You are on page 1of 2
Appendix IV: Causes of Kicks and Shut-In Procedures Appendix 11 Crew Training Assessment Form Leensee Unigue denier bate L ts | tso | sec | wr [eo [w[wlev] [m | 0) vj Contactor Repesettive paren Operations atthetimectthe BOP di ring CJ Tripping(“}_Outathole [ flow = - DRLUNG TRIPPING OUTOF HOLE Yes No Yes_No ‘et called ‘ert cates Art ates Rotary stopped . ely notes [2 ) Wooatonee 77 ‘Tool joint (TJ) positioned { I ‘Slips set Elevators removed + Stabbing vate ints [|] ote tes “Hote ites 7 Pump sht of Pump shutoff - Purp shutoff ] Flow divert oti tnk (7) Flow dvetedto TT [= Rowshveradtort [| TTawoed | Monitored for tow SHUTAN PROCEDURES DRILLING Art cated Merteled Alert cated I Rotary stopped ely hoisted (1) positioned 1 postoned Sips set Elevators removed Stabbing valeintates ote ed Pump shut of - Pump shit of HR opened HOR opened HER opened ‘nla closed Annular closed Bind ams closed Crake slowly closed To) Choke stow closes — |] Choke stout closes ely instaes Sabbingvalve opened Prossuasstabiaed —_[ Pressures etabiined | Pressures stablzed SICP SIDPP recorded SICPA SIOPPrecordes |) SlcP recorded ‘tins recorded Sperisors nated Supervisors otfied — [T] Supervisors notes ‘Prepared to kill well Prepared to trip in or kill [ Prepared to trip in or kill (continued) "EUB Dwctive 036 Dring Blowout Prevention Requirements and Procedures (February 2006) 181 BUB Directive 036 IV-18 “Aeril 2008, Appendix Causes of Kicks and Shut-In Procedures ‘Crew Training Assessment Form (page 2) RESPONSE TIMES 41) Time to respond to ale 1 minute 2) Procedures for fow checks completed; wells ready forfowcheck. 3 minutes 3) Wollisshutin and ead to record pressures: Sinus - CREW ASSESSMENT (YESINO) a 2 3 4 9 5 » co) ial erew members respond to alert? — ‘id acre members know ther postions and responsibies?_ ‘Was flow chock compete inthe proper manner? ‘aswell shui compte inthe proper mammer? Was maximum alowablecesing pressure (MACP) understood by Scensee and contactor representatives, clr, and choke operato’?_ _ id crew knowhow obtinSIDPP, ICP, and tank gain? Did ler know the retuced pum speed and reduced pump pressure Does iter understand wel contol methodsprooedures? ‘COMMENTS: “2+ EUB Directive 036 Dring Blowout Prevention Requirements and Procedures (February 2006) — Iv-19 —_—_=---""— ow

You might also like