Presupuesto

DICEO
Lugar

HOJA DE PRESUPUEST

Item

01.00.00
01.01.00
01.01.01
01.01.02
02.02.00
02.02.01
02.02.03
03.03.00
03.03.01

03.03.03
03.03.04
04.04.00
04.04.01
05.05.00

05.05.01

EXPEDIENTE REALIZADO POR FIRE


CONSTRUCCION DE UNA VIVIENDA BIFAMILIAR

PEREZ MAMANI RICHARD JONATHAN


AREQUIPA - AREQUIPA - J. L. BUSTAMANTE Y RIVERO

HOJA DE PRESUPUESTO

Descripcin

Und.

LOSAS DEPORTIVAS DE FULBITO


OBRAS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL

m2

TRAZO, NIVELES Y REPLANTEO

m2

MOVIMIENTO DE TIERRAS
REFINE Y NIVELACION EN TERRENO NORMAL

m2

ELIMINACION DE MATERIAL EXCEDENTE

m3

CONCRETO SIMPLE
ENCOFRADO Y DESENCOFRADO DE LOSA DE CONCRETO

m2

EMPEDRADO PARA LOSA DEPORTIVA


CONCRETO PARA LOSAS DEPORTIVAS FROTACHADO f'c=175 kg/cm2
RELLENO DE JUNTAS EN LOSAS CON ASFALTO RC-250

m3
m

PINTURA
PINTURA DEMARCATORIA EN LOSA DEPORTIVA
CARPINTERIA METALICA

m2

COLOCACION Y TRANSPORTE DE ARCOS DE FUTBOL

glb

IZADO POR FIRE

VIVIENDA BIFAMILIAR

07/01/2013

TO

Metrado

Duracion

Precio (S/.)

TOTAL

540.00

1 da

6.09

3,286.42

540.00

1 da

4.52

2,440.77

540.00

3 das

12.21

6,595.88

48.00

1 DIA

18.17

872.18

91.83

35.09

3,222.61

25.83

2,092.62

307.30

13,275.31

246.00

4 das
6 das
4 das
1 da

61.34

15,090.79

15.51

1.00

13.66

211.98

81.00
43.20

2.00

1.00

13.67

27.33

MEZCLADORA DE CONCRETO TAMBOR 18 HP 11

MEZCLADORA DE CONCRETO TAMBOR 18 HP 11

CAPATAZ
oficial

01.01.01

m2/DIA

17.2
12.6

LIMPIEZA DE TERRENO MANUAL

40.0000

EQ.

Descripcin Recurso

40.0000

Unidad
Mano de Obra

CAPATAZ

HH

OPERARIO

hh

PEON

hh

Equipos
HERRAMIENTAS MANUALES

%MO

TRAZO DE NIVELES Y REPLANTEO

m2/DIA

500.0000

EQ.

Descripcin Recurso

500.0000

Unidad
Mano de Obra

CAPATAZ

hh

OPERARIO

hh

PEON

hh

Materiales
YESO DE 28 Kg

bls

MADERA TORNILLO

p2

Equipos
HERRAMIENTAS MANUALES

%MO

NIVELACION Y COMPACT

Rendimiento

m2/DIA

Cdigo

Descripcin Recurso

Mano de Obra

MO.

40

Unidad

capataz

hh

OPERARIO

hh

PEON

hh

Materiales
AGUA

Equipos
HERRAMIENTAS MANUALES

%MO

PLANCHA COMPACTADORA

hm

NIVEL TOPOGRAFICO

hm

ELIMINACI

Rendimiento

m3/DIA

MO.

190

Cdigo

Descripcin Recurso

Unidad

CAPATAZ

hh

PEON

hh

CAMION VOLQUETE 4x2 120-140 HP 4 M3.

hm

RETROEXCAVADOR S/LLANTAS 58 HP 1 YD3.

hm

Mano de Obra

Equipos

Partida

04.03.02

Rendimiento

m2/DIA

ENCOFRADO Y DESENCOFR
16.0000

EQ.

Mano de Obra
CAPATAZ
OPERARIO
OFICIAL
PEON

Materiales
ALAMBRE NEGRO RECOCIDO # 8
CLAVOS C/C PARA MADERA (PROMEDIO)
MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADO

Equipos
HERRAMIENTAS MANUALES

Subpartidas
DESENCOFRADO

EMPEDRADO PARA LOSA DEPORTIVA

01.04.06

u/DIA

25.0000

EQ.

Descripcin Recurso
Mano de Obra
CAPATAZ
OFICIAL

Materiales
PIEDRA 6 "

Equipos
HERRAMIENTAS MANUALES

01.04.05

m3/DIA

CONCRETO EN LOSAS ALIGERADAS FC=210 kg/cm2

12.5000

EQ.

Descripcin Recurso

12.5000

Unidad
Mano de Obra

CAPATAZ

hh

OPERARIO

hh

OFICIAL

hh

PEON

hh

Materiales
PIEDRA CHANCADA DE 1/2"

m3

ARENA GRUESA

m3

CEMENTO PORTLAND TIPO I (42.5 kg)

bls

AGUA

m3

Equipos
HERRAMIENTAS MANUALES

%MO

VIBRADOR DE CONCRETO 4 HP 2.40"

hm

MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3

hm

RELLENO DE JUNTAS EN LOSAS CON ASFALTO RC-250


u/DIA

50.0000

Descripcin Recurso
Mano de Obra

EQ.

CAPATAZ
OFICIAL
PEON

Materiales
RC-250
ARENA FINA

Equipos
HERRAMIENTAS MANUALES

Partida

17.04

Rendimiento

m2/DIA

Cdigo

Descripcin Recurso

PINTURA DEMARCATORIA EN LOSA D

20.0000

EQ.

Mano de Obra
CAPATAZ
OPERARIO
PEON

Materiales
THINNER ACRILICO
LIJA
PINTURA ESMALTE SINTETICO
PINTURA ANTICORROSIVA

Equipos
HERRAMIENTAS MANUALES

Partida

17.04

Rendimiento

m2/DIA

Cdigo

Descripcin Recurso

COLOCACION Y TRANSPORTE DE ARC

20.0000

Mano de Obra
CAPATAZ
OPERARIO
PEON

Materiales
THINNER ACRILICO
SOLSADURA

EQ.

LIJA
PINTURA ESMALTE SINTETICO
PINTURA ANTICORROSIVA
TUBO DE 4"

Equipos
HERRAMIENTAS MANUALES

CAPATAZ
oficial

17.2
12.6

01.01.01

LIMPIEZA DE TERRENO MANUAL

Descripcin Recurso

Unidad
Equipos

HERRAMIENTAS MANUALES

%MO

TRAZO DE NIVELES Y REPLANTEO


Descripcin Recurso

Unidad
Materiales

YESO DE 28 Kg

bls

MADERA TORNILLO

p2

NIVELACION Y COMPACT
Cdigo

Descripcin Recurso

Unidad

Materiales
AGUA

Equipos
HERRAMIENTAS MANUALES

%MO

PLANCHA COMPACTADORA

hm

NIVEL TOPOGRAFICO

hm

ELIMINACI

Cdigo

Descripcin Recurso

Unidad

CAPATAZ

hh

Mano de Obra

PEON

hh

CAMION VOLQUETE 4x2 120-140 HP 4 M3.

hm

RETROEXCAVADOR S/LLANTAS 58 HP 1 YD3.

hm

Equipos

ENCOFRADO Y DESENCOFR
Materiales
ALAMBRE NEGRO RECOCIDO # 8
CLAVOS C/C PARA MADERA (PROMEDIO)
MADERA TORNILLO INCLUYE CORTE PARA ENCOFRADO

Equipos
HERRAMIENTAS MANUALES

Subpartidas
DESENCOFRADO

EMPEDRADO PARA LOSA DEPORTIVA


Descripcin Recurso
Materiales
PIEDRA 6 "

Equipos
HERRAMIENTAS MANUALES

CONCRETO EN LOSAS ALIGERADAS FC=210 kg/cm2


Descripcin Recurso

Unidad
Materiales

PIEDRA CHANCADA DE 1/2"

m3

ARENA GRUESA

m3

CEMENTO PORTLAND TIPO I (42.5 kg)

bls

AGUA

m3

Equipos
HERRAMIENTAS MANUALES

%MO

VIBRADOR DE CONCRETO 4 HP 2.40"

hm

MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3

hm

RELLENO DE JUNTAS EN LOSAS CON ASFALTO RC-250


Descripcin Recurso
Materiales

RC-250
ARENA FINA

Equipos
HERRAMIENTAS MANUALES

PINTURA DEMARCATORIA EN LOSA D


Cdigo

Descripcin Recurso
Materiales
THINNER ACRILICO
LIJA
PINTURA ESMALTE SINTETICO
PINTURA ANTICORROSIVA

Equipos
HERRAMIENTAS MANUALES

COLOCACION Y TRANSPORTE DE ARC


Cdigo

Descripcin Recurso

Materiales
THINNER ACRILICO
SOLSADURA
LIJA
PINTURA ESMALTE SINTETICO
PINTURA ANTICORROSIVA
TUBO DE 4"

Equipos
HERRAMIENTAS MANUALES

20.3
14.9
OFICIAL

capataz 17.20 oficial 12.60 operario 14.40 peon 11.56


operario
14.4
17.0
peon
11.56
13.6
14.9

TERRENO MANUAL

Costo unitario directo por : m2

6.09

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

0.1

0.02

20.3

0.40592

0.1000

0.0200

16.99

0.34

2.0000

0.4000

13.64

5.46
5.80

5.0000

5.80

0.29
0.29

RAZO DE NIVELES Y REPLANTEO

Costo unitario directo por : m2

4.52

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

1.0000

0.0160

20.30

0.32

1.0000

0.0160

16.99

0.27

3.0000

0.0480

13.64

0.22
0.81

0.0500

21.01

1.05

0.0200

4.20

0.21
1.26

3.0000

0.81

2.44
2.44

NIVELACION Y COMPACTACION MANUAL

Costo unitario directo por : m2

Cuadrilla

12.2146

Cantidad

Precio S/.

Parcial S/.

0.1

0.02

20.30

0.40592

0.1

0.02

16.99

0.33984

0.2

13.64

0.272816
2.82

m3

0.25

10

2.5
2.5

0.6

2.82

0.4

15

0.5

0.1

8.1

0.0846
6
0.81
6.8946

ELIMINACION MATERIAL EXCEDENTE

Costo unitario directo por : m3

18.1705

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

0.1

0.0042105263

20.30

0.07

0.0842105263

13.64

1.05
1.12

0.0421

210

8.841

0.0421

195

8.2095

17.0505
ENCOFRADO Y DESENCOFRADO DE LOSA DE LOSA
16.0000

Costo unitario directo por : m2

35.09

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

hh

0.1000

0.0500

20.30

1.01

hh

1.0000

0.5000

16.99

8.50

hh

1.0000

0.5000

14.87

7.43

HH

1.0000

0.5000

13.64

6.82
16.94

kg

0.2600

3.42

0.89

kg

0.1600

4.20

0.67

p2

3.3500

3.40

11.39
12.95

%MO

5.0000

16.94

0.85
0.85

m2

1.0000

4.35

4.35
4.35

PARA LOSA DEPORTIVA


800.0000

Costo unitario directo por : u

25.83

Unidad

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

hh

0.1000

0.0320

20.30

0.65

hh

5.0000

1.6000

14.87

23.79
24.44

M3

0.1500

1.51

0.23
0.23

%MO

3.0000

0.39

1.17
1.17

Costo unitario directo por : m3

307.30

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

0.1563

0.1000

20.30

2.03

1.5000

0.9600

16.99

16.31

1.0000

0.6400

14.87

9.52

6.5000

4.1600

13.64

56.75
84.60

0.8500

29.41

25.00

0.4200

27.31

11.47

9.7400

18.07

176.00

0.1840

3.36

0.62
213.09

5.0000

84.60

4.23

0.5000

0.3200

8.40

2.69

0.5000

0.3200

8.40

2.69
9.61

N LOSAS CON ASFALTO RC-250


800.0000

Unidad

Cuadrilla

Costo unitario directo por : u

61.34

Cantidad

Precio S/.

Parcial S/.

hh

0.1000

0.0320

20.30

0.65

hh

5.0000

1.6000

14.87

23.79

HH

2.0000

0.3200

13.64

4.37
28.80

0.0800

45.00

3.60

0.0020

54.00

0.11
3.71

%MO

3.0000

28.80

28.83
28.83

PINTURA DEMARCATORIA EN LOSA DEPORTIVA

20.0000

Costo unitario directo por : m2

13.66

Unidad

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

hh

0.1000

0.0400

20.30

0.81

hh

1.0000

0.4000

16.99

6.80

hh

0.5000

0.2000

13.64

2.73
10.34

gal

0.0100

15.00

0.15

0.1250

1.50

0.19

gal

0.0400

35.00

1.40

gal

0.0400

32.00

1.28
3.02

%MO

3.0000

10.34

0.31
0.31

OLOCACION Y TRANSPORTE DE ARCOS DE FUTBOL

20.0000

Costo unitario directo por : m2

13.67

Unidad

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

hh

0.1000

0.0400

20.30

0.81

hh

1.0000

0.4000

16.99

6.80

hh

0.5000

0.2000

13.64

2.73
10.34

gal

0.0100

15.00

0.15

0.1250

1.50

0.19

gal

0.0400

35.00

1.40

gal

0.0400

32.00

1.28

ML

6.5000

32.00

208.00
3.02

%MO

3.0000

10.34

0.31
0.31

20.3
14.9

operario
peon

OFICIAL

14.9

14.4
11.56

17.0
13.6

Cantidad

Precio S/.

Parcial S/.

5.0000

0.68

0.17

TERRENO MANUAL
Cuadrilla

0.17

RAZO DE NIVELES Y REPLANTEO


Cuadrilla

Cantidad

Precio S/.

Parcial S/.

0.0500

21.01

1.05

0.0200

4.20

0.21
1.26

NIVELACION Y COMPACTACION MANUAL


Cuadrilla

Cantidad

Precio S/.

Parcial S/.

m3

0.25

10

2.5
2.5

0.6

2.82

0.4

15

0.5

0.1

8.1

0.0846
6
0.81
6.8946

ELIMINACION MATERIAL EXCEDENTE


Cuadrilla

Cantidad

Precio S/.

Parcial S/.

0.1

#REF!

#REF!

0.07

1.05
1.12

0.0421

210

8.841

0.0421

195

8.2095

17.0505
ENCOFRADO Y DESENCOFRADO DE LOSA DE LOSA

kg

0.2600

3.42

0.89

kg

0.1600

4.20

0.67

p2

3.3500

3.40

11.39
12.95

%MO

5.0000

#REF!

#REF!
#REF!

m2

1.0000

4.35

4.35
4.35

PARA LOSA DEPORTIVA


Unidad

Cuadrilla

M3

Cantidad

Precio S/.

Parcial S/.

0.1500

1.51

0.23
0.23

%MO

3.0000

0.39

1.17
1.17

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

0.8500

29.41

25.00

0.4200

27.31

11.47

9.7400

18.07

176.00

0.1840

3.36

0.62
213.09

5.0000

#REF!

#REF!

0.5000

0.3200

8.40

2.69

0.5000

0.3200

8.40

2.69
#REF!

N LOSAS CON ASFALTO RC-250


Unidad

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

0.0800

45.00

3.60

0.0020

54.00

0.11
3.71

%MO

3.0000

#REF!

#REF!
#REF!

PINTURA DEMARCATORIA EN LOSA DEPORTIVA


Unidad

Cuadrilla

Cantidad

Precio S/.

Parcial S/.

gal

0.0100

15.00

0.15

0.1250

1.50

0.19

gal

0.0400

35.00

1.40

gal

0.0400

32.00

1.28
3.02

%MO

3.0000

#REF!

#REF!
#REF!

OLOCACION Y TRANSPORTE DE ARCOS DE FUTBOL


Unidad

Cuadrilla

Cantidad

Precio S/.

Parcial S/.
#REF!

gal

0.0100

15.00

0.15

0.1250

1.50

0.19

gal

0.0400

35.00

1.40

gal

0.0400

32.00

1.28

ML

6.5000

32.00

208.00
3.02

%MO

3.0000

#REF!

#REF!
#REF!

DURACION

RECURSO

DIAS

NECESARIO

540.00

10.78
10.8
10.8

1
1
1

10.78
10.8
10.8

540.00

10.8

10.8

540.00

10.8
10.8
10.8

1
1
1

10.8
10.8
10.8

METRADO

539.00
540.00

540.00
540.00

540.00

10.78
10.8
10.8

3
3
3

10.78
10.8
10.8

540.00

10.8

10.8

540.00

10.8
10.8
10.8

3
3
3

10.8
10.8
10.8

0.96
0.96
0
0.96
0.96

1
1

0.96
0.96

1
1

0.96
0.96

1.8366
1.8366
1.8366
1.8566

4
4
4
5

1.8366
1.8366
1.8366
1.8566

91.83

1.8366
1.8366
1.8366

4
4
4

1.8366
1.8366
1.8366

91.83

1.8366

1.8366

91.83

1.8366

1.8366

539.00
540.00

540.00
540.00

48.00
48.00

48.00
48.00

91.83
91.83
91.83
92.83

91.83
91.83

81.00

1.62
1.62

6
6

1.62
1.62

81.00

1.62

1.62

81.00

1.62

1.62

43.20

0.864
0.864
0.864
0.864

4
4
4
4

0.864
0.864
0.864
0.864

0.864
0.864
0.864
0.864

4
4
4
4

0.864
0.864
0.864
0.864

0.864
0.864
0.864

4
4
4

0.864
0.864
0.864

81.00

43.20
43.20
43.20

43.20
43.20
43.20
43.20

43.20
43.20
43.20

4.92
4.92

1
1

4.92
4.92

4.92
0
4.92
4.92
0
0
4.92

4.92

1
1

4.92
4.92

4.92

0.31026
0.31026
0.31026

1
1
1

0.31026
0.31026
0.31026

15.51

0.31026
0.31026
0.31026
0.31026

1
1
1
1

0.31026
0.31026
0.31026
0.31026

15.51

0.31026

0.31026

4
4
4

0.08
0.08
0.08

1
1
1

0.08
0.08
0.08

4
4

0.08
0.08

1
1

0.08
0.08

246.00
246.00

246.00

246.00
246.00

246.00

15.51
15.51
15.51

15.51
15.51
15.51

4
4
4
4

0.08
0.08
0.08
0.08

1
1
1
1

0.08
0.08
0.08
0.08

0.08

0.08

DURACION

RECURSO

DIAS

NECESARIO

METRADO

540.00

10.8

10.8

540.00

10.8

10.8

540.00

540.00

10.8
10.8
10.8

3
3
3

10.8
10.8
10.8

48.00

0.96

0.96

540.00

0.96
0
0.96
0.96

0.96

1
1

0.96
0.96

91.83

1.8366
1.8366
1.8366

4
4
4

1.8366
1.8366
1.8366

91.83

1.8366

1.8366

91.83

1.8366

1.8366

81.00

1.62

1.62

81.00

1.62

1.62

43.20

0.864
0.864
0.864
0.864

4
4
4
4

0.864
0.864
0.864
0.864

0.864
0.864
0.864

4
4
4

0.864
0.864
0.864

48.00

48.00
48.00

91.83
91.83

43.20
43.20
43.20

43.20
43.20
43.20

4.92
4.92
0
0
4.92

1
1

4.92
4.92

4.92

15.51

0.31026
0.31026
0.31026
0.31026

1
1
1
1

0.31026
0.31026
0.31026
0.31026

15.51

0.31026

0.31026

4
4
4
4
4
4

0.08
0.08
0.08
0.08
0.08
0.08

1
1
1
1
1
1

0.08
0.08
0.08
0.08
0.08
0.08

0.08

0.08

246.00
246.00

246.00

15.51
15.51
15.51

Item

Descripcin

01.00.00

LOSAS DEPORTIVAS DE FULBITO

01.01.00

OBRAS PRELIMINARES

01.01.01

LIMPIEZA DE TERRENO MANUAL

01.01.02

TRAZO, NIVELES Y REPLANTEO

02.02.00

MOVIMIENTO DE TIERRAS

02.02.01

NIVELACION EN TERRENO NORMAL

02.02.03

ELIMINACION DE MATERIAL EXCEDENTE

03.03.00

CONCRETO SIMPLE

03.03.01

ENCOFRADO Y DESENCOFRADO DE LOSA DE CONCRETO

03.03.03

CONCRETO PARA LOSAS DEPORTIVAS FROTACHADO f'c=175 kg/cm2

EMPEDRADO PARA LOSA DEPORTIVA


03.03.04
04.04.00
04.04.01
05.05.00
05.05.01

RELLENO DE JUNTAS EN LOSAS CON ASFALTO RC-250


PINTURA
PINTURA DEMARCATORIA EN LOSA DEPORTIVA
CARPINTERIA METALICA
COLOCACION Y TRANSPORTE DE ARCOS DE FUTBOL

CAPATAZ

Item

Descripcin

01.00.00

LOSAS DEPORTIVAS DE FULBITO

01.01.00

OBRAS PRELIMINARES

01.01.01

LIMPIEZA DE TERRENO MANUAL

01.01.02

TRAZO, NIVELES Y REPLANTEO

02.02.00

MOVIMIENTO DE TIERRAS

02.02.01

REFINE Y NIVELACION EN TERRENO NORMAL

02.02.03

ELIMINACION DE MATERIAL EXCEDENTE

03.03.00

CONCRETO SIMPLE

03.03.01

ENCOFRADO Y DESENCOFRADO DE LOSA DE CONCRETO

03.03.03

CONCRETO PARA LOSAS DEPORTIVAS FROTACHADO f'c=175 kg/cm2

EMPEDRADO PARA LOSA DEPORTIVA


03.03.04
04.04.00
04.04.01
05.05.00
05.05.01

RELLENO DE JUNTAS EN LOSAS CON ASFALTO RC-250


PINTURA
PINTURA DEMARCATORIA EN LOSA DEPORTIVA
CARPINTERIA METALICA
COLOCACION Y TRANSPORTE DE ARCOS DE FUTBOL

Item

Descripcin

01.00.00

LOSAS DEPORTIVAS DE FULBITO

01.01.00

OBRAS PRELIMINARES

01.01.01

LIMPIEZA DE TERRENO MANUAL

01.01.02

TRAZO, NIVELES Y REPLANTEO

02.02.00

MOVIMIENTO DE TIERRAS

02.02.01

REFINE Y NIVELACION EN TERRENO NORMAL

02.02.03

ELIMINACION DE MATERIAL EXCEDENTE

03.03.00
03.03.01

CONCRETO SIMPLE
ENCOFRADO Y DESENCOFRADO DE LOSA DE CONCRETO

EMPEDRADO PARA LOSA DEPORTIVA


03.03.03
03.03.04
04.04.00
04.04.01
05.05.00
05.05.01

CONCRETO PARA LOSAS DEPORTIVAS FROTACHADO f'c=175 kg/cm2


RELLENO DE JUNTAS EN LOSAS CON ASFALTO RC-250
PINTURA
PINTURA DEMARCATORIA EN LOSA DEPORTIVA
CARPINTERIA METALICA
COLOCACION Y TRANSPORTE DE ARCOS DE FUTBOL

Item

Descripcin

01.00.00

LOSAS DEPORTIVAS DE FULBITO

01.01.00

OBRAS PRELIMINARES

01.01.01

LIMPIEZA DE TERRENO MANUAL

01.01.02

TRAZO, NIVELES Y REPLANTEO

02.02.00

MOVIMIENTO DE TIERRAS

02.02.01

REFINE Y NIVELACION EN TERRENO NORMAL

02.02.03

ELIMINACION DE MATERIAL EXCEDENTE

03.03.00
03.03.01

CONCRETO SIMPLE
ENCOFRADO Y DESENCOFRADO DE LOSA DE CONCRETO

EMPEDRADO PARA LOSA DEPORTIVA


03.03.03
03.03.04
04.04.00
04.04.01
05.05.00
05.05.01

CONCRETO PARA LOSAS DEPORTIVAS FROTACHADO f'c=175 kg/cm2


RELLENO DE JUNTAS EN LOSAS CON ASFALTO RC-250
PINTURA
PINTURA DEMARCATORIA EN LOSA DEPORTIVA
CARPINTERIA METALICA
COLOCACION Y TRANSPORTE DE ARCOS DE FUTBOL

Und.

Duracion

RECURSO
NECESARIO

10.8
10.8

m2

1 da

m2

1 da

m2

3 das

m3

1 DIA

10.8
1.9

m2

4 das
6 das
4 das
1 da

1.9
0.0
56.7
0.0

m2

1.00

0.3

glb

1.00

0.1

m2
m3

DIAS CALENDARIO

6-Jan-14

7-Jan-14

8-Jan-14

10.80
10.8

10.8

SUMA TOTAL

10.8

60.0
50.0
40.0
30.0
20.0
10.0

10.8

10.8

40.0
30.0
20.0
10.0
0.0

Und.

Duracion

RECURSO
NECESARIO

m2

1 da
1 da

10.8
10.8

m2

3 das

m3

1 DIA

10.8
1.0

m2

4 das
6 das
4 das
1 da

1.8
1.6
0.9
4.9

m2

1.00

0.3

glb

1.00

0.1

m2

m2
m3

DIAS CALENDARIO

6-Jan-14

7-Jan-14

8-Jan-14

6-Jan-14

7-Jan-14

8-Jan-14

10.78
10.8

10.78

SUMA TOTAL

10.8

12.0
10.0
8.0
6.0
4.0
2.0
0.0

10.8

10.8

9-Jan-14 10

6.0
4.0
2.0
0.0

6-Jan-14

7-Jan-14

8-Jan-14

9-Jan-14

OFICIAL

Und.

Duracion

RECURSO
NECESARIO

m2

1 da
1 da

0.0
0.0

m2

3 das

m3

1 DIA

0.0
0.0

m2

4 das
6 das
4 das
1 da

1.6
1.6
0.9
4.9

m2

1.00

0.0

glb

1.00

0.0

m2

m2
m3

DIAS CALENDARIO

6-Jan-14

7-Jan-14

8-Jan-14

0.00
0

SUMA TOTAL

0.0

0.0

0.0

6.0
5.0
4.0
3.0
2.0
1.0
0.0

6-Jan-14

7-Jan-14

8-Jan-14

9-Jan-14

Und.

Duracion

OPERARIO
RECURSO
NECESARIO

10.8
10.8

m2

1 da

m2

1 da

m2

3 das

m3

1 DIA

0.0
0.0

m2

4 das
6 das
4 das
1 da

0.0
0.0
0.9
0.0

m2

1.00

0.3

glb

1.00

0.1

m2
m3

DIAS CALENDARIO

6-Jan-14

7-Jan-14

8-Jan-14

10.80
10.8

SUMA TOTAL

10.8

10.8

0.0

12.0
10.0
8.0
6.0
4.0
2.0
0.0

7-Jan-14
6-Jan-14

8-Ja

PEON

10

11

12

9-Jan-14

10-Jan-14

11-Jan-14

12-Jan-14

13-Jan-14

14-Jan-14

15-Jan-14

16-Jan-14

17-Jan-14

10.8

10.8

1.9

1.9

1.9

1.9

0.0

0.0

0.0

0.0

0.0

56.7

56.7

10.8

10.8

1.9

1.9

PEON

1.9

1.9

0.0

56.7

56.7

8-Jan-14

9-Jan-14 10-Jan-14 11-Jan-14 12-Jan-14 13-Jan-14 14-Jan-14 15-Jan-14 16-Jan-14 17-Jan-14 18-Jan-14 19-Jan-14

10

11

12

9-Jan-14

10-Jan-14

11-Jan-14

12-Jan-14

13-Jan-14

14-Jan-14

15-Jan-14

16-Jan-14

17-Jan-14

10.78

10.78

1.8

1.8

1.8

1.8

1.6

1.6

1.6

1.6

1.6

0.9

0.9

10.8

10.8

1.8

1.8

3.5

CAPATAZ

3.5

1.6

2.5

2.5

8-Jan-14

9-Jan-14 10-Jan-14 11-Jan-14 12-Jan-14 13-Jan-14 14-Jan-14 15-Jan-14 16-Jan-14 17-Jan-14 18-Jan-14 19-Jan-

10

11

12

9-Jan-14

10-Jan-14

11-Jan-14

12-Jan-14

13-Jan-14

14-Jan-14

15-Jan-14

16-Jan-14

17-Jan-14

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

1.6

0.9

0.9

0.0

0.0

1.6

1.6

3.2

3.2

1.6

2.5

2.5

OFICIAL

8-Jan-14

9-Jan-14 10-Jan-14 11-Jan-14 12-Jan-14 13-Jan-14 14-Jan-14 15-Jan-14 16-Jan-14 17-Jan-14 18-Jan-14 19-Jan-14

6-Jan-14

10

11

12

9-Jan-14

10-Jan-14

11-Jan-14

12-Jan-14

13-Jan-14

14-Jan-14

15-Jan-14

16-Jan-14

17-Jan-14

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.9

0.9

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.9

0.9

OPERARIO

7-Jan-14

9-Jan-14
8-Jan-14

11-Jan-14
13-Jan-14
15-Jan-14
17-Jan-14
19-Jan10-Jan-14
12-Jan-14
14-Jan-14
16-Jan-14
18-Jan-14

13

14

15

16

18-Jan-14

19-Jan-14

20-Jan-14

21-Jan-14

1.9

0.0
56.7

56.7
0.0

0.3

56.7

56.7

0.1
0.1

2.2

4 18-Jan-14 19-Jan-14 20-Jan-14 21-Jan-14

13

14

15

16

18-Jan-14

19-Jan-14

20-Jan-14

21-Jan-14

1.0

1.6
0.9

0.9
4.9

0.3

2.5

0.9

0.1
5.0

1.3

n-14 18-Jan-14 19-Jan-14 20-Jan-14 21-Jan-14

13

14

15

16

18-Jan-14

19-Jan-14

20-Jan-14

21-Jan-14

0.0

1.6
0.9

0.9
4.9

0.0

2.5

0.9

0.0
4.9

14 18-Jan-14 19-Jan-14 20-Jan-14 21-Jan-14

0.0

13

14

15

16

18-Jan-14

19-Jan-14

20-Jan-14

21-Jan-14

0.0

0.0
0.9

0.9
0.0

0.3

0.9

0.9

0.1
0.1

7-Jan-14
19-Jan-14
21-Jan-14
18-Jan-14
20-Jan-14

0.3

CAPATAZ
oficial

17.2
12.6

20.3
14.9

operario
peon

14.4
11.56

17.0
13.6

17.2
12.6

LIMPIEZA DE TERRENO MANUAL


Descripcin Recurso

Unidad
Equipos

HERRAMIENTAS MANUALES

%MO

TRAZO DE NIVELES Y REPLANTEO


Descripcin Recurso

Unidad
Materiales

YESO DE 28 Kg
MADERA TORNILLO

Cdigo
Materiales

bls
p2
NIVELACION Y COMPACTACION MANUAL
Descripcin Recurso
Unidad
AGUA

Equipos
HERRAMIENTAS MANUALES
PLANCHA COMPACTADORA
NIVEL TOPOGRAFICO

%MO
hm
hm

ELIMINACION MATERIAL EXCEDENTE


Equipos
CAMION VOLQUETE 4x2 120-140 HP 4 M3.
RETROEXCAVADOR S/LLANTAS 58 HP 1 YD3.

hm
hm

ENCOFRADO Y DESENCOFRADO DE LOSA DE LOSA

HERRAMIENTAS MANUALES

DESENCOFRADO

EMPEDRADO PARA LOSA DEPORTIVA


Descripcin Recurso
PIEDRA 6 "

HERRAMIENTAS MANUALES

CONCRETO EN LOSAS ALIGERADAS FC=210 kg/cm2


Descripcin Recurso
Unidad
Materiales
PIEDRA CHANCADA DE 1/2"
m3
ARENA GRUESA
m3
CEMENTO PORTLAND TIPO I (42.5 kg)
bls
AGUA
m3
Equipos
HERRAMIENTAS MANUALES
VIBRADOR DE CONCRETO 4 HP 2.40"
MEZCLADORA DE CONCRETO TAMBOR 18 HP 11 p3

%MO
hm
hm

RELLENO DE JUNTAS EN LOSAS CON ASFALTO RC-250


Descripcin Recurso
RC-250
ARENA FINA

HERRAMIENTAS MANUALES

Cdigo

Descripcin Recurso
THINNER ACRILICO
LIJA
PINTURA ESMALTE SINTETICO
PINTURA ANTICORROSIVA

HERRAMIENTAS MANUALES

Cdigo

Descripcin Recurso

THINNER ACRILICO
SOLSADURA
LIJA
PINTURA ESMALTE SINTETICO
PINTURA ANTICORROSIVA
TUBO DE 4"

HERRAMIENTAS MANUALES

RECURSO
NECESARIO

10.8

6-Jan-14

7-Jan-14

10.8
8-Jan-14

10.8
10.8
10.8

0.96
0.96

DE LOSA
1.8366
1.8366
1.8366
2 dias cruze

11-Jan-14

1.8366

1.8366

1.62
13-Jan-14

1.62

kg/cm2

0.864
0.864
0.864
0.864

4
16-Jan-14

0.864
0.864
0.864

RC-250

4.92
4.92
20-Jan-14

21-Jan-14

4.92

0.31026
0.31026
0.31026
0.31026

0.31026

2 dias crve

3 dias de cruce con concreto dde


1 dia normal

0.08
0.08
0.08
0.08
0.08
0.08

0.08

20-Jan-14

as de cruce con concreto dde loa