You are on page 1of 17

S.

NO DESCRIPTION OF WORK

NOS

A
1
2
3

R.C.C CONCRETE 1 : 3: 4
COLUMN
LINTEL BEAM - 9" WALL
LINTEL BEAM - 4.5" WALL

4
1
1

4
5
6

SILL CONCRETE
LOFT & SUNSHADE- 1'6" WIDE
ROOF SLAB

1
1
1

S.NO
B
1
2
3
1
2
3
4

DESCRIPTION OF WORK
BRICK WORK - C.M 1:6
9 " WALL
4.5 " WALL
PARAPET
DEDUCTION
DOOR - 9" WALL
DOOR - 4.5" WALL
WINDOW
VENTILATOR

S.NO DESCRIPTION OF WORK


C PLASTERING WORK C.M 1:5
1
INTERIOR WALLS
BED ROOM
BATHROOM - 4.5" WALLS
DOOR CUTS
DOOR CUTS
WINDOW CUTS
VENTILATOR CUTS
2

3
4

EXTERIOR WALLS
ALL AROUND WALL
PARAPET WALL OUTSIDE
PARAPET WALL INSIDE
PARAPET WALL TOP
LOFT
SUNSHADE

FIRST FLOOR - BED ROOM ONLY


L
B

13
40
8
5
15
12

' 4.5 "


'
0 "
' 10.5 "
'
0 "
'
6 "
'
6 "

0
0
0
0
1
10

NOS
1
1
1

40 '
8 '
40 '

1
1
1
1

3
2
3
2

'
'
'
'

9
9
4.5
9
6
6

"
"
"
"
"
"

B
0 "
6 "
0 "

0 '
0 '
0 '

9 "
4.5 "
9 "

0
6
6
0

0
0
0
0

9
4.5
9
9

"
"
"
"

"
"
"
"

NOS

'
'
'
'
'
'

'
'
'
'

1
1
1
1
1
1

40
8
17
17
16
8

'
0 "
' 10.5 "
'
0 "
'
0 "
'
0 "
'
0 "

0
0
0
0
0
0

'
'
'
'
'
'

0
0
9
4.5
9
9

"
"
"
"
"
"

1
1
1
1
2
2

43
43
40
40
9
9

'
'
'
'
'
'

0
0
0
0
1
1

'
'
'
'
'
'

0
0
0
9
6
6

"
"
"
"
"
"

0
0
0
0
0
6

"
"
"
"
"
"

DEDUCTION
DOOR - 9" WALL

2
3
4

DOOR - 4.5" WALL


WINDOW
VENTILATOR

2
2
2

3
2
3
2

'
'
'
'

0
6
6
0

"
"
"
"

0
0
0
0

'
'
'
'

0
0
0
0

"
"
"
"

S.NO DESCRIPTION OF WORK


NOS
D CEILING PLASTERING WORK C.M 1:3
1
ROOF SLAB
1

L
0 "

9 '

L
S.NO DESCRIPTION OF WORK
NOS
E
SURKHI LIME CONCRETE 3" THK OVER ROOF SLAB
1
ROOF SLAB
1
11 '
0 "

S.NO DESCRIPTION OF WORK


NOS
F
WEATHERING TILES OVER SURKHI
1
ROOF SLAB
1

S.NO
G
1
2

DESCRIPTION OF WORK
PAINTING WORK
EXTERIOR WALLS
INTERIOR WALLS

NOS
0
0

11 '

L
11 '

0 "

B
0 "

L
0 '
0 '

9 '

0 "

9 '

0 "

B
0 "
0 "

0 '
0 '

0 "
0 "

WOOD WORKS

S.NO DESCRIPTION OF WORK


H TILES WORK
1
BED ROOM - FLOORING
DEDUCTION - BATH ROOM
2
3

SIDE WALL CUTTING


BATHROOM FLOORING
BATHROOM WALL

0 '

1
1
1

S.NO
J
1
2
3
4
5

DESCRIPTION OF WORK
WOOD WORK
MAIN DOOR
DOOR - D1
PVC DOOR
WINDOW -W1
WINDOW -W2

NOS

S.NO
K
1
2
3

DESCRIPTION OF WORK
REINFORCEMENT
12MM ROD
10MM ROD
8MM ROD

NOS

0
1
1
1
1

6
7
4

0 '

NOS
1
1

0 "

11
3
40
3
3

'
'
'
'
'

B
0
4.5
0
0
0

"
"
"
"
"

9
5
0
5
5

L
0
0
0
0
0

'
'
'
'
'

'
0 "
' 10.5 "
'
0 "
'
6 "
'
6 "

B
0
0
0
0
0

"
"
"
"
"

L
0 '
0 '
0 '

0 "

3
3
2
3
3

'
'
'
'
'

6
0
6
6
0

"
"
"
"
"

B
0 "
0 "
0 "

0 '
0 '
0 '

0 "
0 "
0 "

4
5

6MM ROD
BINDING WIRES

15
1

0 '
0 '

0 "
0 "

0 '
0 '

0 "
0 "

- BED ROOM ONLY


D

0
0
0
0
0
0

'
'
'
'
'
'

9
4.5
4.5
3
3
4.5

"
"
"
"
"
"

VOLUME (CFT)

VOLUME (M3)

30.09
11.25
1.25
0.94
5.81
49.22

0.85
0.32
0.04
0.03
0.16
1.39
2.79
15.27
56.18
74.91

CEMENT
SAND
3/4" JALLY
H
10 '
10 '
3 '
7
7
4
2

'
'
'
'

0 "
0 "
0 "
0
0
6
0

"
"
"
"

VOLUME (CFT)

VOLUME (M3)

300.00
31.88
90.00

8.50
0.90
2.55

5.25
2.63
3.38
1.50

0.15
0.07
0.10
0.04
9.11
14.06
103.42
4556
1274

CEMENT
SAND
BRICK
FLYASH BRICK
H

VOLUME (CFT)

VOLUME (M3)

10
10
0
0
0
0

'
'
'
'
'
'

0
0
0
0
0
0

"
"
"
"
"
"

16.00
3.55
0.51
0.26
0.48
0.24

0.45
0.10
0.01
0.01
0.01
0.01

10
3
3
0
0
0

'
'
'
'
'
'

4.5
0
0
0
0
0

"
"
"
"
"
"

17.85
5.16
4.80
1.20
1.08
1.14

0.51
0.15
0.14
0.03
0.03
0.03

BAGS
CFT
CFT

BAGS
CFT
NOS
NOS

1.48
7
7
4
2

'
'
'
'

0
0
6
0

"
"
"
"

1.68
1.40
1.26
0.32

0.05
0.04
0.04
0.01
0.13

CEMENT
SAND
H
0 '

0 "

VOLUME (CFT)

VOLUME (M3)

3.96

0.11

CEMENT
SAND
T
0 '

3 "

0 '

0 "

VOLUME (M3)

24.75

0.70

0 '
0 '

0 "
0 "

0.70
5.45
24.75

VOLUME (SFT)

VOLUME (M2)

99.00

9.20

CEMENT
SAND
W.TILES

0.11
1.01
3.71

VOLUME (CFT)

LIME
BRICK BALLAST

1.35
8.09
49.58

9.20
0.81
4.46
168.30

VOLUME (SFT)

VOLUME (M2)

444.00
718.25

41.26
66.75

BAGS
CFT

BAGS
CFT

BAGS
CFT

BAGS
CFT
NOS

0 '

0 "

233.00

WALL CARE PUTTY


INTERIOR PRIMER
EXTERIOR PRIMER
INTERIOR EMULSION
EXTERIOR EMULSION
WOOD PRIMER
WOOD PAINTS

T
0
0
0
0
7

'
'
'
'
'

0
0
6
0
0

"
"
"
"
"

21.65

1.04
2.22
9.58
3.55
9.58
2.00
2.00

VOLUME (SFT)

VOLUME (M2)

99.00
19.83
20.00
16.50
119.00

9.20
1.84
1.86
1.53
11.06

BAGS
LITER
LITER
LITER
LITER
LITER
LITER

25.50
CEMENT
SAND
TILES
2' x 2' - FLOOR TILE
13" x 10" - WALL TILE
10" x 10" - FLOOR TILE
T
7
7
7
4
3

'
'
'
'
'

0
0
0
6
0

"
"
"
"
"

T
0 '
0 '
0 '

0 "
0 "
0 "

4.13
13.58

BAGS
CFT

26
133
25

NOS
NOS
NOS

VOLUME (CFT)

VOLUME (M2)

0.00
21.00
17.50
15.75
9.00

0.00
1.95
1.63
1.46
0.84
5.88

WEIGHT (KG)

VOLUME (M2)

74.83
53.04
22.96

6.95
4.93
2.13

0 '
0 '

0 "
0 "

43.01
0.00
193.85

4.00
0.00
18.02

BED ROOM - 11' x 9' & Building area is 132.5 S

SI
DESCRIPTION
NO

CEMENT
(BAGS)

SAND
(CFT)

1 R.C.C CONCRETE 1 : 3: 4

15.27

56.18

2 BRICK WORK - C.M 1:6

14.06

103.42

3 PLASTERING WORK C.M 1:5

8.09

49.58

4 CEILING PLASTERING WORK C.M 1:3

1.01

3.71

6 WEATHERING TILES OVER SURKHI

0.81

4.46

7 TILES WORK

4.13

13.58

43.37

230.93

BAGS

CFT

17,347

7,390

SURKHI LIME CONCRETE 3" THK OVER


5 ROOF SLAB

8 PAINTING WORK
WALL CARE PUTTY

1.04

BAGS

INTERIOR PRIMER

2.22

LITER

EXTERIOR PRIMER

9.58

LITER

INTERIOR EMULSION

3.55

LITER

EXTERIOR EMULSION

9.58

LITER

WOOD PRIMER

2.00

LITER

WOOD PAINTS

2.00

LITER

TILES:
2' x 2' - FLOOR TILE

26 NOS

13" x 10" - WALL TILE

133 NOS

10" x 10" - FLOOR TILE

25 NOS

9 SUMMARY OF REINFORCEMENT STEEL


Size of bar

6mm

8mm

Weight (Kg)

43.01

22.96

10 WOOD WORK
4" x 3" FRAME

3.83 CFT

3" x 1.5" FRAME

0.75 CFT

P.V.C DOOR

1.00 NOS

READYMADE DOOR

1 NOS

TOTAL MATERI

PAINTING WORK - LABOU

TILES WORK - LABOU

WOOD WORK - LABOU

TOTAL COST INCLUDING 10% W

area is 132.5 SFT (including attached toilet)


3/4"
JALLY
(CFT)

BRICKS
(NOS)

BRICK
LIME
WEATHERING
BALLAST
(BAGS)
TILES (NOS)
(CFT)

FLYASH
BRICKS
(NOS)

74.91
4556

1274

5.45

24.75
168.30

74.91

4556.07

5.45

24.75

168.30

1274.43

CFT

NOS

BAGS

CFT

NOS

NOS

2,097
1,086

311

1,437

497

1,437

340

100

5,674

27,336

163

545

2,020

5,735

5,445

792

10mm

12mm

16mm

20mm

Total Weight

53.04

74.83

193.85

7,667
1,500
2,200
3,000

7,754

TOTAL MATERIAL COST

101,874

772

LABOUR COST

32,875

248

ELECTRICAL WORK

13,475

102

PLUMBING WORK

13,475

102

NTING WORK - LABOUR COST

7,500

57

TILES WORK - LABOUR COST

3,691

15

LADDER

3,000

WOOD WORK - LABOUR COST

4,920

120

ST INCLUDING 10% WASTAGE

198,891

1,501

You might also like