Professional Documents
Culture Documents
Contents
Page 1
CONTENTS
GENERAL
Introduction
Use and Maintenance of the Site
Site Access and Entry onto the Site
Protection
Interference
Project Meetings
Submittals
Building Demolition
Materials
Occupational Health and Safety
Engineers Site Facilities
Contractors Site Facilities
Setting Out of the Works
Temporary Works and Equipment
Temporary Controls
Traffic Diversions
Project Co-ordination
Other Contractors
Regulatory Requirements
Clearance of the Site
Final Inspection and Handover Procedures
New Technologies and Innovations
Design and Supervision Consultant Quality Requirement
Construction Dewatering
SECTION 2
Part 1
Part 2
Part 3
Part 4
Part 5
Part 6
Part 7
Part 8
Part 9
Part 10
Part 11
Part 12
Part 13
Part 14
Part 15
ZP
SECTION 1
Part 1
Part 2
Part 3
Part 4
Part 5
Part 6
Part 7
Part 8
Part 9
Part 10
Part 11
Part 12
Part 13
Part 14
Part 15
Part 16
Part 17
Part 18
Part 19
Part 20
Part 21
Part 22
Part 23
Part 24
QCS 2014
Contents
GROUND INVESTIGATION
General
Boreholes
Pits and Trenches
Soil Sampling
in-Situ Testing, Instrumentation and Monitoring
Laboratory Testing
SECTION 4
Part 1
Part 2
Part 3
Part 4
Part 5
SECTION 5
Part 1
Part 2
Part 3
Part 4
Part 5
Part 6
Part 7
Part 8
Part 9
Part 10
Part 11
Part 12
Part 13
Part 14
Part 15
Part 16
Part 17
Part 18
Part 19
Part 20
CONCRETE
General
Aggregates
Cementitious Materials
Water
Admixtures
Property Requirements
Concrete Plants
Transportation and Placing Of Concrete
Formwork
Curing
Reinforcement
Joints
Inspection and Testing Of Hardened Concrete
Protective Treatments for Concrete
Hot Weather Concreting
Miscellaneous
Structural Precast Concrete
Prestressed Concrete
Testing of Water Retaining Structures
Personnel Qualifications and Certification
SECTION 6
Part 1
Part 2
Part 3
Part 4
Part 5
Part 6
Part 7
Part 8
Part 9
ROADWORKS
General
Site Clearance
Earthworks
Unbound Pavement Materials
Asphalt Works
Concrete Road Pavements
Asphalt Plants
Recycled and Stabilised Road Materials
Recycled Aggregate for Roadworks
ZP
SECTION 3
Part 1
Part 2
Part 3
Part 4
Part 5
Part 6
Page 2
QCS 2014
Contents
Vehicle Crash Barriers
Kerbs, Footways and Paved Areas
Fencing
Traffic Signs, Markings and Studs
Works in Relation To Services
Road Lighting
Traffic Signals
Road Drainage
Geosynthetics
Miscellaneous
SECTION 7
Part 1
Part 2
Part 3
Part 4
Part 5
Part 6
GREEN CONSTRUCTIONS
Introduction
Global Sustainability Assessment System - GSAS
Energy
Water [W]
Indoor Environment
Cultural and Economic Value
SECTION 8
Part 1
Part 2
Part 3
Part 4
Part 5
Part 6
Part 7
Part 8
Part 9
Part 10
Part 11
Part 12
DRAINAGE WORKS
General
Earthworks
Pipes and Fittings Materials
Pipeline Installation
Valves, Penstocks and Appurtenances
Miscellaneous Metal Works
Miscellaneous GRP Works
Protective Coatings and Painting
Trenchless Pipeline Construction
Pipelines Cleaning and Inspection Survey
Sewer Rehabilitation
Vacuum Sewerage System
SECTION 9
Part 1
Part 2
Part 3
Part 4
Part 5
Part 6
Part 7
Part 8
Part 9
Part 10
Part 11
Part 12
Part 13
Part 14
ZP
Part 10
Part 11
Part 12
Part 13
Part 14
Part 15
Part 16
Part 17
Part 18
Part 19
Page 3
QCS 2014
Contents
Page 4
SECTION 10
Part 1
Part 2
Part 3
Part 4
Part 5
SECTION 11
Part 1
Part 2
SECTION 12
Part 1
Part 2
Part 3
Part 4
Part 5
SECTION 13
Part 1
Part 2
Part 3
Part 4
Part 5
MASONRY
General
Mortar and Grout
Accessories
Unit Masonry
Masonry Laying
SECTION 14
Part 1
Part 2
Part 3
Part 4
Part 5
ROOFING
General
Membrane Roofing
Metal and Plastic Roofing
Roof and Deck Insulation
Roofing Tiles
SECTION 15
Part 1
Part 2
Part 3
ZP
Part 15
Part 16
Part 17
Part 18
Part 19
Part 20
Part 21
Part 22
QCS 2014
Contents
STRUCTURAL STEELWORKS
General
Materials
Drawings
Fabrication
Welding
Bolting
Accuracy of Fabrication
Erection
Accuracy of Erected Steelwork
Protective Treatment
SECTION 17
Part 1
Part 2
Part 3
Part 4
Part 5
Part 6
METALWORK
General
Materials Classification
Metal Doors and Windows
Architectural Metal Work
Light Metal Support and Cladding Support
Workmanship
SECTION 18
Part 1
Part 2
Part 3
Part 4
Part 5
Part 6
Part 7
SECTION 19
Part 1
Part 2
Part 3
Part 4
Part 5
Part 6
Part 7
PLUMBING WORK
General
Water Distribution
Plumbing Pipework in Trenches
Cold Water Storage
Hot Water Storage
Commissioning of Systems
Plumbing for Gases
SECTION 20
Part 1
Part 2
Part 3
Part 4
Part 5
Part 6
Part 7
ZP
SECTION 16
Part 1
Part 2
Part 3
Part 4
Part 5
Part 6
Part 7
Part 8
Part 9
Part 10
Page 5
QCS 2014
Contents
ELECTRICAL WORKS
General Provisions for Electrical Installation
MV Factory Built Assemblies (FBAs)
Protective Devices
Motor Starters
Low Voltage Variable Speed Controllers
Cables and Small Wiring
Conduits and Conduit Boxes
Trunking
Cable Trays
Wiring Accessories and General Power
Light Fittings
Emergency Lighting
Telephone Installations
Structured Cabling Systems
Electric Motors
Power Factor Correction Capacitors
Standby Diesel Generator Set
Uninterruptible Power Supply Systems
Sound and Call Systems
Elevators/Escalators
Lightning Protection
Earthing and Bonding
Inspection and Testing
Documentation Format
Electrical Identification
Electromagnetic Compatibility
Battery and Battery Charger
Small Enclosures
Underfloor Ducts
Duct Bank and Manholes
Power Distribution Transformers
11 kv Switchgear
Actuators
HV Variable Frequency Drive
SECTION 22
Part 1
Part 2
Part 3
Part 4
Part 5
Part 6
Part 7
Part 8
Part 9
SECTION 23
Part 1
Part 2
ZP
SECTION 21
Part 1
Part 2
Part 3
Part 4
Part 5
Part 6
Part 7
Part 8
Part 9
Part 10
Part 11
Part 12
Part 13
Part 14
Part 15
Part 16
Part 17
Part 18
Part 19
Part 20
Part 21
Part 22
Part 23
Part 24
Part 25
Part 26
Part 27
Part 28
Part 29
Part 30
Part 31
Part 32
Part 33
Part 34
Page 6
QCS 2014
Contents
Analogue Addressable Fire Alarm Systems
Fire Fighting System
Testing and Commissioning
SECTION 24
Part 1
Part 2
Part 3
Part 4
Part 5
Part 6
Part 7
Part 8
Part 9
Part 10
Part 11
Part 12
Part 13
Part 14
FINISHES TO BUILDINGS
General
Lath and Plaster
Dry Lining (Wall Board)
Special Wall Surfaces
Tiles
Terrazzo
Stone Flooring
Unit Masonry Flooring
Floor Screeds and Treatments
Joints, Caulking and Sealants
Recessed Duct Covers
Carpeting
Other Floor Coverings
Ceilings
SECTION 25
Part 1
Part 2
Part 3
Part 4
SECTION 26
Part 1
Part 2
Part 3
Part 4
SECTION 27
Part 1
Part 2
Part 3
Part 4
Part 5
Part 6
Part 7
Part 8
Part 9
EXTERNAL WORKS
General
Block Paved Areas
Fences and Gates
Fountains and Aquatic Features
Site Furniture
Flag Poles
Protective or Shade Cover Systems
Play Field and Park Equipment
Miscellaneous Other External Works
SECTION 28
Part 1
Part 2
Part 3
LANDSCAPING
Landscape Planting
Landscape Irrigation System
Play Equipment General Specification
ZP
Part 3
Part 4
Part 5
Page 7
QCS 2014
ZP
RAILWAYS
Design Related Issues Aspects
Site Clearance
Geotechnical Specifications
Tunnel
Cut and cover Structure
Earthworks and Roadworks
Concrete Structures
Steel Structures
Drainage
Railway Track
Monitoring and Instrumentation
Survey and Setting Out
SECTION 29
Part 1
Part 2
Part 3
Part 4
Part 5
Part 6
Part 7
Part 8
Part 9
Part 10
Part 11
Part 12
Contents
Page 8