You are on page 1of 8

Form

TECHNICAL
SUPERINTENDENT VISIT
REPORT

LF- C 064

Revision
Page

1 of 8

SUPERINTENDENTS DETAILED REPORT


Superintendent:
Ship Name /
IMO No:
Call sign:

Sintong Marpaung

Place:

Sei Pitung

Date:

MIRSHAD

Owner

Flag:

Port of registry:

Class:

KI

Build:

IMO no:

N/A

Call sign:

LOA:

Breath:

GT:

NT:

DWT

Light ship:

12/6/15

PT. LINTAS SAMUDRA BORNEO LINE

FO-consumption 24/hrs:

Speed - loaded:

LO-consumption 24/hrs:

Speed in ballast:

Owner/Manager:

Symbols: A = ABOVE NORMAL, B = NORMAL, C = IMPROVEMENT REQUIRED


Location/install.:

EVALUATION - COMMENTS

HULL - OUTSIDE
Topsides:

Main deck, port:

Main deck, stb.:

Hatch-covers:

Hatch coamings:

Forecastle deck:

Poop deck:

Boat deck:

Bridge deck:

Monkey top:

Masts:

Funnels:

Ventilator flaps:

Davits:

Lifeboats:

Liferafts-craddles:

LF- C064/DES 2012

Written by : Technical

Approved by : VP / DPA

Retention Period : 1 Year

TECHNICAL
SUPERINTENDENT VISIT
REPORT
Location/install.:

Form

LF- C 064

Revision
Page

2 of 8

EVALUATION - COMMENTS

Bollards:

Superstructure:

Skylight:

CO2-room:

Battery room:
Air-condition
plant:
Other rooms:
Fire-hoses /
nozzles:
Fire hydrants:

Lifebuoys:

Outside lights:

Outside cables:

Anchor winches:
Mooring winches,
fwd.:
Capstan /Mooring
winches, aft.:
Ventilators for
cargo holds:
Sounding pipes:

Tank vents:

Derricks:

Gaskets:

CARGO HOLDS, INSTALLATIONS & EQUIPMENT:


Cargo hold # 1:

Cargo hold # 2:

Cargo hold # 3:

Cargo hold #4:

Cargo hold access:

Side ports:

Cargo ramps:

Hydraulics cargo:

Cargo elevators:

Cargo cranes:

Cargo equipment:

LF- C064/DES 2012

Written by : Technical

Approved by : VP / DPA

Retention Period : 1 Year

TECHNICAL
SUPERINTENDENT VISIT
REPORT
Location/install.:

Form

LF- C 064

Revision
Page

3 of 8

EVALUATION - COMMENTS

Cement plant:

Tunnel:

Cargo compr.:

Valves:

Transport links:

Cargo hoses:

TANKS
DB tanks ballast

WT ballast

DB/WT fueltanks

Fore-peak tank:

Deep tank:

Aft-peak tank:

Freshwater tanks:

OTHER COMPARTMENTS AND INSTALLATIONS


Bowthruster room:

Generator room:

Anchors:

Anchor chain:

Mooring ropes:

Pilot ladders:

Gangways:
Accommodation
ladders:
Stores room, fwd:

Stores room, aft:

Railing / bulwark:

LF- C064/DES 2012

Written by : Technical

Approved by : VP / DPA

Retention Period : 1 Year

TECHNICAL
SUPERINTENDENT VISIT
REPORT
Location/install.:

Form

LF- C 064

Revision
Page

4 of 8

EVALUATION - COMMENTS

ACCOMMODATION
Galley
Galley equipment
& installations:
Officers mess:

Crew mess:

Pantry:

Laundry room:
Provision room:
Dry provisions:
Provision-room
reefer spaces:
Masters cabin:

Officers cabins:

Crew cabins:

Corridors:

Bathrooms:

Toilets incl. piping:

Heaters/air-cond.:

Masters office:
Chief
Engineer/Chief
Officer offices:
Furniture:

Carpets:
Floor covering
(vinyl covering):
Hospital:

Pilot cabin:

Spare cabin:

Owners cabin:

Wheel house:

Chart room:

Radio room:

ENGINE-ROOM
Main engine:

Aux. engines:

Stern tube:

LF- C064/DES 2012

Written by : Technical

Approved by : VP / DPA

Retention Period : 1 Year

TECHNICAL
SUPERINTENDENT VISIT
REPORT
Location/install.:

Form

LF- C 064

Revision
Page

5 of 8

EVALUATION - COMMENTS

Lub. oil pumps:

Freshwater pumps:

Seawater pumps:

Debit pompa SW terlalu kecil untuk mendinginkan fresh water cooling main engine

Ballast pumps:

Not Check

Sea-chests:

Sea-valves:

Purifiers:

N/A

Evaporator:

N/A

Heating systems:

N/A

Air compressor:

N/A

ME cooler:

Cooling line banyak yang bocor (tambal temporary repairs)

Aux. eng. coolers:

Cooling line AE sudah banyak yang berkarat

Main switchboard:
Energency fire
pump:
Emergency
generator:
Engine room
general condition:
Floors, platforms
and ladders:
Batteries:

CO2-installations:

N/A

Alarm systems:

N/A

Workshop:

Only at the mid of engine room

Tools:

No Tools List

Spare parts:

No Sparepart List

Diesel-tank full? ( PORTABLE )


N/A
Banyak pompa-pompa SW dan sparepart-sparepart bekas yang sudah rusak

NAVIGATION EQUIPMENT
Standard compass:

Gyro compass:

Auto pilot:

Radar 3cm

Radar 10 cm:

ARPA:
Bridge control
Eng. man system:
Navigation lights:

LF- C064/DES 2012

Written by : Technical

Approved by : VP / DPA

Retention Period : 1 Year

TECHNICAL
SUPERINTENDENT VISIT
REPORT
Location/install.:

Form

LF- C 064

Revision
Page

6 of 8

EVALUATION - COMMENTS

Echo-sounder:

GPS # 1:

GPS # 2:

GMDSS:

Radio station:

VHF:

Search light:

Aldis lamp:

Binoculars:

Calculator:

Charts
Navigation
publications:
Other equipment:

ADDITIONAL EQUIPMENT BRIDGE/OFFICES


Typewriters:

Computer:

N/A

Printer:

N/A

Television:

Videos:

Radios:

SAFETY MANAGEMENT SYSTEM- DOCUMENTATION & IMPLEMENTATION:


SHE&QA-manuals

acc. for:
Bridge check lists:

E/R check lists:

Safety check list:


P&E Committee
established:
RUI-reporting
system impl.:
EXP-Transfer
reports read:
Oil Record Book:
Garbage Disposal
Record Book:

LF- C064/DES 2012

Regular Meetings?

Written by : Technical

Approved by : VP / DPA

Retention Period : 1 Year

TECHNICAL
SUPERINTENDENT VISIT
REPORT
Location/install.:

Form

LF- C 064

Revision
Page

7 of 8

EVALUATION - COMMENTS

Chemicals record:

Deck log book:

Engine log book:

SMS implemented

SMS-meetings:
SMS-motivation &
interest:

(Officers & ratings)

MAINTENANCE SYSTEMS IMPLEMENTATION AND UPKEEP:


Deck:

Engine:

No Computer

LF- C064/DES 2012

Written by : Technical

Approved by : VP / DPA

Retention Period : 1 Year

TECHNICAL
SUPERINTENDENT VISIT
REPORT
DRYDOCKINGS:

Date:

Form

LF- C 064

Revision
Page

8 of 8

Place:

Yard:

Last docking:

Next docking:

Comments to docking:

Place:

Membuat Tool List


Membuat Spare Part list
Membuat Inventory List
Membuat PMS Engine
Perbaikan bertahap cooling line M.E dan A.E
Ganti Pompa SW (KAWAMOTO) dengan Pompa NS-80 yang debitnya lebih banyak untuk menjaga suhu M.E tetap
stabil
Ganti flexible exhaust A.E (P&S) yang bolong
Service oil cooler M.E (S) ke HK Teknik
Service tube cooling M.E (S) ke HK Teknik
Suplai Komputer PC dan Printer

Banjarmasin

Date:

Master - Name:

Sign:

Chief Engineer Name: Not Hire yet

Sign:

Superintendent /
Inspector Name:

Sign:

LF- C064/DES 2012

Sintong Marpaung / Aldo Sitorus

Written by : Technical

June 12, 2015

Approved by : VP / DPA

Retention Period : 1 Year