CRONOGRAMA DE EJECUCION DE OBRA (I.E.I.

475-47 DE CABRACANCHA)
PROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO, PARA EL FORTALECIMIENTO DE LAS CAPACIDADES DE APRENDIZAJE DE LOS ESTUDIANTES DE LAS I.E. INICIALES 111 SANTA ROSITA DE ALAYPAMPA, 489 DE SAYHUAPATA, 952 DE KISHUARA Y 475-47 DE CABRACANCHA.
Id

1
2

Nombre de tarea
I.E.I. 475-47 DE CABRACANCHA

Duracin
270 das

TRABAJOS PRELIMINARES GENERALES

lun 06/06/16

mar 24/01/17

Costo

815,347.13

22 das

lun 06/06/16

mi 29/06/16

13,197.90

8 das

lun 06/06/16

mar 14/06/16

1,909.27

DEMOLICION DE MUROS DE ADOBEC/MAQUINA

3 das

mar 14/06/16

vie 17/06/16

811.25

DESMONTAJE DE PUERTA DE MADERA

2 das

vie 17/06/16

dom 19/06/16

ELIMINACION DE MATERIAL EXCEDENTE CARGUIO MAQUINARIA D=1.0KM

4 das

dom 19/06/16

vie 24/06/16

7,863.23
2,563.36

5 das

vie 24/06/16

mi 29/06/16

lun 06/06/16

vie 08/07/16

11,831.85

8 das

lun 06/06/16

mar 14/06/16

6,908.93

1 da

mar 14/06/16

mi 15/06/16

1,402.64

12

CONSTRUCCIONES PROVISIONALES PARA OFICINA, ALMACN, CASETA


GUARDIANA, Y SS.HH.
CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M INC. TRANSP. Y
COLOC
CERCO PROVISIONAL DE OBRA

3 das

sb 02/07/16

mar 05/07/16

2,976.44

13

AGUA PARA LA CONSTRUCCIN

1 da

mar 05/07/16

mi 06/07/16

272.77

9
10
11

LIMPIEZA MANUAL DE TERRENO


OBRAS PROVISIONALES

14

DESAGUE PARA LA CONSTRUCCIN

15

CONTROL DE CALIDAD DEL CONCRETO

16

DISEO DE MEZCLA DE CONCRETO

17

ENSAYO DE RESITENCIA A LA COMPRESION DEL CONCRETO

18

FLETE TERRESTRE

1 da

jue 07/07/16

vie 08/07/16

271.07

120 das

lun 06/06/16

mi 12/10/16

2,400.00

3 das

lun 06/06/16

jue 09/06/16

1,500.00

120 das

lun 06/06/16

mi 12/10/16

900.00

120 das

lun 06/06/16

mi 12/10/16

32,934.77

120 das

lun 06/06/16

mi 12/10/16

31,917.82

19

FLETE TERRESTRE DE CHINCHEROS A OBRA

20

MOVILIZACION Y DESMOVILIZACION DE MAQUINARIA

1 da

lun 06/06/16

mar 07/06/16

1,016.95

21

TRANSPORTE VERTICAL Y HORIZONTAL DE MATERIALES

217 das

mar 07/06/16

mar 24/01/17

4,330.39

217 das

mar 07/06/16

mar 24/01/17

4,330.39

26 das

mi 29/06/16

mi 27/07/16

12,990.53

CORTE CON MAQUINARIA DE TERRENO P/ NIVELACION

10 das

mi 29/06/16

dom 10/07/16

5,868.41

25

RELLENO CON MATERIAL PROPIO CON EQUIPO

8 das

dom 10/07/16

lun 18/07/16

1,493.13

26

ELIMINACION DE MATERIAL EXCEDENTE CARGUIO MAQUINARIA D=1.0KM

8 das

lun 18/07/16

mi 27/07/16

5,628.99
158,512.57

22
23
24

TRANSPORTE VERTICAL Y HORIZONTAL DE MATERIALES


MOVIMIENTO DE TIERRAS

27

MODULOS AULAS

223 das

lun 06/06/16

dom 29/01/17

28

ESTRUCTURAS

116 das

mi 27/07/16

dom 27/11/16

1 da

mi 27/07/16

jue 28/07/16

246.75
246.75

29

TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO

1 da

mi 27/07/16

jue 28/07/16

31

MOVIMIENTO DE TIERRAS

104 das

mi 27/07/16

mar 15/11/16

7,072.08

EXCAVACION PARA CIMIENTOS HASTA 1.70 MT TERRENO NORMAL

4 das

mi 27/07/16

dom 31/07/16

559.00

33

EXCAVACION PARA ZAPATAS DE 1.40 MT A 1.70 MT DE PROFUNDIDAD

5 das

dom 31/07/16

vie 05/08/16

1,694.28

34

REFINE, NIVELACION Y COMPAC. TERRENO NORMAL C/EQUIPO

5 das

vie 05/08/16

jue 11/08/16

976.00

35

RELLENO COMPACTADO A MANO CON MATERIAL PROPIO

4 das

mi 09/11/16

lun 14/11/16

372.01

36

RELLENO C/AFIRMADO E=4'' COMPAC. C/EQUIPO LIVIANO

1 da

lun 14/11/16

mar 15/11/16

1,524.65

37

ELIMINACION MANUAL DE MAT. EXEDENTE DM=30M

14 das

jue 11/08/16

vie 26/08/16

687.13

1 da

vie 26/08/16

sb 27/08/16

1,259.01

39

OBRAS DE CONCRETO SIMPLE

92 das

jue 11/08/16

jue 17/11/16

4,675.90

40

SOLADO, MEZCLA C:H - 1:12

2 das

jue 11/08/16

sb 13/08/16

1,415.94

41

CIMIENTOS CORRIDOS MEZCLA C:H - 1:10 + 30% PG

3 das

mar 16/08/16

vie 19/08/16

849.15

42

SOBRECIMIENTO,CONCREETO 1:8 + 25% PM

2 das

sb 10/09/16

lun 12/09/16

240.15

43

SOBRECIMIENTO CORRIDO. ENCOFRADO Y DESENCOFRADO

9 das

mi 31/08/16

sb 10/09/16

706.73

38

44
45
46
47

ELIMINACION DE MATERIAL EXCEDENTE CARGUIO MAQUINARIA D=1.0KM

FALSO PISO DE 4" COM MEZCLA C:H - 1:8


OBRAS DE CONCRETO ARMADO
ZAPATAS
ZAPATAS, CONCRETO F'C=210 KG/CM2

mar 15/11/16

jue 17/11/16

1,463.93

sb 13/08/16

dom 27/11/16

76,112.23

3 das

sb 13/08/16

mar 16/08/16

10,517.30

3 das

sb 13/08/16

mar 16/08/16

7,973.25
2,544.05

3 das

sb 13/08/16

mar 16/08/16

vie 19/08/16

mi 31/08/16

14,297.40

ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACIN

5 das

mi 24/08/16

lun 29/08/16

2,756.18

51

CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2

2 das

lun 29/08/16

mi 31/08/16

2,823.65

52

VIGAS DE CIMENTACION, ACERO FY=4200KG/CM2

4 das

vie 19/08/16

mar 23/08/16

8,717.57

12 das

lun 12/09/16

sb 24/09/16

15,012.92

49
50

53

ZAPATAS, ACERO FY=4200 KG/CM2

2 das
100 das

11 das

48

VIGAS DE CIMENTACION

COLUMNAS

54

COLUMNAS, CONCRETO F'C= 210 KG/CM2

3 das

mi 21/09/16

sb 24/09/16

3,526.27

55

ENCOFRADO Y DESENCOFRADO EN COLUMNAS

9 das

lun 12/09/16

mi 21/09/16

4,792.37

56

COLUMNA, ACERO FY=4200 KG/CM2

3 das

lun 12/09/16

jue 15/09/16

6,694.28

16 das

dom 25/09/16

mi 12/10/16

11,919.06

mi 12/10/16

3,282.63

57

VIGAS

58

VIGAS, CONCRETO F'C= 210 KG/CM2

3 das

sb 08/10/16

59

ENCOFRADO Y DESENCOFRADO EN VIGAS

5 das

dom 25/09/16

vie 30/09/16

3,606.25

60

VIGAS, ACERO FY=4200 KG/CM2

8 das

vie 30/09/16

sb 08/10/16

5,030.18

7 das

mi 12/10/16

mi 19/10/16

16,065.95

mar 18/10/16

mi 19/10/16

4,057.02

61

LOSAS ALIGERADAS

62

LOSAS ALIGERADAS, CONCRETO F'C= 210 KG/CM2

1 da

63

ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA

4 das

mi 12/10/16

dom 16/10/16

5,683.37

64

LOSA ALIGERADA, ACERO FY=4200 KG/CM2

3 das

dom 16/10/16

mi 19/10/16

1,896.93

65

LADRILLO ARCILLA P/TECHO 15X30X30 CM 8 HUECOS

1 da

dom 16/10/16

lun 17/10/16

1 da

sb 26/11/16

dom 27/11/16

184.15

66

LAVADERO DE CONCRETO
CONCRETO F'c= 175KG/CM2

1 da

sb 26/11/16

dom 27/11/16

69.57

68

ENCOFRADO Y DESENCOFRADO EN PEDESTAL

1 da

sb 26/11/16

dom 27/11/16

77.99

1 da

sb 26/11/16

dom 27/11/16

36.59

20 das

mi 19/10/16

mi 09/11/16

7,794.82

20 das

mi 19/10/16

mi 09/11/16

7,794.82

1 da

mi 09/11/16

jue 10/11/16

320.63
320.63

70
71
72
73
74
75

ACERO DE REFUERZO FY=4200 KG/CM2 EN LOSA MACIZA DE


LAVADERO
MUROS Y TABIQUES DE ALBAILERIA
MURO DE SOGA LADRILLO K.K 9X12X24
JUNTAS DE CONSTRUCCION
JUNTA DE CONSTRUCCION CON TEKNOPORT
ARQUITECTURA
REVOQUES ENLUCIDOS Y MOLDURAS

1 da

mi 09/11/16

jue 10/11/16

65 das

jue 17/11/16

mi 25/01/17

54,252.51

30 das

mi 23/11/16

dom 25/12/16

9,620.39

76

TARRAJEO PRIMARIO RAYADO CON CEMENTO ARENA

3 das

mi 23/11/16

sb 26/11/16

703.43

77

TARRAJEO EN MURO EXTERIOR E INTERIOR C:A 1:5, E=1.50CM

10 das

vie 09/12/16

mar 20/12/16

3,684.49

78

TARRAJEO DE COLUMNAS INC. ARISTAS C:A 1:5, E=1.50CM

4 das

sb 26/11/16

jue 01/12/16

1,564.30

79

TARRAJEO DE VIGAS INC. ARISTAS C:A 1:5, E=1.50CM

8 das

jue 01/12/16

vie 09/12/16

2,829.85

80

DERRAMES EN PUERTAS, VENTANAS Y VANOS

1 da

mar 20/12/16

mi 21/12/16

400.11

81

BRUAS

4 das

mi 21/12/16

dom 25/12/16

438.21

82

CIELORRASOS

6 das

jue 17/11/16

mi 23/11/16

4,921.46

6 das

jue 17/11/16

mi 23/11/16

4,921.46

5 das

dom 25/12/16

sb 31/12/16

11,236.23

1 da

dom 25/12/16

lun 26/12/16

8,426.66

83
84
85

CIELORRASOS CON MEZCLA C:A 1:4 CON CINTAS E=1.5CM.


PISOS Y PAVIMENTOS
PISO DE MADERA TORNILLO MACHIEMBRADO

Proyecto: CRONOGRAMA EJEC


Fecha: 06/06/16

CONSORCIO ZAYI

mes 3

mes 4

mes 5

4,428.63

67
69

mes 2

88,106.96

30
32

mes 1

50.79

30 das

mes -1

77,685.44

DESMONTAJE DE TECHO DE CAA/ETERNIT/CALAMINA

TRABAJOS PRELIMINARES

Comienzo
Fin
lun 06/06/16
mar 21/03/17

218 das

Tarea

Resumen

Hito inactivo

solo duracin

solo el comienzo

Hito externo

Divisin crtica

Divisin

Resumen del proyecto

Resumen inactivo

Informe de resumen manual

solo fin

Fecha lmite

Progreso

Hito

Tarea inactiva

Tarea manual

Resumen manual

Tareas externas

Tareas crticas

Progreso manual

Pgina 1

mes 6

mes 7

mes 8

mes 9

mes 10

mes 11

CRONOGRAMA DE EJECUCION DE OBRA (I.E.I. 475-47 DE CABRACANCHA)


PROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO, PARA EL FORTALECIMIENTO DE LAS CAPACIDADES DE APRENDIZAJE DE LOS ESTUDIANTES DE LAS I.E. INICIALES 111 SANTA ROSITA DE ALAYPAMPA, 489 DE SAYHUAPATA, 952 DE KISHUARA Y 475-47 DE CABRACANCHA.
Id

86
87
88
89

Nombre de tarea
PISO GRANITO 30X30CM

Duracin
2 das

Comienzo
lun 26/12/16

Fin
mi 28/12/16

1 da

mi 28/12/16

jue 29/12/16

VEREDA DE CONCRETO F'C= 175 KG/CM2. E=4''


JUNTAS ASFALTICAS
ZOCALOS Y CONTRAZOCALOS

Costo

885.95

1 da

vie 30/12/16

sb 31/12/16

91.43

6 das

mi 28/12/16

mi 04/01/17

4,406.12

90

CONTRAZOCALO CEMENTO S/COLOREAR H = 30 CM

2 das

mi 28/12/16

sb 31/12/16

701.96

91

CONTRAZOCALO DE CERAMICO DE 20X30CM

1 da

mi 28/12/16

jue 29/12/16

746.30

92

ZOCALO DE CERAMICA 20 X 40 EN BAO O SIMILAR

6 das

mi 28/12/16

mi 04/01/17

2,957.86

5 das

mi 21/12/16

lun 26/12/16

10,921.35

93

CUBIERTAS

94

COBERTURA CON TEJA ANDINA DECORATIVA

4 das

mi 21/12/16

dom 25/12/16

95

CUMBRERA CON TEJA ANDINA DECORATIVA

1 da

dom 25/12/16

lun 26/12/16

13 das

mi 04/01/17

mi 18/01/17

5,438.55

2 das

mi 04/01/17

vie 06/01/17

952.89

98

VENTANA DE MADERA CEDRO C/BARRA SEG.

10 das

vie 06/01/17

mar 17/01/17

3,439.46

99

PUERTA EN CUBICULOS DE BAOS C/P LAMINADO

1 da

mar 17/01/17

mi 18/01/17

517.52

101

PANAEL DIVISORIO EN CUBICULOS DE SS.HH


CERRAJERIA

1 da

mar 17/01/17

mi 18/01/17

528.68

3 das

mar 17/01/17

vie 20/01/17

807.60

102

BISAGRA ALUMINIZADA PESADA DE 4"

2 das

mar 17/01/17

jue 19/01/17

295.20

103

CERRADURA TIPO A EXTERIOR INGRESOS

1 da

jue 19/01/17

vie 20/01/17

160.86

104

CERRADURA TIPO H BAOS PUBLICOS

1 da

jue 19/01/17

vie 20/01/17

333.44

105

MANIJA DE 4'' PARA PUERTAS

1 da

jue 19/01/17

vie 20/01/17

18.10

106

VIDRIOS, CRISTALES Y SIMILARES

6 das

vie 06/01/17

jue 12/01/17

2,410.76

107

6 das

vie 06/01/17

jue 12/01/17

2,410.76

108

VIDRIOS SEMIDOBLES PROVICION Y COLOCACION EN PUERTAS Y


VENTANAS
PINTURA

5 das

vie 20/01/17

mi 25/01/17

4,490.05

109

PINTURA LATEX ACRILICO SATINADO EN INTERIORES 02 MANOS

5 das

vie 20/01/17

mi 25/01/17

893.55

110

PINTURA LATEX ACRILICO SATINADO EN EXTERIORES 02 MANOS

2 das

vie 20/01/17

dom 22/01/17

893.55

111

PINTURA LATEX ACRILICO SATINADO EN CIELO RASO 02 MANOS

4 das

vie 20/01/17

mar 24/01/17

1,112.48

112

PINTURA LATEX ACRILICO SATINADO EN VIGAS Y COLUMNAS 02 MANOS

4 das

vie 20/01/17

mar 24/01/17

1,433.67

113

PINTURA ESMALTE EN CONTRAZOCALOS

1 da

mar 24/01/17

mi 25/01/17

156.80

223 das

lun 06/06/16

dom 29/01/17

7,652.48

5 das

mar 24/01/17

dom 29/01/17

3,867.19

114
115

INSTALACIONES SANITARIAS
APARATOS SANITARIOS Y ACCESORIOS

116

INODORO PARA NIOS INCLUIDO ACCESORIOS

1 da

mar 24/01/17

mi 25/01/17

749.72

117

LAVATORIO DE PARED BLANCO 1 LLAVE

1 da

mar 24/01/17

mi 25/01/17

453.57

118

URINARIOS DE LOZA DE PICO BLANCO

1 da

mar 24/01/17

mi 25/01/17

300.00

119

JABONERA DE LOSA COLOR BLANCO

3 das

mar 24/01/17

vie 27/01/17

53.70

120

TOALLERA C/SOPORTE DE LOSA Y BARRA PLASTICA, COLOR BLANCO

4 das

mar 24/01/17

sb 28/01/17

207.60

121

PAPELERA DE LOSA Y BARRA PLASTICA, COLOR BLANCO

4 das

mar 24/01/17

sb 28/01/17

75.60

122

COLOCACION DE APARATOS SANITARIOS

5 das

mar 24/01/17

dom 29/01/17

1,351.40

COLOCACION DE ACCESORIOS SANITARIOS

5 das

mar 24/01/17

dom 29/01/17

675.60

5 das

lun 06/06/16

sb 11/06/16

1,209.08

3 das

mi 08/06/16

sb 11/06/16

413.90

123
124
125

SISTEMA DE DESAGUE Y VENTILACION


SALIDA DE DESAGUIE EN PVC

126

SALIDA DE DESAGUE EN PVC 4"

1 da

mi 08/06/16

jue 09/06/16

145.28

127

SALIDA DE DESAGUE EN PVC 2"

2 das

mi 08/06/16

vie 10/06/16

223.85

1 da

vie 10/06/16

sb 11/06/16

44.77

2 das

lun 06/06/16

mi 08/06/16

135.25
96.80

128
129

SALIDA DE VENTILACION EN PVC 2"


REDES DE DISTRIBUCIN

130

TUBERIA DE PVC SAL 4"

1 da

lun 06/06/16

mar 07/06/16

131

TUBERIA DE PVC SAL 2"

1 da

mar 07/06/16

mi 08/06/16

38.45

2 das

lun 06/06/16

mi 08/06/16

659.93

132

ACCESORIOS EN REDES

133

YEE DE PVC SAL CON REDUCCION DE 4"-2"

1 da

lun 06/06/16

mar 07/06/16

53.96

134

YEE PVC SAL 4"

1 da

lun 06/06/16

mar 07/06/16

33.58

135

TEE PVC SAL 4"

1 da

lun 06/06/16

mar 07/06/16

29.40

136

REDUCCIONES PVC SAL SP DE 4" A 2"

1 da

lun 06/06/16

mar 07/06/16

113.90

137

CODO PVC SAL 4"X90

1 da

lun 06/06/16

mar 07/06/16

68.76

138

CODO PVC SAL 4"X45

1 da

lun 06/06/16

mar 07/06/16

68.76

139

CODO PVC SAL 2"X90

1 da

lun 06/06/16

mar 07/06/16

34.38

140

CODO PVC SAL 2"X45

1 da

lun 06/06/16

mar 07/06/16

34.38

141

REGISTRO DE BRONCE 4"

1 da

mar 07/06/16

mi 08/06/16

120.70

142

SOMBRERO PARA VENTILACION DE PVC DE 2"

1 da

mar 07/06/16

mi 08/06/16

24.07

143

SUMIDEROS C/TRAMPA PVC SAL 2"

1 da

mar 07/06/16

mi 08/06/16

78.04

144

SISTEMA DE AGUA FRIA Y CONTRA INCENDIO

5 das

mi 08/06/16

lun 13/06/16

2,576.21

3 das

jue 09/06/16

dom 12/06/16

387.80

3 das

jue 09/06/16

dom 12/06/16

387.80

1 da

mi 08/06/16

jue 09/06/16

50.80

1 da

mi 08/06/16

jue 09/06/16

50.80

2 das

mi 08/06/16

vie 10/06/16

479.43
15.14

145
146
147
148
149

SALIDA DE AGUA FRIA


SALIDA DE AGUA FRIA 1/2"
REDES DE DISTRIBUCIN
TUBERIA PVC CLASE 10 DE 1/2"
ACCESORIOS EN REDES

150

TEE PVC-SAP 1/2"

1 da

mi 08/06/16

jue 09/06/16

151

CODO PVC-SAP AGUA 1/2" X 90

1 da

mi 08/06/16

jue 09/06/16

77.90

152

NIPLES FG DE 1/2"

2 das

mi 08/06/16

vie 10/06/16

211.20

153

UNION UNIVERSAL PVC SAP DE 3/4"

1 da

mi 08/06/16

jue 09/06/16

27.08

154

REDUCCION DE PVC DE 3/4" A 1/2"

1 da

mi 08/06/16

jue 09/06/16

17.08

155

VALVULA DE COMPUERTA DE BRONCE DE 3/4"

1 da

mi 08/06/16

jue 09/06/16

61.28

156

GRIFO CROMADO DE 1/2"

1 da

mi 08/06/16

jue 09/06/16

69.75

1 da

jue 09/06/16

vie 10/06/16

500.44

157
158
159

PIEZAS VARIAS
CAJA PARA VALVULA DE PASO
SISTEMA DE AGUA DE LLUVIA

1 da

jue 09/06/16

vie 10/06/16

500.44

3 das

vie 10/06/16

lun 13/06/16

1,157.74
46.26

160

SALIDA DE AGUAS PLUVIALES PVC 3"

1 da

vie 10/06/16

sb 11/06/16

161

SUMIDEROS DE BRONCE 3" PROVISION Y COLOCACION

1 da

sb 11/06/16

dom 12/06/16

86.32

162

TUBERIA DE PVC SAP 4" P/LLUVIAS

1 da

dom 12/06/16

lun 13/06/16

379.04

163

CODO PVC SAL 4"X90

1 da

dom 12/06/16

lun 13/06/16

68.76

164

CODO PVC SAL 4"X45

1 da

dom 12/06/16

lun 13/06/16

34.38

165

REDUCCION PVC SAP 4" - 3"

1 da

dom 12/06/16

lun 13/06/16

24.58

166

ACCESORIOS DE TUB. BAJADA DE EVAC. PLUVIAL

1 da

dom 12/06/16

lun 13/06/16

266.70

167
168
169
170
171

COLUMNETAS PARA EVACUACION PLUVIAL


INSTALACIONES ELECTRICAS
SALIDA PARA ELECTRICIDAD Y FUERZA
SALIDA DE TECHO
SALIDA DE TECHO C/CABLE THW 2X4 mm2+ PVC SEL 16MM(5/8)

Proyecto: CRONOGRAMA EJEC


Fecha: 06/06/16

CONSORCIO ZAYI

mes 2

mes 3

mes 4

mes 5

10,296.22

PUERTA DE MADERA T/TABLERO REBAJADO 4.5MM - CEDRO

100

CARPINTERIA DE MADERA

mes 1

625.13

97

96

mes -1

1,832.19

1 da

dom 12/06/16

lun 13/06/16

251.70

7 das

vie 20/01/17

vie 27/01/17

8,500.62

6 das

vie 20/01/17

jue 26/01/17

4,190.46

4 das

vie 20/01/17

mar 24/01/17

2,405.34

4 das

vie 20/01/17

mar 24/01/17

2,405.34

Tarea

Resumen

Hito inactivo

solo duracin

solo el comienzo

Hito externo

Divisin crtica

Divisin

Resumen del proyecto

Resumen inactivo

Informe de resumen manual

solo fin

Fecha lmite

Progreso

Hito

Tarea inactiva

Tarea manual

Resumen manual

Tareas externas

Tareas crticas

Progreso manual

Pgina 2

mes 6

mes 7

mes 8

mes 9

mes 10

mes 11

CRONOGRAMA DE EJECUCION DE OBRA (I.E.I. 475-47 DE CABRACANCHA)


PROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO, PARA EL FORTALECIMIENTO DE LAS CAPACIDADES DE APRENDIZAJE DE LOS ESTUDIANTES DE LAS I.E. INICIALES 111 SANTA ROSITA DE ALAYPAMPA, 489 DE SAYHUAPATA, 952 DE KISHUARA Y 475-47 DE CABRACANCHA.
Id
172
173

Nombre de tarea
SALIDA PARA TOMACORRIENTE

Duracin
2 das

SALIDA PARA TOMACORRIENTE DOBLE C/LINEA A TIERRA

Comienzo
Fin
mar 24/01/17
jue 26/01/17

Costo

1,785.12

2 das

mar 24/01/17

jue 26/01/17

1,785.12

174

ARTEFACTOS

1 da

jue 26/01/17

vie 27/01/17

4,310.16

175

LAMPARAS

1 da

jue 26/01/17

vie 27/01/17

4,310.16

176

ARTEFACTO TIPO A

1 da

jue 26/01/17

vie 27/01/17

1,029.96

177

ARTEFACTO TIPO D

1 da

jue 26/01/17

vie 27/01/17

3,280.20

132 das

dom 30/10/16

dom 19/03/17

108 das

dom 30/10/16

mi 22/02/17

107,359.92

1 da

dom 30/10/16

lun 31/10/16

374.47
374.47

178
179
180

MDULOS SALA MULTIUSO - COCINA - DEPOSITO - ADMINISTRATIVO


ESTRUCTURAS
TRABAJOS PRELIMINARES
TRAZO Y REPLANTEO

1 da

dom 30/10/16

lun 31/10/16

182

MOVIMIENTO DE TIERRAS

105 das

lun 31/10/16

lun 20/02/17

8,380.51

EXCAVACION PARA CIMIENTOS HASTA 1.70 MT TERRENO NORMAL

4 das

lun 31/10/16

vie 04/11/16

581.71

184

EXCAVACION PARA ZAPATAS DE 1.40 MT A 1.70 MT DE PROFUNDIDAD

4 das

vie 04/11/16

mar 08/11/16

2,121.20

185

REFINE, NIVELACION Y COMPAC. TERRENO NORMAL C/EQUIPO

4 das

mar 08/11/16

dom 13/11/16

1,100.29

186

RELLENO COMPACTADO A MANO CON MATERIAL PROPIO

4 das

mar 14/02/17

dom 19/02/17

671.48

187

RELLENO C/AFIRMADO E=4'' COMPAC. C/EQUIPO LIVIANO

1 da

dom 19/02/17

lun 20/02/17

2,129.76

188

ELIMINACION MANUAL DE MAT. EXEDENTE DM=30M

16 das

dom 13/11/16

mi 30/11/16

627.08

189
190

ELIMINACION DE MATERIAL EXCEDENTE CARGUIO MAQUINARIA D=1.0KM


CONCRETO SIMPLE

1 da

mi 30/11/16

jue 01/12/16

1,148.99

95 das

dom 13/11/16

mi 22/02/17

7,467.98
1,829.89

191

SOLADO, MEZCLA C:H - 1:12

1 da

dom 13/11/16

lun 14/11/16

192

CIMIENTOS CORRIDOS MEZCLA C:H - 1:10 + 30% PG

2 das

jue 17/11/16

sb 19/11/16

1,590.65

193

SOBRECIMIENTO,CONCREETO 1:8 + 25% PM

1 da

vie 09/12/16

sb 10/12/16

447.79

194

SOBRECIMIENTO CORRIDO. ENCOFRADO Y DESENCOFRADO

10 das

mar 29/11/16

vie 09/12/16

1,320.56

195

FALSO PISO DE 4" COM MEZCLA C:H - 1:8

2 das

lun 20/02/17

mi 22/02/17

2,279.09

90 das

lun 14/11/16

sb 18/02/17

91,136.96

3 das

lun 14/11/16

jue 17/11/16

13,773.48

196
197

OBRAS DE CONCRETO ARMADO


ZAPATAS

198

ZAPATAS, CONCRETO F'C=210 KG/CM2

1 da

mi 16/11/16

jue 17/11/16

10,302.13

199

ZAPATAS, ACERO FY=4200 KG/CM2

2 das

lun 14/11/16

mi 16/11/16

3,471.35

9 das

sb 19/11/16

mar 29/11/16

12,738.32

4 das

mi 23/11/16

dom 27/11/16

4,731.86

200
201

VIGAS DE CIMENTACION
ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACIN

202

CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2

1 da

lun 28/11/16

mar 29/11/16

4,531.43

203

VIGAS DE CIMENTACION, ACERO FY=4200KG/CM2

4 das

sb 19/11/16

mi 23/11/16

3,475.03

14 das

sb 10/12/16

dom 25/12/16

13,960.82

sb 24/12/16

dom 25/12/16

2,597.64

204

COLUMNAS

205

COLUMNAS, CONCRETO F'C= 210 KG/CM2

1 da

206

ENCOFRADO Y DESENCOFRADO EN COLUMNAS

8 das

vie 16/12/16

sb 24/12/16

2,923.33

207

COLUMNA, ACERO FY=4200 KG/CM2

5 das

sb 10/12/16

vie 16/12/16

8,439.85

13 das

dom 25/12/16

dom 08/01/17

15,742.00

209

VIGAS, CONCRETO F'C= 210 KG/CM2

1 da

sb 07/01/17

dom 08/01/17

3,535.45

210

ENCOFRADO Y DESENCOFRADO EN VIGAS

6 das

dom 25/12/16

dom 01/01/17

5,601.68

211

VIGAS, ACERO FY=4200 KG/CM2

6 das

dom 01/01/17

sb 07/01/17

6,604.87

15 das

dom 08/01/17

mar 24/01/17

23,302.25

1 da

lun 23/01/17

mar 24/01/17

6,426.60

208

212

VIGAS

LOSAS ALIGERADAS

213

LOSAS ALIGERADAS, CONCRETO F'C= 210 KG/CM2

214

ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA

10 das

dom 08/01/17

jue 19/01/17

7,132.86

215

LOSA ALIGERADA, ACERO FY=4200 KG/CM2

4 das

jue 19/01/17

lun 23/01/17

3,331.13

216

LADRILLO ARCILLA P/TECHO 15X30X30 CM 8 HUECOS

1 da

lun 23/01/17

mar 24/01/17

6,411.66

1 da

mar 14/02/17

mi 15/02/17

1,442.69

217

LAVADERO DE CONCRETO

218

CONCRETO F'c= 175KG/CM2

1 da

mar 14/02/17

mi 15/02/17

417.40

219

ENCOFRADO Y DESENCOFRADO EN PEDESTAL

1 da

mar 14/02/17

mi 15/02/17

542.92

1 da

mar 14/02/17

mi 15/02/17

482.37

20 das

mar 24/01/17

mar 14/02/17

8,279.52

20 das

mar 24/01/17

mar 14/02/17

8,279.52

3 das

mar 14/02/17

sb 18/02/17

1,897.88

3 das

mar 14/02/17

sb 18/02/17

1,897.88

24 das

mi 22/02/17

dom 19/03/17

85,862.88

10 das

mar 28/02/17

sb 11/03/17

11,578.73

220
221
222
223
224
225
226

ACERO DE REFUERZO FY=4200 KG/CM2 EN LOSA MACIZA DE


LAVADERO
MUROS Y TABIQUES DE ALBAILERIA
MURO DE SOGA LADRILLO K.K 9X12X24
JUNTAS DE CONSTRUCCION
JUNTA DE CONSTRUCCION CON TEKNOPORT
ARQUITECTURA
REVOQUES ENLUCIDOS Y MOLDURAS

227

TARRAJEO PRIMARIO RAYADO CON CEMENTO ARENA

2 das

mar 28/02/17

jue 02/03/17

385.95

228

TARRAJEO EN MURO EXTERIOR E INTERIOR C:A 1:5, E=1.50CM

10 das

mar 28/02/17

sb 11/03/17

4,219.92

229

TARRAJEO DE COLUMNAS INC. ARISTAS C:A 1:5, E=1.50CM

9 das

mar 28/02/17

vie 10/03/17

1,956.76

230

TARRAJEO DE VIGAS INC. ARISTAS C:A 1:5, E=1.50CM

10 das

mar 28/02/17

sb 11/03/17

2,923.03

231

DERRAMES EN PUERTAS, VENTANAS Y VANOS

6 das

dom 05/03/17

sb 11/03/17

1,637.53

232

BRUAS

3 das

dom 05/03/17

mi 08/03/17

455.54

233

CIELORRASOS

6 das

mi 22/02/17

mar 28/02/17

6,466.66

6 das

mi 22/02/17

mar 28/02/17

6,466.66

3 das

sb 11/03/17

mar 14/03/17

29,559.66

PISO DE CERAMICO DE 0.60X0.60CM

1 da

sb 11/03/17

dom 12/03/17

5,397.54

237

CONCRETO F'C=175 KG/CM2 PARA VEREDAS ACABADO PULIDO

1 da

dom 12/03/17

lun 13/03/17

24,028.62

238

JUNTAS ASFALTICAS

1 da

lun 13/03/17

mar 14/03/17

133.50

234
235
236

CIELORRASOS CON MEZCLA C:A 1:4 CON CINTAS E=1.5CM.


PISOS Y PAVIMENTOS

7 das

dom 12/03/17

dom 19/03/17

3,284.02

CONTRAZOCALO CEMENTO S/COLOREAR H = 30 CM

2 das

dom 12/03/17

mar 14/03/17

363.58

241

CONTRAZOCALO DE CERAMICO DE 20X30CM

3 das

dom 12/03/17

mi 15/03/17

1,297.58

242

ZOCALO DE CERAMICA 20 X 40 EN BAO O SIMILAR

7 das

dom 12/03/17

dom 19/03/17

1,622.86

6 das

mar 28/02/17

mar 07/03/17

15,699.06

239
240

243

ZOCALOS Y CONTRAZOCALOS

CUBIERTAS

244

COBERTURA CON TEJA ANDINA DECORATIVA

5 das

mar 28/02/17

lun 06/03/17

14,936.64

245

CUMBRERA CON TEJA ANDINA DECORATIVA

1 da

lun 06/03/17

mar 07/03/17

762.42

5 das

dom 12/03/17

vie 17/03/17

9,626.37

247

PUERTA DE MADERA T/TABLERO REBAJADO 4.5MM - CEDRO

5 das

dom 12/03/17

vie 17/03/17

5,082.09

248

VENTANA DE MADERA CEDRO C/BARRA SEG.

5 das

dom 12/03/17

vie 17/03/17

4,544.28

1 da

vie 17/03/17

sb 18/03/17

832.08

246

249

CARPINTERIA DE MADERA

CERRAJERIA

250

BISAGRA ALUMINIZADA PESADA DE 4"

1 da

vie 17/03/17

sb 18/03/17

295.20

251

CERRADURA TIPO A EXTERIOR INGRESOS

1 da

vie 17/03/17

sb 18/03/17

482.58

252

MANIJA DE 4'' PARA PUERTAS

1 da

vie 17/03/17

sb 18/03/17

54.30

253

VIDRIOS, CRISTALES Y SIMILARES

6 das

dom 12/03/17

sb 18/03/17

3,185.40

254

VIDRIOS SEMIDOBLES PROVICION Y COLOCACION EN PUERTAS Y


VENTANAS
PINTURA

6 das

dom 12/03/17

sb 18/03/17

3,185.40

255

6 das

dom 12/03/17

sb 18/03/17

5,630.90

256

PINTURA LATEX ACRILICO SATINADO EN INTERIORES 02 MANOS

6 das

dom 12/03/17

sb 18/03/17

1,735.21

257

PINTURA LATEX ACRILICO SATINADO EN EXTERIORES 02 MANOS

2 das

dom 12/03/17

mar 14/03/17

311.59

Proyecto: CRONOGRAMA EJEC


Fecha: 06/06/16

CONSORCIO ZAYI

mes 1

mes 2

mes 3

mes 4

mes 5

204,879.51

181
183

mes -1

Tarea

Resumen

Hito inactivo

solo duracin

solo el comienzo

Hito externo

Divisin crtica

Divisin

Resumen del proyecto

Resumen inactivo

Informe de resumen manual

solo fin

Fecha lmite

Progreso

Hito

Tarea inactiva

Tarea manual

Resumen manual

Tareas externas

Tareas crticas

Progreso manual

Pgina 3

mes 6

mes 7

mes 8

mes 9

mes 10

mes 11

CRONOGRAMA DE EJECUCION DE OBRA (I.E.I. 475-47 DE CABRACANCHA)


PROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO, PARA EL FORTALECIMIENTO DE LAS CAPACIDADES DE APRENDIZAJE DE LOS ESTUDIANTES DE LAS I.E. INICIALES 111 SANTA ROSITA DE ALAYPAMPA, 489 DE SAYHUAPATA, 952 DE KISHUARA Y 475-47 DE CABRACANCHA.
Id
258
259
260
261

Nombre de tarea
PINTURA LATEX ACRILICO SATINADO EN CIELO RASO 02 MANOS

Duracin
5 das

PINTURA LATEX ACRILICO SATINADO EN VIGAS Y COLUMNAS 02 MANOS


PINTURA ESMALTE EN CONTRAZOCALOS
INSTALACIONES SANITARIAS

dom 12/03/17

vie 17/03/17

Costo

1,464.75

1 da

dom 12/03/17

lun 13/03/17

81.21

26 das

mar 14/02/17

mar 14/03/17

3,848.60

1 da

lun 13/03/17

mar 14/03/17

299.01

LAVADERO DE COCINA DE ACERO INOXIDABLE

1 da

lun 13/03/17

mar 14/03/17

197.66

264

COLOCACION DE APARATOS SANITARIOS

1 da

lun 13/03/17

mar 14/03/17

67.57

265

COLOCACION DE ACCESORIOS SANITARIOS

1 da

lun 13/03/17

mar 14/03/17

33.78

3 das

mar 14/02/17

sb 18/02/17

258.11

266

SISTEMA DE DESAGUE Y VENTILACION

2 das

jue 16/02/17

sb 18/02/17

89.54

268

SALIDA DE DESAGUE EN PVC 2"

1 da

jue 16/02/17

vie 17/02/17

44.77

269

SALIDA DE VENTILACION EN PVC 2"

1 da

vie 17/02/17

sb 18/02/17

44.77

1 da

mar 14/02/17

mi 15/02/17

76.90

1 da

mar 14/02/17

mi 15/02/17

76.90

1 da

mar 14/02/17

mi 15/02/17

91.67

267

270
271
272

SALIDA DE DESAGUIE EN PVC

REDES DE DISTRIBUCIN
TUBERIA DE PVC SAL 2"
ACCESORIOS EN REDES

273

REDUCCIONES PVC SAL SP DE 4" A 2"

1 da

mar 14/02/17

mi 15/02/17

11.39

274

CODO PVC SAL 2"X45

1 da

mar 14/02/17

mi 15/02/17

17.19

275

SUMIDEROS C/TRAMPA PVC SAL 2"

1 da

mar 14/02/17

mi 15/02/17

39.02

276

SOMBRERO PARA VENTILACION DE PVC DE 2"

1 da

mar 14/02/17

mi 15/02/17

24.07

4 das

sb 18/02/17

mi 22/02/17

3,291.48

1 da

dom 19/02/17

lun 20/02/17

38.78

1 da

dom 19/02/17

lun 20/02/17

38.78

1 da

sb 18/02/17

dom 19/02/17

50.80

1 da

sb 18/02/17

dom 19/02/17

50.80

1 da

sb 18/02/17

dom 19/02/17

123.99

277
278
279
280
281
282

SISTEMA DE AGUA FRIA Y CONTRA INCENDIO


SALIDA DE AGUA FRIA
SALIDA DE AGUA FRIA 1/2"
REDES DE DISTRIBUCIN
TUBERIA PVC CLASE 10 DE 1/2"
ACCESORIOS EN REDES

283

TEE PVC-SAP 1/2"

1 da

sb 18/02/17

dom 19/02/17

7.57

284

CODO PVC-SAP AGUA 1/2" X 90

1 da

sb 18/02/17

dom 19/02/17

7.79

285

UNION UNIVERSAL PVC SAP DE 3/4"

1 da

sb 18/02/17

dom 19/02/17

13.54

286

NIPLES FG DE 1/2"

1 da

sb 18/02/17

dom 19/02/17

10.56

287

VALVULA DE COMPUERTA DE BRONCE DE 3/4"

1 da

sb 18/02/17

dom 19/02/17

61.28

288

GRIFO CROMADO DE 1/2"

1 da

sb 18/02/17

dom 19/02/17

23.25

1 da

dom 19/02/17

lun 20/02/17

125.11

289
290
291

PIEZAS VARIAS
CAJA PARA VALVULA DE PASO
SISTEMA DE AGUA DE LLUVIA

1 da

dom 19/02/17

lun 20/02/17

125.11

2 das

lun 20/02/17

mi 22/02/17

2,952.80

292

SALIDA DE AGUAS PLUVIALES PVC 3"

1 da

lun 20/02/17

mar 21/02/17

92.52

293

SUMIDEROS DE BRONCE 3" PROVISION Y COLOCACION

1 da

lun 20/02/17

mar 21/02/17

172.64

294

TUBERIA DE PVC SAP 4" P/LLUVIAS

1 da

lun 20/02/17

mar 21/02/17

1,326.64

295

CODO PVC SAL 4"X90

1 da

mar 21/02/17

mi 22/02/17

137.52

296

CODO PVC SAL 4"X45

1 da

mar 21/02/17

mi 22/02/17

137.52

297

REDUCCION PVC SAP 4" - 3"

1 da

mar 21/02/17

mi 22/02/17

49.16

298

ACCESORIOS DE TUB. BAJADA DE EVAC. PLUVIAL

1 da

mar 21/02/17

mi 22/02/17

533.40

299
300
301
302
303
304
305

COLUMNETAS PARA EVACUACION PLUVIAL


INSTALACIONES ELECTRICAS
SALIDA PARA ELECTRICIDAD Y FUERZA
SALIDA DE TECHO
SALIDA DE TECHO C/CABLE THW 2X4 mm2+ PVC SEL 16MM(5/8)
SALIDA PARA TOMACORRIENTE
SALIDA PARA TOMACORRIENTE DOBLE C/LINEA A TIERRA

1 da

mar 21/02/17

mi 22/02/17

503.40

5 das

dom 12/03/17

vie 17/03/17

7,808.11

4 das

dom 12/03/17

jue 16/03/17

4,146.34

4 das

dom 12/03/17

jue 16/03/17

2,138.08

4 das

dom 12/03/17

jue 16/03/17

2,138.08

3 das

dom 12/03/17

mi 15/03/17

2,008.26

3 das

dom 12/03/17

mi 15/03/17

2,008.26

306

ARTEFACTOS

2 das

mi 15/03/17

vie 17/03/17

3,661.77

307

LAMPARAS

2 das

mi 15/03/17

vie 17/03/17

3,661.77

308

ARTEFACTO TIPO A

1 da

mi 15/03/17

jue 16/03/17

1,201.62

309

ARTEFACTO TIPO D

1 da

jue 16/03/17

vie 17/03/17

2,460.15

101 das

sb 03/12/16

mar 21/03/17

87,048.95

82 das

sb 03/12/16

mar 28/02/17

43,479.25

1 da

sb 03/12/16

dom 04/12/16

118.71
118.71

310
311
312

MODULOS VIVIENDA - DOCENTE


ESTRUCTURAS
TRABAJOS PRELIMINARES

313

TRAZO Y REPLANTEO

1 da

sb 03/12/16

dom 04/12/16

314

MOVIMIENTO DE TIERRAS

80 das

dom 04/12/16

lun 27/02/17

EXCAVACION PARA CIMIENTOS HASTA 1.70 MT TERRENO NORMAL

7 das

dom 04/12/16

dom 11/12/16

316

EXCAVACION PARA ZAPATAS DE 1.40 MT A 1.70 MT DE PROFUNDIDAD

10 das

dom 11/12/16

jue 22/12/16

724.76

317

REFINE, NIVELACION Y COMPAC. TERRENO NORMAL C/EQUIPO

8 das

jue 22/12/16

sb 31/12/16

571.38

318

RELLENO COMPACTADO A MANO CON MATERIAL PROPIO

4 das

mi 22/02/17

dom 26/02/17

287.50

319

RELLENO C/AFIRMADO E=4'' COMPAC. C/EQUIPO LIVIANO

1 da

dom 26/02/17

lun 27/02/17

420.75

320

ELIMINACION MANUAL DE MAT. EXEDENTE DM=30M

15 das

sb 31/12/16

lun 16/01/17

250.82

321

ELIMINACION DE MATERIAL EXCEDENTE CARGUIO MAQUINARIA D=1.0KM

2 das

lun 16/01/17

mi 18/01/17

459.57

56 das

sb 31/12/16

mar 28/02/17

2,373.59

dom 01/01/17

605.61

315

322

CONCRETO SIMPLE

1 da

sb 31/12/16

324

CIMIENTOS CORRIDOS MEZCLA C:H - 1:10 + 30% PG

1 da

mar 03/01/17

mi 04/01/17

504.30

325

SOBRECIMIENTO,CONCREETO 1:8 + 25% PM

1 da

lun 16/01/17

mar 17/01/17

142.59

326

SOBRECIMIENTO CORRIDO. ENCOFRADO Y DESENCOFRADO

5 das

mar 10/01/17

lun 16/01/17

419.17

327

FALSO PISO DE 4" COM MEZCLA C:H - 1:8

1 da

lun 27/02/17

mar 28/02/17

701.92

52 das

dom 01/01/17

sb 25/02/17

37,946.82

2 das

dom 01/01/17

mar 03/01/17

3,955.11

OBRAS DE CONCRETO ARMADO


ZAPATAS

330

ZAPATAS, CONCRETO F'C=210 KG/CM2

1 da

lun 02/01/17

mar 03/01/17

3,101.35

331

ZAPATAS, ACERO FY=4200 KG/CM2

1 da

dom 01/01/17

lun 02/01/17

853.76

6 das

mi 04/01/17

mar 10/01/17

6,226.36

333

ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACIN

3 das

vie 06/01/17

lun 09/01/17

2,438.83

334

CONCRETO EN VIGAS DE CIMENTACION F'C= 210 KG/CM2

1 da

lun 09/01/17

mar 10/01/17

2,151.73

335

VIGAS DE CIMENTACION, ACERO FY=4200KG/CM2

2 das

mi 04/01/17

vie 06/01/17

1,635.80

7 das

mar 17/01/17

mar 24/01/17

8,131.44

332

336

VIGAS DE CIMENTACION

COLUMNAS

337

COLUMNAS, CONCRETO F'C= 210 KG/CM2

1 da

lun 23/01/17

mar 24/01/17

1,585.36

338

ENCOFRADO Y DESENCOFRADO EN COLUMNAS

4 das

jue 19/01/17

lun 23/01/17

2,729.33

339

COLUMNA, ACERO FY=4200 KG/CM2

2 das

mar 17/01/17

jue 19/01/17

3,816.75

9 das

mar 24/01/17

vie 03/02/17

5,951.55

340

VIGAS

341

VIGAS, CONCRETO F'C= 210 KG/CM2

1 da

jue 02/02/17

vie 03/02/17

1,553.64

342

ENCOFRADO Y DESENCOFRADO EN VIGAS

5 das

mar 24/01/17

dom 29/01/17

2,980.57

343

VIGAS, ACERO FY=4200 KG/CM2

3 das

dom 29/01/17

jue 02/02/17

1,417.34

Proyecto: CRONOGRAMA EJEC


Fecha: 06/06/16

CONSORCIO ZAYI

mes 2

mes 3

mes 4

mes 5

3,040.13

SOLADO, MEZCLA C:H - 1:12

329

mes 1

325.35

323

328

mes -1

2,038.14

263

262

APARATOS SANITARIOS Y ACCESORIOS

Comienzo
Fin
dom 12/03/17
vie 17/03/17

5 das

Tarea

Resumen

Hito inactivo

solo duracin

solo el comienzo

Hito externo

Divisin crtica

Divisin

Resumen del proyecto

Resumen inactivo

Informe de resumen manual

solo fin

Fecha lmite

Progreso

Hito

Tarea inactiva

Tarea manual

Resumen manual

Tareas externas

Tareas crticas

Progreso manual

Pgina 4

mes 6

mes 7

mes 8

mes 9

mes 10

mes 11

CRONOGRAMA DE EJECUCION DE OBRA (I.E.I. 475-47 DE CABRACANCHA)


PROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO, PARA EL FORTALECIMIENTO DE LAS CAPACIDADES DE APRENDIZAJE DE LOS ESTUDIANTES DE LAS I.E. INICIALES 111 SANTA ROSITA DE ALAYPAMPA, 489 DE SAYHUAPATA, 952 DE KISHUARA Y 475-47 DE CABRACANCHA.
Id
344

Duracin
7 das

Comienzo
vie 03/02/17

Fin
vie 10/02/17

345

Nombre de tarea
LOSAS ALIGERADAS
LOSAS ALIGERADAS, CONCRETO F'C= 210 KG/CM2

1 da

jue 09/02/17

vie 10/02/17

346

ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA

4 das

vie 03/02/17

mar 07/02/17

2,007.99

347

LOSA ALIGERADA, ACERO FY=4200 KG/CM2

1 da

mar 07/02/17

mi 08/02/17

783.25
490.60

4,359.00

3 das

mi 22/02/17

sb 25/02/17

CONCRETO F'c= 175KG/CM2

1 da

mi 22/02/17

jue 23/02/17

117.16

350

ENCOFRADO Y DESENCOFRADO EN PEDESTAL

1 da

jue 23/02/17

vie 24/02/17

348.40

1 da

vie 24/02/17

sb 25/02/17

25.04

13 das

mi 08/02/17

mi 22/02/17

8,112.76

11 das

vie 10/02/17

mi 22/02/17

6,549.11

1 da

mi 08/02/17

jue 09/02/17

1,563.65

1 da

mi 22/02/17

jue 23/02/17

720.00
720.00

351
352

ACERO DE REFUERZO FY=4200 KG/CM2 EN LOSA MACIZA DE


LAVADERO
MUROS Y TABIQUES DE ALBAILERIA

353

MURO DE SOGA LADRILLO K.K 9X12X24

354

LADRILLO ARCILLA P/TECHO 15X30X30 CM 8 HUECOS

355
356
357
358

JUNTAS DE CONSTRUCCION
JUNTA DE CONSTRUCCION CON TEKNOPORT
ARQUITECTURA
REVOQUES ENLUCIDOS Y MOLDURAS

1 da

mi 22/02/17

jue 23/02/17

18 das

mar 28/02/17

dom 19/03/17

33,263.11

11 das

lun 06/03/17

vie 17/03/17

6,767.41
271.34

359

TARRAJEO PRIMARIO RAYADO CON CEMENTO ARENA

1 da

lun 06/03/17

mar 07/03/17

360

TARRAJEO EN MURO EXTERIOR E INTERIOR C:A 1:5, E=1.50CM

10 das

mar 07/03/17

vie 17/03/17

361

TARRAJEO DE COLUMNAS INC. ARISTAS C:A 1:5, E=1.50CM

5 das

mar 07/03/17

dom 12/03/17

362

TARRAJEO DE VIGAS INC. ARISTAS C:A 1:5, E=1.50CM

7 das

mar 07/03/17

mar 14/03/17

1,388.77

363

DERRAMES EN PUERTAS, VENTANAS Y VANOS

4 das

vie 10/03/17

mar 14/03/17

927.23

364

BRUAS

2 das

mar 14/03/17

jue 16/03/17

439.56

365

CIELORRASOS

5 das

mar 28/02/17

lun 06/03/17

5,763.21

5 das

mar 28/02/17

lun 06/03/17

5,763.21

3 das

mar 14/03/17

vie 17/03/17

3,343.35

366
367

CIELORRASOS CON MEZCLA C:A 1:4 CON CINTAS E=1.5CM.


PISOS Y PAVIMENTOS

1 da

mar 14/03/17

mi 15/03/17

2,385.29

369

PISO DE CERAMICO DE 0.60X0.60CM

1 da

mar 14/03/17

mi 15/03/17

564.12

370

PISO GRANITO 30X30CM

1 da

mar 14/03/17

mi 15/03/17

186.32

371

VEREDA DE CONCRETO F'C= 175 KG/CM2. E=4''

1 da

mi 15/03/17

jue 16/03/17

196.00

372

JUNTAS ASFALTICAS

1 da

jue 16/03/17

vie 17/03/17

11.62

3 das

mar 14/03/17

vie 17/03/17

1,766.82

374

CONTRAZOCALO CEMENTO S/COLOREAR H = 30 CM

2 das

mar 14/03/17

jue 16/03/17

405.17

375

CONTRAZOCALO DE CERAMICO DE 20X30CM

3 das

mar 14/03/17

vie 17/03/17

220.72

ZOCALO DE CERAMICA 20 X 40 EN BAO O SIMILAR

3 das

mar 14/03/17

vie 17/03/17

1,140.93

2 das

lun 06/03/17

mi 08/03/17

4,572.75

376
377

CUBIERTAS

378

COBERTURA CON TEJA ANDINA DECORATIVA

1 da

lun 06/03/17

mar 07/03/17

4,234.44

379

CUMBRERA CON TEJA ANDINA DECORATIVA

1 da

mar 07/03/17

mi 08/03/17

338.31

5 das

mar 14/03/17

dom 19/03/17

5,070.56

381

PUERTA DE MADERA T/TABLERO REBAJADO 4.5MM - CEDRO

5 das

mar 14/03/17

dom 19/03/17

2,373.87

382

VENTANA DE MADERA CEDRO C/BARRA SEG.

5 das

mar 14/03/17

dom 19/03/17

2,696.69

3 das

mi 15/03/17

sb 18/03/17

554.72

380

383

CARPINTERIA DE MADERA

CERRAJERIA

384

BISAGRA ALUMINIZADA PESADA DE 4"

1 da

mi 15/03/17

jue 16/03/17

196.80

385

CERRADURA TIPO A EXTERIOR INGRESOS

1 da

jue 16/03/17

vie 17/03/17

321.72

386

MANIJA DE 4'' PARA PUERTAS

1 da

vie 17/03/17

sb 18/03/17

36.20

387

VIDRIOS, CRISTALES Y SIMILARES

5 das

mar 14/03/17

dom 19/03/17

1,890.16

388

VIDRIOS SEMIDOBLES PROVICION Y COLOCACION EN PUERTAS Y


VENTANAS
PINTURA

5 das

mar 14/03/17

dom 19/03/17

1,890.16

389

5 das

mar 14/03/17

dom 19/03/17

3,534.13

390

PINTURA LATEX ACRILICO SATINADO EN INTERIORES 02 MANOS

5 das

mar 14/03/17

dom 19/03/17

707.44

391

PINTURA LATEX ACRILICO SATINADO EN EXTERIORES 02 MANOS

2 das

mar 14/03/17

jue 16/03/17

707.44

392

PINTURA LATEX ACRILICO SATINADO EN CIELO RASO 02 MANOS

4 das

mar 14/03/17

sb 18/03/17

1,305.41

393

PINTURA LATEX ACRILICO SATINADO EN VIGAS Y COLUMNAS 02 MANOS

3 das

mar 14/03/17

vie 17/03/17

723.34

394
395

PINTURA ESMALTE EN CONTRAZOCALOS


INSTALACIONES SANITARIAS

mar 14/03/17

mi 15/03/17

90.50

mi 22/02/17

mar 21/03/17

3,982.08

5 das

mi 15/03/17

mar 21/03/17

1,375.72

1 da

lun 20/03/17

mar 21/03/17

187.43

398

LAVATORIO DE PARED C/GRIFE.CROMADA 20X17CM

1 da

lun 20/03/17

mar 21/03/17

120.00

399

LAVADERO DE COCINA DE ACERO INOXIDABLE

1 da

lun 20/03/17

mar 21/03/17

197.66

400

DUCHA CROMADA 1 LLAVE INCL.ACCESORIOS

1 da

lun 20/03/17

mar 21/03/17

72.48

401

JABONERA DE LOSA COLOR BLANCO

1 da

lun 20/03/17

mar 21/03/17

17.90

402

TOALLERA C/SOPORTE DE LOSA Y BARRA PLASTICA, COLOR BLANCO

1 da

lun 20/03/17

mar 21/03/17

51.90

403

PAPELERA DE LOSA Y BARRA PLASTICA, COLOR BLANCO

1 da

lun 20/03/17

mar 21/03/17

18.90

404

COLOCACION DE APARATOS SANITARIOS

4 das

mi 15/03/17

dom 19/03/17

472.99

COLOCACION DE ACCESORIOS SANITARIOS

4 das

mi 15/03/17

dom 19/03/17

236.46

5 das

mi 22/02/17

lun 27/02/17

748.04

3 das

vie 24/02/17

lun 27/02/17

215.40

397

405
406
407

APARATOS SANITARIOS Y ACCESORIOS

1 da
25 das

INODORO TANQUE BAJO BLANCO

396

SISTEMA DE DESAGUE Y VENTILACION


SALIDA DE DESAGUIE EN PVC

408

SALIDA DE DESAGUE EN PVC 4"

1 da

vie 24/02/17

sb 25/02/17

36.32

409

SALIDA DE DESAGUE EN PVC 2"

1 da

sb 25/02/17

dom 26/02/17

134.31

410
411

SALIDA DE VENTILACION EN PVC 2"


REDES DE DISTRIBUCIN

1 da

dom 26/02/17

lun 27/02/17

44.77

2 das

mi 22/02/17

vie 24/02/17

100.24
38.72

412

TUBERIA DE PVC SAL 4"

1 da

mi 22/02/17

jue 23/02/17

413

TUBERIA DE PVC SAL 2"

1 da

jue 23/02/17

vie 24/02/17

61.52

4 das

mi 22/02/17

dom 26/02/17

432.40

414

ACCESORIOS EN REDES

415

YEE DE PVC SAL CON REDUCCION DE 4"-2"

1 da

mi 22/02/17

jue 23/02/17

26.98

416

YEE PVC SAL 4"

1 da

mi 22/02/17

jue 23/02/17

33.58

417

CODO PVC SAL 4"X90

1 da

mi 22/02/17

jue 23/02/17

68.76

418

CODO PVC SAL 4"X45

1 da

mi 22/02/17

jue 23/02/17

17.19

419

TEE PVC SAL 4"

1 da

mi 22/02/17

jue 23/02/17

14.70

420

REDUCCIONES PVC SAL SP DE 4" A 2"

1 da

mi 22/02/17

jue 23/02/17

22.78

421

CODO PVC SAL 2"X90

1 da

jue 23/02/17

vie 24/02/17

51.57

422

CODO PVC SAL 2"X45

1 da

jue 23/02/17

vie 24/02/17

34.38

423

SUMIDEROS C/TRAMPA PVC SAL 2"

1 da

vie 24/02/17

sb 25/02/17

78.04

424

REGISTRO DE BRONCE 4"

1 da

vie 24/02/17

sb 25/02/17

60.35

425

SOMBRERO PARA VENTILACION DE PVC DE 2"

1 da

sb 25/02/17

dom 26/02/17

24.07

5 das

vie 24/02/17

mi 01/03/17

1,858.32

1 da

sb 25/02/17

dom 26/02/17

155.12

1 da

sb 25/02/17

dom 26/02/17

155.12

1 da

vie 24/02/17

sb 25/02/17

50.80

426
427
428
429

SISTEMA DE AGUA FRIA Y CONTRA INCENDIO


SALIDA DE AGUA FRIA
SALIDA DE AGUA FRIA 1/2"
REDES DE DISTRIBUCIN

Proyecto: CRONOGRAMA EJEC


Fecha: 06/06/16

CONSORCIO ZAYI

mes 2

mes 3

mes 4

mes 5

2,916.89

PISO DE MADERA TORNILLO MACHIEMBRADO

ZOCALOS Y CONTRAZOCALOS

mes 1

823.62

368

373

mes -1

1,567.76

349

348

LAVADERO DE CONCRETO

Costo

Tarea

Resumen

Hito inactivo

solo duracin

solo el comienzo

Hito externo

Divisin crtica

Divisin

Resumen del proyecto

Resumen inactivo

Informe de resumen manual

solo fin

Fecha lmite

Progreso

Hito

Tarea inactiva

Tarea manual

Resumen manual

Tareas externas

Tareas crticas

Progreso manual

Pgina 5

mes 6

mes 7

mes 8

mes 9

mes 10

mes 11

CRONOGRAMA DE EJECUCION DE OBRA (I.E.I. 475-47 DE CABRACANCHA)


PROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO, PARA EL FORTALECIMIENTO DE LAS CAPACIDADES DE APRENDIZAJE DE LOS ESTUDIANTES DE LAS I.E. INICIALES 111 SANTA ROSITA DE ALAYPAMPA, 489 DE SAYHUAPATA, 952 DE KISHUARA Y 475-47 DE CABRACANCHA.
Id
430
431

Nombre de tarea
TUBERIA PVC CLASE 10 DE 1/2"

Duracin
1 da

Comienzo
vie 24/02/17

Fin
sb 25/02/17

1 da

vie 24/02/17

sb 25/02/17

240.41

ACCESORIOS EN REDES

Costo
50.80

432

TEE PVC-SAP 1/2"

1 da

vie 24/02/17

sb 25/02/17

7.57

433

CODO PVC-SAP AGUA 1/2" X 90

1 da

vie 24/02/17

sb 25/02/17

15.58

434

UNION UNIVERSAL PVC SAP DE 3/4"

1 da

vie 24/02/17

sb 25/02/17

27.08

435

NIPLES FG DE 1/2"

1 da

vie 24/02/17

sb 25/02/17

21.12

436

VALVULA DE COMPUERTA DE BRONCE DE 3/4"

1 da

vie 24/02/17

sb 25/02/17

122.56

GRIFO CROMADO DE 1/2"

1 da

vie 24/02/17

sb 25/02/17

46.50

1 da

sb 25/02/17

dom 26/02/17

125.11

437
438
439
440

PIEZAS VARIAS
CAJA PARA VALVULA DE PASO
SISTEMA DE AGUA DE LLUVIA

1 da

sb 25/02/17

dom 26/02/17

125.11

3 das

dom 26/02/17

mi 01/03/17

1,286.88
46.26

441

SALIDA DE AGUAS PLUVIALES PVC 3"

1 da

dom 26/02/17

lun 27/02/17

442

SUMIDEROS DE BRONCE 3" PROVISION Y COLOCACION

1 da

dom 26/02/17

lun 27/02/17

86.32

443

TUBERIA DE PVC SAP 4" P/LLUVIAS

1 da

dom 26/02/17

lun 27/02/17

473.80

444

CODO PVC SAL 4"X90

1 da

lun 27/02/17

mar 28/02/17

68.76

445

CODO PVC SAL 4"X45

1 da

lun 27/02/17

mar 28/02/17

68.76

446

REDUCCION PVC SAP 4" - 3"

1 da

lun 27/02/17

mar 28/02/17

24.58

447

ACCESORIOS DE TUB. BAJADA DE EVAC. PLUVIAL

1 da

lun 27/02/17

mar 28/02/17

266.70

448
449
450
451
452
453
454

COLUMNETAS PARA EVACUACION PLUVIAL


INSTALACIONES ELECTRICAS
SALIDA PARA ELECTRICIDAD Y FUERZA
SALIDA DE TECHO
SALIDA DE TECHO C/CABLE THW 2X4 mm2+ PVC SEL 16MM(5/8)
SALIDA PARA TOMACORRIENTE
SALIDA PARA TOMACORRIENTE DOBLE C/LINEA A TIERRA

1 da

mar 28/02/17

mi 01/03/17

251.70

4 das

mar 14/03/17

sb 18/03/17

6,324.51

3 das

mar 14/03/17

vie 17/03/17

3,076.03

3 das

mar 14/03/17

vie 17/03/17

1,737.19

3 das

mar 14/03/17

vie 17/03/17

1,737.19

2 das

mar 14/03/17

jue 16/03/17

1,338.84

2 das

mar 14/03/17

jue 16/03/17

1,338.84
3,248.48

455

ARTEFACTOS

2 das

jue 16/03/17

sb 18/03/17

456

LAMPARAS

2 das

jue 16/03/17

sb 18/03/17

3,248.48

1 da

jue 16/03/17

vie 17/03/17

514.98

457
458
459
460
461

ARTEFACTO TIPO A
ARTEFACTO TIPO D
OBRAS DE COMPLEMENTARIAS
TANQUE SEPTICO - POZO PERCOLACION
TANQUE SEPTICO

1 da

vie 17/03/17

sb 18/03/17

2,733.50

70 das

sb 31/12/16

mi 15/03/17

251,123.31

27 das

sb 31/12/16

sb 28/01/17

15,161.07

27 das

sb 31/12/16

sb 28/01/17

11,004.63
32.38

462

TRABAJOS PRELIMINARES

1 da

sb 31/12/16

dom 01/01/17

463

TRAZO Y REPLANTEO

1 da

sb 31/12/16

dom 01/01/17

32.38

464

MOVIMIENTO DE TIERRAS

13 das

dom 01/01/17

sb 14/01/17

1,613.43
620.58

465

EXCAVACION DE ZANJA EN TERRENO NORMAL

3 das

dom 01/01/17

mi 04/01/17

466

REFINE, NIVELACION Y COMPAC. TERRENO NORMAL C/EQUIPO

1 da

mi 04/01/17

jue 05/01/17

165.66

467

ELIMINACION MANUAL DE MAT. EXEDENTE DM=30M

8 das

jue 05/01/17

vie 13/01/17

292.06

1 da

vie 13/01/17

sb 14/01/17

535.13

1 da

jue 05/01/17

vie 06/01/17

478.21

468
469

ELIMINACION DE MATERIAL EXCEDENTE CARGUIO MAQUINARIA


D=1.0KM
OBRAS DE CONCRETO SIMPLE

470

SOLADO, MEZCLA C:H - 1:12

1 da

jue 05/01/17

vie 06/01/17

478.21

471

OBRAS DE CONCRETO ARMADO

7 das

vie 06/01/17

vie 13/01/17

5,573.21

472

CONCRETO EN MUROS REFORZADOS F'C= 210 KG/CM2

1 da

jue 12/01/17

vie 13/01/17

2,425.14

473

ENCOFRADO Y DESENCOF MUROS REFORZADOS

4 das

dom 08/01/17

jue 12/01/17

1,566.40

474

ACERO EN MUROS REFORZADOS GRADO 60

2 das

vie 06/01/17

dom 08/01/17

2 das

vie 13/01/17

lun 16/01/17

486.24

2 das

vie 13/01/17

lun 16/01/17

486.24

3 das

lun 16/01/17

jue 19/01/17

554.95

475
476
477

REVOQUES ENLUCIDOS Y MOLDURAS


TARRAJEO CON IMPERMEABILIZANTE DE MUROS INTERIORES
SISTEMA DE DESAGUE
SALIDA DE VENTILACION DE FG 2"

1 da

lun 16/01/17

mar 17/01/17

296.43

479

SALIDA DE DESAGUE EN PVC SAL 4"

1 da

mar 17/01/17

mi 18/01/17

161.72

480

TUBERIA DE PVC SAL 4"

1 da

mi 18/01/17

jue 19/01/17

96.80

5 das

mar 17/01/17

dom 22/01/17

632.51

CAJA DE DISTRIBUCION

482

EXCAVACION EN TERRENO NORMAL

1 da

mar 17/01/17

mi 18/01/17

35.48

483

CONCRETO F'c= 175KG/CM2

1 da

vie 20/01/17

sb 21/01/17

183.07

484

ENCOFRADO Y DESENCOFRADO EN PEDESTAL

1 da

mi 18/01/17

jue 19/01/17

149.40

485

TAPA DE ACERO FY=4200 KG/CM2

1 da

jue 19/01/17

vie 20/01/17

112.61

486
487

TARRAJEO CON IMPERMEABILIZANTES


REDES COLECTORAS

1 da

sb 21/01/17

dom 22/01/17

151.95

5 das

vie 13/01/17

jue 19/01/17

760.38

488

TRAZO Y REPLANTEO

1 da

vie 13/01/17

sb 14/01/17

32.03

489

EXCAVACION DE ZANJA EN TERRENO NORMAL

2 das

vie 13/01/17

lun 16/01/17

299.41

490

TUBERIA DE PVC SAL 4"

1 da

lun 16/01/17

mar 17/01/17

306.47

491

RELLENO COMPACTADO A MANO CON MATERIAL PROPIO

3 das

lun 16/01/17

jue 19/01/17

122.47

6 das

dom 22/01/17

sb 28/01/17

873.32
5.46

492

CAJA DE REGISTRO

493

TRAZO Y REPLANTEO

1 da

dom 22/01/17

lun 23/01/17

494

EXCAVACION DE ZANJA EN TERRENO NORMAL

1 da

dom 22/01/17

lun 23/01/17

35.71

495

ENCOFRADO Y DESENCOFRADO EN PEDESTAL

1 da

lun 23/01/17

mar 24/01/17

250.99

496

CONCRETO F'c= 175KG/CM2

1 da

mi 25/01/17

jue 26/01/17

461.34

497

ACERO FY= 4200 KG/CM2

1 da

mar 24/01/17

mi 25/01/17

60.32

498

ELIMINACION MANUAL DE MAT. EXEDENTE DM=30M

2 das

jue 26/01/17

sb 28/01/17

59.50

13 das

sb 31/12/16

vie 13/01/17

4,156.44

499

POZO DE PERCOLADOR

500

TRABAJOS PRELIMINARES

1 da

sb 31/12/16

dom 01/01/17

9.61

501

TRAZO Y REPLANTEO

1 da

sb 31/12/16

dom 01/01/17

9.61

502

MOVIMIENTO DE TIERRAS

8 das

sb 31/12/16

dom 08/01/17

602.33

503

EXCAVACION DE ZANJA EN TERRENO NORMAL

2 das

sb 31/12/16

lun 02/01/17

323.53

504

REFINE, NIVELACION Y COMPAC. TERRENO NORMAL C/EQUIPO

1 da

lun 02/01/17

mar 03/01/17

119.67

ELIMINACION MANUAL DE MAT. EXEDENTE DM=30M

5 das

mar 03/01/17

dom 08/01/17

159.13

2 das

mar 03/01/17

jue 05/01/17

136.65
64.94

505
506

OBRAS DE CONCRETO SIMPLE

507

CONCRETO CICLOPEO MEZCLA 1:10 + 30 % PG.

1 da

mi 04/01/17

jue 05/01/17

508

ENCOFRADO Y DESENCOFRADO EN PEDESTAL

1 da

mar 03/01/17

mi 04/01/17

71.71

OBRAS DE CONCRETO ARMADO

3 das

lun 09/01/17

jue 12/01/17

871.40

510

CONCRETO F'c= 175KG/CM2

1 da

mi 11/01/17

jue 12/01/17

556.53

511

ENCOFRADO Y DESENCOFRADO EN PEDESTAL

1 da

lun 09/01/17

mar 10/01/17

227.09

509

512
513
514
515
516

ACERO FY= 4200 KG/CM2


ALBAILERIA
MURO DE CABEZA LADRILLO K.K 9X12X24
FILTROS Y REDES
FILTRO DE GRAVA Y CASCAJO

Proyecto: CRONOGRAMA EJEC


Fecha: 06/06/16

CONSORCIO ZAYI

mes 1

mes 2

mes 3

mes 4

mes 5

1,581.67

478

481

mes -1

1 da

mar 10/01/17

mi 11/01/17

87.78

4 das

jue 05/01/17

lun 09/01/17

2,286.88

4 das

jue 05/01/17

lun 09/01/17

2,286.88

1 da

jue 12/01/17

vie 13/01/17

249.57

1 da

jue 12/01/17

vie 13/01/17

249.57

Tarea

Resumen

Hito inactivo

solo duracin

solo el comienzo

Hito externo

Divisin crtica

Divisin

Resumen del proyecto

Resumen inactivo

Informe de resumen manual

solo fin

Fecha lmite

Progreso

Hito

Tarea inactiva

Tarea manual

Resumen manual

Tareas externas

Tareas crticas

Progreso manual

Pgina 6

mes 6

mes 7

mes 8

mes 9

mes 10

mes 11

CRONOGRAMA DE EJECUCION DE OBRA (I.E.I. 475-47 DE CABRACANCHA)


PROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO, PARA EL FORTALECIMIENTO DE LAS CAPACIDADES DE APRENDIZAJE DE LOS ESTUDIANTES DE LAS I.E. INICIALES 111 SANTA ROSITA DE ALAYPAMPA, 489 DE SAYHUAPATA, 952 DE KISHUARA Y 475-47 DE CABRACANCHA.
Id
517
518

Nombre de tarea
CERCO PERIMTRICO

Duracin
52 das

Comienzo
vie 13/01/17

Fin
vie 10/03/17

43 das

vie 13/01/17

mar 28/02/17

83,242.50

ESTRUCTURAS

Costo

91,825.00

519

TRABAJOS PRELIMINARES

1 da

vie 13/01/17

sb 14/01/17

376.72

520

TRAZO Y REPLANTEO

1 da

vie 13/01/17

sb 14/01/17

376.72

521

MOVIMIENTO DE TIERRAS

39 das

dom 15/01/17

sb 25/02/17

9,768.70
3,846.85

522

EXCAVACION PARA CIMIENTOS HASTA 1.70 MT TERRENO NORMAL

9 das

dom 15/01/17

mar 24/01/17

523

REFINE, NIVELACION Y COMPAC. TERRENO NORMAL C/EQUIPO

4 das

mar 24/01/17

sb 28/01/17

1,862.14

524

RELLENO COMPACTADO A MANO CON MATERIAL PROPIO

4 das

mar 21/02/17

sb 25/02/17

495.09

ELIMINACION MANUAL DE MAT. EXEDENTE DM=30M

18 das

sb 28/01/17

vie 17/02/17

1,258.57

1 da

vie 17/02/17

sb 18/02/17

2,306.05

9 das

mar 24/01/17

vie 03/02/17

29,543.49

525
526
527

ELIMINACION DE MATERIAL EXCEDENTE CARGUIO MAQUINARIA


D=1.0KM
CONCRETO SIMPLE

528

CIMIENTOS CORRIDOS MEZCLA C:H - 1:10 + 30% PG

2 das

mar 24/01/17

jue 26/01/17

15,581.63

529

SOBRECIMIENTO,CONCREETO 1:8 + 25% PM

1 da

jue 02/02/17

vie 03/02/17

3,537.26

530
531
532

SOBRECIMIENTO CORRIDO. ENCOFRADO Y DESENCOFRADO


OBRAS DE CONCRETO ARMADO
COLUMNAS

6 das

jue 26/01/17

jue 02/02/17

10,424.60

24 das

vie 03/02/17

mar 28/02/17

43,553.59

15 das

dom 05/02/17

mar 21/02/17

12,895.22

dom 19/02/17

mar 21/02/17

2,593.46

533

COLUMNAS, CONCRETO F'C= 210 KG/CM2

2 das

534

ENCOFRADO Y DESENCOFRADO EN COLUMNAS

10 das

mi 08/02/17

dom 19/02/17

3,272.11

535

COLUMNA, ACERO FY=4200 KG/CM2

3 das

dom 05/02/17

mi 08/02/17

7,029.65

6 das

mar 21/02/17

lun 27/02/17

6,168.36

536

VIGAS

537

VIGAS, CONCRETO F'C= 210 KG/CM2

1 da

dom 26/02/17

lun 27/02/17

1,704.52

538

ENCOFRADO Y DESENCOFRADO EN VIGAS

3 das

mar 21/02/17

vie 24/02/17

1,813.32

539

VIGAS, ACERO FY=4200 KG/CM2

2 das

vie 24/02/17

dom 26/02/17

2,650.52

540

MUROS Y TABIQUES DE ALBAILERIA

15 das

vie 03/02/17

dom 19/02/17

23,408.88

15 das

vie 03/02/17

dom 19/02/17

23,408.88

1 da

lun 27/02/17

mar 28/02/17

1,081.13

MURO DE SOGA LADRILLO K.K 9X12X24

541
542

JUNTAS DE CONSTRUCCION
JUNTA DE CONSTRUCCION CON TEKNOPORT

543
544
545

ARQUITECTURA
REVOQUES ENLUCIDOS Y MOLDURAS

1 da

lun 27/02/17

mar 28/02/17

1,081.13

10 das

lun 27/02/17

vie 10/03/17

8,582.50

5 das

lun 27/02/17

dom 05/03/17

6,848.06

546

CONTRAZOCALO CEMENTO S/COLOREAR H = 30 CM

5 das

lun 27/02/17

dom 05/03/17

3,400.72

547

TARRAJEO DE COLUMNAS INC. ARISTAS C:A 1:5, E=1.50CM

5 das

lun 27/02/17

dom 05/03/17

2,190.23

548

TARRAJEO DE VIGAS INC. ARISTAS C:A 1:5, E=1.50CM

5 das

lun 27/02/17

dom 05/03/17

1,257.11

5 das

dom 05/03/17

vie 10/03/17

1,734.44

5 das

dom 05/03/17

vie 10/03/17

959.66

549
550
551
552
553

PINTURA
PINTURA AL LATEX MATE EN VIGAS Y COLUMNAS 2 MANOS
PINTURA ESMALTE EN CONTRAZOCALOS
PORTADA DE INGRESO
ESTRUCTURAS

2 das

dom 05/03/17

mar 07/03/17

774.78

34 das

vie 20/01/17

sb 25/02/17

20,802.59

20 das

vie 20/01/17

vie 10/02/17

11,469.44
69.80

554

TRABAJOS PRELIMINARES

1 da

vie 20/01/17

sb 21/01/17

555

TRAZO Y REPLANTEO

1 da

vie 20/01/17

sb 21/01/17

69.80

556

MOVIMIENTO DE TIERRAS

20 das

vie 20/01/17

vie 10/02/17

238.85
81.03

557

EXCAVACION PARA ZAPATAS DE 1.40 MT A 1.70 MT DE PROFUNDIDAD

1 da

vie 20/01/17

sb 21/01/17

558

REFINE, NIVELACION Y COMPAC. TERRENO NORMAL C/EQUIPO

1 da

sb 21/01/17

dom 22/01/17

56.76

559

RELLENO COMPACTADO A MANO CON MATERIAL PROPIO

1 da

jue 09/02/17

vie 10/02/17

9.67

ELIMINACION MANUAL DE MAT. EXEDENTE DM=30M

1 da

dom 22/01/17

lun 23/01/17

32.27

1 da

lun 23/01/17

mar 24/01/17

59.12

18 das

dom 22/01/17

vie 10/02/17

835.88

560
561
562

ELIMINACION DE MATERIAL EXCEDENTE CARGUIO MAQUINARIA


D=1.0KM
CONCRETO SIMPLE

563

SOLADO, MEZCLA C:H - 1:12

1 da

dom 22/01/17

lun 23/01/17

108.34

564

FALSO PISO DE 4" COM MEZCLA C:H - 1:8

1 da

jue 09/02/17

vie 10/02/17

727.54

16 das

lun 23/01/17

jue 09/02/17

10,324.91

2 das

lun 23/01/17

mi 25/01/17

768.94

565
566

OBRAS DE CONCRETO ARMADO


ZAPATAS

567

ZAPATAS, CONCRETO F'C=210 KG/CM2

1 da

mar 24/01/17

mi 25/01/17

611.86

568

ZAPATAS, ACERO FY=4200 KG/CM2

1 da

lun 23/01/17

mar 24/01/17

157.08

3 das

mar 31/01/17

vie 03/02/17

5,028.69

570

COLUMNAS, CONCRETO F'C= 210 KG/CM2

1 da

jue 02/02/17

vie 03/02/17

1,171.24

571

COLUMNA, ACERO FY=4200 KG/CM2

1 da

mar 31/01/17

mi 01/02/17

2,221.59

572

ENCOFRADO Y DESENCOFRADO EN COLUMNAS

2 das

mar 31/01/17

jue 02/02/17

1,635.86

3 das

vie 03/02/17

lun 06/02/17

2,299.43

dom 05/02/17

lun 06/02/17

668.76

569

573

COLUMNAS

VIGAS

574

VIGAS, CONCRETO F'C= 210 KG/CM2

1 da

575

ENCOFRADO Y DESENCOFRADO EN VIGAS

1 da

vie 03/02/17

sb 04/02/17

1,240.96

576

VIGAS, ACERO FY=4200 KG/CM2

1 da

sb 04/02/17

dom 05/02/17

389.71

3 das

lun 06/02/17

jue 09/02/17

731.78

578

LOSA MACIZA, CONCRETO F'C= 210 KG/CM2

1 da

mi 08/02/17

jue 09/02/17

120.43

579

ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS MACIZAS

1 da

lun 06/02/17

mar 07/02/17

67.34

580

LOSA MACIZA, ACERO FY=4200 KG/CM2

1 da

mar 07/02/17

mi 08/02/17

544.01

5 das

mi 25/01/17

lun 30/01/17

1,496.07

5 das

mi 25/01/17

lun 30/01/17

1,496.07

15 das

jue 09/02/17

sb 25/02/17

9,333.15

7 das

vie 10/02/17

sb 18/02/17

1,260.55

TARRAJEO EN MURO EXTERIOR E INTERIOR C:A 1:5, E=1.50CM

6 das

sb 11/02/17

sb 18/02/17

707.17

586

TARRAJEO DE COLUMNAS INC. ARISTAS C:A 1:5, E=1.50CM

3 das

sb 11/02/17

mar 14/02/17

369.41

587

TARRAJEO DE VIGAS INC. ARISTAS C:A 1:5, E=1.50CM

1 da

vie 10/02/17

sb 11/02/17

183.97

1 da

jue 09/02/17

vie 10/02/17

341.49

1 da

jue 09/02/17

vie 10/02/17

341.49

2 das

sb 18/02/17

lun 20/02/17

1,274.95
1,233.23

577

581

LOSA MACIZA

MUROS Y TABIQUES DE ALBAILERIA


MURO DE SOGA LADRILLO K.K 9X12X24

582
583
584
585

588
589
590

ARQUITECTURA
REVOQUES ENLUCIDOS Y MOLDURAS

CIELORRASOS
CIELORRASOS CON MEZCLA C:A 1:4 CON CINTAS E=1.5CM.
PISOS Y PAVIMENTOS

591

VEREDA DE CONCRETO F'C= 175 KG/CM2. E=4''

1 da

sb 18/02/17

dom 19/02/17

592

JUNTAS ASFALTICAS

1 da

dom 19/02/17

lun 20/02/17

41.72

593

CARPINTERIA DE FIERRO

4 das

sb 18/02/17

mi 22/02/17

5,735.76
3,020.50

594

PUERTA METAL DOBLE HOJA EN PORTADA

1 da

sb 18/02/17

dom 19/02/17

595

PUERTA METALICA DE ACERO UNA HOJA

2 das

dom 19/02/17

mar 21/02/17

2,237.84

596

LETRERO METALICO DE IDENTIFICACIN

1 da

mar 21/02/17

mi 22/02/17

477.42

3 das

dom 19/02/17

mi 22/02/17

185.85

598

BISAGRA ALUMINIZADA PESADA DE 4"

1 da

dom 19/02/17

lun 20/02/17

98.40

599

CERRADURA TIPO A EXTERIOR INGRESOS

1 da

lun 20/02/17

mar 21/02/17

80.43

600

CERROJO DE 4"ALUMINIZADA EN PUERTA

1 da

mar 21/02/17

mi 22/02/17

7.02

5 das

lun 20/02/17

sb 25/02/17

534.55

3 das

lun 20/02/17

jue 23/02/17

317.13

597

601
602

CERRAJERIA

PINTURA
PINTURA AL OLEO MATE EN EXTERIORES 2 MANOS

Proyecto: CRONOGRAMA EJEC


Fecha: 06/06/16

CONSORCIO ZAYI

mes -1

mes 1

mes 2

mes 3

mes 4

mes 5

Tarea

Resumen

Hito inactivo

solo duracin

solo el comienzo

Hito externo

Divisin crtica

Divisin

Resumen del proyecto

Resumen inactivo

Informe de resumen manual

solo fin

Fecha lmite

Progreso

Hito

Tarea inactiva

Tarea manual

Resumen manual

Tareas externas

Tareas crticas

Progreso manual

Pgina 7

mes 6

mes 7

mes 8

mes 9

mes 10

mes 11

CRONOGRAMA DE EJECUCION DE OBRA (I.E.I. 475-47 DE CABRACANCHA)


PROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO, PARA EL FORTALECIMIENTO DE LAS CAPACIDADES DE APRENDIZAJE DE LOS ESTUDIANTES DE LAS I.E. INICIALES 111 SANTA ROSITA DE ALAYPAMPA, 489 DE SAYHUAPATA, 952 DE KISHUARA Y 475-47 DE CABRACANCHA.
Id
603
604
605
606

Nombre de tarea
PINTURA AL LATEX MATE EN CIELO RASO 2 MANOS

Duracin
1 da

Comienzo
jue 23/02/17

Fin
vie 24/02/17

1 da

vie 24/02/17

sb 25/02/17

10 das

sb 11/02/17

mi 22/02/17

11,699.39

9 das

sb 11/02/17

mar 21/02/17

2,647.46

PINTURA AL LATEX MATE EN VIGAS Y COLUMNAS 2 MANOS


PATIO DE RECREACIN
ESTRUCTURAS

Costo
62.76

607

TRABAJOS PRELIMINARES

1 da

sb 11/02/17

dom 12/02/17

227.70

608

TRAZO Y REPLANTEO

1 da

sb 11/02/17

dom 12/02/17

227.70

609

MOVIMIENTO DE TIERRAS

9 das

sb 11/02/17

mar 21/02/17

2,419.76

EXCAVACION DE ZANJA EN TERRENO NORMAL

2 das

sb 11/02/17

lun 13/02/17

319.28

611

REFINE, NIVELACION Y COMPAC. TERRENO NORMAL C/EQUIPO

2 das

lun 13/02/17

mi 15/02/17

432.90

612

RELLENO C/AFIRMADO E=4'' COMPAC. C/EQUIPO LIVIANO

1 da

jue 16/02/17

vie 17/02/17

1,291.32

613

ELIMINACION MANUAL DE MAT. EXEDENTE DM=30M

4 das

jue 16/02/17

lun 20/02/17

132.85

610

614
615
616

ELIMINACION DE MATERIAL EXCEDENTE CARGUIO MAQUINARIA


D=1.0KM
ARQUITECTURA
PISOS Y PAVIMENTOS

1 da

lun 20/02/17

mar 21/02/17

243.41

5 das

vie 17/02/17

mi 22/02/17

9,051.93

5 das

vie 17/02/17

mi 22/02/17

8,622.90

617

LOSAS DE CONCRETO F'C=175 KG/CM2

1 da

sb 18/02/17

dom 19/02/17

7,629.48

618

ENCOFRADO Y DESENCOFRADO DE, LOSA

1 da

vie 17/02/17

sb 18/02/17

595.25

619

PEDESTAL, CONCRETO F'c= 175KG/CM2

1 da

lun 20/02/17

mar 21/02/17

282.38

620

ENCOFRADO Y DESENCOFRADO EN PEDESTAL

1 da

dom 19/02/17

lun 20/02/17

60.36

621

JUNTAS ASFALTICAS

1 da

mar 21/02/17

mi 22/02/17

55.43

622

CARPINTERIA DE FIERRO

1 da

mar 21/02/17

mi 22/02/17

429.03

623
624
625
626

TUBERIA FIE.GALVANIZADO 3" X 6 M, HAZTA DE BANDERA


CANALETA DE DRENAJE PLUVIAL
ESTRUCTURAS
TRABAJOS PRELIMINARES

1 da

mar 21/02/17

mi 22/02/17

429.03

19 das

vie 20/01/17

jue 09/02/17

19,303.45

11 das

vie 20/01/17

mi 01/02/17

15,156.95

1 da

vie 20/01/17

sb 21/01/17

323.71
323.71

627

TRAZO Y REPLANTEO

1 da

vie 20/01/17

sb 21/01/17

628

MOVIMIENTO DE TIERRAS

10 das

vie 20/01/17

lun 30/01/17

2 das

vie 20/01/17

dom 22/01/17

629

EXCAVACION DE ZANJA EN TERRENO NORMAL


REFINE Y NIVELACION DE ZANJAS

1 da

dom 22/01/17

lun 23/01/17

67.56

ELIMINACION MANUAL DE MAT. EXEDENTE DM=30M

7 das

dom 22/01/17

dom 29/01/17

251.76
461.30

633
634
635
636

ENCOFRADO Y DESENCOFRADO PARA CANALETA DE DRENAJE


PLUVIAL
CONCRETO F'c= 175KG/CM2
ARQUITECTURA

1 da

dom 29/01/17

lun 30/01/17

8 das

lun 23/01/17

mi 01/02/17

13,568.50

7 das

lun 23/01/17

lun 30/01/17

7,948.25

1 da

mar 31/01/17

mi 01/02/17

5,620.25

8 das

mi 01/02/17

jue 09/02/17

3,653.63
2,730.96

637

REVOQUES ENLUCIDOS Y MOLDURAS

6 das

mi 01/02/17

mar 07/02/17

638

TARRAJEO CON IMPERMEABILIZANTE PARA CANALETA DE DRENAJE


PLUVIAL
CARPINTERIA METALICA

6 das

mi 01/02/17

mar 07/02/17

2,730.96

2 das

mar 07/02/17

jue 09/02/17

922.67

2 das

mar 07/02/17

jue 09/02/17

922.67

2 das

mar 07/02/17

jue 09/02/17

492.87

2 das

mar 07/02/17

jue 09/02/17

211.71

639
640
641
642

REJILLA DE PLATINA SOBRE CANALETA PLUVIAL


INSTALACIONES SANITARIAS
SISTEMA DE AGUA PLUVIAL

643

EXCAVACION DE ZANJAS MANUAL T.N.

2 das

mar 07/02/17

jue 09/02/17

72.93

644

SALIDA DE AGUAS PLUVIALES PVC 3"

1 da

mi 08/02/17

jue 09/02/17

138.78

1 da

mar 07/02/17

mi 08/02/17

281.16

646

CODO PVC SAL 3"X90

1 da

mar 07/02/17

mi 08/02/17

70.14

647

TEE PVC SAL 3"

1 da

mar 07/02/17

mi 08/02/17

68.94

648

YEE PVC SAL 3"

1 da

mar 07/02/17

mi 08/02/17

80.94

649

CODO PVC SAL 3"X45

1 da

mar 07/02/17

mi 08/02/17

61.14

18 das

lun 23/01/17

sb 11/02/17

15,792.98
58.65

645

650

ACCESORIOS EN REDES DE EVACUACION PLUVIAL

MURO DE CONTENCIN

651

TRABAJOS PRELIMINARES

1 da

lun 23/01/17

mar 24/01/17

652

TRAZO Y REPLANTEO

1 da

lun 23/01/17

mar 24/01/17

58.65

653

MOVIMIENTO DE TIERRAS

17 das

lun 23/01/17

vie 10/02/17

1,432.04
548.21

654

EXCAVACION DE ZANJA EN TERRENO NORMAL

4 das

lun 23/01/17

vie 27/01/17

655

REFINE Y NIVELACION DE ZANJAS

2 das

vie 27/01/17

dom 29/01/17

76.49

656

ELIMINACION MANUAL DE MAT. EXEDENTE DM=30M

12 das

vie 27/01/17

jue 09/02/17

285.05

657
658

ELIMINACION DE MATERIAL EXCEDENTE CARGUIO MAQUINARIA D=1.0KM


OBRAS DE CONCRETO SIMPLE

1 da

jue 09/02/17

vie 10/02/17

522.29

12 das

dom 29/01/17

sb 11/02/17

14,302.29

659

CONCRETO FC=210 KG/CM2 PARA MURO DE CONTENCIN

4 das

mar 07/02/17

sb 11/02/17

11,370.02

660

ENCOFRADO Y DESENCOFRADO MURO DE CONTENCIN

8 das

dom 29/01/17

mar 07/02/17

2,932.27
12,667.19

661

VEREDAS Y RAMPAS

11 das

dom 29/01/17

vie 10/02/17

662

ESTRUCTURAS

9 das

dom 29/01/17

mi 08/02/17

11,970.49

1 da

dom 29/01/17

lun 30/01/17

283.71

663

TRABAJOS PRELIMINARES

664

TRAZO Y REPLANTEO

1 da

dom 29/01/17

lun 30/01/17

283.71

665

MOVIMIENTO DE TIERRAS

7 das

dom 29/01/17

lun 06/02/17

866.55

666

EXCAVACION EN TERRENO NORMAL

2 das

dom 29/01/17

mi 01/02/17

397.79

667

ELIMINACION MANUAL DE MAT. EXEDENTE DM=30M

4 das

mi 01/02/17

dom 05/02/17

165.51
303.25

1 da

dom 05/02/17

lun 06/02/17

669

ELIMINACION DE MATERIAL EXCEDENTE CARGUIO MAQUINARIA


D=1.0KM
OBRAS DE CONCRETO SIMPLE

7 das

mi 01/02/17

mi 08/02/17

10,820.23

670

CONCRETO F'C=175 KG/CM2 PARA VEREDAS ACABADO PULIDO

1 da

sb 04/02/17

dom 05/02/17

7,129.33

671

ENCOFRADO Y DESENCOFRADO DE VEREDA

3 das

mi 01/02/17

sb 04/02/17

1,914.60

672

CONCRETO F'C=175 KG/CM2 PARA RAMPAS ACABADO BRUADO

2 das

lun 06/02/17

mi 08/02/17

1,438.50

673

ENCOFRADO Y DESENCOFRADO PARA RAMPAS

1 da

dom 05/02/17

lun 06/02/17

337.80

9 das

mi 01/02/17

vie 10/02/17

696.70

7 das

mi 01/02/17

mi 08/02/17

146.29

7 das

mi 01/02/17

mi 08/02/17

146.29

1 da

mi 08/02/17

jue 09/02/17

133.71

1 da

mi 08/02/17

jue 09/02/17

133.71

2 das

mi 08/02/17

vie 10/02/17

416.70

2 das

mi 08/02/17

vie 10/02/17

416.70

4 das

vie 03/02/17

mar 07/02/17

5,716.26

4 das

vie 03/02/17

mar 07/02/17

5,716.26
31.04

668

674
675
676
677
678
679
680
681
682

ARQUITECTURA
REVOQUES ENLUCIDOS Y MOLDURAS
BRUAS
PINTURA
PINTURA EN ADORNOS DE PISO
CARPINTERIA METALICA
PASAMANOS DE TUBO GALVANIZADO DE 1"
SARDINELES
ESTRUCTURAS

683

TRABAJOS PRELIMINARES

1 da

vie 03/02/17

sb 04/02/17

684

TRAZO Y REPLANTEO

1 da

vie 03/02/17

sb 04/02/17

31.04

685

MOVIMIENTO DE TIERRAS

3 das

vie 03/02/17

lun 06/02/17

252.75

686

EXCAVACION EN TERRENO NORMAL

1 da

vie 03/02/17

sb 04/02/17

116.12

687

ELIMINACION MANUAL DE MAT. EXEDENTE DM=30M

1 da

sb 04/02/17

dom 05/02/17

48.24

Proyecto: CRONOGRAMA EJEC


Fecha: 06/06/16

CONSORCIO ZAYI

mes 2

mes 3

mes 4

mes 5

1,264.74

631

ELIMINACION DE MATERIAL EXCEDENTE CARGUIO MAQUINARIA


D=1.0KM
CONCRETO SIMPLE

mes 1

484.12

630
632

mes -1

154.66

Tarea

Resumen

Hito inactivo

solo duracin

solo el comienzo

Hito externo

Divisin crtica

Divisin

Resumen del proyecto

Resumen inactivo

Informe de resumen manual

solo fin

Fecha lmite

Progreso

Hito

Tarea inactiva

Tarea manual

Resumen manual

Tareas externas

Tareas crticas

Progreso manual

Pgina 8

mes 6

mes 7

mes 8

mes 9

mes 10

mes 11

CRONOGRAMA DE EJECUCION DE OBRA (I.E.I. 475-47 DE CABRACANCHA)


PROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO, PARA EL FORTALECIMIENTO DE LAS CAPACIDADES DE APRENDIZAJE DE LOS ESTUDIANTES DE LAS I.E. INICIALES 111 SANTA ROSITA DE ALAYPAMPA, 489 DE SAYHUAPATA, 952 DE KISHUARA Y 475-47 DE CABRACANCHA.
Id
688

Nombre de tarea
ELIMINACION DE MATERIAL EXCEDENTE CARGUIO MAQUINARIA
D=1.0KM
OBRAS DE CONCRETO SIMPLE

Duracin
1 da

Comienzo
Fin
dom 05/02/17
lun 06/02/17

Costo
88.39

3 das

sb 04/02/17

mar 07/02/17

5,432.47

690

SARDINEL DE 15X40CM, CONCRETO F'C=175 KG/CM2 TARRAJEADO

1 da

lun 06/02/17

mar 07/02/17

2,081.15

691

ENCOFRADO Y DESENC. EN SARDINELES

3 das

sb 04/02/17

mar 07/02/17

3,351.32

689

692

ZANJA DE DRENAJE

11 das

dom 29/01/17

vie 10/02/17

5,285.86

693

ESTRUCTURAS

11 das

dom 29/01/17

vie 10/02/17

3,646.46
67.27

694

TRABAJOS PRELIMINARES

1 da

dom 29/01/17

lun 30/01/17

695

TRAZO Y REPLANTEO

1 da

dom 29/01/17

lun 30/01/17

67.27

696

MOVIMIENTO DE TIERRAS

11 das

dom 29/01/17

vie 10/02/17

3,579.19

697

EXCAVACION DE ZANJA EN TERRENO NORMAL

2 das

dom 29/01/17

mi 01/02/17

503.04

698

REFINE Y NIVELACION DE ZANJAS

2 das

dom 29/01/17

mi 01/02/17

140.41

699

RELLENO CON MATERIAL DE PRESTAMO MANUAL

3 das

sb 04/02/17

mar 07/02/17

2,046.60

700

ELIMINACION MANUAL DE MAT. EXEDENTE DM=30M

8 das

mi 01/02/17

jue 09/02/17

313.93

701
702
703

ELIMINACION DE MATERIAL EXCEDENTE CARGUIO MAQUINARIA


D=1.0KM
INSTALACIONES SANITARIAS
TUBERIAS
TUBERIA PVC SAP DE 3" PERFORADO

704
705
706
707
708
709

OTROS
CARPINTERIA DE FIERRO
TACHOS METALICO DE BASURA SUM. E INSTALACION
BANCA DE MADERA Y METAL
AREAS VERDES Y LIMPIEZA

1 da

jue 09/02/17

vie 10/02/17

575.21

5 das

dom 29/01/17

sb 04/02/17

1,639.40

5 das

dom 29/01/17

sb 04/02/17

1,639.40

5 das

dom 29/01/17

sb 04/02/17

1,639.40

52 das

jue 19/01/17

mi 15/03/17

52,869.52

4 das

jue 23/02/17

lun 27/02/17

10,187.36

2 das

jue 23/02/17

sb 25/02/17

2,448.80

2 das

sb 25/02/17

lun 27/02/17

7,738.56

15 das

lun 27/02/17

mi 15/03/17

9,237.00
8,458.00

710

SEMBRADO DE GRAS(INC.SUMIN.COLOC)

4 das

lun 27/02/17

vie 03/03/17

711

SEMBRADO DE PLANTONES (INC.SUMIN.COLOC)

1 da

sb 04/03/17

dom 05/03/17

89.15

712

LIMPIEZA GENERAL AL FINALIZAR OBRA

10 das

dom 05/03/17

mi 15/03/17

689.85

713

INSTALACIONES SANITARIAS GENERALES

20 das

jue 19/01/17

jue 09/02/17

4,078.52

13 das

jue 19/01/17

jue 02/02/17

1,994.70

sb 28/01/17

532.37
133.15

714

REDES COLECTORAS DE DESAGUE

715

EXCAVACION DE ZANJAS MANUAL T.N.

9 das

jue 19/01/17

716

RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS


DE 0.20 M.
TUBERIA PVC NTP 399.003 DN 4"

3 das

dom 29/01/17

jue 02/02/17

1 da

sb 28/01/17

dom 29/01/17

1,329.18

1 da

sb 28/01/17

dom 29/01/17

33.58

1 da

sb 28/01/17

dom 29/01/17

33.58

2 das

jue 02/02/17

sb 04/02/17

789.85

2 das

jue 02/02/17

sb 04/02/17

789.85

7 das

jue 02/02/17

jue 09/02/17

975.51
317.01

717
718
719
720
721
722

ACCESORIOS EN REDES DE DESAGUE


YEE PVC SAL 4"
CAMARA DE INSPECCION
CAJA DE REGISTRO DE DESAGUE 12" X 24"
REDES DE DISTRIBUCIN DE AGUA

723

EXCAVACION DE ZANJAS MANUAL T.N.

4 das

jue 02/02/17

lun 06/02/17

724

RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS


DE 0.20 M.
TUBERIA PVC CLASE 10 DE 3/4"

1 da

mi 08/02/17

jue 09/02/17

79.29

1 da

lun 06/02/17

mar 07/02/17

528.41

726

TUBERIA PVC CLASE 10 DE 1/2"

1 da

mar 07/02/17

mi 08/02/17

50.80

727

ACCESORIOS DE REDES DE AGUA

1 da

mar 07/02/17

mi 08/02/17

284.88

725

728

TEE PVC-SAP 3/4"

1 da

mar 07/02/17

mi 08/02/17

55.00

729

CODO PVC-SAP 3/4"X90

1 da

mar 07/02/17

mi 08/02/17

40.85

730

LLAVE DE PASO ESFERA ROSCADA DE 3/4''

1 da

mar 07/02/17

mi 08/02/17

31.18

731

REDUCCION DE PVC DE 3/4" A 1/2"

1 da

mar 07/02/17

mi 08/02/17

42.70

732

UNION UNIVERSAL PVC SAP DE 3/4"

1 da

mar 07/02/17

mi 08/02/17

67.70

733

ADAPTADORES PVC SAP DE 3/4"

1 da

mar 07/02/17

mi 08/02/17

47.45

734

INSTALACIONES ELECTRICAS GENERALES

23 das

sb 28/01/17

mi 22/02/17

28,916.64

735

REDES DE DISTRIBUCIN ELCTRICA

18 das

sb 28/01/17

vie 17/02/17

22,753.84

lun 06/02/17

724.49

736

EXCAVACION DE ZANJAS MANUAL T.N.

8 das

sb 28/01/17

737

RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS


DE 0.20 M.
ALIMENTADOR CABLE NYY (2X25 + 1X16) MM2.

2 das

mar 14/02/17

vie 17/02/17

181.20

738

1 da

lun 06/02/17

mar 07/02/17

4,542.00

739

ALIMENTADOR CABLE NYY (2X16 + 1X10) MM2.

5 das

lun 06/02/17

sb 11/02/17

7,728.24

740

ALIMENTADOR CABLE NYY (2X10 + 1X6) MM2.

3 das

sb 11/02/17

mar 14/02/17

3,611.23

741

ALIMENTADOR CABLE NYY (2X6 + 1X6) MM2.

3 das

sb 11/02/17

mar 14/02/17

5,966.68

1 da

mar 14/02/17

mi 15/02/17

1,080.85

742

TABLEROS DE DISTRIBUCION

743

TABLEROS DISTRIBUCION CAJA METALICA CON 08 POLOS

1 da

mar 14/02/17

mi 15/02/17

481.91

744

TABLEROS DISTRIBUCION CAJA METALICA CON 04 POLOS

1 da

mar 14/02/17

mi 15/02/17

476.85

1 da

mar 14/02/17

mi 15/02/17

122.09

5 das

mar 14/02/17

lun 20/02/17

3,922.50
1,544.88

745
746

TABLEROS DISTRIBUCION CAJA METALICA CON 04 POLOS-ALUMBR.


EXTERIOR
ARTEFACTOS Y OTROS

747

POSTE METALICO P/FAROLAS INC. INSTALACION

3 das

mar 14/02/17

sb 18/02/17

748

LAMPARA DE ALUMBRADO EXTERIOR DE 125W

1 da

sb 18/02/17

dom 19/02/17

749

SALIDA DE TECHO C/CABLE THW 2X4 mm2+ PVC SEL 16MM(5/8)

1 da

dom 19/02/17

lun 20/02/17

534.52

1 da

lun 20/02/17

mar 21/02/17

650.98

1 da

lun 20/02/17

mar 21/02/17

650.98

1 da

mar 21/02/17

mi 22/02/17

508.47

1 da

mar 21/02/17

mi 22/02/17

508.47

13 das

jue 09/02/17

jue 23/02/17

450.00

750
751
752
753
754

PUESTA A TIERRA
POZO PUESTA A TIERRA
INSTALACION A SERVICIO PUBLICO
CONEXIONES A SERVICIO PUBLICO DE ELECTRICIDAD
PRUEBA INSTALACIONES PARA LA INFRAESTRUCCTURA
PRUEBA PARA LAS INSTALACIONES ELECTRICAS EN GENERAL

1 da

mi 22/02/17

jue 23/02/17

250.00

756

PRUEBA PARA LAS INSTALACIONES SANITARIAS EN GENERAL

1 da

jue 09/02/17

vie 10/02/17

200.00

3 das

jue 23/02/17

dom 26/02/17

1 da

jue 23/02/17

vie 24/02/17

13,394.91

758

IMPLEMENTACION DIVERSA
EQUIPAMIENTO
ADQUISICION DE MOBILIARIO Y MATERIALES- AULA

1 da

jue 23/02/17

vie 24/02/17

4,661.93

760

ADQUISICION DE IMPLEMENTOS PARA SALON DE USOS


MULTIPLES-COCINA-DEPOSITO
ADQUISICION DE MOBILIARIO Y MATERIALES-VIVIENDA DOCENTE

1 da

jue 23/02/17

vie 24/02/17

5,539.36

761

1 da

jue 23/02/17

vie 24/02/17

1,297.46

762

IMPLEMENTOS DEPORTIVOS

1 da

jue 23/02/17

vie 24/02/17

1,896.16

2 das

vie 24/02/17

dom 26/02/17

12,296.61

IMPLEMENTACION DE JUEGOS MULTIPLES PARA NIVEL INICIAL

764

JUEGOS DIVERSOS

1 da

vie 24/02/17

sb 25/02/17

11,296.61

765

INSTALACION DE JUEGOS DIVERSOS (JUEGOS KIT)

1 da

sb 25/02/17

dom 26/02/17

1,000.00

1 da

jue 23/02/17

vie 24/02/17

2,040.00

1 da

jue 23/02/17

vie 24/02/17

800.00

766
767

ADQUISICION DE MATERIALES
ADQUISICION DE MATERIALES DIDACTICOS PARA NIOS

768

AREA LOGICO MATEMATICO

1 da

jue 23/02/17

vie 24/02/17

200.00

769

AREA COMUNICACION

1 da

jue 23/02/17

vie 24/02/17

200.00

770

AREA PERSONAL SOCIAL

1 da

jue 23/02/17

vie 24/02/17

200.00

771

AREA CIENCIA Y AMBIENTE

1 da

jue 23/02/17

vie 24/02/17

200.00

Proyecto: CRONOGRAMA EJEC


Fecha: 06/06/16

CONSORCIO ZAYI

mes 2

mes 3

mes 4

mes 5

25,691.52

759

763

mes 1

1,843.10

755
757

mes -1

Tarea

Resumen

Hito inactivo

solo duracin

solo el comienzo

Hito externo

Divisin crtica

Divisin

Resumen del proyecto

Resumen inactivo

Informe de resumen manual

solo fin

Fecha lmite

Progreso

Hito

Tarea inactiva

Tarea manual

Resumen manual

Tareas externas

Tareas crticas

Progreso manual

Pgina 9

mes 6

mes 7

mes 8

mes 9

mes 10

mes 11

CRONOGRAMA DE EJECUCION DE OBRA (I.E.I. 475-47 DE CABRACANCHA)


PROYECTO: "MEJORAMIENTO DEL SERVICIO EDUCATIVO, PARA EL FORTALECIMIENTO DE LAS CAPACIDADES DE APRENDIZAJE DE LOS ESTUDIANTES DE LAS I.E. INICIALES 111 SANTA ROSITA DE ALAYPAMPA, 489 DE SAYHUAPATA, 952 DE KISHUARA Y 475-47 DE CABRACANCHA.
Id
772
773
774
775
776
777
778
779

Nombre de tarea
ADQUISICION DE MATERIAL BIBLIOGRFICO-DOCENTES

Duracin
1 da

Comienzo
jue 23/02/17

Fin
vie 24/02/17

1 da

jue 23/02/17

vie 24/02/17

1,240.00

2 das

jue 23/02/17

sb 25/02/17

4,110.17

2 das

jue 23/02/17

sb 25/02/17

4,110.17

2 das

jue 23/02/17

sb 25/02/17

1,906.77

2 das

jue 23/02/17

sb 25/02/17

2,203.40

255 das

lun 06/06/16

dom 05/03/17

4,255.66

2 das

lun 06/06/16

mi 08/06/16

284.74
42.37

TEXTOS DOCENTES
FORTALECIMIENTO DEL DESARROLLO DE CAPACIDADES
DESARROLLO DE CAPACIDADES
CAPACITACION 1: ESTRATEGIAS DE ATENCIN SIMULTANEA Y
DIFERENCIADA EN AULAS MULTIGRADO
CAPACITACION 2: CAPACITACION EN TRABAJO DOCENTE -PADRES DE
FAMILIA
PLAN DE MITIGACION E IMPACTO AMBIENTAL
SUPERVICION AMBIENTAL

Costo

1,240.00

780

APLICACION DE NORMAS AMBIENTALES

2 das

lun 06/06/16

mi 08/06/16

781

FIRMAS DE ACTA DE COMPROMISO

2 das

lun 06/06/16

mi 08/06/16

42.37

782

SEGUIMIENTO AMBIENTAL

2 das

lun 06/06/16

mi 08/06/16

200.00

2 das

lun 06/06/16

mi 08/06/16

1,016.95

2 das

lun 06/06/16

mi 08/06/16

1,016.95

10 das

mi 22/02/17

dom 05/03/17

360.00

783
784
785

NORMAS DE SEGURIDAD
CAPACITACION EN CONTROL DE SEGURIDAD EN OBRA
MANEJO DE CANTERAS

786

LIMPIEZA GENERAL DEL REA

10 das

mi 22/02/17

dom 05/03/17

100.00

787

RECUPERACIN MORFOLOGICA DEL AREA

10 das

mi 22/02/17

dom 05/03/17

260.00

2 das

lun 06/06/16

mi 08/06/16

230.00

1 da

lun 06/06/16

mar 07/06/16

150.00

788
789
790
791

SEALIZACION
SELIZACION DE VIAS
LETREROS DE UBICACION
MEDIDAS DE CONTROL

1 da

mar 07/06/16

mi 08/06/16

80.00

255 das

lun 06/06/16

dom 05/03/17

1,303.97

792

MICRO RELLENOS SANITARIOS

1 da

lun 06/06/16

mar 07/06/16

677.97

793

IMPLEMENTOS DE BOTIQUIN

1 da

lun 06/06/16

mar 07/06/16

200.00

794

LIMPIEZA Y RECUPERACION DEL AREA AFECTADA

10 das

mi 22/02/17

dom 05/03/17

66.00

795

INSTALACION DE CONTENEDORES

1 da

lun 06/06/16

mar 07/06/16

360.00

60 das

lun 06/06/16

mar 09/08/16

600.00

60 das

lun 06/06/16

mar 09/08/16

600.00

6 das

lun 06/06/16

dom 12/06/16

460.00

mar 07/06/16

130.00

796
797
798

EDUCACION AMBIENTAL
CAPACITACION AL PERSONAL DE OBRA
MEDIOS DE CONCIENTIZACION

799

LETREROS INFORMATICOS

1 da

lun 06/06/16

800

AFICHES AMBIENTALES

4 das

mar 07/06/16

sb 11/06/16

80.00

801

PROYECCION DE VIDEOS

1 da

sb 11/06/16

dom 12/06/16

250.00

Proyecto: CRONOGRAMA EJEC


Fecha: 06/06/16

CONSORCIO ZAYI

mes -1

mes 1

mes 2

mes 3

mes 4

mes 5

Tarea

Resumen

Hito inactivo

solo duracin

solo el comienzo

Hito externo

Divisin crtica

Divisin

Resumen del proyecto

Resumen inactivo

Informe de resumen manual

solo fin

Fecha lmite

Progreso

Hito

Tarea inactiva

Tarea manual

Resumen manual

Tareas externas

Tareas crticas

Progreso manual

Pgina 10

mes 6

mes 7

mes 8

mes 9

mes 10

mes 11