XYZ Project

A%

B%

Project Management

Offsite Fabrication &


Transport

System / Area /
Package

Engineering (A.1.1%)

Acid Gas Removal (B.1.1%)

Bulks (C.1.1%)

PAU 1 (D.1.1%)

Area 1 (E.1.1%)

System 1 (F.1.1%)

HSE (A.1.2%)

TEG Dehydration (B.1.2%)

Equip. (Ex.PAU Scope) (C.1.2%)

PAU 2 (D.1.2%)

Area 2 (E.1.2%)

System 2 (F.1.2%)

Const. Coord. (A.1.3%)

Incineration (B.1.3%)

Speciality Item (C.1.3%)

PAU 3 (D.1.3%)

Area 3 (E.1.3%)

System 3 (F.1.3%)

PAU 4 (D.1.4%)

Area 4 (E.1.4%)

System 4 (F.1.4%)

Utility Systems (B.1.5%)

PAU 5 (D.1.5%)

Area 5 (E.1.5%)

System 5 (F.1.5%)

Seawater Pipelines (B.1.6%)

PAU 6 (D.1.6%)

Area 6 (E.1.6%)

Flare Package (B.1.7%)

PAU 7 (D.1.7%)

Flue Gas Treatment (B.1.4%)

F.1%

SVT Area /
Sub Package

Commissioning/ Start
up

E.1%

Pre-Assembled Units
(PAU's) Fab

F%

Installation /
Construction

D.1%

Procurement

C.1%

B.1%

Engineering
Packages

E%

D%

Procure/
Subcontract Award

Engineering

A.1%

Project Engineering

C%

System 6 (F.1.6%)
System 7 (F.1.7%)

Priority 1 (D.2.1%)

PAU Installation (C.2.2%)

Priority 2 (D.2.2%)

Constr. Contracts (C.2.3%)

Priority 3 (D.2.3%)

Document Control (A.2.3%)


Planning/Scheduling (A.2.4%)

Mechanical
Completion

Priority 4 (D.2.4%)

A.3%

Others

XYZ Project

PAU Fabrication (C.2.1%)

As Built Engg/Support (B.2.2%)

E.3%

Construction Support (B.2.1%)

Business Services (A.2.2%)

Inter-connects/
Interface

E.2%

Cost Control (A.2.1%)

D.2%

Subcontract Award

C.2%

Engineering Office
Support

B.2%

A.2%

Project Services

EPC Stage

System 8 (F.1.8%)
Transport/
Delivery

Legal & Admin

MC (E.3.1%)

Finance & Accounts

Area 2 (E.3.2%)

Revision Status

XYZ Project
Rev

Work breakdown Structure


WBS Structure

Level 0
(Project)

Level 1
(Phase)

Level 2
(Discipline)

Level 3
(Packages/PAU /Area/System)

Level 4 (Not included in this chart) :


Deliverables by Discipline/PAU/
Area/System

Prep. By

App. By

Date