No.
Jenis Upah dan Bahan
A.
Upah
1
Pekerja
2
Tukang
3
Kepala tukang
4
Mandor
B.
Bahan / Material
Harga Dasar Bahan
1
Dolken Kayu Diameter 8-10/400 cm
2
Semen Portland (pc)
3
Semen Portland (pc)
4
Semen warna
5
Cornis
6
Pasir Beton
7
Pasir Beton
8
Pasir Urug
9
Batu Split
10
Batu Koral
11
Batu Split
12
Batu bata
Bahan Penutup Atap
13
Genteng metal uk. 2x4 (0,25mm)
Nok Genteng metal
14
Keramik Warna Natural
15
Nok Keramik Warna Natural
Bahan Besi/Baja/Aluminium/Baja Ringan
16
Besi Beton
17
Kawat Beton
18
Wiremesh
19
Profil kusen
20
Aluminium Strip
21
Baja profil C channel 75.80
Reng R.40.45
Bahan Pipa
Satuan
OH
OH
OH
OH
Batang
zak
kg
kg
kg
m3
kg
m3
m3
m3
m3
bh
lbr
bh
bh
bh
kg
kg
kg
m
m
btg
btg
btg
btl
kpg
btg
dus
roll
ltr
kg
kg
liter
kg
kg
kg
Liter
bh
m2
bh
bh
bh
bh
bh
Btg
roll
bks
m
m
bh
bh
bh
bh
bh
bh
bh
bh
51
Selang Flexible
52
Bak Air fiberglass uk. 1 m3
53
kitchen silkrik stainless steel
54
Waterdrain
55
Seal tape
56
Pintu KW/WC PVC
Bahan Pengikat
57
Paku bermacam ukuran
58
Paku beton
59
Lem Kayu
60
Air
61
Minyak bekisting
62
Minyak Pelumas
63
Seng datar lebar 55 cm
69
Handle jendela
70
Floor drain
71
Penguras bak (saringan air)
72
Instalasi + Titik Lampu + Kabel
73
Instalasi + Stop Kontak + Kabel
78
MCB 2A
79
Stop Kontak
80
Kayu Kelas Balok
81
Balok Kayu Kelas II
82
Papan Kayu Kelas III
83
Papan Kayu Kelas II
84
Plywood 9mm
85
Kaca polos 5mm
86
Kaso 5x7 cm
87
Kunci Tanam Biasa
88
Kait Angin Stanless steel
89
Door Handle
90
Cat Dasar / sealer
91
Cat Penutup
92
Kuas
93
Pengencer
94
Amplas
95
Plamur
bh
bh
bh
bh
bh
bh
kg
ktk
kg
ltr
ltr
ltr
m'
bh
bh
bh
ttk
ttk
bh
bh
m3
m3
m3
m3
lbr
m2
m3
bh
bh
bh
kg
kg
bh
kg
Lbr
kg
Keterangan
75,000
90,000
110,000
120,000
8,000.00
67,000.00
1,340.00
12,000.00 setara SG
3,750.00
100,000.00
71.43 BJ 1400 Kg/m3
80,000.00
475,000.00
435,000.00
351.85 BJ 1350 Kg/m3
550.00 uk 8x8x18 cm. Lubang press mesin
29,500.00 setara Sakura Roof, 1 m2 @1,62 lbr
23,000.00 panjang 90 cm
225,000.00
55,000.00
550,000.00
90,000.00
75,000.00
35,000.00
90,000.00
395,000.00
1,240,000.00
25,000.00
3,000.00
220,000.00
18,000.00
20,000.00 1 ktk @50 buah
13,000.00
66.60
10,700.00
23,500.00
19,400.00
16,200.00
10,800.00
220,000.00
25,000.00
30,000.00
2,000.00
1,600,000.00
5,800,000.00
3,500,000.00
5,500,000.00
110,000.00
95,000.00
3,800,000.00
133,000.00
15,000.00
125,000.00
31,000
52,000
5,000
25,000
5,000
38,500
BAHAN
C.
PERALATAN
D.
E.
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
Kode
Satuan
L.01
L.04
OH
OH
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
BAHAN
Dolken Kayu Diameter 8-10/400 cm
Kayu
Paku Biasa 2"- 5"
Semen Portland
Pasir Beton
Koral Beton
Seng Gelombang
Seng Plat
C.
PERALATAN
D.
E
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
Batang
m3
kg
kg
m3
m3
lbr
lbr
Kode
Satuan
L.01
L.02
L.03
OH
OH
OH
Mandor
B.
L.04
BAHAN
Kayu Balok 5/7
Paku 2"-3"
Kayu Papan 3/20
C.
PERALATAN
D.
E
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
BAHAN
C.
PERALATAN
D.
E.
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
BAHAN
C.
PERALATAN
D.
E.
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
OH
m3
Kg
m3
Kode
Satuan
L.01
L.04
OH
OH
Kode
Satuan
L.01
L.04
OH
OH
Kode
Satuan
A.
B.
TENAGA
Pekerja
Mandor
BAHAN
Pasir urug
C.
PERALATAN
D.
E.
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
PERALATAN
D.
E
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
OH
OH
m3
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
BAHAN
Batu Kali
Semen Portland
Pasir Pasang
C.
B.
L.01
L.04
m3
Kg
m3
Kode
Satuan
L.01
L.02
L.02
L.02
L.03
L.04
OH
OH
OH
OH
OH
OH
m3
kg
liter
PERALATAN
D.
E.
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
kg
kg
kg
m3
m3
Membuat 1 m3 lantai kerja beton mutu f'c=7.4 mpa (k100), slump (3-6)cm, w/c= 0.87
No
Uraian
Kode
Satuan
A.
TENAGA
Pekerja
L.01
OH
Tukang Kayu
L.02
OH
Kepala Tukang
L.03
OH
Mandor
L.04
OH
B.
BAHAN
Semen Portland
Pasir Beton
Kerikil (maks, 30mm)
Air
C.
PERALATAN
D.
E
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
D.
E.
F.
E.
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
kg
kg
kg
liter
Kode
Satuan
L.01
L.02
L.02
L.02
OH
OH
OH
OH
Kepala Tukang
Mandor
B.
OH
OH
BAHAN
Kayu kelas
Paku 5-12cm
Minyak Bekesting
Besi Beton Polos
Kawat beton
Pasir Beton
Kerikil
C.
PERALATAN
D.
E.
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
L.03
L.04
BAHAN
Kayu kelas
Paku 5-12 cm
Minyak bekesting
Besi Beton Polos
Kawat beton
Semen Portland
Pasir Beton
Kerikil
Kayu Kelas Balok
Plywood 9mm
Dolken Kayu 8-10 cm p. 4m
C.
PERALATAN
D.
E.
Jumlah (A+B+C)
Overhead & Profit
m3
kg
liter
kg
kg
kg
m3
m3
Kode
Satuan
L.01
L.02
L.02
L.02
L.03
L.04
OH
OH
OH
OH
OH
OH
m3
kg
Liter
kg
kg
kg
m3
kg
m3
Lbr
Batang
F.
Kode
Satuan
L.01
L.02
L.02
L.02
L.03
L.04
OH
OH
OH
OH
OH
OH
BAHAN
Kayu kelas
Paku 5-12 cm
Minyak Bekesting
Besi beton polos
Kawat beton
Sement Portland
Pasir Beton
Kerikil
C.
PERALATAN
D.
E.
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
Kerikil
C.
PERALATAN
D.
E.
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
m3
kg
Liter
kg
kg
kg
m3
kg
kg
Kode
Satuan
L.01
L.02
L.02
L.02
L.03
L.04
OH
OH
OH
OH
OH
OH
B.
BAHAN
Kayu kelas
Paku 5-12 cm
Minyak Bekesting
Besi beton polos
Kawat beton
Sement Portland
Pasir Beton
Kerikil
Kayu kelas balok
Plywood 9mm
Dolken kayu diameter 8-10 cm p.4m
C.
PERALATAN
D.
E.
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
BAHAN
Kayu kelas
Paku 5 - 12 cm
Minyak bekesting
Besi beton polos
Kawat beton
Semen Portland
Pasir beton
Kerikil
m3
kg
Liter
kg
kg
kg
m3
kg
m3
lbr
btg
Kode
Satuan
L.01
L.02
L.02
L.02
L.03
L.04
OH
OH
OH
OH
OH
OH
m3
kg
Liter
kg
kg
kg
m3
kg
JUMLAH TENAGA BAHAN
C.
PERALATAN
JUMLAH TENAGA ALAT
D
E.
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
BAHAN
Bata Merah
Semen Portland
Pasir Pasang
C.
PERALATAN
D.
E
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
bh
kg
m3
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
BAHAN
Semen Portland
Pasir Pasang
C.
PERALATAN
D.
E
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
kg
m3
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
B.
BAHAN
Keramik 20x20 (KM/WC)
Semen Portland
Pasir pasang
Semen warna
C.
PERALATAN
D.
E.
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
BAHAN
Keramik 20x20 (KM/WC)
Semen Portland
Pasir pasang
Semen warna
C.
PERALATAN
D.
E.
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
bh
kg
kg
kg
Kode
L.01
L.02
L.03
L.04
Satuan
OH
OH
OH
OH
bh
kg
kg
kg
BAHAN
Lembar
kg
kg
roll
C.
PERALATAN
D.
E.
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
BAHAN
List gypsum sedang
Paku skrup
Comis
C.
PERALATAN
D.
E.
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
Kode
BAHAN
genteng keramik ex. Sakura
Paku biasa 1/2"-1"
C.
PERALATAN
D.
E
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
m
kg
kg
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
bh
kg
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
BAHAN
Nok Genteng Metal
Paku biasa 1/2"-1"
C.
PERALATAN
D.
E
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
Kode
BAHAN
Papan kayu kelas II
Paku
C.
PERALATAN
D.
E
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
bh
kg
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
bh
kg
Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II
No
Uraian
Kode
Satuan
A.
TENAGA
Pekerja
L.01
OH
Tukang Kayu
L.02
OH
Kepala Tukang
L.03
OH
Mandor
L.04
OH
B.
BAHAN
Balok Kayu Kelas II
m3
Paku 10 cm
Lem Kayu
C.
PERALATAN
D.
E
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
BAHAN
Papan Kayu Kelas II
Lem Kayu
Kaca Polos 5mm
C.
PERALATAN
D.
E
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
kg
kg
BAHAN
Handle
Isi Silinder
C.
PERALATAN
D.
E.
Jumlah (A+B+C)
Overhead & Profit
m3
kg
m2
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
bh
bh
F.
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
BAHAN
Kait Angin Stainless Steel
C.
PERALATAN
D.
E.
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
Kode
bh
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
BAHAN
Door Stop
C.
PERALATAN
D.
E.
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
bh
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
B.
BAHAN
Kait Angin Stainless Steel
C.
PERALATAN
D.
E.
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
bh
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
BAHAN
Door Handle
C.
PERALATAN
D.
E.
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
bh
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
JUMLAH TENAGA KERJA
B.
BAHAN
Engsel Pintu
psg
JUMLAH TENAGA BAHAN
C.
PERALATAN
JUMLAH TENAGA ALAT
D
E.
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
Pengecatan 1 m2 tembok baru untuk exterior (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
No
Uraian
Kode
Satuan
A.
TENAGA
Pekerja
L.01
OH
Tukang cat
L.02
OH
Kepala Tukang
L.03
OH
Mandor
L.04
OH
B.
BAHAN
Plamir
Cat Dasar
Cat Penutup ex. Dulux
C.
PERALATAN
D.
E
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
L
kg
kg
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
JUMLAH TENAGA KERJA
B.
BAHAN
Cat penutup ex. Vinilex
Lbr
JUMLAH TENAGA BAHAN
C.
PERALATAN
JUMLAH TENAGA ALAT
D.
E.
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
C.
BAHAN
Closed Duduk ex. AmStand
Perlengkapan
PERALATAN
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
m3
kg
D.
E
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
BAHAN
Closed Jongkok
Semen Portland
Pasir pasang
Batu Bata
C.
PERALATAN
D.
E.
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
Kode
BAHAN
Wastafel
Semen Portland
Pasir pasang
Perlengkapan (siphon, kran, stop kran, flexible)
C.
PERALATAN
D.
E.
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
unit
kg
m3
bh
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
unit
kg
m3
No
A.
B.
Uraian
TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor
PERALATAN
D.
E.
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
L.01
L.02
L.03
L.04
OH
OH
OH
OH
unit
Ls
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
BAHAN
Bak cuci piring stainless steel
waterdrain
C.
PERALATAN
D.
E.
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
Satuan
BAHAN
Bak fiberglass
Perlengkapan
C.
B.
Kode
BAHAN
Floor Drain
unit
unit
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
unit
C.
PERALATAN
D.
E.
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
BAHAN
Keran air ex. Onda
sealtape
C.
PERALATAN
D.
E
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
m
buah
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
JUMLAH TENAGA KERJA
B.
BAHAN
Pipa PVC tipe AW 3/4"
Perlengkapan
m
Ls
JUMLAH TENAGA BAHAN
C.
PERALATAN
JUMLAH TENAGA ALAT
D
E.
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
BAHAN
smartruss C 75.80
smartruss C 75.75
Reng AZ 0,55mm x 6m
Srew
Dynabolt
Valery Gutter Talang Jurai
C.
PERALATAN
D.
E
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
Kode
BAHAN
Pintu KN/WC PVC
Sealent
C.
PERALATAN
D.
E
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
m
m
m
bh
bh
m
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
bh
tube
No
A.
B.
Uraian
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
PERALATAN
D.
E
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
L.01
L.02
L.03
L.04
OH
OH
OH
OH
m
ls
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
BAHAN
NYM 2 X 2,5 mm2
Perlengkapan (35% harga coundit, klem, isolasi)
C.
PERALATAN
D.
E
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
Satuan
BAHAN
pipa PVC tipe AW diameter 3/4"
Perlengkapan
C.
B.
Kode
BAHAN
NYM 2 X 2,5 mm2
Perlengkapan (35% harga coundit, klem, isolasi)
Kode
Satuan
L.01
L.02
L.03
L.04
OH
OH
OH
OH
C.
PERALATAN
D.
E
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
BAHAN
Smartruss C.75.80
Smartruss C.75.75
Reng AZ 0,55mm x 6m
Screw
Dynabolt
Valery Gutter Talang Jurai
C.
PERALATAN
D.
E
F.
Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)
Kode
L.01
L.02
L.03
L.04
Satuan
OH
OH
OH
OH
m
m
m
bh
bh
m
Koefisien
0.100
0.050
75000.00
120000.00
JUMLAH TENAGA KERJA
7500.00
6000.00
13500.00
0.00
0.00
Koefisien
0.00
0.00
13500.00
1350.00
14850.00
1.000
2.000
0.200
0.050
75000.00
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
75000.00
180000.00
22000.00
6000.00
283000.00
1.700
0.180
0.300
10.500
0.030
0.050
1.500
0.25
8000.00
1600000.00
18000.00
1340.00
100000.00
435000.00
31000.00
14000.00
JUMLAH TENAGA BAHAN
13600.00
288000.00
5400.00
14070.00
3000.00
21750.00
46500.00
3500.00
395820.00
Koefisien
0.100
0.100
0.010
0.00
0.00
678820.00
101823.00
780643.00
75000.00
90000.00
110000.00
7500.00
9000.00
1100.00
0.005
120000.00
JUMLAH TENAGA KERJA
600.00
18200.00
0.012
0.020
0.007
1600000.00
18000.00
1300000.00
JUMLAH TENAGA BAHAN
19200.00
360.00
9100.00
28660.00
15% X D
Koefisien
0.750
0.025
75000.00
120000.00
JUMLAH TENAGA KERJA
56250.00
3000.00
59250.00
0.00
0.00
Koefisien
0.250
0.008
0.00
0.00
59250.00
5925.00
65175.00
75000.00
120000.00
JUMLAH TENAGA KERJA
18750.00
1000.00
19750.00
0.00
0.00
Koefisien
0.00
0.00
46860.00
7029.00
53889.00
0.00
0.00
19750.00
1975.00
21725.00
0.300
0.010
75000.00
120000.00
JUMLAH TENAGA KERJA
22500.00
1200.00
23700.00
1.200
80000.00
JUMLAH TENAGA BAHAN
96000.00
96000.00
Koefisien
0.00
0.00
119700.00
17955.00
137655.00
1.500
0.750
0.075
0.075
75000.00
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
112500.00
67500.00
8250.00
9000.00
197250.00
1.200
202.000
0.485
465000.00
1340.00
100000.00
JUMLAH TENAGA BAHAN
558000.00
270680.00
48500.00
877180.00
Koefisien
0.00
0.00
1074430.00
161164.50
1235594.50
5.300
0.275
1.300
1.05
0.262
0.265
75000.00
90000.00
90000.00
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
397500.00
24750.00
117000.00
94500.00
28820.00
31800.00
694370.00
0.200
1.500
0.400
1600000.00
18000.00
10700.00
320000.00
27000.00
4280.00
157.5
2.25
336
0.54
0.81
9157.21
18000.00
1340.00
100000.00
475000.00
JUMLAH TENAGA BAHAN
JUMLAH TENAGA ALAT
15% X D
Koefisien
1442260.58
40500.00
450240.00
54000.00
384750.00
2723030.58
0.00
0.00
3417400.58
512610.09
3930010.66
1.200
0.200
0.020
0.060
75000.00
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
90000.00
18000.00
2200.00
7200.00
117400.00
230.000
893.000
1027.000
200.000
1340.00
71.43
351.85
66.60
JUMLAH TENAGA BAHAN
308200.00
63786.99
361349.95
13320.00
746656.94
15 % X D
15 % X D
Koefisien
5.650
0.275
1.560
1.4
0.00
0.00
864056.94
129608.54
993665.48
0.00
0.00
131808.54
19771.28
151579.82
22736.97
174316.80
75000.00
90000.00
90000.00
90000.00
423750.00
24750.00
140400.00
126000.00
0.323
0.283
110000.00
120000.00
JUMLAH TENAGA KERJA
35530.00
33960.00
784390.00
0.270
2.000
0.600
210
3
336
0.54
0.81
1600000.00
18000.00
10700.00
9157.21
18000.00
1340.00
100000.00
475000.00
JUMLAH TENAGA BAHAN
432000.00
36000.00
6420.00
1923014.10
54000.00
450240.00
54000.00
384750.00
3340424.10
0.00
0.00
4124814.10
618722.12
4743536.22
Koefisien
7.05
0.275
1.65
2.1
0.403
0.353
75000.00
90000.00
90000.00
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
528750.00
24750.00
148500.00
189000.00
44330.00
42360.00
977690.00
0.32
3.2
1.6
210
3
336
0.54
0.18
0.14
2.8
16
1600000.00
18000.00
10700.00
91577.21
18000.00
1340.00
100000.00
475000.00
1600000.00
110000.00
8000.00
JUMLAH TENAGA BAHAN
640000.00
72000.00
21400.00
2884521.88
81000.00
450240.00
54000.00
384750.00
240000.00
385000.00
160000.00
5372911.88
0.00
0.00
15 % X D
6350601.88
952590.28
7303192.16
Koefisien
0.18
0.002
0.002
0.002
0.006
0.009
75000.00
90000.00
90000.00
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
13500.00
1800.00
1800.00
1800.00
660.00
1080.00
20640.00
0.002
0.001
0.1
3
0.45
4
0.006
0.009
1600000.00
18000.00
10700.00
9157.21
18000.00
1340.00
100000.00
475000.00
JUMLAH TENAGA BAHAN
3200.00
18.00
1070.00
27471.64
8100.00
5360.00
600.00
42275.00
88094.64
0.00
0.00
475000.00
JUMLAH TENAGA BAHAN
108734.64
16310.20
125044.84
42275.00
292364.67
0.00
0.00
15% X D
0.009
Koefisien
6.35
0.275
1.65
1.4
0.333
0.318
15% X D
334639.67
50195.95
384835.62
75000.00
90000.00
90000.00
90000.00
110000.00
120000.00
476250.00
24750.00
148500.00
126000.00
36630.00
38160.00
0.32
3.2
1.6
210
3
336
0.54
0.81
0.14
2.8
16
Koefisien
0.297
0.033
0.033
0.003
0.010
0.015
0.003
0.020
0.100
3.600
0.050
5.500
0.009
0.015
JUMLAH TENAGA BAHAN
850290.00
1600000.00
18000.00
10700.00
9157.21
18000.00
1340.00
100000.00
475000.00
1600000.00
110000.00
8000.00
JUMLAH TENAGA BAHAN
512000.00
57600.00
17120.00
1923014.10
54000.00
450240.00
54000.00
384750.00
224000.00
308000.00
128000.00
4112724.10
0.00
0.00
15% X D
4963014.10
744452.12
5707466.22
75000.00
90000.00
90000.00
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
22275.00
2970.00
2970.00
270.00
1100.00
1800.00
31385.00
1600000.00
18000.00
10700.00
9157.21
18000.00
1340.00
100000.00
475000.00
4800.00
360.00
1070.00
32965.96
900.00
7370.00
900.00
7125.00
55490.96
0.00
0.00
86875.96
13031.39
99907.35
Koefisien
0.300
0.100
0.010
0.015
75000.00
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
22500.00
9000.00
1100.00
1800.00
34400.00
66.000
7.832
0.022
550.00
1340.00
100000.00
JUMLAH TENAGA BAHAN
36300.00
10494.40
2180.00
48974.40
Koefisien
0.00
0.00
83374.40
12506.16
95880.56
0.260
0.200
0.020
0.013
75000.00
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
19500.00
18000.00
2200.00
1560.00
41260.00
10.368
0.031
1340.00
100000.00
JUMLAH TENAGA BAHAN
13893.12
3100.00
16993.12
Koefisien
0.090
0.090
0.035
0.005
0.00
0.00
58253.12
8737.97
66991.09
75000.00
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
6750.00
8100.00
3850.00
600.00
19300.00
3.530
1.140
0.003
0.050
1696.97
1340.00
100000.00
12000.00
JUMLAH TENAGA BAHAN
Koefisien
5990.30
1527.60
300.00
600.00
8417.90
0.00
0.00
27717.90
4157.69
31875.59
0.250
0.125
0.013
0.013
75000.00
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
18750.00
11250.00
1430.00
1560.00
32990.00
6630.000
10.000
0.045
1.500
10540.00
1340.00
100000.00
12000.00
JUMLAH TENAGA BAHAN
69880.20
13400.00
4500.00
18000.00
105780.20
Koefisien
0.00
0.00
138770.20
20815.53
159585.73
0.1
0.05
0.005
0.005
75000.00
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
7500.00
4500.00
550.00
600.00
13150.00
0.364
0.11
0.3
0.07
60000.00
40000.00
3750.00
15000.00
JUMLAH TENAGA BAHAN
21840.00
4400.00
1125.00
1050.00
28415.00
0.00
0.00
15% X D
41565.00
6234.75
47799.75
0.05
0.05
0.005
0.003
75000.00
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
3750.00
4500.00
550.00
360.00
9160.00
1.05
0.01
0.1
10000.00
40000.00
3750.00
JUMLAH TENAGA BAHAN
10500.00
400.00
375.00
11275.00
0.00
0.00
Koefisien
15% X D
20435.00
3065.25
23500.25
0.200
0.100
0.010
0.010
75000.00
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
15000.00
9000.00
1100.00
120.00
25220.00
1.620
0.200
29500.00
18000.00
JUMLAH TENAGA BAHAN
47790.00
3600.00
51390.00
Koefisien
0.00
0.00
76610.00
11491.50
88101.50
Koefisien
0.250
0.150
0.015
0.013
75000.00
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
18750.00
13500.00
1650.00
1560.00
35460.00
1.100
0.050
23000.00
18000.00
JUMLAH TENAGA BAHAN
25300.00
900.00
26200.00
Koefisien
0.00
0.00
61660.00
9249.00
70909.00
0.100
0.200
0.020
0.005
75000.00
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
7500.00
18000.00
2200.00
600.00
28300.00
0.011
0.050
5500000.00
18000.00
JUMLAH TENAGA BAHAN
60500.00
900.00
61400.00
Koefisien
0.00
0.00
89700.00
13455.00
103155.00
6.000
18.000
1.800
0.300
75000.00
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
450000.00
1620000.00
198000.00
36000.00
2304000.00
1.200
5800000.00
6960000.00
1.250
1
18000.00
13000.00
JUMLAH TENAGA BAHAN
Koefisien
22500.00
13000.00
6995500.00
0.00
0.00
9299500.00
1394925.00
10694425.00
0.800
2.400
0.240
0.040
75000.00
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
60000.00
216000.00
26400.00
4800.00
307200.00
0.024
0.300
1
3500000.00
13000.00
95000.00
JUMLAH TENAGA BAHAN
84000.00
3900.00
95000.00
182900.00
Koefisien
0.00
0.00
490100.00
73515.00
563615.00
0.01
0.5
0.05
0.005
75000.00
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
750.00
45000.00
5500.00
600.00
51850.00
1
1
150000.00
100000.00
JUMLAH TENAGA BAHAN
150000.00
100000.00
250000.00
0.00
0.00
15% X D
301850.00
45277.50
347127.50
Koefisien
0.02
0.2
0.02
0.001
75000.00
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
1500.00
18000.00
2200.00
120.00
21820.00
17500.00
JUMLAH TENAGA BAHAN
17500.00
17500.00
0.00
0.00
15% X D
39320.00
5898.00
45218.00
0.01
0.1
0.01
0.005
75000.00
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
750.00
9000.00
1100.00
600.00
11450.00
18000.00
JUMLAH TENAGA BAHAN
18000.00
18000.00
0.00
0.00
Koefisien
Koefisien
0.015
0.15
0.015
0.008
15% X D
29450.00
4417.50
33867.50
75000.00
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
1125.00
13500.00
1650.00
960.00
17235.00
15000.00
JUMLAH TENAGA BAHAN
15000.00
15000.00
0.00
0.00
15% X D
32235.00
4835.25
37070.25
0.05
0.5
0.05
0.003
75000.00
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
3750.00
45000.00
5500.00
360.00
54610.00
125000.00
JUMLAH TENAGA BAHAN
125000.00
125000.00
0.00
0.00
Koefisien
15% X D
Koefisien
0.015
0.150
0.015
0.001
JUMLAH TENAGA KERJA
1125.00
13500.00
1650.00
120.00
16395.00
1.000
JUMLAH TENAGA BAHAN
15000.00
15000.00
0.00
0.00
31395.00
4709.25
36104.25
179610.00
26941.50
206551.50
0.020
0.063
0.0063
0.003
75000.00
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
1500.00
5670.00
693.00
360.00
8223.00
0.100
0.100
0.26
6000.00
25000.00
90000.00
JUMLAH TENAGA BAHAN
600.00
2500.00
23400.00
26500.00
0.00
0.00
34723.00
5208.45
39931.45
Koefisien
0.028
0.042
0.004
0.003
JUMLAH TENAGA KERJA
75000.00
90000.00
110000.00
120000.00
2100.00
3780.00
462.00
360.00
6702.00
0.180
JUMLAH TENAGA BAHAN
21200.00
3816.00
3816.00
0.00
0.00
10518.00
1577.70
12095.70
Koefisien
3.300
1.100
0.010
0.160
75000.00
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
247500.00
99000.00
1100.00
19200.00
366800.00
1.000
1250000.00
1250000.00
75000.00
1325000.00
6% x closed
JUMLAH TENAGA BAHAN
Koefisien
0.00
0.00
1691800.00
253770.00
1945570.00
1.000
0.300
0.150
0.050
75000.00
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
75000.00
27000.00
16500.00
6000.00
124500.00
1.000
6.000
0.010
7.000
225000.00
1340.00
100000.00
550.00
JUMLAH TENAGA BAHAN
225000.00
8040.00
1000.00
3850.00
237890.00
Koefisien
0.00
0.00
362390.00
54358.50
416748.50
1.200
1.450
0.150
0.060
75000.00
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
90000.00
130500.00
16500.00
7200.00
244200.00
1.000
6.000
0.010
550000.00
1340.00
100000.00
550000.00
8040.00
1000.00
290000.00
849040.00
0.00
0.00
1093240.00
163986.00
1257226.00
Koefisien
0.300
0.450
0.045
0.015
75000.00
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
22500.00
40500.00
4950.00
1800.00
69750.00
1.000
395000.00
395000.00
47400.00
442400.00
12%xbak
JUMLAH TENAGA BAHAN
Koefisien
0.00
0.00
512150.00
76822.50
588972.50
0.030
0.300
0.030
0.015
75000.00
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
2250.00
27000.00
3300.00
1800.00
34350.00
1.000
1.000
1240000.00
25000.00
JUMLAH TENAGA BAHAN
1240000.00
25000.00
1265000.00
Koefisien
0.00
0.00
1299350.00
194902.50
1494252.50
0.010
0.100
0.010
0.005
75000.00
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
750.00
9000.00
1100.00
600.00
11450.00
1.000
125000.00
JUMLAH TENAGA BAHAN
125000.00
125000.00
Koefisien
0.00
0.00
136450.00
20467.50
156917.50
0.010
0.100
0.0400
0.005
75000.00
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
750.00
9000.00
4400.00
600.00
14750.00
1.000
0.025
55000.00
3000.00
JUMLAH TENAGA BAHAN
55000.00
75.00
55075.00
0.00
0.00
69825.00
10473.75
80298.75
Koefisien
0.081
0.135
0.014
0.004
JUMLAH TENAGA KERJA
75000
90000
110000
120000
6075.00
12150.00
1485.00
480.00
20190.00
18750
34800.00
1.200
35% x pipa
JUMLAH TENAGA BAHAN
34800.00
0.00
0.00
54990.00
8248.50
63238.50
Koefisien
0.200
0.450
0.010
0.050
75000.00
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
15000.00
40500.00
1100.00
6000.00
62600.00
1.488
2.232
5.4
38
1.6
0.124
18833.33
12666.67
6000.00
165.00
1000.00
39000.00
JUMLAH TENAGA ALAT
28024.00
28272.01
32400.00
6270.00
1600.00
4836.00
101402.00
Koefisien
0.00
0.00
164002.00
24600.30
188602.30
0.050
0.500
0.050
0.003
75000.00
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
3750.00
45000.00
5500.00
360.00
54610.00
1.208
0.432
220000.00
25000.00
JUMLAH TENAGA BAHAN
265833.33
10800.00
276633.33
0.00
0.00
331243.33
49686.50
380929.83
Koefisien
0.036
0.060
0.0060
0.002
75000.00
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
2700.00
5400.00
660.00
240.00
9000.00
1.200
5500.00
6600.00
1925.00
8525.00
35% x pipa
JUMLAH TENAGA BAHAN
Koefisien
0.00
0.00
17525.00
2628.75
20153.75
0.135
0.0135
0.005
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
12150.00
1485.00
600.00
14235.00
15.000
9000.00
135000.00
47250.00
182250.00
Koefisien
0.00
0.00
196485.00
29472.75
225957.75
0.135
0.0135
0.005
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
12150.00
1485.00
600.00
14235.00
15.000
11400.00
171000.00
59850.00
Koefisien
230850.00
0.00
0.00
245085.00
36762.75
281847.75
0.200
0.450
0.0100
0.050
75000.00
90000.00
110000.00
120000.00
JUMLAH TENAGA KERJA
15000.00
40500.00
1100.00
6000.00
62600.00
1.488
2.232
5.4
38
1.6
0.124
18833.33
12666.67
6000.00
165.00
1000.00
39000.00
JUMLAH TENAGA BAHAN
15% X D
28024.00
28272.01
32400.00
6270.00
1600.00
4836.00
101402.00
0.00
0.00
164002.00
24600.30
188602.30
II.
III.
IV.
V.
VI.
Vol
Pek.
Sat
Pek.
290
69
6
m2
m2
m2
77.34
2.057
11.375
23.05
99.278
m3
m3
m3
m3
m3
Pekerjaan Beton
1 Pek. Pondasi Beton Bertulang
2 Pek. Sloof Beton Bertulang
3 Pek. Kolom Utama Lantai 1 dan 2
4 Pek. Kolom Praktis
4 Pek. Balok Beton Bertulang
5 Pek. Plat
6 Pek. Reng Balok
7 Pek. Lantai Kerja untuk Pondasi dan Lantai
5.952
8.97
14.28
0.99
13.588
17.88
3.1
14.125
m3
m3
m3
m3
m3
m3
m3
m3
837.896
1675.922
m
m
16.758
4
16
52
24
26
16
16
m3
m2
unit
unit
buah
psg
buah
buah
buah
Pekerjaan Atap
1 Pek. Rangka Atap Baja Ringan
2 Pek. Penutup Atap Genteng Metal
3 Pek. Nok Genteng Metal
4 Pek. Lisplank Kayu
195.91
195.91
46.5
68
m2
m2
m'
m'
Uraian Pekerjaan
Pekerjaan Persiapan
1 Pek. Pembersihan Lokasi dan Perataan Lapangan
2 Pek. Pengukuran dan Pemasangan 1m' Bouwplank
3 Pek. Pembuatan Gudang Semen dan Peralatan
3.9
Pekerjaan Sanitasi
1 Pek. Pemasangan Pipa Air Kotor
2 Pek. Pemasangan Pipa Air Bersih
3 Pek. Septictank
4 Pek. Pemasangan Kloset Duduk
5 Pek. Pemasangan Kloset Jongkok
6 Pek. Pemasangan Kran Air
7 Pek. Pemasangan Wastafle
8 Pek. Pemasangan Bak Air Fiber
9 Pek. Pemasangan Bak Cuci Piring
10 Pek. Pemasangan Floor drain
126
225.5
m2
m'
24
20
unit
unit
308
14.5
m2
m2
48.5
52
1
3
1
10
1
4
1
4
m
m
unit
unit
unit
unit
unit
unit
unit
unit
1442.79
233
m2
m2
IX.
X.
Pekerjaan Pengecatan
1 Pek. Pengecatan Dinding
1 Pek. Pengecatan Plafond
TOTAL
Pekerjaan Persiapan
Pekerjaan Tanah dan Pondasi
Pekerjaan Beton
Pekerjaan Dinding
Pekerjaan Pintu dan Jendela
Pekerjaan Atap
Pekerjaan Instalasi Listrik
Pekerjaan Keramik
Pekerjaan Sanitasi
Pekerjaan Pengecatan
JUMLAH
DIBULATKAN
TERBILANG
Delapan ratus enam puluh lima juta dua ratus lima puluh dua ribu rupiah
Jumlah harga
(Rp)
Rp4,306,500
Rp3,718,341
Rp4,683,858
Rp12,708,699
Rp5,040,635
Rp134,065
Rp14,054,887
Rp3,172,948
Rp2,156,815
Rp24,559,349
Rp23,391,423
Rp42,549,520
Rp104,289,584
Rp380,987
Rp77,553,051
Rp102,049,496
Rp309,713
Rp2,462,225
Rp352,985,999
Rp80,337,938
Rp112,271,838
Rp192,609,776
Rp41,708,258
Rp9,445,060
Rp1,523,719
Rp5,554,040
Rp1,927,653
Rp866,502
Rp1,175,668
Rp3,304,824
Rp541,880
Rp66,047,604
Rp36,949,077
Rp17,259,965
Rp3,297,269
Rp0
Rp6,022,769
Rp5,299,306
Rp68,828,385
Rp5,422,986
Rp5,636,955
Rp11,059,941
Rp49,152,405
Rp462,196
Rp49,614,601
Rp3,067,067
Rp1,047,995
Rp9,500,000
Rp5,836,710
Rp416,749
Rp802,988
Rp1,257,226
Rp2,355,890
Rp1,494,253
Rp627,670
Rp26,406,547
Rp57,612,697
Rp2,818,298
Rp60,430,995
Rp865,251,896
Rp12,708,699
Rp24,559,349
Rp352,985,999
Rp192,609,776
Rp66,047,604
Rp68,828,385
Rp11,059,941
Rp49,614,601
Rp26,406,547
Rp60,430,995
Rp865,251,896
Rp865,252,000