CALCULO DE MATERIAL DE CONTRAPISO 5CM

Contrapiso
Base
Acabado
total =

4 cm
1 cm
5 cm

Para 1m3

1:5
7.40
1.05
0.268

cemento-arena base
Bol
m3 de arena
m3 de agua

0.04
Volumen de la base:
Material por M2+10% de desperdicio
Cemento (Bls)
0.3256
Arena (m3)
0.0462
Agua (m3)
0.0118
Resumen:
Cemento (Bls)
Arena (m3)
Agua (m3)

m3/m2

Para 1m3

1:2
15.20
0.86
0.277

Volumen de Acabado:
Material por M2+8% de desperdicio
Cemento (Bls)
0.1642
Arena (m3)
0.0093
Agua (m3)
0.0030

0.4898
0.0555
0.0148

CUARTO 1

CUARTO 2

3.7

3.2
Area=
Resumen 1:
Cemento (Bls)
Arena (m3)
Agua (m3)

4.7
11.84 m2

Area=
Resumen 2:
Cemento (Bls)
Arena (m3)
Agua (m3)

5.7988
0.6570
0.1750

COMPUTO DE MATERIAL

Pedido:

27.26

13.3509
1.5126
0.4030

Cemento (Bls)
Arena (m3)
Agua (m3)

19.15 =====>
2.17 =====>
0.58 =====>

19 Bolsas de cemento
2.5 cubos de arena
0.6 cubos de agua

RAPISO 5CM

cemento-arena acabado
Bol
m3 de arena
m3 de agua
0.01
de desperdicio

m3/m2

5.8

m2
1.0904