Professional Documents
Culture Documents
Contrapiso
Base
Acabado
total =
4 cm
1 cm
5 cm
Para 1m3
1:5
7.40
1.05
0.268
cemento-arena base
Bol
m3 de arena
m3 de agua
0.04
Volumen de la base:
Material por M2+10% de desperdicio
Cemento (Bls)
0.3256
Arena (m3)
0.0462
Agua (m3)
0.0118
Resumen:
Cemento (Bls)
Arena (m3)
Agua (m3)
m3/m2
Para 1m3
1:2
15.20
0.86
0.277
Volumen de Acabado:
Material por M2+8% de desperdicio
Cemento (Bls)
0.1642
Arena (m3)
0.0093
Agua (m3)
0.0030
0.4898
0.0555
0.0148
CUARTO 1
CUARTO 2
3.7
3.2
Area=
Resumen 1:
Cemento (Bls)
Arena (m3)
Agua (m3)
4.7
11.84 m2
Area=
Resumen 2:
Cemento (Bls)
Arena (m3)
Agua (m3)
5.7988
0.6570
0.1750
COMPUTO DE MATERIAL
Pedido:
27.26
13.3509
1.5126
0.4030
Cemento (Bls)
Arena (m3)
Agua (m3)
19.15 =====>
2.17 =====>
0.58 =====>
19 Bolsas de cemento
2.5 cubos de arena
0.6 cubos de agua
RAPISO 5CM
cemento-arena acabado
Bol
m3 de arena
m3 de agua
0.01
de desperdicio
m3/m2
5.8
m2
1.0904