PipeSizingCalculations(IncominglinetoUGT)

7/5/201511:58AM

PROJECT:

PROPOSED 2B+G+7 RESIDENTIAL BUILDING ON PLOTS NO.23090015/23090013, BIN MAHMOUD, DOHA,


QATAR

CLIENT:

M/s GULF TRADING AND CONTRACTING

LEAD CONSULTANT:

M/s LACASA

MEP CONSULTANT:

M/s IAN BANHAM & ASSOCIATES

MAIN CONTRACTOR:

M/s CHALLENGER CONSTRUCTION & TRADING

MEP CONTRACTOR:

M/s TAKYEEF ELECTRO-MECHANICAL w.l.l

PIPE SIZING CALCULATIONS FOR WATER MAIN LINE TO UNDER GROUND TANK (UGT)
FIRE ( M3) DOM ( M3)

A. CAPACITY
1

UGT CAPACITY- 1ST DAY REQUIREMENT

ASSUMING AVAILABILITY OF CONTINOIUS WATER

460

M3

24

HRS

19.17
84
319
5.3

M3//HR
GPM
LTRS/ MIN
LTRS/SEC

65

MM

PROPOSED CAPACITY OF THE PUMP

PROPOSED PIPE SIZE

WATER VELOCITY IN PIPE

1.61

MTRS/SEC

FILLING OF UGT CAPACITY @ 0.7 DF

343

M3

ASSUMING AVAILABILITY OF CONTINOIUS WATER

PROPOSED CAPACITY OF THE PUMP

PROPOSED PIPE SIZE

24

HRS

14.29

M3//HR

63

GPM

238

LTRS/ MIN

4.0

LTRS/SEC

65

MM

WATER VELOCITY IN PIPE

1.20

MTRS/SEC

FILLING OF UGT CAPACITY @ 0.5 DF

172

M3

ASSUMING AVAILABILITY OF CONTINOIUS WATER

24

HRS

7.15

M3//HR

PROPOSED CAPACITY OF THE PUMP

PROPOSED PIPE SIZE

WATER VELOCITY IN PIPE

31

GPM

119

LTRS/ MIN

2.0

LTRS/SEC

65

MM

0.60

MTRS/SEC

117

343

1ST DAY

AT NO DF

AT 0.5 DF

THE PROPOSED PIPE SIZING OF 65MM DIA FOR MAIN WATER LINE TO UGT MEETS THE REQUIREMENT