REVISED QTY

Sl No Description of Items

Unit

Qty

Rate

Land Devlopment

sqm

5,150.00

Excavation in Earthwork

cum

5,750.42

Backfilling by Excavated Earth

cum

3,850.22

Disposal of Excavated Earth

cum

1,481.70

PCC(1:5:10)

cum

130.00

PCC(1:4:8)

cum

174.00

PCC(1:3:6)

cum

PCC(1:2:4)

cum

RCC-M25

cum

10

Reinforcement

ton

11

Shuttering works up to 3mt

sqm

5,112.00

12

Shuttering works 3mt and above

sqm

4,282.99

13

Boulder Soling

cum

150.00

14

Brickwork

cum

473.80

15

Plaster-20mm

sqm

2,635.00

16

Plaster-12mm

sqm

1,460.00

17

Plaster- 18mm

sqm

1,050.00

18

Plaster-6mm

sqm

2,731.00

19

Distemper

sqm

1,460.00

20

Plastic Paint

sqm

2,731.00

21

Exterior Paint

sqm

2,635.00

22

White Wash

sqm

23

Cement Paint

sqm

24

IPS Flooring

sqm

850.00

25

Kota Stone

sqm

350.00

26

Marble Slab

sqm

27

Granite Tile

sqm

28

Granite Slab

sqm

270.00

29

Vetrified Tiles

sqm

80.00

30

Ceramic Tiles

sqm

75.00

31

Acid Proof Tiles

sqm

95.00

32

Sanitory & Water supply

lot

33

Aluminium Door & Window

sqm

1,385.48
145.99

1.00
93.60

34

MS Door & Window

sqm

18.00

35

Wooden Door & Window

sqm

17.64

36

Structural steel work (insert plate, angle fixing etc.)

TON

4.46

37

Roof Teatment

sqm

660.00

38

False Celing

sqm

202.50

39

MS Steel work

Kg

3,983.69

40

Foundation bolt

Kg

5,104.20

41

Br Wire

Rm

1,200.00

42

Gravel spreading

Cum

43

Demolition of existing one no. 2 storied building, office with shed, 2


nos single storied buildings (barracks) & 6 nos. toilets & other existing
installations et

lot

1.00

44

Dismantling of a portion of existing damaged boundary wall

lot

1.00

45

Dismantling of existing fencing at the boundary

lot

1.00

46

Water Bound Macadam Roads with 50mm thk bituminous topping

rm

140.00

47

construction of 5.5M wide MS gate including trap gate

lot

1.00

48

Design Construction of Security goomty (approx 6 sqm)

lot

1.00

49

1(One) no. Deep Tube well (without pump)

lot

1.00

lot

1.00

50

Distribution pipe lines connecting to Integrated building

76.50

51

2 nos. overhead P.V.C water tank

lot

1.00

52

Supplying & Laying of HDPE Pipes for sub trenchs

rm

200.00

53

construction of sump pit

nos

6.00

54

Supplying & Laying of 100 mm thick Crushed stone

cum

170.00

55

Dust Prooof Paint

sqm

200

56

Acid Proof paint

sqm

30

57

Stair Hand Rail

rm

TOTAL =

100

REVISED QTY
Amount
-

0
0
0
-