ITEM
1.00
1.01
1.01.01
1.01.02
1.01.03
1.02
1.02.01
1.02.02
1.02.03
1.03
1.03.01
1.03.02
1.03.03
1.03.04
2.00
2.01
2.02
DESCRIPCIN
CONCRETEO ARMADO
COLUMNA
CONCRETO FC= 175 KG/CM2
ENCOFRA. - DESENCOF.
ACERO CORRUGADO
VIGA
CONCRETO FC= 175 KG/CM2
ENCOFRA. - DESENCOF.
ACERO CORRUGADO
LOSA ALIGERADA
CONCRETO FC= 175 KG/CM2
ENCOFRA. - DESENCOF.
ACERO CORRUGADO
LADRILLO O.15x0.30x0.30
MUROS
LADRILLO KK 18 HCO. SOGA
LADRILLO KK 18 HCO. CABEZA
FECHA:
Apr-16
UBICACIN: JESUS MARIA
AREA GEOGRFICA:02
UND.
CANT.
P. UNIT.
PARCIAL
IMPORTE
M3
M2
KG
15.00
70.00
900.00
347.64
46.01
4.63
5,214.53
3,220.46
4,169.26
12,604.24
M3
M2
KG
10.00
55.00
800.00
309.92
51.41
4.63
3,099.24
2,827.30
3,706.01
9,632.54
M3
M2
KG
UND
11.00
150.00
990.00
1500.00
287.70
36.31
4.63
2.08
3,164.65
5,447.20
4,586.18
3,123.75
16,321.78
M2
M2
40.00
55.51
2,220.57
90.00
86.07
7,745.92
COSTO DIRECTO
GASTOS GENERALES ( 15% )
UTILIDAD ( 10 % )
SUBTOTAL
IGV
TOTAL
9,966.50
48,525.06
7,278.76
4,852.51
60,656.32
10,918.14
71,574.46
03+000
03+000
03+000
UPLA
IX CICLO
ING. CIVIL
PRESUPUESTO
OBRA: AMPLIACIN DE LABORATORIO
PROPIETARIO: CAD
CONTRATISTA: NQT CONTRATISTAS SAC
ITEM
1.00
1.01
1.01.01
1.01.02
1.01.03
1.02
1.02.01
1.02.02
1.02.03
1.03
1.03.01
1.03.02
1.03.03
1.03.04
2.00
2.01
2.02
DESCRIPCIN
CONCRETEO ARMADO
COLUMNA
CONCRETO FC= 175 KG/CM2
ENCOFRA. - DESENCOF.
ACERO CORRUGADO
VIGA
CONCRETO FC= 175 KG/CM2
ENCOFRA. - DESENCOF.
ACERO CORRUGADO
LOSA ALIGERADA
CONCRETO FC= 175 KG/CM2
ENCOFRA. - DESENCOF.
ACERO CORRUGADO
LADRILLO O.15x0.30x0.30
MUROS
LADRILLO KK 18 HCO. SOGA
LADRILLO KK 18 HCO. CABEZA
FECHA:
May-16
UBICACIN: JESUS MARIA
AREA GEOGRFICA:02
UND.
CANT.
P. UNIT.
PARCIAL
M3
M2
KG
15.00
70.00
900.00
347.64
46.01
4.63
5,214.53
3,220.46
4,169.26
M3
M2
KG
10.00
55.00
800.00
309.92
51.41
4.63
3,099.24
2,827.30
3,706.01
M3
M2
KG
UND
11.00
150.00
990.00
1500.00
287.70
36.31
4.63
2.08
3,164.65
5,447.20
4,586.18
3,123.75
M2
M2
40.00
55.51
2,220.57
90.00
86.07
7,745.92
COSTO DIRECTO
GASTOS GENERALES ( 15% )
UTILIDAD ( 10 % )
SUBTOTAL
IGV
TOTAL
CANTIDAD DE RECURSOS
CANTIDAD DE RECURSOS
MATERIALES
MANO DE OBRA
HERRAMIENTAS Y EQUIPOS
AGR. GRU. PIED. CH. CEMENTO AGUA ALAMB. 8 CLAVOS MAD. TOR. ALAMAB. 16 ACERO LAD. TECH. LAD. KK-18 CAPATAZ OPERARIO OFICIAL PEON MEZCLAD.
VIBR.GAS. HERR. MAN.
(H-H)
(H-H)
(H-H)
(H-H)
(H-M)
(H-M)
(%)
IMPORTE
(M3)
(M3)
(BLS)
(M3)
(KG)
(KG)
(P2)
(KG)
(KG)
(UND.)
(UND.)
WINCHE
(H-M)
12,604.24
7.65
-----------
11.40
-----------
129.90
-----------
2.76
-----------
-----14.00
------
-----14.00
------
-----313.60
------
----------22.50
----------963.00
----------------
----------------
2.00
4.67
9.00
20.00
46.67
29.97
20.00
46.67
29.97
100.00
-------------
10.05
-------------
10.05
-------------
------280.00
3600.00
-------------------
5.10
-----------
7.60
9,632.54
------
86.60
-----------
1.84
-----------
-----5.50
------
-----9.90
------
-----254.10
------
----------20.00
----------856.00
----------------
----------------
1.14
4.40
8.00
11.43
44.00
26.64
5.71
44.00
26.64
57.14
-------------
4.00
-------------
4.00
-------------
------220.00
3200.00
-------------------
16,321.78
5.61
----------------
8.36
----------------
95.26
----------------
2.02
----------------
-----15.00
-----------
-----15.00
-----------
-----534.00
-----------
----------24.75
------
----------1059.30
------
---------------1635.00
---------------------
1.41
8.00
9.90
7.50
10.56
79.95
32.97
-------
7.04
79.95
32.97
-------
45.76
------------75.00
3.52
-------------------
3.52
-------------------
------600.00
3960.00
-------
3.52
-------------------
1.16
5.22
24.74
----------27.36
9.44
36.00
357.20
----------6.62
----------34.50
0.44
0.99
40.33
13.20
29.70
1144.60
----------67.25
----------2878.30
----------1635.00
1480.00
6120.00
7600.00
3.40
10.29
69.71
34.04
102.86
439.09
------27.24
------82.29
292.95 387.43
------------17.57
------------17.57
160.00
360.00
12380.00
------------3.52
9,966.50
48,525.06
7,278.76
4,852.51
60,656.32
10,918.14
71,574.46
03+000
03+000
03+000
UPLA
IX CICLO
ING. CIVIL
PRESUPUESTO
OBRA: AMPLIACIN DE LABORATORIO
PROPIETARIO: CAD
CONTRATISTA: NQT CONTRATISTAS SAC
ITEM
1.00
1.01
1.01.01
1.01.02
1.01.03
1.02
1.02.01
1.02.02
1.02.03
1.03
1.03.01
1.03.02
1.03.03
1.03.04
2.00
2.01
2.02
DESCRIPCIN
CONCRETEO ARMADO
COLUMNA
CONCRETO FC= 175 KG/CM2
ENCOFRA. - DESENCOF.
ACERO CORRUGADO
VIGA
CONCRETO FC= 175 KG/CM2
ENCOFRA. - DESENCOF.
ACERO CORRUGADO
LOSA ALIGERADA
CONCRETO FC= 175 KG/CM2
ENCOFRA. - DESENCOF.
ACERO CORRUGADO
LADRILLO O.15x0.30x0.30
MUROS
LADRILLO KK 18 HCO. SOGA
LADRILLO KK 18 HCO. CABEZA
FECHA:
May-16
UBICACIN: JESUS MARIA
AREA GEOGRFICA:02
AGR. GRU.
S/. 36.00
PIED. CH.
S/. 43.00
CEMENTO
S/. 15.00
(BLS)
(KG)
(P2)
(KG)
(KG)
(UND.)
(UND.)
-----S/. 43.40
------
-----S/. 43.40
------
-----S/. 1,317.12
------
----------S/. 69.75
----------S/. 2,792.70
----------------
----------------
S/. 44.99
S/. 105.05
S/. 202.50
S/. 384.59
S/. 897.44
S/. 576.32
S/. 318.79
S/. 743.90
S/. 477.72
S/. 1,433.01
-------------
S/. 170.85
-------------
S/. 120.60
-------------
------S/. 69.86
S/. 50.26
-------------------
S/. 326.80
-----------
-----S/. 17.05
------
-----S/. 30.69
------
-----S/. 1,067.22
------
----------S/. 62.00
----------S/. 2,482.40
----------------
----------------
S/. 25.72
S/. 99.00
S/. 180.00
S/. 219.78
S/. 846.12
S/. 512.29
S/. 91.08
S/. 701.36
S/. 424.64
S/. 818.86
-------------
S/. 68.00
-------------
S/. 48.00
-------------
------S/. 65.86
S/. 44.68
-------------------
S/. 359.48
----------------
-----S/. 46.50
-----------
-----S/. 46.50
-----------
-----S/. 2,242.80
-----------
----------S/. 76.73
------
--------------------S/. 3,071.97
----------S/. 1,880.25
---------------------
S/. 31.68
S/. 179.89
S/. 222.75
S/. 168.75
S/. 655.74
------------S/. 1,074.75
S/. 59.84
-------------------
S/. 42.24
-------------------
------S/. 119.67
S/. 55.29
-------
S/. 49.28
-------------------
-----S/. 141.60
----------S/. 1.36
S/. 55.44
-----S/. 540.00
----------S/. 3.07
S/. 124.74
S/. 1,176.48 S/. 5,358.00 S/. 66.24 S/. 106.95 S/. 125.02 S/. 4,807.32
----------S/. 208.48
S/. 390.29
------S/. 1,179.17
------S/. 5,551.82 S/. 298.69
S/. 20,233.50
------------S/. 210.84
S/. 44.86
S/. 135.55
S/. 586.02
------------S/. 49.28
S/. 1,144.83
P. UNIT.
PARCIAL
IMPORTE
(M3)
(M3)
M3
M2
KG
15.00
70.00
900.00
347.64
46.01
4.63
5,214.53
3,220.46
4,169.26
12,604.24
S/. 275.40
-----------
S/. 490.20
-----------
M3
M2
KG
10.00
55.00
800.00
309.92
51.41
4.63
3,099.24
2,827.30
3,706.01
9,632.54
S/. 183.60
-----------
M3
M2
KG
UND
11.00
150.00
990.00
1500.00
287.70
36.31
4.63
2.08
3,164.65
5,447.20
4,586.18
3,123.75
16,321.78
S/. 201.96
----------------
40.00
55.51
2,220.57
90.00
86.07
7,745.92
COSTO DIRECTO
GASTOS GENERALES ( 15% )
UTILIDAD ( 10 % )
SUBTOTAL
IGV
TOTAL
9,966.50
48,525.06
7,278.76
4,852.51
60,656.32
10,918.14
71,574.46
S/. 41.76
S/. 187.92
S/. 890.64
(M3)
ACERO
S/. 2.90
LAD. TECH.
S/. 1.15
LAD. KK-18
S/. 0.55
COSTOS DE RECURSOS
HERRAMIENTAS Y EQUIPOS
PEON
MEZCLAD. VIBR.GAS. HERR. MAN.
WINCHE
S/. 14.33
S/. 17.00
S/. 12.00
S/. 14.00
(H-H)
(H-M)
(H-M)
(%)
(H-M)
(KG)
CANT.
ALAMAB. 16
S/. 3.10
MANO DE OBRA
OPERARIO
OFICIAL
S/. 19.23
S/. 15.94
(H-H)
(H-H)
CAPATAZ
S/. 22.50
(H-H)
UND.
M2
M2
COSTOS DE RECURSOS
MATERIALES
CLAVOS MAD. TOR.
S/. 3.10
S/. 4.20
AGUA ALAMB. 8
S/. 10.00 S/. 3.10
S/. 203.07
S/. 112.22
S/. 1,537.44 S/. 1,274.40
S/. 633.96
S/. 525.49
-------------
S/. 814.00
S/. 76.59
S/. 654.67
------S/. 3,366.00
S/. 231.46 S/. 1,978.02
------S/. 4,180.00 S/. 1,568.37 S/. 8,443.69 S/. 4,669.62
S/. 27,146.45
-S/. 0.28
S/. 5,214.53
S/. 3,220.18
S/. 4,169.26
S/. 0.00
S/. 3,099.24
S/. 2,827.30
S/. 3,706.01
S/. 0.00
S/. 3,164.65
S/. 5,447.20
S/. 4,586.18
S/. 3,123.75
S/. 0.00
S/. 2,220.57
S/. 7,745.92
S/. 48,524.78
UPLA - IX CICLO
ANALISIS DE COSTO
PARTIDA: 1.01.01
DESCRIPCIN: CONCRETO FC= 175 KG/CM2
CUADRILLA: 0.1 CAP. + 1 OP + 1 OFIC + 5 PE
RENDIMIENTO: 6.00 M3/da
IU
4
5
21
39
MATERIALES
ARENA GRUE.
PIED.CHA.1/2X3/4
CEMENTO I
AGUA
UND
M3
M3
BL
M3
CANT.
0.5100
0.7600
8.6600
0.1840
UND.: M3
FECHA: 21/04/16
ELABORADO POR: WEGNER ESCOBAR
P.UNIT
P.PARCIAL
36.00
18.36
43.00
32.68
15.00
129.90
10
1.84
IMPORTE
182.78
IU
47
47
47
47
MANO DE OBRA
CAPATAZ
OPERARIO
OFICIAL
PEON
UND
H-H
H-H
H-H
H-H
CANT.
0.1333
1.3333
1.3333
6.6667
P.UNIT
P.PARCIAL
22.50
3.00
19.23
25.64
15.94
21.25
14.33
95.53
IMPORTE
145.43
IU
48
48
MAQUINARIA-EQUIPO UND
MEZCLADORA
H-M
VIBR.GAS.1-3/4
H-M
CANT.
0.6700
0.6700
P.UNIT
P.PARCIAL
17.00
11.39
12.00
8.04
IMPORTE
19.43
P. UNIT.
347.64
UPLA - IX CICLO
ANALISIS DE COSTO
PARTIDA: 1.01.03
DESCRIPCIN: ACERO CORRUGADO
CUADRILLA: 0.3 CAP. + 1 OP + 1 OFIC.
RENDIMIENTO: 240.00 KG/da
IU
2
3
MATERIALES
ALAM.NEG.#16
ACERO
UND
KG
KG
UND.: KG
FECHA: 21/04/16
ELABORADO POR: WEGNER ESCOBAR
CANT.
0.0250
1.0700
P.UNIT
P.PARCIAL
3.10
0.08
2.90
3.10
IMPORTE
3.18
IU
47
47
47
MANO DE OBRA
CAPATAZ
OPERARIO
OFICIAL
UND
H-H
H-H
H-H
CANT.
0.0100
0.0333
0.0333
P.UNIT
P.PARCIAL
22.50
0.23
19.23
0.64
15.94
0.53
IMPORTE
1.40
IU
37
MAQUINARIA-EQUIPO UND
HERR.
%
CANT.
4.00
P.UNIT
P.PARCIAL
1.40
0.06
IMPORTE
0.06
P. UNIT.
4.63
UPLA - IX CICLO
ANALISIS DE COSTO
PARTIDA: 1.02.02
DESCRIPCIN: ENCOFRA. - DESENCOF.
CUADRILLA: 0.1 CAP. + 1 OPE. + 1 OFIC.
RENDIMIENTO: 10.00 M2/da
IU
2
2
43
MATERIALES
ALAM.NEG.8
CLAVOS
MAD.TORN.
UND
KG
KG
P2
UND.: m2
FECHA: 21/04/16
ELABORADO POR: WEGNER ESCOBAR
CANT.
0.1000
0.1800
4.6200
P.UNIT
P.PARCIAL
3.10
0.31
3.10
0.56
4.20
19.40
IMPORTE
20.27
IU
47
47
47
MANO DE OBRA
CAPATAZ
OPERARIO
OFICIAL
UND
H-H
H-H
H-H
CANT.
0.0800
0.8000
0.8000
P.UNIT
P.PARCIAL
22.50
1.80
19.23
15.38
15.94
12.75
IMPORTE
29.94
IU
37
MAQUINARIA-EQUIPO UND
HERR.
%
CANT.
4.00
P.UNIT
P.PARCIAL
29.94
1.20
IMPORTE
1.20
P. UNIT.
51.41
UPLA - IX CICLO
ANALISIS DE COSTO
PARTIDA: 1.03.01
DESCRIPCIN: CONCRETO FC= 175 KG/CM2
CUADRILLA: 0.2 CAP. + 1.5 OPE. + 1 OFIC. + 6.5 PE
RENDIMIENTO: 12.50 M3/da
IU
4
5
21
39
MATERIALES
ARENA GRUE.
PIEDRA CHAN
CEMENTO I
AGUA
UND
M3
M3
BL
M3
CANT.
0.5100
0.7600
8.6600
0.1840
UND.: m2
FECHA: 21/04/16
ELABORADO POR: WEGNER ESCOBAR
P.UNIT
P.PARCIAL
36.00
18.36
43.00
32.68
15.00
129.90
10
1.84
IMPORTE
182.78
IU
47
47
47
47
MANO DE OBRA
CAPATAZ
OPERARIO
OFICIAL
PEON
UND
H-H
H-H
H-H
H-H
CANT.
0.1280
0.9600
0.6400
4.1600
P.UNIT
P.PARCIAL
22.50
2.88
19.23
18.46
15.94
10.20
14.33
59.61
IMPORTE
91.16
IU
48
48
48
MAQUINARIA-EQUIPO UND
MEZCLADORA
H-M
VIBR.GAS.1-3/4
H-M
WINCHE
H-M
CANT.
0.32
0.3200
0.3200
P.UNIT
P.PARCIAL
17.00
5.44
12.00
3.84
14.00
4.48
IMPORTE
13.76
P. UNIT.
287.70
UPLA - IX CICLO
ANALISIS DE COSTO
PARTIDA: 1.03.03
DESCRIPCIN: ACERO CORRUGADO
CUADRILLA: 0.3 CAP. + 1 OP + 1 OFIC.
RENDIMIENTO: 240.00 KG/da
IU
2
3
MATERIALES
ALAM.NEG.#16
ACERO
UND
KG
KG
UND.: KG
FECHA: 21/04/16
ELABORADO POR: WEGNER ESCOBAR
CANT.
0.0250
1.0700
P.UNIT
P.PARCIAL
3.10
0.08
2.90
3.10
IMPORTE
3.18
IU
47
47
47
MANO DE OBRA
CAPATAZ
OPERARIO
OFICIAL
UND
H-H
H-H
H-H
CANT.
0.0100
0.0333
0.0333
P.UNIT
P.PARCIAL
22.50
0.23
19.23
0.64
15.94
0.53
IMPORTE
1.40
IU
37
MAQUINARIA-EQUIPO UND
HERR.
%
CANT.
4.00
P.UNIT
P.PARCIAL
1.40
0.06
IMPORTE
0.06
P. UNIT.
4.63
UPLA - IX CICLO
ANALISIS DE COSTO
PARTIDA: 2.01
DESCRIPCIN: LADRILLO KK 18 HCO. SOGA
CUADRILLA: 0.1 CAP. + 1 OPE. + 0.8 PE
RENDIMIENTO: 9.40 M2/da
IU
2
4
17
21
43
MATERIALES
CLAVOS
ARENA GRUE.
LADRILLO
CEMENTO I
MAD.TORN.
UND
KG
M3
UND.
BL
P2
CANT.
0.0110
0.0290
37.0000
0.2360
0.3300
UND.: m2
FECHA: 21/04/16
ELABORADO POR: WEGNER ESCOBAR
P.UNIT
P.PARCIAL
3.10
0.03
36.00
1.04
0.55
20.35
15.00
3.54
4.2
1.39
IMPORTE
26.35
IU
47
47
47
MANO DE OBRA
CAPATAZ
OPERARIO
PEON
UND
H-H
H-H
H-H
CANT.
0.0851
0.8511
0.6809
P.UNIT
P.PARCIAL
22.50
1.91
19.23
16.37
14.33
9.76
IMPORTE
28.04
IU
37
MAQUINARIA-EQUIPO UND
HERR.
%
CANT.
4.00
P.UNIT
P.PARCIAL
28.04
1.12
IMPORTE
1.12
P. UNIT.
55.51
UPLA - IX CICLO
UPLA - IX CICLO
ANALISIS DE COSTO
PARTIDA: 1.01.02
DESCRIPCIN: ENCOFRA. - DESENCOF.
CUADRILLA: 0.1 CAP. + 1 OPE. + 1 OFIC.
RENDIMIENTO: 12.00 M2/da
IU
2
2
43
MATERIALES
ALAM.NEG.8
CLAVOS
MAD.TORN.
UND
KG
KG
P2
UND.: m2
FECHA: 21/04/16
ELABORADO POR: WEGNER ESCOBAR
CANT.
0.2000
0.2000
4.4800
P.UNIT
P.PARCIAL
3.10
0.62
3.10
0.62
4.20
18.82
IMPORTE
20.06
IU
47
47
47
MANO DE OBRA
CAPATAZ
OPERARIO
OFICIAL
UND
H-H
H-H
H-H
CANT.
0.0667
0.6667
0.6667
P.UNIT
P.PARCIAL
22.50
1.50
19.23
12.82
15.94
10.63
IMPORTE
24.95
IU
37
MAQUINARIA-EQUIPO UND
HERR.
%
CANT.
4.00
P.UNIT
P.PARCIAL
24.95
1.00
IMPORTE
1.00
P. UNIT.
46.01
UPLA - IX CICLO
ANALISIS DE COSTO
PARTIDA: 1.02.01
DESCRIPCIN: CONCRETO FC= 175 KG/CM2
CUADRILLA: 0.1 CAP. + 1 OPE. + 0.5 OFIC. + 5 PE
RENDIMIENTO: 7.00 M3/da
IU
4
5
21
39
MATERIALES
ARENA GRUE.
PIEDRA CHAN
CEMENTO I
AGUA
UND
M3
M3
BL
M3
CANT.
0.5100
0.7600
8.6600
0.184
UND.: m3
FECHA: 21/04/16
ELABORADO POR: WEGNER ESCOBAR
P.UNIT
P.PARCIAL
36.00
18.36
43.00
32.68
15.00
129.90
10
1.84
IMPORTE
182.78
IU
47
47
47
47
MANO DE OBRA
CAPATAZ
OPERARIO
OFICIAL
PEON
UND
H-H
H-H
H-H
H-H
CANT.
0.1143
1.1429
0.5714
5.7143
P.UNIT
P.PARCIAL
22.50
2.57
19.23
21.98
15.94
9.11
14.33
81.89
IMPORTE
115.54
IU
48
48
MAQUINARIA-EQUIPO UND
MEZCLADORA
H-M
VIBR.GAS.1-3/4
H-M
CANT.
0.4000
0.4000
P.UNIT
P.PARCIAL
17.00
6.80
12.00
4.80
IMPORTE
11.60
P. UNIT.
309.92
UPLA - IX CICLO
ANALISIS DE COSTO
PARTIDA: 1.02.03
DESCRIPCIN: ACERO CORRUGADO
CUADRILLA: 0.3 CAP. + 1 OP + 1 OFIC.
RENDIMIENTO: 240.00 KG/da
IU
2
3
MATERIALES
ALAM.NEG.#16
ACERO
UND
KG
KG
UND.: KG
FECHA: 21/04/16
ELABORADO POR: WEGNER ESCOBAR
CANT.
0.0250
1.0700
P.UNIT
P.PARCIAL
3.10
0.08
2.90
3.10
IMPORTE
3.18
IU
47
47
47
MANO DE OBRA
CAPATAZ
OPERARIO
OFICIAL
UND
H-H
H-H
H-H
CANT.
0.01
0.0333
0.0333
P.UNIT
P.PARCIAL
22.50
0.23
19.23
0.64
15.94
0.53
IMPORTE
1.40
IU
37
MAQUINARIA-EQUIPO UND
HERR.
%
CANT.
4.0000
P.UNIT
P.PARCIAL
1.40
0.06
IMPORTE
0.06
P. UNIT.
4.63
UPLA - IX CICLO
ANALISIS DE COSTO
PARTIDA: 1.03.02
DESCRIPCIN: ENCOFRA. - DESENCOF.
CUADRILLA: 0.1 CAP. + 1 OPE. + 1 OFIC.
RENDIMIENTO: 15.00 M2/da
IU
2
2
43
MATERIALES
ALAM.NEG.8
CLAVOS
MAD.TORN.
UND
KG
KG
P2
UND.: m2
FECHA: 21/04/16
ELABORADO POR: WEGNER ESCOBAR
CANT.
0.1000
0.1000
3.5600
P.UNIT
P.PARCIAL
3.10
0.31
3.10
0.31
4.20
14.95
IMPORTE
15.57
IU
47
47
47
MANO DE OBRA
CAPATAZ
OPERARIO
OFICIAL
UND
H-H
H-H
H-H
CANT.
0.0533
0.533
0.533
P.UNIT
P.PARCIAL
22.50
1.20
19.23
10.25
15.94
8.50
IMPORTE
19.94
IU
37
MAQUINARIA-EQUIPO UND
HERR.
%
CANT.
4.0000
P.UNIT
P.PARCIAL
19.94
0.80
IMPORTE
0.80
P. UNIT.
36.31
UPLA - IX CICLO
ANALISIS DE COSTO
PARTIDA: 1.03.04
DESCRIPCIN: LADRILLO O.15x0.30x0.30
CUADRILLA: 0.1 CAP. + 1 OPE. + 1 OFIC.
RENDIMIENTO: 160.00 UNI/da
IU
17
MATERIALES
LADRILL TECH
UND
UND.
UND.: UNI
FECHA: 21/04/16
ELABORADO POR: WEGNER ESCOBAR
CANT.
1.0900
P.UNIT
P.PARCIAL
1.15
1.25
IMPORTE
1.25
IU
47
47
MANO DE OBRA
CAPATAZ
PEON
UND
H-H
H-H
CANT.
0.005
0.05
P.UNIT
P.PARCIAL
22.50
0.11
14.33
0.72
IMPORTE
0.83
IU
MAQUINARIA-EQUIPO UND
CANT.
P.UNIT
P.PARCIAL
IMPORTE
0.00
P. UNIT.
2.08
UPLA - IX CICLO
ANALISIS DE COSTO
PARTIDA: 2.02
DESCRIPCIN: LADRILLO KK 18 HCO. SOGA
CUADRILLA: 0.1 CAP. + 1 OPE. + 0.8 PE
RENDIMIENTO: 9.40 M2/da
IU
2
4
17
21
43
MATERIALES
CLAVOS
ARENA GRUE.
LADRILLO
CEMENTO I
MAD.TORN.
UND
KG
M3
UND.
BL
P2
CANT.
0.0110
0.0580
68.0000
0.4000
0.3300
UND.: m2
FECHA: 21/04/16
ELABORADO POR: WEGNER ESCOBAR
P.UNIT
P.PARCIAL
3.10
0.03
36.00
2.09
0.55
37.40
15.00
6.00
4.2
1.39
IMPORTE
46.91
IU
47
47
47
MANO DE OBRA
CAPATAZ
OPERARIO
PEON
UND
H-H
H-H
H-H
CANT.
0.1143
1.1429
0.9143
P.UNIT
P.PARCIAL
22.50
2.57
19.23
21.98
14.33
13.10
IMPORTE
37.65
IU
37
MAQUINARIA-EQUIPO UND
HERR.
%
CANT.
4.0000
P.UNIT
P.PARCIAL
37.65
1.51
IMPORTE
1.51
P. UNIT.
86.07
UPLA - IX CICLO
PRECIOS UNITARIOS
INSUMO
arena gruesa
piedra chancada
cemento
agua
alambre negro N8
madera tornillo
clavo
acero corrugado
alambre n16
ladrillo arcilla 15x30x30
lad. Kk 18h maquina 9x13x24
cap
operario
oficial
peon
mezcladora de 11p3
winche
vibradora
UND
M3
M3
BLS.
M3
KG
p2
KG
KG
KG
UND
UND
HH
HH
HH
HH
HM
HM
HM
SIN IGV
P.UNIT. (S/.)
36.00
43.00
15.00
10.00
3.10
4.20
3.10
2.90
3.10
1.15
0.55
22.50
19.23
15.94
14.33
17.00
14.00
12.00
INDICES UNIFICADOS
IU
DESCRIPCION
Aceite
Agregado fino
Agregado grueso
Alcantarilla metlica
10
11
12
13
Asfalto
14
Baldosa acstica
15
Baldosa asfltica
16
Baldosa vinlica
17
Bloque y ladrillo
18
Cable telefnico
19
20
Cemento asfltico
21
22
23
24
25
Cerrajera importada
26
Cerrajera nacional
27
Desmonte
28
Dinamita
30
31
Ducto de concreto
32
Flete terrestre
33
Flete areo
34
Gasolina
37
Herramienta manual
38
Hormign
39
40
Loseta
41
42
43
44
45
46
Malla de acero
47
Mano de obra
48
49
50
51
52
Perfil de aluminio
53
Petrleo Diesel
54
Pintura ltex
55
Pintura temple
56
57
59
Plancha de asbesto-cemento
60
Plancha de poliuretano
61
Plancha galvanizada
62
Poste de concreto
63
Poste de fierro
64
Terrazo
65
66
Tubera de asbesto-cemento
68
Tubera de cobre
69
70
71
72
73
77
78
79
80
Concreto Premezclado