)
Majid cont
(plastering)
TOTAL
Contract #08
Al-wahab
(mobile crane)
Labors: 3
Royal
geotech(piling
sub -contractor)
Labors:
Abbot
Construction
(Plastering)
Contract #04
Ishaq butt
(steel fixer)
Mgt staff: 1
Labors:
Contract #09
Contract #03
Labors: 9
TOTAL
21
Rain
REMARKS
REMARKS
1. Auger machine
2. Excavator
3. Dewatering pumps
4. Air compressor
01m
5. Welding plant
6. Dumper
7. Concrete mixer
SAFETY NOTE
Nil
KEY ACTIVITIES
Activity
1.steel cage fabrication
Qty
9
Unit
#
Total
-
2.de watering
3.pile concreting
948
5.pile boring/drilling
6.Slush removal
Activity detail
1.Pile concreting
Zone
1
Pile concreted
(particular
day )
-
Pile
concreted to
date
186
2
3
6
3
449
322
Total piles
Pile No
Total Concrete
used (M)
186
79
466
1039,636,678,677,631,629
405
800,779,778
Total pile concreted=957
ICL
Remarks
131,334,1038,355,595,1037,272,614,271,666,335
Strength
achieved (psi)
4622
3360
Required
strength
(28 days)
4000
Remarks
Passed
Passed
Grid
Zone
PC 17
C~5
Completed
PC 8
C~5
Completed
Completed
PC 156
F~8
In process
32
10
42
Partially cut
4.Steel fixing :
Pile cap
PC12B
PC8
5.Plastering:
Location
Main office
Mustafa tower side
Excavation
Grid
C~4-5
Status
Completed
C~5
Completed
Grid
1~6
1~2,5~6
Completion status
Completed
Completed
Strength achieved
-
Remarks
Completed
Remarks
Bottom and top reinforcement
placed
SOG steel placed
Remarks
Strength Required
-
Remarks
-
MATERIAL DELIVERIES
Items
DIESEL
DATE
26-04-2016
QTY
SOURCE/VENDOR
CALTEX
200
Signature
UNIT
LTRS
REMARKS
-