You are on page 1of 23

STANDARD INSPECTION AND TEST PLAN

ITP No: 610


POWER AND CONTROL CABLE INSTALLATION
PROJECT NAME:

MAIN ACTIVITY NAME: POWER AND CONTROL CABLE INSTALLATION

Activity
No.

PROJECT NO:

NAJYBIA 4x125 MW POWER PLANT PROJECT

Activity
Description

DRAWING NO/BUILDING NO/ SHALTER NO ECT:

740011
EQUIPMENT NO: 56BBT

Inspection/Test
Requirements

Doc. No.: 4740011 00 T-969 04


Rev.: 1
Date: 27 Nov. 2014
Page 1 of 23

UNIQUE ID:

Inspection and Acceptance Initials/Stamp and Date

Reference
Document

Enka Teknik QC.

Client/ Rep.

Cable route ready for cable


installation

By checking completion of trays enough for cable pulling.

H/R

H/R

610-2.0

Correct cable type and size


which is free from damage
installed, as per requirement.

Verify no undue mechanical stress is applied to cable during


installation.
Verify cable manufacturers criteria for max. Tension on
cables during pulling, no kinking.
Verify correct segregation/layering of cables.
Verify correct cable ID.
Verify correct splicing as per spec.
Verify min. bending radius of cable as per cable
manufacturer.

Manufacturer's
Instructions

Cable glanding/termination
complete.

Verify terminating materials are of specified type.


Verify cable connection tight and secure.

Manufacturer's
Instructions

610-3.0

Insulation resistance test and


continuity check after
glanding/lugging complete.

Verify continuity and insulation resistance test complete and


conformant.

610-4.0

Manufacturer's
Instructions

610-5.0

AC Hi-Pot test for MV cables


(After termination complete)

Verify AC Hi-Pot test complete and conformant for MV cables

610-6.0

Cable installation complete.

Verify all inspection and tests complete and conformant.

610-1.0

TEST EQUIPMENT
TYPE
AND SERIAL NO.:

CONTINUITY
CHECK

L1-L3

L2-L3

Report
Reference No.:

See table below


for continuity and
insulation
resistance check.

N/A
H

INSULATION RESISTANCE in M.OHMS


L1-L2

OTHER REFERENCES:

E-073 70-5

L1L2L3- N

ENKA TEKNIK QC Date & Signature /Stamp

L1L2L3N - E

ENKA TEKNIK

Client Rep. Date & Signature/ Stamp

CLIENT

STANDARD INSPECTION AND TEST PLAN


ITP No: 601
CABLE TRAY AND COVERS INSTALLATION
PROJECT NAME:

MAIN ACTIVITY NAME: CABLE TRAY AND COVERS INSTALLATION AT STEP-UP


TRANSFORMER

Activity
No.

601-1.0

Activity
Description

Structural steel ready for


installation of cable trays.

601-2.0 Supports installed.


Clamps, fittings, connectors,
hanger clamps, expansion
601-3.0 guides, installed as required.

601-4.0

601-5.0

601-6.0

601-7.0

PROJECT NO:

NAJYBIA 4x125 MW POWER PLANT PROJECT

DRAWING NO/BUILDING NO/ SHALTER NO ECT:

740011
EQUIPMENT NO: CABLE TRAY( STEP-UP 55)

Inspection/Test
Requirements

Inspection and Acceptance Initials/Stamp and Date


Enka Teknik QC.

H/R

Client/ Rep.

H/R

ITP-302
ITP-303
ITP-250

Verify cable tray supports installed as per drawings/specs.

Manufacturers S
Instructions

Verify anchor points located as per drawings, if applicable.


Verify clamps, screws, fasteners correctly installed/tight.

Manufacturers
Instructions
W

See NOTE under item 601-4.0.


Cable trays, cable tray fittings, Verify clear from heat sources
dividers, barriers, isolators, etc. Verify no damage
installed as required.
Verify sharp edges removed
Verify
dead
end trays provided with tray end caps, if
NOTE: Connecting metal surfaces
cleaned
from
applicable
oil, dirt, oxidation, abraded once with
emery
Verify galvanizing repairs made to areas which will be
paper and Corrosion inhibitor applied
Immediately prior to connection. inaccessible after installation
Verify touch up of galvanizing performed, if required
Trays installation.
All inspection complete and conformant.
Release for cable pulling.
Cable tray installation complete By checking the completion for all cables/wires for the tray.
and all cables for the tray
Release for installation of covers and fire-proofing of cable
pulled, terminated and tested.
trays.
Verify correct material, type etc.
Cable tray covers installation
Verify cable tray covers are undamaged, tight and secure.
complete.
Verify cover banding correct type, tight and secure.

601-8.0 Installation of covers complete. All inspection for covers complete and conformant.

OTHER REFERENCES:

E-082 59-1

UNIQUE ID:

Reference
Document

Verify ITP-302 for primary structural steel complete.


Verify ITP-303 for secondary structural steel complete.
Verify ITP-250 complete for grouting of supports, if
applicable.
Release for cable tray installation.

Doc. No.: 4740011 00 T-969 01


Rev.: 0
Date: 28 August. 2013
Page 2 of 23

Manufacturers
Instructions

Manufacturers
Instructions
Drawings
Manufacturers
Instructions

ENKA TEKNIK QC Date & Signature /Stamp

Client Rep. Date & Signature/ Stamp

Report
Reference No.:

STANDARD INSPECTION AND TEST PLAN


ITP No: 602
COVERS, FIREPROTECTION, ETC. FOR CABLE TRAYS
PROJECT NAME:

MAIN ACTIVITY NAME:

Activity
No.

PROJECT NO:

NAJYBIA 4x125 MW POWER PLANT PROJECT

DRAWING NO/BUILDING NO/ SHALTER NO ECT:

OTHER REFERENCES:

740011
EQUIPMENT NO:

Activity
Description

Doc. No.: 4740011 00 T-969 02


Rev.: 0
Date: 17 Dec 2013
Page 3 of 23

Inspection/Test
Requirements

UNIQUE ID:

Inspection and Acceptance Initials/Stamp and Date

Reference
Document

602-1.0

Verify ITP-610, 701, 702 complete for all cables/wires for the
Cable tray installation complete
ITP-610
tray.
and all cables for the tray
ITP-701
pulled, terminated and tested. Release for installation of covers and fire-proofing of cable
ITP-702
trays.

602-2.0

Cable tray covers installation


complete.

Verify correct material, type etc.


Verify cable tray covers are undamaged, tight and secure.
Verify cover banding correct type, tight and secure.

Manufacturers
Instructions

602-3.0

Cable tray fireprotection


installation complete.

Verify correct grade, type of material


Verify visual inspection.
.

Manufacturers
Instructions

602-4.0

Permanent signs installation


complete.

Verify signs such as tray system voltage class, tray number


and safety signs as applicable.

Manufacturers
Instructions

602-5.0

Grounding connections from


tray to structural steel
complete.

Verify grounding connections complete as per vendor


data/specification requirements.
Manufacturers
Verify continuity checks performed and conformant, between Instructions
cable tray and structural steel.

602-6.0

Installation of covers,
fireprotection complete.

All inspection and tests complete and conformant.


Cable tray covers, fireprotection released..

ENKA TEKNIK QC Date & Signature /Stamp

Sub-Contr. QC

Enka Teknik QC.

H/R

H/R

Client/ Rep.

Client Rep. Date & Signature/ Stamp

Report
Reference
No.:

STANDARD INSPECTION AND TEST PLAN


ITP No: 603
CONDUIT INSTALLATION
PROJECT NAME:

MAIN ACTIVITY NAME:

Activity
No.

PROJECT NO:

NAJYBIA 4x125 MW POWER PLANT PROJECT

Inspection/Test
Requirements

To check the structural steel ready for conduit installation.


Structural steel, trenches ready
Verify co-ordinates, depth of underground conduits as per
for conduit installation.
drawing.

603-2.0

Supports installed, as required.

603-3.0

NOTE: Conduit shall be


installed neatly,
Straight and plumb and in the
correct location.

OTHER REFERENCES:

UNIQUE ID:

Reference
Document

603-1.0

Rigid conduits and conduit


fittings as required.

DRAWING NO/BUILDING NO/ SHALTER NO ECT:

740011
EQUIPMENT NO:

Activity
Description

Doc. No.: 4740011 00 T-969 03


Rev.: 0
Date: 26 August. 2013
Page 4 of 23

Verify conduit supported within maximum specified intervals


(if applicable).
Verify correct size, type of material used.

Vendor data.
Drawings

Verify cleaned from dirt, cuttings and foreign material prior to


installation
Verify conduits in parallel have a minimum equip. distance as
specified in the drawings.
Verify no welding of conduits
Vendor data
Verify threads coated with approved coating
Verify conduit body openings are sealed against the water
leakage.
Verify space factor conformity, correct size of conduit, etc.

603-4.0

Boxes installed, as required.

Verify boxes supported independently from conduits.

603-5.0

Conduit field bends (cold


bends)

Verify minimum radius of 6 times inner radius


Verify no flattening/distortion or damage to interior or exterior Vendor data
coating

603-6.0

Flexible conduit and unions,


installed as required.

Verify flexible conduit installed when specified by


drawings/specifications.

603-7.0

Conduit installation complete.

Verify all inspection complete and conformant.

Inspection and Acceptance Initials/Stamp and Date


Sub-Contr. QC

Enka Teknik QC.

H/R

H/R

Client/ Rep.

Vendor data

Vendor data

ENKA TEKNIK QC Date & Signature /Stamp

Client Rep. Date & Signature/ Stamp

Report
Reference No.:

STANDARD INSPECTION AND TEST PLAN


ITP No: 620
POWER CIRCUIT INSTALLATION
PROJECT NAME:

MAIN ACTIVITY NAME:

Activity
No.

Activity
Description

Installation of socket outlets


620-2.0
and junction boxes complete.

620-3.0 Cables installed.

Power circuit installation


complete.

TEST EQUIPMENT
TYPE
AND SERIAL NO.:

Reference
Document

Inspection and Acceptance Initials/Stamp and Date


Sub-Contr. QC

H/R
Verify installation of conduits complete.
Verify installation of junction boxes completed.
Drawings
Release for power circuit installation.
S
Verify sockets outlets and junction boxes enclosures suitable
for the area.
Manufacturers
Instructions
Verify mounting and location of socket outlets correct as per
installation drawings.
W
Verify continuity and insulation tests complete for service
socket stations.
Manufacturers
Verify terminations checked.
Instructions
Verify loose connection checked.

All inspection and tests complete and conformant.


Power circuit released.
Cable No

Insulation Resistance in Mohms


L1-L2

OTHER REFERENCES:

UNIQUE ID:

Inspection/Test
Requirements

DRAWING NO/BUILDING NO/ SHALTER NO ECT:

740011
EQUIPMENT NO:

Power circuit ready for cable


620-1.0 pulling and socket outlets
installation.

620-4.0

PROJECT NO:

NAJYBIA 4x125 MW POWER PLANT PROJECT

Doc. No.: 4740011 00 T-969 05


Rev.: 0
Date: 28 August. 2013
Page 5 of 23

L1-L3

L1L2L3-N

L1L2L3N-E

Continuity
Check

ENKA TEKNIK QC Date & Signature /Stamp

Enka Teknik QC.

Client/ Rep.

Report
Reference No.:

H/R

See table below


for continuity and
insulation
resistance
checks

Sub-Contractor/Enka Teknik
Construction Signature & Date

Sub-Contractor/Enka Teknik
QC Signature and Date

Client Rep. Date & Signature/ Stamp

STANDARD INSPECTION AND TEST PLAN


ITP No: 621
POWER BOARD INSTALLATION
PROJECT NAME:

MAIN ACTIVITY NAME:

Activity
No.

621-1.0

PROJECT NO:

NAJYBIA 4x125 MW POWER PLANT PROJECT

Structural steel, building,


foundation ready for power
board installation.

Inspection/Test
Requirements

Reference
Document

By checking the foundation and/or structural completions


enough for power board installation.
Release for power board installation.

Power board supports installed,


if applicable..

Power board installed.

Testing of power distribution


board complete

H/R

H/R

Client/ Rep.

Manufacturers
instructions
Installation
Drawings.

Manufacturers
instructions
All inspection complete and conformant

621-5.0

Enka Teknik QC.

ITP-222
ITP-302

Verify loose connection checked.


621-4.0

Inspection and Acceptance Initials/Stamp and Date


Sub-Contr. QC

Manufacturers
data
Verify as per installation drawings and vendor instructions.
Verify accessories, guards etc., fitted correctly.

621-3.0

OTHER REFERENCES:

UNIQUE ID:

Verify supports installed as per requirements


621-2.0

DRAWING NO/BUILDING NO/ SHALTER NO ECT:

740011
EQUIPMENT NO:

Activity
Description

Doc. No.: 4740011 00 T-969 06


Rev.: 0
Date: 28 August. 2013
Page 6 of 23

Power board installation


complete.

ENKA TEKNIK QC Date & Signature /Stamp

Client Rep. Date & Signature/ Stamp

Report
Reference No.:

Doc. No.: 4740011 00 T-969 07


Rev.: 0
Date: 28 August. 2013
Page 7 of 23

STANDARD INSPECTION AND TEST PLAN


ITP No: 622
LIGHTING CIRCUIT INSTALLATION
PROJECT NAME:

MAIN ACTIVITY NAME:

Activity
No.

PROJECT NO:

NAJYBIA 4x125 MW POWER PLANT PROJECT


EQUIPMENT NO:

Activity
Description

Inspection/Test
Requirements

By checking completion of concrete slabs and/or structural


steel installations are enough for lighting installation.
Release for lighting circuit installation.

Lighting supports, lighting


622-2.0 poles, lighting fixtures, cable
etc. installed.

622-4.0

Cable installation and


termination complete

Lighting system installation


complete.

OTHER REFERENCES:

Verify as per applicable lighting drawings.


Verify correct location of switches.
Verify correct support and fixtures installation.
Verify correct orientation and alignment.
Verify lamps installed in all fixtures.
Verify check lights and light switches for proper operation.
Verify check photo cells for proper operation

Verify termination and installation meets specification


requirement.

Verify all inspection complete.


Lighting system released..

UNIQUE ID:

Reference
Document

Concrete slabs ready for


lighting pole installation.
622-1.0 Structural steel ready for
supports and lighting fixture
installation.

622-3.0

DRAWING NO/BUILDING NO/ SHALTER NO ECT:

740011

Inspection and Acceptance Initials/Stamp and Date


Sub-Contr. QC

Enka Teknik QC.

H/R

H/R

Client/ Rep.

Drawings
ITP-224 or
ITP-231, ITP302 or ITP-303

Lighting layout
drawings
Manufacturers
Instructions.

Manufacturers
Instructions
ITP-610
W

Manufacturers
Instructions.

ENKA TEKNIK QC Date & Signature /Stamp

Client Rep. Date & Signature/ Stamp

Report
Reference No.:

STANDARD INSPECTION AND TEST PLAN


ITP No: 631
AREA GROUNDING NETWORK INSTALLATION
PROJECT NAME:

MAIN ACTIVITY NAME:

Activity
No.

PROJECT NO:

NAJYBIA 4x125 MW POWER PLANT PROJECT

631-1.0

The below ground grounding


cable for the area installed, as
per requirement.

631-2.0

Splicing of below grade cable


complete.

631-3.0

Area grounding cable network


complete.

631-4.0

Grounding rod installed as per


requirement.

631-5.0

Area connected to grounding rod


directly or via grounding network.
Network connection to grounding
rod complete as per requirement,
if applicable.

631-6.0

Area grounding network


complete.

TEST EQUIPMENT TYPE


AND SERIAL NUMBER

Test No.:

Inspection/Test
Requirements

OTHER REFERENCES:

UNIQUE ID:

Reference
Document

Verify installation at correct depth and location as per


drawings.
Verify correct type and size of grounding wire.
Verify correct type and size of splice used.
Verify compression type splices wrapped with insulating tape
and sealant applied, as applicable.
Verify grounding cable placed as per drawings.
Verify cable backfilled/compacted, except for future
connections to equipment, structural steel etc.
Verify location and depth as per drawing.
Verify correct type and size of grounding rods.
Verify no damage to ground rod.
Verify cable connections undamaged and tight.
Verify complete for installation of grounding rods as
applicable.
Verify adjacent area grounding system complete if there are
no grounding rods in this grounding network area.
Verify connections to grounding rods tight.
Verify continuity to grounding rods/other grounding systems
acceptable.
Verify three different resistances to earth measurements
meet specification requirements.
Verify all inspection and tests complete and conformant.
Release for equipment, structural steel grounding
connections, as applicable..
R1

DRAWING NO/BUILDING NO/ SHALTER NO ECT:

740011
EQUIPMENT NO:

Activity
Description

Doc. No.: 4740011 00 T-969 08


Rev.: 0
Date: 23 August. 2013
Page 8 of 23

Resistance Measurement for grounding Network to Earth


R2
R3
Ground Rod/Test Station No.:

Manufacturers
Instructions
Manufacturers
Instructions

Inspection and Acceptance Initials/Stamp and Date


Sub-Contr. QC

Enka Teknik QC.

W/R

W/R

Client/ Rep.

Report
Reference No.:

Drawings
Manufacturer's
Instructions
Drawings

See table below


for resistance of
grounding
network to earth.

Manufacturers
data sheets

Permissible
Value

ENKA TEKNIK QC Date & Signature /Stamp

ENKA TEKNIK
Construction Signature & Date

ENKA TEKNIK
QC Signature and Date

Client Rep. Date & Signature/ Stamp

STANDARD INSPECTION AND TEST PLAN


ITP No: 632
GROUNDING OF EQUIPMENT, STRUCTURE STEEL ECT.
PROJECT NAME:

MAIN ACTIVITY NAME: Grounding Of Equipment, Structure Steel at Station Service


Transformer

Activity
No.

632-1.0

632-2.0

632-3.0

632-4.0

632-5.0

PROJECT NO:

NAJYBIA 4x125 MW POWER PLANT PROJECT

Activity
Description

Inspection/Test
Requirements

Grounding cable routing complete.

Verify clamps fitting tight and snug as per specification


requirements.
Verify correct size and type of clamps.
Verify grounding cable routing as per spec.
requirements.
Verify grounding cable fittings and hold down clamps as
per specification.

Verify steel surfaces wire brushed and thoroughly


cleaned prior to installing ground clamp.
Verify correct grade and type of connections used for
Grounding terminations, connections
connection to the grounding system.
complete for each individual equipment, Verify grounding system connections wrapped, coated,
structural steel, instrument etc.
sealed as applicable.
Verify connections checked for tightness.
Verify continuity of grounding connection to grounding
system conformant.
Verify underground connections backfilled.
Verify all inspection and tests complete and
Grounding connections complete.
conformant.
Grounding of equipment, structures etc. released.

OTHER REFERENCES:

E-078 89-1

UNIQUE ID:

Inspection and Acceptance Initials/Stamp and Date

Reference
Document

Verify grounding network complete.


Equipment structural steel supports etc. Verify complete for structural steel items.
Released for grounding of equipment, structures etc.
ready for grounding connections.

Installation of grounding clamps


complete.

DRAWING NO/BUILDING NO/ SHALTER NO ECT:

740011
EQUIPMENT NO: BBT02

Doc. No.: 4740011 00 T-969 09


Rev.: 0
Date: 26 August. 2013
Page 9 of 23

Enka Teknik QC.

H/R

H/R

Client/ Rep.

Drawings

Drawings.

Drawings

ENKA TEKNIK QC Date & Signature /Stamp

Client Rep. Date & Signature/ Stamp

Report
Reference No.:

STANDARD INSPECTION AND TEST PLAN


ITP No 634
INSTALLATION OF NEUTRAL EARTH RESISTORS
PROJECT NAME:

Activity
No.

PROJECT NO: 740011 DRAWING NO:

NAJYBIA 4x125 MW POWER PLANT PROJECT

MAIN ACTIVITY NAME:

Document No: 4 740011 00 T-969 11


Rev. No: 0
Date: 03 Jan. 2014
Page 10 of 23

EQUIPMENT NO:

UNIQUE ID:

Reference
Document

Inspection and Acceptance Initials/Stamp and Date

Activity
Description

Inspection/Test
Requirements

634-1.0

Equipment ready for neutral earth


resistor installation

Verify ITP-501, 550 complete for initial setting of


equipment.
Verify ITP-631 or ITP-633 for completion of grounding
rod/area grounding network as applicable.
Release for neutral earth resistor installation

634-2.0

Pre-installation check complete.

Verify no damages.
Verify correct labels rating and compliance with specs.

Manufacturer's
W
Instructions

634-3.0

Neutral earth resistors installed.

Verify installation as per drawings and vendor data sheet.


Verify correct orientation and alignment.

Manufacturer's
W
Instructions

634-4.0

Equipment connection to grounding


rod or via grounding network and to
the power system neutral complete.

Verify connections as per spec.


Verify space heater and its power source properly
connected, if applicable.

Manufacturer's
W
Instructions

634-5.0

Insulation test and high voltage tests Verify insulation resistance test conformant.
complete, as applicable.
Verify high voltage test conformant, as applicable.

Manufacturer's
W
Instructions

634-6.0

Installation of neutral earth resistor


complete.

All inspection and test complete and conformant.


Neutral earth resistor released.

OTHER REFERENCES:

ITP-501
ITP-550
ITP-631
ITP-633

Sub-Contr. QC

Enka Teknik QC.

H/R

H/R

ENKA TEKNIK QC Date & Signature /Stamp

Client/ Rep.

Client Rep. Date & Signature/ Stamp

Report
Reference
No.:

STANDARD INSPECTION AND TEST PLAN


ITP No 634
INSTALLATION OF NEUTRAL EARTH RESISTORS
Test
Equipme
nt
Type and
Serial
Number

Insulation
Resistance
Desired
Resistance

Measured
Resistance

High Voltage Pressure Test


Test
Voltage in
kVolts

Applied Voltage
in kVolts

Leakage Current in
mApms

Document No: 4 740011 00 T-969 11


Rev. No: 0
Date: 03 Jan. 2014
Page 11 of 23

Sub-Contractor/Contractor

Sub-Contractor/Contractor

Construction Signature &


Date

QC Signature and Date

30%

60%

90%
100
%1MIN
.

ENKA TEKNIK QC Date & Signature /Stamp

Client Rep. Date & Signature/ Stamp

STANDARD INSPECTION AND TEST PLAN


ITP No: 635
LIGHTNING PROTECTION SYSTEM INSTALLATION
PROJECT NAME:

MAIN ACTIVITY NAME:

Activity
No.

PROJECT NO:

NAJYBIA 4x125 MW POWER PLANT PROJECT

Reference
Document

Structure, building, equipment By checking condition of structure, building and/ or


ready for lightning protection
equipment enough for installation of the lightning system.
system installation.
Release for lightning protection system installation.

635-2.0

Air terminals installed correctly.

Verify air terminals installed as per drawings/specifications


and manufacturers instructions.

635-3.0

Earth tapes and conductors


installed correctly

Verify correct materials


Verify tapes and conductors securely fixed.
Verify specified type and size of rods installed.

635-4.0

Test clamp and disconnect


facilities installed.

Verify test clamps and disconnect facilities installed correctly.

635-5.0

Lightning protection system


connected to grounding rod
directly or via grounding
network.

Verify connections to ground road/network as per spec.

635-6.0

Installation of lightning
protection system complete.

All inspection complete and conformant.


Lightning protection system released.

R1

R2

R3

Ground Rod/Test Station


No.:

Inspection and Acceptance Initials/Stamp and Date


Sub-Contr. QC

H/R

Enka Teknik QC.

Installation
W
drawings
Manufacturers
Instructions
Installation
W/R
drawings
Manufacturers
Instructions
H

Permissible
Value

ENKA TEKNIK QC Date & Signature /Stamp

Report
Reference No.:

Client/ Rep.

H/R

Manufacturers W
Instructions
Drawings
W
Manufacturers
Instructions.

Resistance Measurement for grounding Network to Earth


Test No.:

OTHER REFERENCES:

UNIQUE ID:

Inspection/Test
Requirements

635-1.0

TEST EQUIPMENT
TYPE
AND SERIAL
NUMBER

DRAWING NO/BUILDING NO/ SHALTER NO ECT:

740011
EQUIPMENT NO:

Activity
Description

Doc. No.: 4740011 00 T-969 12


Rev.: 0
Date: 28 August. 2013
Page 12 of 23

W/R

ENKA TEKNIK

See table below


for resistance of
grounding
network to earth.

CLIENT

Client Rep. Date & Signature/ Stamp

STANDARD INSPECTION AND TEST PLAN


ITP No: 636
ELECTRICAL JUNCTION BOX INSTALLATION
PROJECT NAME:

MAIN ACTIVITY NAME:

Activity
No.

636-1.0

636-2.0

636-3.0

PROJECT NO:

NAJYBIA 4x125 MW POWER PLANT PROJECT

Structural steel, building,


foundation, equipment ready
for junction box installation.

Inspection/Test
Requirements

Junction box installed correctly.

Junction box installation


complete

DRAWING NO/BUILDING NO/ SHALTER NO ECT:

OTHER REFERENCES:

740011
EQUIPMENT NO:

Activity
Description

Doc. No.: 4740011 00 T-969 13


Rev.: 0
Date: 28 August. 2013
Page 13 of 23

UNIQUE ID:

Reference
Document

Verify completion of structural steel.


Verify completion of buildings or initial setting of equipment.
Verify completion of foundations.
Release for junction box installation.

Verify as per applicable specifications.


Verify as per installation drawings and plot plan
Verify correct tag number and IP rating.
Verify holding down bolts tightened.

Inspection and Acceptance Initials/Stamp and Date


Sub-Contr. QC

Enka Teknik QC.

H/R

H/R

Client/ Rep.

Installation
Drawings.

Manufacturers
Instructions

Verify inspection complete and conformant

ENKA TEKNIK QC Date & Signature /Stamp

Client Rep. Date & Signature/ Stamp

Report
Reference No.:

STANDARD INSPECTION AND TEST PLAN


ITP No: 640
RECTIFIER INSTALLATION
PROJECT NAME:

MAIN ACTIVITY NAME:

Activity
No.

640-1.0

640-2.0

640-3.0

640-4.0

640-5.0

PROJECT NO:

NAJYBIA 4x125 MW POWER PLANT PROJECT

Inspection/Test
Requirements

Concrete foundation ready for


installation of rectifier.

Rectifier installed as per


requirement.

Rectifier cables connected to


deep well anodes

Rectifier/junction box
installation complete.

OTHER REFERENCES:

UNIQUE ID:

Inspection and Acceptance Initials/Stamp and Date

Reference
Document

Verify ITP-224 for foundation complete.


Verify ITP-654 complete for deep well anode installation.
Release for rectifier installation..

Junction box, including


supports installed as per
requirement.

DRAWING NO/BUILDING NO/ SHALTER NO ECT:

740011
EQUIPMENT NO:

Activity
Description

Doc. No.: 4740011 00 T-969 14


Rev.: 0
Date: 17 Dec 2013
Page 14 of 23

Verify equipment undamaged.


Verify orientation and alignment correct.
Verify name plate correct.
Verify rectifier bolted down securely.

Sub-Contr. QC

Enka Teknik QC.

H/R

H/R

Client/ Rep.

ITP-224
ITP-654

Manufacturers
Instructions

Verify orientation and alignment correct.


Verify no damage to junction box
Verify JB bolted down securely

Manufacturers
Instructions

Verify anode cable connections secure and tight.

Manufacturers
Instructions

Verify all inspection and tests complete and conformant.


Rectifier release.

ENKA TEKNIK QC Date & Signature /Stamp

Client Rep. Date & Signature/ Stamp

Report
Reference
No.:

STANDARD INSPECTION AND TEST PLAN


ITP No: 641
INSTALLATION OF POWER TRANSFORMERS
PROJECT NAME:

Activity
No.

PROJECT NO: 4740011 DRAWING NO ECT: E-096 32-1

AL-NAJYBIA 4X125 MW GAS TURBINE POWER PLANT PROJECT

MAIN ACTIVITY NAME: INSTALLATION OF POWER TRANSFORMER (STATION SERVICE


TRANSFORMER)

Activity
Description

EQUIPMENT NO: BBT 02

Inspection/Test
Requirements

Transformer ready for electrical


installation.

Verify completion of initial setting of


equipment.
Release for transformer installation.

641-2.0

Check oil level indicator shows


correct level.

Verify oil level indicators show correct


level.

Vendor
data

641-3.0

Electric fan cooling and alarm


system continuity checks (if
applicable).

Verify cooling system and alarm in


accordance with Data sheet.

Vendor
data

641-4.0

Initial charge of transformer oil

Verify oil as per manufacturers data


sheets.
Verify oil filed to correct level.

Vendor
data

641-5.0

Check oil and winding temperature


indicators.

Verify correct as per manufacturers data


sheets
Verify moisture indicator fitted, if required

Vendor
data

641-6.0

Transformer installation complete.

Verify all inspection and tests complete and


conformant.
Transformer released.

As per
drawings

OTHER REFERENCES:

UNIQUE ID:

Inspection and Acceptance Initials/Stamp and Date

Reference
Document

641-1.0

Doc. No.: 4740011 00 T-969 15


Rev.: 1
Date: 04 Feb. 2015
Page 15 of 23

Enka Teknik QC.

Client/ Rep.

H/R

H/R

ENKA TEKNIK QC Date & Signature /Stamp

Client Rep. Date & Signature/ Stamp

Report
Reference No.:

STANDARD INSPECTION AND TEST PLAN


ITP No: 642

Document No: 4740011 00 T-972 27 0


Rev. No: 0
Date: 27 March 2013
Page 16 of 23

EMERGENCY DIESEL GENERATOR INSTALLATION


PROJECT NAME:

MAIN ACTIVITY NAME:

Activity
No.

642-1.0

642-2.0

642-3.0

PROJECT NO: 4740011

NAJYBIA 4X125 MW TURBINE POWER PLANT PROJECT


EQUIPMENT NO:

Activity
Description

Inspection/Test
Requirements

Verify initial setting of diesel generator


Diesel generator skid or generator
skid/generator.
ready for electrical installation.
Release for generator installation.

Generator lubrication satisfactory

Insulation/resistance test of
generator winding.

Verify lubrication, as per vendor data.

Verify insulation resistance test


conformant.

Reference
Document

Inspection and Acceptance Initials/Stamp and Date


Sub-Contr. QC

Enka Teknik QC.

H/R

H/R

Client/ Rep.

Report
Reference No.:

Vendor data.

Vendor data.

Vendor data

FM-6421

Insulation resistance check of


space heater, if applicable.

Verify insulation resistance test


conformant.

Generator installation complete.

Verify all inspection and tests complete and


Project
conformant.
specifications
Generator released.

Manuf. Data
Sheet

FM-6421

H
642-5.0

OTHER REFERENCES:

UNIQUE ID:

W
642-4.0

DRAWING NO ECT:

ENKA TEKNIK QC Date & Signature /Stamp

Client Rep. Date & Signature/ Stamp

FM-6421
EMERGENCY DIESEL GENERATOR
INSPECTION AND TEST RECORD
EQUIPMENT TITLE

LOCATION

EQUIPMENT TAG No.

SERIAL No.

Doc. No: 4740011 00 T-972 27


Rev. No: 0
Date: 27 March 2013
Page 17 of 23

GENERATOR DATA
VOLTAGE

KV

RATING

KVA

FREQUENCY

Hz

SPEED

RPM

ENGINE TYPE
ENGINE SPEED
FUEL SYSTEM
COOLING

DESCRIPTION

1.0

INSTALLATION INSPECTION

1.1

EQUIPMENT INSTALLED UNDAMAGED

1.2

ORIENTATION AND ALIGNMENT CORRECT (SEE ITP-550)

1.3

AUXILIARY ITEMS INSTALLED

1.4

LUBE OIL SYSTEMS CHARGED

1.5

SYSTEM FREE FROM LEAKS AND SPILLAGES

1.6

INTERCONNECTION WIRING/CABLES/FUNCTIONAL CHECK/LOOP COMPLETE IN


ACCORDANCE WITH RELEVANT PROJECT DOCUMENTS AND MANUFACTURERS
DOCUMENTS.

2.0

INSULATION RESISTANCE

Sub-Contractor/
Sub-Contractor/
Enka Teknik
Enka Teknik QC
Construction
Signature And Date
Signature And Date

INSULATION RESISTANCE - MEG. OHMS


3 WIRE
6 WIRE
PH1 - E
PH1 - E
PH2 - E
PH3 - E
2.1

STATOR WINDING

2.2

ROTOR WINDING

2.3

SPACE HEATER

3.0

FUNCTION CHECKS

3.1

GENERATOR CONTROL PANEL FUNCTIONALLY CHECKED

ENKA TEKNIK QC Date & Signature /Stamp

Client Rep. Date & Signature/ Stamp

STANDARD INSPECTION AND TEST PLAN


ITP No:643
INSTALLATION OF MOTORS
PROJECT NAME:

Activity
No.

PROJECT NO: 740011 DRAWING NO ECT:

NAJYBIA 4x125 MW POWER PLANT PROJECT

MAIN ACTIVITY NAME:

EQUIPMENT NO:

Activity
Description

Inspection/Test
Requirements

Inspection and Acceptance Initials/Stamp and Date

Reference
Document

ITP No 250

Bearing lubrication
643-2.0 satisfactory and motor
rotates freely by hand.

Vendor data

Verify bearing lubrication with motor disconnected from


load.

643-3.0

Anti condensation heaters


installed if applicable

Verify Anti condensation heater is provided (Motor

643-4.0

Insulation resistance test of


motor winding.

Verify insulation resistance test for 415 V motors and


below complete and conformant.

643-5.0

Insulation resistance test of


motor, test performed.

Verify motors above 415 V insulation resistance test,

squalor above 1,1kW)

performed and conformant.

Sub-Contr. QC

Enka Teknik QC

H/R

H/R

Client Rep.

Report
Reference
No.:

Vendor data
W/R

Vendor data

FM-6431
W

W/R

Vendor data

Verify correct as per manufacturers data sheets

Vendor data

643-7.0

Insulation resistance check Verify insulation resistance test of space heater


of space heater, if applicable
conformant, if applicable.

Vendor data

643-8.0

Motor installation complete


and conformant.

All inspection and tests complete and conformant.


Motor released.

OTHER REFERENCES:

UNIQUE ID:

Verify completion of initial setting of motors and


completion of grouting, as applicable.
Initial setting and grouting of
Note: Motors directly coupled to pumps etc. may not
643-1.0 motor complete, as
have a separate alignment record. Refer to the
applicable.
equipment the motor is connected to.
Release for motor installation.

Check bearing oil and


643-6.0 winding temperature
indicators if applicable.

Doc. No.: 4740011 00 T-969 17


Rev.: 0
Date: 27 June. 2012
Page 18 of 23

FM-6432
W

ENKA TEKNIK QC Date & Signature /Stamp

Client Rep. Date & Signature/ Stamp

Doc. No.: 4740011 00 T-969 17


Rev.: 0
Date: 27 June. 2012
Page 19 of 23

FM-6431
INSPECTION AND TEST RECORD
FOR MOTORS
EQUIPMENT TITLE

LOCATION

EQUIPMENT TAG No.

SERIAL No.

1.0

INSPECTION OF MOTOR AND HEATER ELEMENTS


DESCRIPTION

ENKA TEKNIK

1.1

CHECK THE EQUIPMENT DATA SHEET AGAINST MOTOR TAG

1.2

CHECK MANUFACTURERS INSTRUCTION AND DOCUMENTS AVAILABLE ON SITE

1.3

VISUALLY INSPECT MOTOR FOR PHYSICAL DAMAGE

1.4

REMOVE ANY SHAFT BLOCKING

1.5

CONFIRM THAT ALL MECHANICAL CHECKS HAVE BEEN CARRIED OUT ON THE
MOTOR

1.6

CHECK STATOR WINDING CONNECTIONS AND RECORD PHASE ROTATION

1.7

INSPECT TERMINAL BOX FIXING BOLTS

1.8

INSPECT TERMINAL BOX FLANGE SURFACES & APPLY PROPRIETARY GREASE


AS NECESSARY

1.9

CHECK MOTOR HEATER RATING.

1.10

CHECK THE FOLLOWING INSTRUMENTS WHERE APPROPRIATE :

RATING = V :

CLIENT

A:

1.10A WINDING TEMPERATURE ( IF ANY)


1.10B AIR TEMPERATURE INDICATORS ( IF ANY )
1.10C BEARING TEMPERATURE INDICATORS ( IF ANY )
1.11

INSPECT THE INSTALLATION OF ANY VENTILATION / PURGE FANS ( IF ANY )

2.0

TEST EQUIPMENT

TEST EQUIPMENT

TEST CERTIFICATION No.

TYPE

VALID
FROM

3.0
PHASE

MAKER

EXPIRY DATE

SERIAL No.

RESISTANCE AND INSULATION CHECK OF MOTORS (415 V AND BELOW)


WINDING RESISTANCE
OHM
U-V

V-W

W-U

INSULATION MEGGER CHECK


MOHMS
U-E

V- E

W- E

ENKA TEKNIK

CLIENT

UVW- E

MEASUREMENT
TEMPERATURE

HUMIDITY

4.0
ITEM

INSULATION RESISTANCE OF HEATER, DETECTORS, ETC.


U-V

W-V

U-W

UVW-E

ENKA TEKNIK QC Date & Signature /Stamp

ENKA TEKNIK

CLIENT

Client Rep. Date & Signature/ Stamp

Doc. No.: 4740011 00 T-969 17


Rev.: 0
Date: 27 June. 2012
Page 20 of 23

FM-6432
MOTOR TEST RECORD
(ABOVE 415 VOLTS)
EQUIPMENT TITLE

LOCATION

EQUIPMENT TAG No.

SERIAL No.

TEST EQUIPMENT
TEST EQUIPMENT

TEST CERTIFICATION No.

MAKER

VALID FROM

TAPE

SERIAL No.

EXPIRY DATE

RESISTANCE AND INSULATION CHECK OF MOTOR

PHASE

WINDING RESISTANCE OHM

U-V

V-W

INSULATION MEGGER CHECK MOHMS

W-U

U- E

V-E

W-E

UVW- E

MEASUREMENT

ENKA TEKNIK QC Date & Signature /Stamp

Client Rep. Date & Signature/ Stamp

STANDARD INSPECTION AND TEST PLAN


ITP No: 644
MOTOR OPERATED VALVE (MOV) INSTALLATION
PROJECT NAME: AL-NAJYBIA

4X125 MW GAS TURBINE POWER PLANT PROJECT

MAIN ACTIVITY NAME:

Activity
No.

Activity
Description

Inspection/Test
Requirements

644-1.0

By checking completion of piping


installation
Release for MOV installation.

644-2.0

Pre-installation equipment
inspection complete.

Verify correct tag number.


Verify no damages
Verify MOV as per specification

Verify as per installation drawings.


Verify correct operational position.
Verify correct valve flow direction.
Verify permanent gaskets

Installation
drawings
Manufacturers
data sheets

Verify post-installation insulation resistance


of .motor windings performed and
conformant.

Manufacturers
data sheets

Verify inspection and tests complete and


conformant.
Release for insulation, pre-commissioning
etc., as applicable.

644-3.0

MOV installed.

644-4.0

Post-installation winding
insulation resistance test
complete.

644-5.0

Installation of motor
operated valve (MOV)
complete

OTHER REFERENCES:

UNIQUE ID:

Reference
Document

Piping ready for MOV


installation.

DRAWING NO/BUILDING NO/ ISO NO ECT:

PROJECT NO: 740011

EQUIPMENT NO:

Doc. No: 4 740011 00 T-969 18


Rev. : 0
Date: 10 Sep. 2012
Page 21 of 23

Inspection and Acceptance Initials/Stamp and Date


Sub-Contr. QC

Enka Teknik QC.

H/R

H/R

H/R

H/R

Client/ Rep.

Report
Ref No.:

ITP-421

MOV data sheet


Manufacturers
data sheets

ENKA TEKNIK QC Date & Signature /Stamp

W/R
FM 6441

Client Rep. Date & Signature/ Stamp

FM-6441
MOTOR OPERATED VALVE
(MOV) TEST RECORD
EQUIPMENT TAG No (s)

Doc. No: 4 740011 00 T-969 18


Rev. : 0
Date: 10 Sep. 2012
Page 22 of 23

VALVE SIZE RATING

DRAWING No. (s)

DATA SHEET Nos.

ACTUATOR SERIAL No.

ACTUATOR MODEL No.

VALVE MOTOR DATA


RATING

KVA

VOLTAGE

VOLTS

FREQUENCY

Hz

CURRENT

AMPS

MOTOR WINDING INSULATION RESISTANCE TEST AFTER INSTALLATION


TEST EQUIPMENT

TYPE

TEST CERTIFICATION No.

VALID FROM

MAKER

EXPIRY DATE

SERIAL No.

MEASURED RESISTANCE
INSULATION RESISTANCE (MOHMS)
U-E

V-E

ENKA TEKNIK QC Date & Signature /Stamp

W-E

Client Rep. Date & Signature/ Stamp

ENKA TEKNIK QC Date & Signature /Stamp

Client Rep. Date & Signature/ Stamp