URAIAN ANALISA ALAT

No.

U RAIAN

KODE

KOEF.

A.
1.
2.
3.
4.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat= 10 % x B

10

2.

Faktor Angsuran Modal

0.29832

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Mo( B - C ) x D
W

0.01

b. Asuransi, d

0.00

0.01

0.002 x B
W

Biaya Pasti per Jam


C.

= i x (1 + i)^A
(1 + i)^A - 1

(E+F)

COMPRESSOR 4000-6500 L\M


Pw
60.0
Cp
5,000.0
A
5.0
W
2,000.0
B
100

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

95,320.80

2.

Pelumas

82,759.50

Biaya bengke(6.25% dan 8.75%) x B


W

3.

Perawatan da (12,5 % - 17,5 %) x B


perbaika
W

0.01

4.
5.

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Ope
= ( 1 Orang / Jam ) x U2

L
M

22,598.42
13,589.79

= (2.5%-3%) x Pw x Mp

Biaya Operasi per Jam


D.

E.
1.
2.
3.
4.
5.
6.
7.

(H+I+K+L+M)

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

214,268.52

214,268.54

i
U1
U2
Mb
Ms
Mp

15.00
22,598.42
13,589.79
8,276.00
13,239.00
55,173.00

URAIAN ANALISA ALAT

No.

U RAIAN

KODE

KOEF.

A.
1.
2.
3.
4.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat= 10 % x B

10

2.

Faktor Angsuran Modal

0.61512

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Mo( B - C ) x D
W

0.04

b. Asuransi, d

0.00

= i x (1 + i)^A
(1 + i)^A - 1

0.002 x B
W

CONCRETE MIXER 0.3-0.6 M3


Pw
20.0
Cp
500.0
A
2.0
W
1,500.0
B
100

Biaya Pasti per Jam


C.

(E+F)

0.04

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

39,717.00

2.

Pelumas

33,103.80

Biaya bengke(6.25% dan 8.75%) x B


W

3.

Perawatan da (12,5 % - 17,5 %) x B


perbaika
W

0.01

4.
5.

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Ope
= ( 1 Orang / Jam ) x U2

L
M

22,598.42
13,589.79

Biaya Operasi per Jam

109,009.03

109,009.07

i
U1
U2
Mb
Ms
Mp

15.00
22,598.42
13,589.79
8,276.00
13,239.00
55,173.00

D.

E.
1.
2.
3.
4.
5.
6.
7.

= (2.5%-3%) x Pw x Mp

(H+I+K+L+M)

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

SATUAN

SOR 4000-6500 L\M


HP
CPM/(L/m)
Tahun
Jam
Rupiah

Rupiah
-

Rupiah

Rupiah

Rupiah

Rupiah
Rupiah

Rupiah

Rupiah
Rupiah

KET.

E05

Rupiah
Rupiah

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter

SATUAN

E MIXER 0.3-0.6 M3
HP
Liter
Tahun
Jam
Rupiah

Rupiah
-

Rupiah

Rupiah

KET.

E06

Rupiah

Rupiah
Rupiah
Rupiah

Rupiah

Rupiah
Rupiah
Rupiah
Rupiah

% / Tahun
Rp./Jam
Rp./Jam
Liter
Liter
Liter