Project Duration:
CBES designed and project managed works to the highest standards meeting or
4 weeks
exceeding all key dates and delivered the project on budget.
Approach
Initial CBES undertook a dilapidation survey with Somerfield’s consultant prior to
quoting to replace the existing plant.
CBES proposed housed external plant, roof mounted on steel supports as the
preferred option, freeing space within store for a new frozen food room. This
approach greatly reduced store disruption, unsightly ceiling removals, cost of
replacing ceiling areas and enabled 1st fix works to be carried out in normal
working hours.
Throughout the project health and safety was of paramount importance with site
specific risk analysis, method statements, COSCH and site health and safety plan
compiled and adhered to at all times.
• Refrigeration
• Electrical
• Commissioning
• Project Management
• Case Installation
• Coldroom Installation
CBES Ltd., Caledonia House, Lawmoor Street, Glasgow, G5 0US, Tel: 0845 674 0017, Fax: 0845 674 0027, cbes.info@city-holdings.co.uk, www.cbes.co.uk, Part of City Refrigeration Holdings (UK) Ltd.