You are on page 1of 9

Cadangan Membina 1 Blok Bangunan Perdagangan Bercampur 118 Tingkat Di atas Lot 795, 796, 799,

800 & Sebahagian Lot 746 dan Basmen Letak Kereta, Di atas Lot 354, 355 & 742, Mukim Bandar Kuala
Lumpur, Daerah Kuala Lumpur, Wilayah Persekutuan.
Samsung C&T Corporation UEM
Construction JV Sdn Bhd

Method Statement
For
Mackintosh Probe Test
MAIN CONTRACT BP 03
Document
Ref No.

Discipline

STRUCTURE WORKS

Revision

00

Date Issued

08/03/2016

BP03-CN-MS-STR-000__

Document Revision History


Rev
00

08/03/2016

Date

Details

Remarks

1st Submission Method Statement Mackintosh Probe Test

Review and Approval Record


Name

Authorised by:

Hyunseok Lee

Title

Technical Manager

Date

Signature

KL118

Document No: BP03-CN-MS-STR-000__ Rev.: 00

Project Method Statement

Method Statement For Mackintosh


Title :
Probe Test

Method Statement
For
Mackintosh Probe Test
MAIN CONTRACT BP 03
Document
Ref No.

Discipline

STRUCTURE WORKS

Revision

00

Date Issued

08/03/2016

BP03-CN-MS-STR-000__

Document Revision History


Rev
00

Date
08/03/2016

Details

Remarks

1 Submission Method Statement Mackintosh Probe Test


st

Review and Approval Record


Name
Prepared by

Ronnie Loo

Reviewed by:

Revision: 00

Title
Podium Construction
Manager

Norhanisah Hanafi

QAQC Manager

Mohd Rizam
Abd.Ghani

Health, Safety &


Environmental Manager

Hyunseok Lee

Technical Manager

Kyountae Kang

Project Construction
Manager

Revision Date: 20 Feb 2015


Page: 1 of 9

Date

Signature

KL118

Document No: BP03-CN-MS-STR-000__ Rev.: 00

Method Statement For Mackintosh


Title :
Probe Test

Project Method Statement

TABLE OF CONTENTS
SECTION

PAG

1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0

PURPOSE
SCOPE
REFERENCES DOCUMENT
MANPOWER
PLANT & MACHINERIES
MATERIAL
WORK EXECUTION METHOD
SAFETY AND HEALTH

8.1

Job Safety and Health Analysis

8.2

Information to Personnel

8.3

Emergency Arrangements

8.4

Permit Requirement

9.0 ENVIRONMENTAL ISSUES


9.1

Operation and Monitoring

9.2

Control Measures to Be Implemented

10.0 QUALITY ASSURANCE AND QUALITY CONTROL


10.1

Contractual Requirements

10.2 Inspection and Testing


10.3

Follow Up and Evaluation

11.0 APPENDICES

Revision: 00

Revision Date: 20 Feb 2015


Page: 2 of 9

KL118

Document No: BP03-CN-MS-STR-000__ Rev.: 00

Method Statement For Mackintosh


Title :
Probe Test

Project Method Statement

1.0

PURPOSE
This method statement is prepared for given guideline on Mackintosh Pobe Test at a general
earthwork.

2.0

SCOPE
Mackintosh Probe Test is carried out to determine the bearing capacity of soil. The result
obtained from the test provides a rough estimation of the soil layer at a point.

3.0

REFERENCES DOCUMENTS
Relevant documents to be referred in accordance with this method statement:
No.

Document Ref. No.

1.

Project Quality Plan

BP03-QA-PL-GEN-0001

2.
3.
4.

Safety & Health Plan


Site Security Plan
Emergency Response Preparedness
and Crisis Management Plan
Environmental Management Plan
Erosion and Sedimentation Control
Plan
Construction Pollution Prevention Plan
Project Execution Plan
Site Logistic Plan
General Specification
Material & Workmanship Specification:

BP03-HSE-PL-GEN-0001
BP03-HSE-PL-GEN-0003

5.
6.
7.
8.
10.
11.
12.
13.

4.0

Description

Material Receiving, Handling and


Storage procedure

BP03-HSE-PL-GEN-0004
BP03-HSE-PL-GEN-0002
BP03-HSE-PL-GEN-0005
BP03-TEC-PL-GEN-0001
BP03-CN-PL-GEN-0001
BP03-MTS-0002 (In Aconex BP03-MS-0002)
Section 01 00 00 General Requirement
Structural Specification -Section 31 00 00
Earthworks.
BP03-CN-SPP-GEN-0013

MANPOWER
List of supervision and workforce to be involved in the work:
No.

Description

No. of person

1.

Project Manager

2.

Site Engineer

Revision: 00

Brief Roles and Responsibilities


Responsible
for
the
successful
initiation,
planning,
execution,
monitoring, controlling and closure of
the project.
Acting as main point of call for technical
advice, checking plans, quantities and

Revision Date: 20 Feb 2015


Page: 3 of 9

KL118

Document No: BP03-CN-MS-STR-000__ Rev.: 00

Method Statement For Mackintosh


Title :
Probe Test

Project Method Statement

5.0

3.

Site Supervisor

4.

Lab Tecnician

5.

Skilled Worker

drawings to ensure accuracy and


liaising with clients and subcontractors.
Coordinate and control of physical
aspects of day to day working to ensure
safety and compliance with all
regulatory requirements.
made up of a wide range of activities
including aspects of testing, design
and quality control of construction
materials.
Responsible for getting the job done in
an orderly manner and in accordance
with
specifications
and
quality
standards.

PLANT & MACHINERIES


Detail of plant, machinery and tool proposed to be used to perform work:
No.
1.

6.0

Plant (mobile), Machinery (static) and tool (if any)


Hand Compactor

Quantity.
1

TESTING EQUIPMENT
Testing equipment for field test as follow:
No
1
2
3
4
5
6
7

6.0

Quantity
1
1
1
1
1
1
1

MATERIAL
Materials delivered on site will be inspected and verify prior to use.
No.
1.

7.0

Equipment
Driving Hammer
Striker Plate
Rods
Barrel Connector
Driving Point
60 Cone
Auger

Type of Material
Grease

Remark
1

PROCEDURES
7.1

Preparotary Work
Ensure all the equipments and tools in good condition before assemble it to site.
Identify and ascertain that the areas to carry out the Mackintosh Probe Test.
Carry out clearing,grubbing and removing top soil as per method statement.

Revision: 00

Revision Date: 20 Feb 2015


Page: 4 of 9

KL118

Document No: BP03-CN-MS-STR-000__ Rev.: 00

Method Statement For Mackintosh


Title :
Probe Test

Project Method Statement

7.1.1

Site Clearance

Prior to commencement of works, the contractor shall obtain the relevant work

permits from relevant authorities and permit to work from supervision consultant.
The contractor shall under take clearing of site in order to remove any existing
vegetation, steel, concrete, unused buildings identified for demolition, piping

debris and other foreign material.


All existing structures, foundations, etc as indicated above shall be entirely
demolished, removed, transported and disposed of by the contractor to a debris
yard or designated area approved by local authorities. All soft spot left shall be

filled with suitable material and compacted as specification.


Excavated material, if any and sutable and approved by supervision consultant for
backfilling shall be transported and placed in fill areas within the limit of the works.

7.2

Work Methodology

The rods(1.2m long and 12mm diameter) and hammer with total 4 kg are joint using

the rod coupling.


Joint the driving point 60 cone and screw into the lower rods.
Mark every 300mm on the rods.
Apply grease to the entire rods and cone to ensure easy dismantle it driven to the

ground soil.
During the Mackintosh probing streamline the driving point in the longitudinal section

with maximum diameter of 27mm.


The 4kg hammer driven freely with the full drop height available from hammer onto the

profile.
The number of blow required for every 300mm penetration recorded.
The probing to be terbimated when the blows counts of 400 (refusal) recorded over a
penetration of 300mm or less.

Revision: 00

Revision Date: 20 Feb 2015


Page: 5 of 9

KL118
Project Method Statement

Document No: BP03-CN-MS-STR-000__ Rev.: 00

Method Statement For Mackintosh


Title :
Probe Test

After termination of probr the rods can be roatated clockwise at ground level by using

abox spanner.
Tools can be pushed into or pulled out of the soil using lifting/driving tool.

SAFETY AND HEALTH


8.1 Hazard Identification, Risk Assessment and Determining Control
1. Safety and health aspects shall be exercised before and when implementation of the
works and shall be in accordance to Safety and Health Plan and other relevant
documents.
2. All control measures required for the activity is listed in Hazard Identification, Risk
Assessment and Determining Control (HIRADC) refer appendix 3.
8.2 Information to Personnel
1. Pre-task briefing will be conducted by the safety personnel in charge based on the control
measures detailed in the HIRADC.
2. In the event of any emergencies, the work team representative is required to immediately
contact the designated safety personnel as per the Emergency Response Preparedness and
Crisis Management Plan.
8.3 Emergency Arrangements
1. Safety and health officer shall be informed of the works to be performed and HIRADC of the
works to be carried out is established and approved.
Revision: 00

Revision Date: 20 Feb 2015


Page: 6 of 9

KL118

Document No: BP03-CN-MS-STR-000__ Rev.: 00

Method Statement For Mackintosh


Title :
Probe Test

Project Method Statement

2. Relevant personnel on site shall be briefed of the emergency contact details, response and
made reference to procedures in accordance to Emergency Response Preparedness and
Crisis Management Plan.

3. Traffic Management Plan for emergency arrangement shall be made available at suitable and
appropriate work location.

9.0 ENVIRONMENTAL ISSUES


9.1

Operation and Monitoring


Complying with all the particular requirements, statutory requirements and best industry practices
in order to preserve and take due care of the local existing environment. Environmental
Management Plan (EMP) for this package has been developed and every personnel shall comply
with the requirements as stated in the EMP.

9.2

Control Measures to be implemented


The potential environmental impacts shall be identified by the project team for all the related
activities and control measures shall be developed concurrently based on the identified impacts.
This control measures shall be implemented by the project team as to reduce or minimize the
environmental impacts to the environment and also the local public. Environmental Aspect and
Impact applies to all operations and activities, under normal conditions and reasonably
foreseeable situations.
10.0

QUALITY ASSURANCE AND QUALITY CONTROL


10.1

Contractual Requirements

1. Implementation of QAQC works shall be in accordance to Samsung C&T Corporation


UEM Construction JV (SUJV) Sdn Bhd Project Quality Plan and relevant quality system
procedures.
2. The quality of works shall comply with the requirements of Material and Workmanship
Specification and other relevant documents as listed in section 3.
10.2

Inspection and Testing

1. The inspection and test plan (ITP) shall be approved by SC.The ITP details for the work
shall be referred in Appendix 1. Checklist shall be used during inspection at hold point as
per Appendix 2.

Revision: 00

Revision Date: 20 Feb 2015


Page: 7 of 9

KL118
Project Method Statement

10.3

Document No: BP03-CN-MS-STR-000__ Rev.: 00

Method Statement For Mackintosh


Title :
Probe Test

Follow up and Evaluation

1. The work shall be carried out using the inspection form/checklist attached in Appendices and
to ensure the finishing quality of work shall be acceptable by SUJV and SC or CA
representative.
2. Should there is any Non-conformity of work issued, we will respond within agreed time. Root
cause shall be determined, correction of work shall be taken immediately if possible and
corrective action shall be taken accordingly within agreed date. All NCR shall be closed within
the agreed completion date.

11.0

APPENDICES

Appendix 1
Appendix 2

Revision: 00

: Inspection and Test Plan


: Quality Control Inspection Checklist

Revision Date: 20 Feb 2015


Page: 8 of 9