DAILY ACTIVITY REPORT ACTUAL - INSTRUMENT & ELECTRICAL TECHNICIAN

WEEK-20
Name
NIP
Position

: Denan Aprilio
: 14787
: TDP 2
Time

No.

Day, Date

Type

Job Card

Id. No.

Description

Detail History

WI

JSA

Chk Lst

WP

Start

End

Total

Notes

*morning meeting+work preparation


*safety tool box
1

Monday, 12nd
May 2014

Maintenance Fuel Forwarding Skid Block #1 (GTG3, Cleaning area FF Block 1, PMS Visual check for motor, Panel Control and
4, 6)
Lamp Status FF and Recording Pressure Indicator and Temprature Indicator

PMS

*Tools check and 5R


*morning meeting+work preparation
Maintenance Battery and Charger Room at
Switchgear 1

PMS
2

Tuesday, 13th
May 2014

WORK HOURS

0.00

WORK HOURS

0.00

WORK HOURS

0.00

WORK HOURS

0.00

WORK HOURS

0.00

WORK HOURS

0.00

WORK HOURS

0.00

Check Voltage Battery, Check SG Battery, Check Temprature Battery,


Cleaning Battery and Refill Wet Battery

*Tools check and 5R

*morning meeting+work preparation


Maintenance Battery and Charger Room at
Switchgear 3

PMS

Check Voltage Battery, Check SG Battery, Check Temprature Battery,


Cleaning Battery and Refill Wet Battery

Wednesday,
14th May
2014

Thursday,
15rd May
2014

Event
Event

Friday, 16th
May 2014

Event

*morning meeting+work preparation


MI GTG-1
*Tools check and 5R

Replace Temprature Switch on Turbine Compartement

Saturday,
17th May
2014

Event

*morning meeting+work preparation


MI GTG-1
*Tools check and 5R

Cleaning MCC Panel and Calibration Temprature Switch with AMATEC

*Tools check and 5R

*morning meeting+work preparation


MI GTG-1

Replace Flame Detector and Sparkplug at Unit GTG 1

*Tools check and 5R

*morning meeting+work preparation


7

Sunday, 18th
May 2014
Note :

Event

MI GTG-1

Calibation Temprature Transmitter with Hart Equipment and Cleaning MCC


Panel

*Tools check and 5R


: Over time
: On call

Weekly

Employee Signature

Acknowledge By

Approved By

Denan Aprilio

Sarip Kosim

Bondan Priyambodo

0.00

Persen (%)

(TDP 2)

( Supervisor )

(Assisten Manager )

DAILY ACTIVITY REPORT ACTUAL - INSTRUMENT & ELECTRICAL TECHNICIAN


WEEK-20
Name
NIP
Position

: Bambang Febrianto
: 14785
: TDP 2
Time

No.

Day, Date

Type

Job Card

Id. No.

Description

Detail History

*morning meeting+work preparation


*toolbox meeting
1

Monday, 19nd
May 2014

Event

MI GTG-1

Event

MI GTG-1

Calibration Temp. Transmitter HRSG 1 area


Remove Pressure Transmitter HRSG 1 Area
Calibration Pressure Tranmitter HRSG 1 Area
-IP Steam Pressure

*Tools check and 5R

Tuesday, 20th
May 2014

Event

MI GTG-1

Wednesday,
21st May
2014

Event

CWP 1 block 1 can't running

Event

MI GTG-1

WP

Start

End

Total

8:00
8:30

8:30
9:00

0.50
0.50

9:00

12:00

3.00

13:00

16:30

3.50

8:00

6.50
0.50
8.00
1.00

9:00

10:00

1.00

11:00

1.00

11:00

12:00

1.00

Remove Flame Detector GTG1 (right Side)


Calibration Temp. Transmitter HRSG 1 area

7:00
8:00
10:30
16:30

Thursday,
15rd May
2014

Event
Event

Friday, 16th
May 2014

Event

*morning meeting+work preparation


MI GTG-1
*Tools check and 5R

Calibration Temp. Transmitter HRSG 1 area

8:00
9:00
16:30

Saturday,
17th May
2014

Event

*morning meeting+work preparation


HGPI GTG-4
*Tools check and 5R

Calibration Temp. Transmitter HRSG 1 area

8:00
9:00
16:30

Sunday, 18th
May 2014

Event

*morning meeting+work preparation

8:00
Replace Cable Damper GTG-1
Calibration Temp. Transmitter HRSG 1 area

*Tools check and 5R

WORK HOURS
8:00
10:30
16:30
17:00
WORK HOURS
9:00
16:30
17:00
WORK HOURS
9:00
16:30
17:00
WORK HOURS
9:00

9:00
16:30

: Over time
: On call

Employee Signature

17:00
WORK HOURS
9:00

10:00

Note :

16:30

0.50
8.00
1.00

Calibration Pressure Transmitter HRSG 1 Area


-HP Drum Pressure
rewiring, cause wire is broke, make a seal
Calibration Pressure Transmitter HRSG 1 Area
-HP Drum Pressure (cont'd)

*morning meeting+work preparation


MI GTG-1
MI GTG-1
*Tools check and 5R

MI GTG-1

17:00
WORK HOURS
9:00

9:00
16:30

*morning meeting+work preparation


MI GTG-1

Chk Lst

8:00
Calibration Pressure Tranmitter HRSG 1 Area
-HP Steam Pressure
-IP Drum Pressure

*Tools check and 5R

Event

JSA

16:30

*morning meeting+work preparation


2

WI

16:30
17:00
WORK HOURS

Weekly

Acknowledge By

Approved By

53.00

4.00
1.00
2.50
5.00
0.50
9.00
1.00
6.50
0.50
8.00
1.00
6.50
0.50
8.00
1.00
6.50
0.50
8.00
133

Agus Kurnia
(Instel Technician)

Sarip Kosim
( Supervisor )

Bondan Priyambodo
(Assisten Manager )

Notes