CASE STUDY

REMODEL OF SOMERFIELD STORE

CBES carried out work at Somerfield’s store in Cockerton, Dar-


Client: lington to replace all existing refrigeration plant. The work in-
Somerfield clude the replacement of chilled, produce and frozen food cabi-
nets, cold room evaporators, the refurbishment of existing cold
Project Value: rooms, installation of a new frozen food room and a new alarm
£67k and monitoring system.

Project Duration:
CBES designed and project managed works to the highest standards meeting or
4 weeks
exceeding all key dates and delivered the project on budget.

Approach
Initial CBES undertook a dilapidation survey with Somerfield’s consultant prior to
quoting to replace the existing plant.

CBES proposed housed external plant, roof mounted on steel supports as the
preferred option, freeing space within store for a new frozen food room. This
approach greatly reduced store disruption, unsightly ceiling removals, cost of
replacing ceiling areas and enabled 1st fix works to be carried out in normal
working hours.

Health and Safety


By installing mechanical and electrical service externally on traywork using raised
service brackets to allow future roof maintenance CBES met health and safety
restrictions and minimized risks. Old equipment was disposed of to current
regulations.

Throughout the project health and safety was of paramount importance with site
specific risk analysis, method statements, COSCH and site health and safety plan
compiled and adhered to at all times.

CBES divisions involved in this project:

• Refrigeration
• Electrical
• Commissioning
• Project Management
• Case Installation
• Coldroom Installation