Site Survey and Layout Design

350000
Wireless engineering technical site survey
065127

Site

350000
Wireless telecom equipment installation design
065129

Site

1.1

1.2
2

Site Transportation

2.1

Site transportation from warehouse to site

BTS/NodeB Installation

3.1
3.2
3.5
3.6
3.3
3.4
3.7
3.8
3.9
3.10
3.11
3.12
3.13
3.14
3.15
4

350000
062214
350000
062215
350000
062230
350000
062231
350000
062221
350000
062222
350000
062238
350000
062240
350000
062241
350000
062147
350000
063872
350000
063873
350000
063891
350000
063892
350000
063893

Site

Indoor Macro site installation (Sub-cabinet Qty(1))

Site

Indoor Macro site installation (Sub-cabinet Qty(2))

Site

Indoor Marco&RRU site installation(RRU Qty(1-3)


on tower)
Indoor Marco&RRU site installation(RRU Qty(4-6)
on tower)
Outdoor Macro site installation(Sub-cabinet Qty(12))
Outdoor Macro site installation(Sub-cabinet Qty(34))
Outdoor Marco&RRU installation(RRU Qty(1-3) on
tower,Sub-cabinet Qty(1-2))
Outdoor Marco&RRU installation(RRU Qty(4-6) on
tower,Sub-cabinet Qty(1-2))
Outdoor Marco&RRU installation(RRU Qty(4-6) on
tower,Sub-cabinet Qty(3-4))

Site
Site
Site
Site
Site
Site
Site

DBS site installation(RRU Qty(4-6), on tower)

Site

DBS site installation(RRU Qty(7-9) on tower)

Site

DBS site installation(RRU Qty(10-12) on tower)

Site

DBS installation(outdoor Cabinet, RRU Qty(4-6) on


tower )
DBS installation(outdoor Cabinet, RRU Qty(7-9) on
tower )
DBS installation(outdoor Cabinet, RRU Qty(10-12)
on tower )
Power Equipment Installation

Site
Site
Site

<>

23 , 1

Proprietary Confidential

ZTE

350000
DC Power system installation (indoor)
062167

Site

350000
DC Power system installation(outdoor)
062168

Site

350000
Battery installation(12V*4, 3 groups)
062173

Site

350000
Battery installation(2V*24, 1 group)
062178

Site

4.1

4.2

4.3

4.4
5

5.1

Site Acceptance and As-built Documents


350000
Wireless site installation acceptance
063096

Site

350000
Wireless site as-built document
063097

Site

5.2
Optional Items
6

Site Expansion with Equipment Transportation

<>

23 , 2

Proprietary Confidential

ZTE

6.1

350000
Macro Base Station Sub-cabinet expansion
062228

Cabine
t

6.2

350000
RRU expansion(RRU Qty(1) on tower)
062205

RRU

6.3

DC Power system expansion

Site

6.4

Battary cabinet expansion with batteries

6.5

Battery string expansion

Site Commissioning and Integration

Cabine
t

Site

<>

23 , 3

Proprietary Confidential

ZTE

7.1

350000 BTS/NodeB commissioning & integration(single


064092 mode commissioning)

Site

7.2

350000 BTS/NodeB commissioning & integration(dual064139 mode commissioning)

Site

Site Dismantle with Equipment Transportation

8.1

350000
Complete site dismantling without RRUs
063006

Site

8.2

350000
Complete site dismantling with RRUs (on tower)
063000

Site

8.3

Cabinet dismantling

Equipment Swap

Cabine
t

<>

23 , 4

Proprietary Confidential

ZTE

Cabine
t

9.1

Cabinet swap

9.2

RRU swap

RRU

9.3

Battery swap

Site

10

RF System and Antenna Installation

10.1

350000 RF Antenna and Feeder installation(On tower


064171 Antenna Qty(1), Feeder Qty(1-2)

Set

10.2

350000 RF Antenna and Feeder installation(On tower


064178 Antenna Qty(3), Feeder Qty(7-12

Set

<>

23 , 5

Proprietary Confidential

ZTE

10.3

10.4

11
11.1

11.2

12
12.1
12.2
13

350000 RF Antenna installation(On tower Antenna


064159 Qty(1)

RF Antenna swap(On tower Antenna Qty(1)

Civil Work
Outdoor cable tray installation_Supply of
350000
galvanised outdoor cable tray with cover fitted
064753
inlcuding all accessories

350000 Supply and construction of reinforced concrete


064940 (R.C.C) plinth for equipment

Rent Crane
Using crane till 40 TON
Using crane till 60 TON
Civil Consulting

Set

Set

Day
Day

13.1

350000
Tower/pole structual anlysis
065125

Site

13.2

350000
Tower/pole structual strengthening design
065126

Site

14

DT

14.1

350000 GU(dual mode) DT and CQT for Single Site(with


067920 instrument)

Site

14.2

350000 GU(dual mode) DT and CQT Analysis of test data


067921 for Single Site(with instrument)

Site

14.3

350000
GSM DT and CQT for Single Site(with instrument)
067880

Site

<>

23 , 6

ZTE

Proprietary Confidential

14.4

350000 GSM DT and CQT Analysis of test data for Single


067881 Site(with instrument)

Site

14.5

350000 UMTS DT and CQT for Single Site(with


067908 instrument)

Site

14.6

350000 UMTS DT and CQT Analysis of test data for


067909 Single Site(with instrument)

Site

<>

23 , 7

Proprietary Confidential

ZTE
Work Description

Qty
The scope of work includes but is not limited to:
1. Site basic information survey and collecting (both on tower and on ground);
2. Environment survey for swapping the existing equipments and installing new
equipments;
3. Environment survey for site power distrubition and lightning-protection system
implementation;
4. Environment survey for intalling new antenna and feeder equipments;
5. Perparation and submission of TSSR.

The scope of work includes but is not limited to:


Complete layout design, swapping design of existing equipments, layout design and
installation design of new equipments, cable route design, antenna and feeder system
design, including drawings and bill of materials.

The scope of work includes but is not limited to:


Equipments and material transportation from warehouse to site, and transport remaining
material from site to warehouse if there is, including lift equipments and material from
warehouse to truck and from truck to site in normal case.

The working contents include but not limited to:


1. Equipment & material and all its cards/modules installation.
2. All the cables installation, including the optical fibers, ethernet cables, power cables,
grounding bar and cables, lighting protection, alarms cables, E1 cables, inter-connection
cables, RF jumpers, lighting protection.
3. Supply and installation of all necessary accessories, consume material such as
labels, flexible pipe, PVC pipes, ducts, etc. if using for site installation.
4. Labels for sites and supply the labels as Etisalat's standard (RF Labels: Macroni,
Telecom Cabinets label: printed on T-tie wrap).
5. Site power on inspection and power on;
6. Site swap if it's swapping sites;
7. Site Clean-up.

<>

23 , 8

ZTE

Proprietary Confidential

The scope of work include but not limited to:


1. Acceptance for installation environment of equipment, make sure to match the
requirement of installation;
2. Unpacking inspection;
3. Rack installation;
4. Installation of AC input cable and making the labels;
5. Installation of protection grounding cable and making the label;
6. Self-checking after equipment installed;
7. Checking before equipment power-on, and equipment power-on;
8. System parameter setting, system debugging;
9.cleaning the sites.
The scope of work include but not limited to:
1. Acceptance for installation environment of equipment, make sure to match the
requirement of installation;
2. Unpacking inspection;
3. Rack installation;
4. Installation of AC input cable and making the labels;
5. Installation of protection grounding cable and making the label;
6. Self-checking after equipment installed;
7. Checking before equipment power-on, and equipment power-on;
8. System parameter setting, system debugging;
9.cleaning the sites.
The scope of work include but not limited to:
1. Acceptance for installation environment of equipment, make sure to match the
requirement of installation;
2. Unpacking inspection;
3. Installation of battery shelf;
4. Installation of 12 pics 12V battery;
5. Connection of battery cable;
6. Self-checking after equipment installed;
7.cleaning the sites..

The scope of work include but not limited to:


1. Acceptance for installation environment of equipment, make sure to match the
requirement of installation;
2. Unpacking inspection;
3. Installation of battery shelf;
4. Installation of 24 pics 2V battery;
5. Connection of battery cable;
6. Self-checking after equipment installed;
7.cleaning the sites.
The scope of work include but not limited to:
Work with the customer to perform the installation acceptance test based on the
acceptance test specifications required by ZTE; Output the acceptance test report.

The scope of work include but not limited to:


1.Output of engineering completion material and documents related to engineering as
required by the contract, including: collection and transfer of remaining engineering
problems and engineering completion documents
2.Handover of maintenance work.

<>

23 , 9

ZTE

Proprietary Confidential

The scope of work include but not limited to:


1. Base station installation environment inspection. Check whether the installation
environment of the base station meets the requirements for equipment installation.
2. Deliver the equipment to site, unpack and inspect the base station devices delivered
to the site.
3. Install the sub-cabinet.
4. Routing, connection, and labeling of the related cable.
5. Power on the sub-cabinet, and check the installation quality.
6. Clean up the site.
The scope of work include but not limited to:
1.Base station installation environment inspection. Check whether the installation
environment of the base station meets the requirements for equipment installation.
2.Deliver the equipment to site, unpack and inspect the base station devices delivered
to the site.
3.Install one RRU on tower pole.
4.Lay and connect optical fiber from 1 RRU to the BBU, and make and attach labels on
the optical fiber.
5.Layout and connection of the power cables between RRU and the DCPC, label
creation and attachment;
6.Connect RF jumpers from the RRU to the antenna; take waterproof measures for the
feeder connectors; and make and attach labels on the jumper and the feeder.
7. Power on the base station device and other devices, and check the installation
quality.
The scope of work include but not limited to:
1. Acceptance for installation environment of equipment, make sure to match the
requirement of installation;
2. Deliver the equipment to site, and unpacking inspection;
3. Rack installation;
4. Installation of AC input cable and making the labels;
5. Installation of protection grounding cable and making the label;
6. Self-checking after equipment installed;
7. Checking before equipment power-on, and equipment power-on;
8. System parameter setting, system debugging;
9.cleaning the sites.
The scope of work include but not limited to:
1. Acceptance for installation environment of equipment, make sure to match the
requirement of installation;
2. Deliver the equipment and unpacking inspection;
3. Installation of battery cabinet and batteries;
4. Connection of battery cable;
5. Self-checking after equipment installed;
6. Cleaning the sites.
The scope of work include but not limited to:
1. Acceptance for installation environment of equipment, make sure to match the
requirement of installation;
2. Deliver the equipment and unpacking inspection;
3. Installation of batteries;
4. Connection of battery cable;
5. Self-checking after equipment installed;
6. Cleaning the sites.

<>

23 , 10

ZTE

Proprietary Confidential

The scope of work include but not limited to:


1. Hardware inspection.
2. Configuration data processing.
3. Base station version and data loading.
4. Transmission integration between BTS/NodeB and BSC/RNC.
5. Troubleshooting.
6. Basic function test after site commissioning (including CS service test and PS service
test).
The scope of work include but not limited to:
1. Hardware inspection.
2. Configuration data processing.
3. Base station version and data loading.
4. Transmission integration between BTS/NodeB and BSC/RNC.
5. Troubleshooting.
6. Basic function test after site commissioning (including CS service test and PS service
test).

The scope of work include but not limited to:


1. Removal of the main equipment of the original site, including power equipment.
2. Removal of the power cable, transmission cable, and dry contact alarm cable of the
original site.
3. Removal of the RF jumpers.
4. Packing and deliver the dismantled equipment back to warehouse.
5. Clean up the site.
Notes: feeder cables and antennas are not included.
The scope of work include but not limited to:
1. Hardware removal of the main equipment of the original site, including power
equipment and RRUs.
2. Removal of the power cable, transmission cable and fiber cable of the original site.
3. Removal of the original lightning protection box (if necessary).
4. Removal of RF jumper.
5. Packing and deliver the dismantled equipment back to warehouse.
6. Clean up the site.
Notes: feeder cables and antennas are not included.

The scope of work include but not limited to:


1. Removal of the original cabinet.
2. Removal of the power cable, transmission cable, and dry contact alarm cable of the
original cabinet if there is.
3. Removal of the RF jumpers if there is.
4. Packing and deliver the dismantled equipment back to warehouse.
4. Clean up the site.
Notes: feeder cables and antennas are not included.

<>

23 , 11

ZTE

Proprietary Confidential

The scope of work include but not limited to:


1. Acceptance for installation environment of equipment, make sure to match the
requirement of installation.
2. Deliver the equipment to site.
3. Remove the cabinet devices (BC /RC /Power (Rectifier & Battery) cabinet), power
cable, grounding cable, etc.
4. Packing the dismantled equipments and transport to warehouse .
5. Install the new cabinet and material.
6. Install the cables, including the optical fibers, ethernet cables, power cables,
grounding cables, DRY panel ,lighting protection, alarms cables, E1 cables, interconnection cables, RF jumpers as required.
7. Labels for sites.
8. Cleaning the sites.
The scope of work include but not limited to:
1. Acceptance for installation environment of equipment, make sure to match the
requirement of installation.
2. Deliver the equipment to site.
3. Remove the original RRU, power cable, grounding cable, fiber, alarm cable and RF
jumpers, etc.
4. New RRU and auxiliary installation.
5. Packing the dismantled equipment and transport to warehouse.
6. Cleaning the sites.
The scope of work include but not limited to:
1. Acceptance for installation environment of equipment, make sure to match the
requirement of installation.
2. Deliver the equipment to site.
3. Remove the original batteries.
4. Packing the dismantled batteries and transport to warehouse.
5. Install the new batteries and cables.
6. Labels for sites.
7. Cleaning the sites.

The scope of work include but not limited to:


1. Check whether the environment meet the requirements of installation.
2. Deliver the equipment to site, unpacking and inspection of antenna and equipment.
3. Install the antenna to the pole on tower-top.
4. Lay the feeder from antenna to BTS/NodeB, and finish the feeder connector and
labeling
5. Install and connect the jumper and finish the water-proof treatment.
6. After the installation, adjust the antenna pitch angel as per the design requirements.
7. Testing the VSWR of antenna and feeder
8. Performing installation check: to make sure the antenna installation meet the design
and inslallation requirements.
The scope of work include but not limited to:
1. Check whether the environment meet the requirements of installation.
2. Deliver the equipment to site, unpacking and inspection of antenna and equipment.
3. Install the antennas to the pole on tower-top.
4. Lay the feeders from antenna to BTS/NodeB, and finish the feeder connector and
labeling
5. Install and connect the jumper and finish the water-proof treatment.
6. After the installation, adjust the antenna pitch angel as per the design requirements.
7. Testing the VSWR of antenna and feeder
8. Performing installation check: to make sure the antenna installation meet the design
and inslallation requirements.

<>

23 , 12

ZTE

Proprietary Confidential

The scope of work include but not limited to:


1. Check whether the environment meet the requirements of installation.
2. Deliver the equipment to site, unpacking and inspection of antenna and equipment.
3. Install the antenna (1 piece) to the pole on tower-top.
4. After the installation, adjust the antenna pitch angel as per the design requirements.
5. Hardware installation check: to make sure the antenna installation meet the design
and inslallation requirements.
The scope of work include but not limited to:
1. Check whether the environment meet the requirements of installation.
2. Deliver the equipment to site, unpacking and inspection of antenna and equipment.
3. Remove the original antenna.
3. Install the new antenna (1 piece) to the pole on tower-top.
4. After the installation, adjust the antenna pitch angel as per the design requirements.
5. Hardware installation check: to make sure the antenna installation meet the design
and inslallation requirements.
6. Packing and deliver the dismantled antenna back to warehouse.
This work package including but not limited to :
1. Supply cable tray with cover fitted inlcuding all accessories
This work package including but not limited to :
1. Excavation and backfilling required for foundation construction
2. Reinforcement(default as 280MPa) supply, bending,placing,and binding
3. Formworks supply and fixtation
4. Concrete material supply, on-site mixing,casting and curing
5. Remove concrete formworks and check the construction quality
Using crane till 40 TON
Using crane till 60 TON
The scope of work includes but is not limited to:
1. On-site survey to gather information about existing tower/pole structure as well as the
equipments intalled on the structure;
2. Evaluate and analyse the bearing capacity of the exisitng tower/pole structure by
ways of on-site structure test or structure model analysis;
3. Prepare Structure Stability Analysis Report with all necessary information required for
future design and construction.
The scope of work includes but is not limited to:
Complete structure strengthing design solution including calculation report, design
drawings as well as bill of materials based on the Structure Stability Analysis Report.
This work includes but is not limited to: collecting test data of single sites by DT and
checking whether every function of the site is normal and whether every parameter is
correctly configured. The contents of each test may include: 1) long voice call, 2) short
voice call,3) data uploading or downloading service, 4) PDP test,5) scanner test if
needed, 6) CQT on the voice service if needed.
This work includes but is not limited to: making statistical analysis of the DT and CQT
data and outputting single site verification test (SSV) reports.
This work includes but is not limited to: collecting test data of single sites by DT and
checking whether every function of the site is normal and whether every parameter is
correctly configured. The contents of each test may include: 1) long voice call, 2) short
voice call,3) data uploading or downloading service, 4) PDP test,5) scanner test if
needed, 6) CQT on the voice service if needed.

<>

23 , 13

ZTE

Proprietary Confidential

This work includes but is not limited to: making statistical analysis of the DT and CQT
data and outputting single site verification test (SSV) reports.
This work includes but is not limited to: collecting test data of single sites by DT and
checking whether every function of the site is normal and whether every parameter is
correctly configured. The contents of each test may include: 1) long voice call, 2) short
voice call,3) data uploading or downloading service, 4) PDP test,5) scanner test if
needed, 6) CQT on the voice service if needed.
This work includes but is not limited to: making statistical analysis of the DT and CQT
data and outputting single site verification test (SSV) reports.

<>

23 , 14

ZTE

Proprietary Confidential

340

226

3000

<>

23 , 15

ZTE

Proprietary Confidential

934

283

226

113

<>

23 , 16

ZTE

Proprietary Confidential

<>

23 , 17

ZTE

Proprietary Confidential

821

471

<>

23 , 18

ZTE

Proprietary Confidential

<>

23 , 19

ZTE

Proprietary Confidential

<>

23 , 20

ZTE

Proprietary Confidential

<>

23 , 21

Purchase Order Request


(For Engineering
Outsourcing)
Application

Region
Request By
PM Name

PR Numer

Date
Mobile No.
Ahmed Eldemerdash

Mobile No.

1289136500

E-mail
Address
E-mail
Address

Site ID.
Subcontractor
Scope of Work
Time of Completion

Civil Works
Installation
Completion
Date

Starting Date

Site ID.

Site Name

Region

DEL2931

DEL2931

Delta

Requirements
Approved By PM

Description

If subcontractor can not completed these sites before., ZTE reserve the right to take back

uest

ing)

ahmed.saleh@zte.com.cn

Time
Period

escription

TE reserve the right to take back this PO.