1. ACCESS TO PARKSIDE ESTATES SHALL BE MAINTAINED ALONG SHADY GROVE 10. DISPOSAL AREAS FOR EXCESS EXCAVATION SHALL NOT IMPACT WETLANDS, 10.ANY TEMPORARY CROSSINGS OF WETLANDS (I.E., CROSSINGS THAT WILL NOT 3. IMPACTS TO INTERIOR FOREST HABITAT AND THEIR BUFFERS SHOULD BE
ROAD AT ALL TIMES. STREAMS, OR FLOODPLAINS WITHOUT PRIOR AUTHORIZATION FROM THE MDE REMAIN PERMANENTLY), SUCH AS WETLAND CROSSINGS REQUIRED FOR AVOIDED DURING CONSTRUCTION, WHEN POSSIBLE, FROM APRIL 1ST TO AUGUST
AND USACE. THE CONTRACTOR SHALL TRACK THE DISPOSAL OF ALL EXCESS TEMPORARY HAUL ROADS, TEMPORARY ACCESS ROADS, AND UTILITY 31ST, WHICH IS THE BREEDING SEASON FOR MOST FOREST INTERIOR DWELLING
2. THE SIDEWALK ALONG SHADY GROVE ROAD IN PARKSIDE ESTATES COMMUNITY
EXCAVATION TO ENSURE THAT THERE IS NO UNAUTHORIZED DISCHARGE OF FILL INSTALLATIONS, SHALL BE ACCOMPLISHED IN A MANNER THAT WILL ACHIEVE SPECIES (FIDS).
AREA SHALL BE RETAINED FOR WALKERS AND BIKERS IN THE COMMUNITY.
IN REGULATED WETLANDS, STREAMS, OR FLOODPLAINS. IF THE CONTRACTOR THE FOLLOWING OBJECTIVES: WHEN THE TEMPORARY CROSSING IS NO LONGER
4. ENVIRONMENTALLY SENSITIVE CONSTRUCTION TECHNIQUES SHALL BE
3. ACCESS TO LOCAL ROADS SHALL BE MAINTAINED FOR BUSINESSES DURING PROPOSES TO DISCHARGE FILL AT LOCATIONS OUTSIDE THE PERMITTED NEEDED, THE OBJECTIVE IS TO RESTORE ANY IMPACTED WETLANDS TO A
IMPLEMENTED AS PART OF FURTHER DESIGN EFFORTS TO AID IN THE ONGOING
CONSTRUCTION. PROJECT LIMITS, IT IS THE CONTRACTOR’S RESPONSIBILITY TO ENSURE THAT FUNCTIONING WETLAND CONSISTENT WITH THE CORPS’ 1987 WETLAND
MINIMIZATION OF IMPACTS TO NATURAL, CULTURAL, AND SOCIOECONOMIC
4. THE EXISTING NUMBER OF TRAFFIC LANES SHALL BE MAINTAINED, TO THE ALL REQUIRED FEDERAL, STATE, AND LOCAL PERMITS HAVE BEEN ACQUIRED DELINEATION MANUAL. THE TEMPORARY FILL MATERIAL SHALL BE REMOVED, THE
RESOURCES.
MAXIMUM EXTENT POSSIBLE, AND CONSTRUCTION SCHEDULES SHALL BE FOR THE DISPOSAL OPERATION. IF THE DISPOSAL OPERATION REQUIRES A COMPACTED TOPSOIL SHALL BE SCARIFIED, THE WETLAND PLANTED WITH NATIVE
PLANNED IN A MANNER THAT WILL NOT CREATE TRAFFIC DISRUPTION AND MODIFICATION TO THIS PERMIT, A REQUEST FOR PERMIT MODIFICATION WILL BE PLANTINGS OR RESEEDED WITH A WETLAND SEED MIX, AND ANY EXPOSED SOIL
5. CHAMPION AND SPECIMEN TREES HAVE BEEN IDENTIFIED WITHIN THE PROJECT
INCREASE AIR POLLUTANTS. APPLICATION OF THESE MEASURES SHALL ENSURE SUBMITTED TO THE USACE, AT LEAST 30 DAYS IN ADVANCE OF THE SHALL BE MULCHED. THE CONTRACTOR SHALL ENSURE THAT SUFFICIENT
STUDY AREA. THE CONTRACTOR WILL COORDINATE WITH THE ADMINISTRATION
THAT CONSTRUCTION IMPACT OF THE PROJECT WILL BE MINIMIZED. CONTRACTOR’S TARGET DATE FOR DISPOSAL. SUCH REQUEST SHALL INCLUDE WETLAND HYDROLOGY IS RE-ESTABLISHED.
TO IDENTIFY AND PROVIDE A BUFFER FOR ANY SUCH TREE OUTSIDE OF THE
AN ALTERNATIVES ANALYSIS IF THE PROPOSED IMPACT TO REGULATED
PRE-CONSTRUCTION ACTIVITIES 11. CONSTRUCTION WORK WITHIN STREAM CHANNELS SHALL DEPLOY A STREAM AREA TO BE CLEARED TO AVOID ITS REMOVAL DURING CLEARING AND
WETLANDS AND STREAMS IS MORE THAN MINIMAL. NO DISPOSAL MAY BEGIN
DIVERSION DEVICE TO LIMIT TURBIDITY-INCREASES. EARTHEN MATERIALS SHALL GRUBBING ACTIVITIES IN ACCORDANCE WITH SECTION 120 - TREE PRESERVATION
1. INSPECTION NOTIFICATION: THE CONTRACTOR SHALL NOTIFY THE ADMINISTRATION UNTIL ANY NECESSARY USACE AUTHORIZATION [VIA THE ADMINISTRATION] HAS
NOT BE USED IN THE DEPLOYMENT OF TEMPORARY STREAM DIVERSIONS, OF THE STANDARDS SPECIFICATIONS FOR CONSTRUCTION AND MATERIALS. THE
WHO WILL NOTIFY MDE’S COMPLIANCE, SEDIMENT & STORMWATER AND DAM SAFETY BEEN RECEIVED.
STREAM CROSSINGS, OR COFFERDAMS, DUE TO THE POTENTIAL FOR WASHOUT CONTRACTOR SHALL AVOID AS MANY SPECIMEN TREES AS POSSIBLE WITHOUT
DIVISIONS AT (410) 537-3510 AT LEAST FIVE(5) DAYS BEFORE STARTING ACTIVITIES TEMPORARY WORK DURING STORM EVENTS. ANY TEMPORARY STREAM CROSSINGS SHALL BE AFFECTING RESOURCES WITH EQUAL OR GREATERREGULATORY PROTECTION. AS
AUTHORIZED BY THE NON-TIDAL WETLANDS AND WATERWAYS (NTWW) PERMIT AND COMPLETELY REMOVED WHEN NO LONGER NEEDED AND THE STREAM BANKS THE DESIGN ADVANCES, IT MAY BE FOUND THAT SPECIMEN TREES ARE LOCATED
FIVE (5) DAYS AFTER COMPLETION. 1. TEMPORARY IMPACTS TO REGULATED WATERWAYS AND NON-TIDAL WETLANDS
RESTORED BY PLANTING NATIVE WOODY VEGETATION. NEAR THE OUTER EDGE OF THE REQUIRED LOD/ ROW OR JUST OUTSIDE THE
SHALL BE AVOIDED AND/OR MINIMIZED TO THE GREATEST EXTENT POSSIBLE.
2. PRECONSTRUCTION MEETINGS: THE MARYLAND DEPARTMENT OF THE LOD/ ROW. IF THIS CONDITION EXISTS, THE CONTRACTOR SHALL COORDINATE WITH
12.TEMPORARY IMPACTS TO STREAMS: PROPOSED TEMPORARY STREAM CROSSINGS
ENVIRONMENT (MDE) DIVISION NON-TIDAL WETLANDS AND WATERWAYS (DIVISION) 2. RESTORATION OF REGULATED AREAS IMPACTED BY TEMPORARY CONSTRUCTION THE ADMINISTRATION TO MARK AND PROVIDE A BUFFER FOR ANY SUCH TREE TO
FOR CONSTRUCTION ACCESS TO BE IN PLACE LESS THAN ONE YEAR SHALL BE
SHALL BE INVITED TO ATTEND A SCHEDULED PRE-CONSTRUCTION MEETING WITH ACTIVITIES SHALL BE INCLUDED IN THE PROJECT DESIGN AND RELATED AVOID ITS REMOVAL DURING CLEARING AND GRUBBING ACTIVITIES.
DESIGNED TO PASS THE TWO-YEAR STORM EVENT. CROSSINGS TO BE IN PLACE
THE POTENTIAL DESIGN-BUILD CONTRACTORS FOR EACH CONTRACT. AT THIS CONSTRUCTION DOCUMENTS, AND COORDINATED WITH THE ADMINISTRATION.
BETWEEN ONE AND TWO YEARS SHALL BE DESIGNED TO PASS THE FIVE-YEAR
MEETING, THE DIVISION WILL PRESENT WATER QUALITY (WQ) CERTIFICATION AND 6. TO THE EXTENT PRACTICABLE, THE CONTRACTOR SHALL FURTHER AVOID AND
3. THE CONTRACTOR SHALL RESTORE TEMPORARY IMPACTS IN COMPLIANCE WITH STORM EVENT. ALL TEMPORARY CROSSINGS MUST BE DESIGNED TO REMAIN
THE NTWW PERMIT CONDITIONS AND ADDRESS THE CONTRACTOR’S QUESTIONS. MINIMIZE IMPACTS TO JURISDICTIONAL WETLANDS, STREAMS, FOREST, AND
PERFORMANCE SPECIFICATION 310, ENVIRONMENTAL PERFORMANCE SPECIFICATION STABLE IN CASE OF OVERTOPPING. IF CONSTRUCTION CONSTRAINTS MAKE
FOLLOWING AWARD OF ANY DESIGN-BUILD CONTRACT RELATED TO THIS PERMIT, PARKLAND IN THE DEVELOPMENT OF FINAL DESIGN PLANS AND DURING
SECTION 3.3.4.5. THE RESTORATION PLAN FOR THE TEMPORARY IMPACTS SHALL THESE REQUIREMENTS IMPRACTICAL, THE DESIGN SUBMITTAL SHALL INCLUDE
THE OWNER WILL SCHEDULE A MEETING WITH THE CONTRACTOR, CONSTRUCTION. THE PERMIT CONVEYS AUTHORIZATION TO IMPACT WETLANDS
INCLUDE THE FOLLOWING ELEMENTS: DETAILED INFORMATION SHOWING PROVISIONS TO PREVENT DEGRADATION TO
SUBCONTRACTORS, STATE HIGHWAY ADMINISTRATION (SHA) STAFF, AND THE MDE AND STREAMS WITHIN THE LIMIT OF DISTURBANCE AS SHOWN ON THE PERMIT
A. REMOVAL OF ALL CONSTRUCTION AND TEMPORARY FILL MATERIAL; WATER QUALITY DURING PERIODS OF OVERTOPPING, INCLUDING PROVISIONS TO
TO DISCUSS REQUIREMENTS OF THE WQ CERTIFICATION AND NTWW PERMIT, DRAWINGS, TITLED "ICC CORRIDOR 1" DATED 1 MAY 2006, BY SHA, WITH THE
SECURE ALL DEVICES TO PREVENT MOVEMENT DOWNSTREAM.
COMPLIANCE MEASURES, DESIGN REVIEW AND COORDINATION, AND SCHEDULING. B. DE-CONSOLIDATION AND/OR SCARIFICATION OF COMPACTED SOILS; CAVEAT THAT TEMPORARY AND PERMANENT STREAM IMPACTS ARE LIMITED TO
THE MDE SHALL BE NOTIFIED OF THIS MEETING A MINIMUM OF 14 DAYS PRIOR 13.NO MATERIALS, EQUIPMENT, DEBRIS, OR EXCAVATED SOILS SHALL BE KEPT NO MORE THAN 25 FEET FROM THE ENDS OF CULVERTS AND RIP-RAPPED PIPE
C. REPLACEMENT OF TOPSOIL AND/OR ORGANIC MATTER LOST TO EROSION WITHIN THE 100-YEAR FLOODPLAIN WITHOUT SPECIFIC APPROVAL FROM THE MDE. OUTLETS. (SEE SPECIAL CONDITION #17 OF THE NTWW PERMIT).
TO THE DATE OF THE MEETING. THIS MEETING MAY BE IN CONJUNCTION WITH
AND SEDIMENT CONTROL MEASURES; PROPOSED MAINTENANCE OF STREAM FLOW FOR CONSTRUCTION ACTIVITIES
A PARTNERING ACTIVITY OR OTHER REGULATORY AGENCY MEETING. 7. AVOIDANCE AND MINIMIZATION: THIS NTWW PERMIT CONVEYS AUTHORIZATION TO
D. RE-ESTABLISHMENT OF GRADES TO PRECONSTRUCTION CONDITIONS; SHALL ALSO BE SUBMITTED TO THE MDE FOR APPROVAL, AND WILL REQUIRE A
3. THE CONTRACTOR SHALL CONDUCT A PRE-WORK MEETING WITH SHA, USACE, IMPACT WETLANDS, WETLAND BUFFERS, WATERS, AND THE REGULATED
DESIGN REPORT INDICATING THE FLOWS TO BE HANDLED, AND PROVISIONS FOR
AND MDE TO DISCUSS PERMIT CONDITIONS, COMPLIANCE MEASURES, DESIGN E. REMOVAL OF TEMPORARY STREAM CROSSINGS; FLOODPLAIN WITHIN THE LIMIT OF DISTURBANCE AS SHOWN ON THE PERMIT
WHEN FLOWS EXCEED CAPACITY. IN NO CASE MAY A TEMPORARY STREAM
REVIEW AND COORDINATION, AND SCHEDULING. DRAWINGS TITLED "ICC CORRIDOR 1" DATED 1 MAY 2006. AVOIDANCE AND
F. RESTORATION OF STREAM BANKS WITH WOODY VEGETATION AS SPECIFIED CROSSING OR MAINTENANCE OF STREAM FLOW TECHNIQUE RESULT IN AN
MINIMIZATION OF IMPACTS TO THESE REGULATED RESOURCES SHALL BE
4. THE CONTRACTOR SHALL NOTIFY SHA 48 HOURS PRIOR TO THE IN PLANTING AND LANDSCAPE ARCHITECTURAL PERFORMANCE SPECIFICATION INCREASED RISK OF FLOODING TO ADJACENT PROPERTY OWNERS WITHOUT
EMPHASIZED THROUGHOUT THE REMAINDER OF THE DESIGN AND CONSTRUCTION
COMMENCEMENT OF ANY STREAM DEWATERING OR OTHER IN-STREAM ACTIVITIES. AND DRAINAGE PERFORMANCE SPECIFICATION; THEIR WRITTEN CONSENT. DESIGN SUBMITTALS FOR TEMPORARY STREAM IMPACTS
PROCESS (SEE SPECIAL CONDITION #17 OF THE NTWW PERMIT)."
SHALL INCLUDE DETAILED PLANS FOR RESTORATION, STABILIZATION, AND
5.THE CONTRACTOR SHALL SUBMIT A LIST PRIOR TO THE START OF G. AVOID DISTURBANCE TO RIPARIAN VEGETATION, PARTICULARLY WITHIN 30
LANDSCAPING OF THE CHANNEL AND FLOODPLAIN AREA. 8. EVERY EFFORT SHALL BE MADE TO AVOID DISTURBANCE TO RIPARIAN
CONSTRUCTION AND EACH QUARTER DURING CONSTRUCTION OF THE OFF-ROAD FEET OF STREAM BANKS; AND
VEGETATION, PARTICULARLY WITHIN 30 FEET OF STREAM BANKS. ANY
DIESEL POWERED CONSTRUCTION EQUIPMENT WITH 60 HORSEPOWER OR 14.TEMPORARY IMPACTS TO WETLANDS: THE CONTRACTOR SHALL DEVELOP PLANS
H. REPLANT ANY AREA WITHIN 30 FEET OF A STREAM BANK THAT WAS PRE-EXISTING VEGETATION THAT IS GRUBBED WITHIN A TEMPORARILY-DISTURBED
GREATER WHICH SPECIFICALLY DEMONSTRATES AND DETAILS COMPLIANCE: FOR APPROVAL BY THE MDE DETAILING PROPOSED METHODS TO MINIMIZE
DISTURBED TEMPORARILY, AND THAT WAS VEGETATED PRE-CONSTRUCTION, AREA WITHIN 30 FEET OF A STREAM BANK, WILL BE REPLANTED WITH NATIVE
THE LIST SHALL INCLUDE: DEGRADATION (INCLUDING COMPACTION, ALTERATION OF HYDROLOGY, RELEASE
WITH NATIVE VEGETATION SIMILAR TO PRE-CONSTRUCTION SPECIES RIPARIAN VEGETATION AFTER THE REMOVAL OF THE TEMPORARY DISTURBANCE,
OF CONTAMINANTS, ETC.) OF TEMPORARILY IMPACTED NON-TIDAL WETLANDS AND
A. THE EQUIPMENT NUMBER, TYPE, MAKE, AND CONTRACTOR/SUB-CONTRACTOR COMPOSITION, WITH THE EXCEPTION OF UNDERGROUND UTILITY CORRIDORS. WITH THE EXCEPTION OF UTILITY CORRIDORS.
NON-TIDAL WETLAND BUFFERS PRIOR TO INITIATION OF WORK IN THESE AREAS.
NAME; REFER TO PLANTING AND LANDSCAPE ARCHITECTURAL PERFORMANCE
PLANS SHALL INCLUDE A DETAILED ASSESSMENT OF PRE-IMPACT CONDITIONS; 9. THE DISTURBANCE TO THE BOTTOM OF WATERWAYS AND SEDIMENT TRANSPORT
SPECIFICATION FOR DETAILS.
B. ANY EMISSION CONTROL DEVICE MAKE, MODEL AND EPA CERTIFICATION AN ANALYSIS OF THE HYDROLOGIC CONDITIONS SUPPORTING THE WETLAND; INTO STATE WATERS SHALL BE MINIMIZED. SHA SHALL OBTAIN AND CERTIFY
NUMBER; AND 4. REMEDIATION EFFORTS OF TEMPORARY IMPACTS SHALL BE IMPLEMENTED BY MEASURES TO RESTORE HYDROLOGY TO PRE-IMPACT CONDITIONS; MEASURES COMPLIANCE WITH GRADING AND SEDIMENT CONTROL PLANS WHICH HAVE BEEN
THE CONTRACTOR IF DEEMED NECESSARY AFTER THREE YEARS BY SHA. THE TO MITIGATE COMPACTION; AND RESTORATION PLANS, INCLUDING LANDSCAPING APPROVED BY THE MARYLAND DEPARTMENT OF THE ENVIRONMENT, WATER
C. THE TYPE AND SOURCE OF FUEL TO BE USED.
CONTRACTOR SHALL BE RESPONSIBLE TO MITIGATE FOR THE LOST RESOURCE WITH APPROPRIATE SPECIES. NO MATERIALS, EQUIPMENT, DEBRIS, OR EXCAVATED MANAGEMENT ADMINISTRATION.
6.THE PROPOSED PROJECT SHALL BE CONSTRUCTED IN A MANNER WHICH WILL IF REMEDIATION DOES NOT PROVE SUCCESSFUL ONE YEAR AFTER THE SOILS WILL BE STOCKPILED OR STORED WITHIN TEMPORARILY IMPACTED 10.DISCHARGE: RUNOFF OR ACCUMULATED WATER CONTAINING SEDIMENT OR
NOT VIOLATE MARYLAND’S WATER QUALITY STANDARDS AS SET FORTH IN REMEDIATION EFFORTS ARE IMPLEMENTED. WETLANDS OR REGULATED BUFFERS. OTHER SUSPENDED MATERIALS SHALL NOT BE DISCHARGED INTO WATERS OF
COMAR 26.0802. THE APPLICANT IS TO NOTIFY THE ADMINISTRATION SO THEY
5. TEMPORARY CONSTRUCTION IMPACTS TO STREAM CHANNELS AND OTHER 15.TEMPORARY STAGING AREAS: TEMPORARY CONSTRUCTION TRAILERS OR THE STATE UNLESS TREATED BY AN APPROVED SEDIMENT CONTROL DEVICE OR
CAN IN TURN NOTIFY THE DEPARTMENT TEN (10) DAYS PRIOR TO COMMENCING
SENSITIVE RESOURCES SHALL BE MINIMIZED BY USING EQUIPMENT FITTED WITH STRUCTURES, STAGING AREAS AND STOCKPILES SHALL NOT BE LOCATED WITHIN STRUCTURE.
WORK. VERBAL NOTIFICATION IS TO BE FOLLOWED BY WRITTEN NOTICE WITHIN
LOW-PRESSURE TIRES OR TRACKS IN STREAMS AND WETLANDS AND OTHER NON-TIDAL WETLANDS, NON-TIDAL WETLANDS BUFFERS, OR THE 100-YEAR
TEN (10) DAYS. 11. DISTURBANCE OF STREAM CHANNELS: MOTOR DRIVEN CONSTRUCTION EQUIPMENT
SENSITIVE AREAS. THE CONTRACTOR SHALL NOT OPERATE HEAVY EQUIPMENT IN FLOODPLAIN UNLESS SPECIFICALLY APPROVED BY THE ADMINISTRATION [MDE]. SHALL NOT BE ALLOWED WITHIN THE STREAM CHANNEL UNLESS SHOWN ON
CONSTRUCTION ACTIVITIES A MANNER THAT WILL DAMAGE UN-PERMITTED NON-TIDAL WETLANDS, NON-TIDAL
16.TEMPORARY STREAM ACCESS CROSSINGS: TEMPORARY STREAM ACCESS THE NTWW PERMIT DRAWINGS OR SPECIFICALLY AUTHORIZED IN WRITING BY
WETLAND BUFFERS, WATERWAYS, OR THE 100-YEAR FLOODPLAIN.
1. THE CONTRACTOR SHALL DEVELOP A MONITORING PLAN TO MINIMIZE ANY CROSSINGS SHALL NOT BE CONSTRUCTED OR UTILIZED UNLESS SHOWN ON THE THE ADMINISTRATION AND MDE.
POTENTIAL BLASTING EFFECTS. THIS PLAN SHALL IDENTIFY THE BEST 6.TEMPORARY CONSTRUCTION IMPACTS TO STREAM CHANNELS AND OTHER PERMIT DRAWINGS. IF TEMPORARY STREAM ACCESS CROSSINGS ARE DETERMINED 12.MINIMUM DISTURBANCE: ANY DISTURBANCE OF STREAM BANKS, CHANNEL
TECHNIQUES FOR USE DURING CONSTRUCTION, AS WELL AS MONITORING, SENSITIVE RESOURCES SHALL BE MINIMIZED BY LOCATING CONSTRUCTION NECESSARY PRIOR TO INITIATION OF WORK OR AT ANY TIME DURING BOTTOM, NON-TIDAL WETLANDS, AND NON-TIDAL WETLANDS BUFFER AUTHORIZED
PERMITS AND LICENSE REQUIREMENTS. ACCESS ROADS THAT AVOID STREAMS AND WETLANDS WHEREVER POSSIBLE AND CONSTRUCTION, THE CONTRACTOR, ITS EMPLOYEES, AGENTS OR BY THE NTWW PERMIT SHALL BE THE MINIMUM NECESSARY TO CONDUCT
BY IMPLEMENTATION OF TIMBER MATTING AND GEOTEXTILES. THE TEMPORARY SUBCONTRACTORS SHALL SUBMIT A WRITTEN REQUEST TO THE ADMINISTRATION
2. ALL FILL AND CONSTRUCTION MATERIALS NOT USED IN THE PROJECT SHALL BE PERMITTED ACTIVITIES. ALL DISTURBED AREAS SHALL BE VEGETATIVELY
BRIDGE STRUCTURES FOR CONSTRUCTION OF ACCESS ROADS THROUGH WETLANDS [MDE] AND SECURE THE NECESSARY PERMITS OR APPROVALS FOR SUCH
REMOVED AND DISPOSED OF IN A MANNER WHICH WILL PREVENT THEIR ENTRY STABILIZED NO LATER THAN SEVEN (7) DAYS AFTER CONSTRUCTION IS
AND STREAMS THAT ARE NOT PERMITTED SHALL BE USED WHEN COMPLETE CROSSINGS BEFORE INSTALLATION OF THE CROSSINGS. TEMPORARY STREAM
INTO WATERS OF THIS STATE. COMPLETED OR IN ACCORDANCE WITH APPROVED EROSION AND SEDIMENT
AVOIDANCE IS NOT POSSIBLE. ACCESS CROSSINGS SHALL BE REMOVED AND THE DISTURBANCE STABILIZED CONTROL PLAN(S).
3. UNLESS OTHERWISE SHOWN ON THE PERMIT DRAWINGS, ALL EXCESS FILL, SPOIL PRIOR TO COMPLETION OF AUTHORIZED ACTIVITIES OR WITHIN ONE (1) YEAR OF
7. TEMPORARY CONSTRUCTION IMPACTS TO STREAM CHANNELS AND OTHER
MATERIAL, DEBRIS, AND CONSTRUCTION MATERIAL SHALL BE DISPOSED OF INSTALLATION. 13.REGULATED IMPACTS - PLAN SUBMITTAL: PRIOR TO ANY DISTURBANCE TO A
SENSITIVE RESOURCES SHALL BE MINIMIZED BY STRINGENT USE AND
OUTSIDE OF NON-TIDAL WETLANDS, NON-TIDAL WETLANDS BUFFERS, AND THE STATE REGULATED NON-TIDAL WETLAND, NON-TIDAL WETLAND BUFFER, OR
MAINTENANCE OF STATE OF THE ART SEDIMENT AND EROSION CONTROL 17.THE CONTRACTOR SHALL MAKE POST CONSTRUCTION GRADES AND ELEVATIONS
100-YEAR FLOODPLAIN, AND IN A LOCATION AND MANNER WHICH DOES NOT NON-TIDAL WATERWAY, INCLUDING THE REGULATED 100-YEAR FLOODPLAIN,
MEASURES DURING CONSTRUCTION THAT IN MANY CASES EXCEED MDE THE SAME AS THE ORIGINAL GRADES AND ELEVATIONS IN TEMPORARILY
ADVERSELY IMPACT SURFACE OR SUBSURFACE WATER FLOW INTO OR OUT OF DETAILED PLAN SUBMITTALS FOR THE PROPOSED IMPACTS MUST BE SUBMITTED
REGULATIONS. IMPACTED AREAS AFTER CONSTRUCTION HAS BEEN COMPLETED.
NON-TIDAL WETLANDS. TO AND APPROVED BY THE MDE
8. ANY TEMPORARY CROSSINGS OF WETLANDS (I.E., CROSSINGS THAT WILL NOT 18.IN TEMPORARY AND CONVERTED WETLANDS AREAS, VEGETATION MAY BE
4. CONSTRUCTION EQUIPMENT SHALL BE MAINTAINED TO MINIMIZE NOISE
REMAIN PERMANENTLY), SUCH AS WETLAND CROSSINGS REQUIRED FOR CLEARED BUT SHALL NOT BE GRUBBED EXCEPT FOR AREAS EXCAVATED FOR
EMISSIONS CAUSED BY INEFFICIENTLY TUNED ENGINES, POORLY LUBRICATED
TEMPORARY HAUL ROADS, TEMPORARY ACCESS ROADS, AND UTILITY BRIDGE PIERS.
MOVING PARTS AND POOR-INEFFECTIVE MUFFLING/EXHAUST SYSTEMS.
INSTALLATIONS, SHALL BE ACCOMPLISHED IN A MANNER THAT WILL ACHIEVE
5. THE CONTRACTOR SHALL PREPARE A PLAN DEMONSTRATING MEANS AND AVOIDANCE AND MINIMIZATION OF IMPACTS
THE FOLLOWING OBJECTIVES: WHERE TEMPORARY AGGREGATE IS PLACED IN A
METHODS FOR COMPLIANCE WITH THE PERFORMANCE SPECIFICATION AIR WETLAND, THE OBJECTIVE IS TO ENSURE THAT THE AGGREGATE DOES NOT 1. THE CONTRACTOR SHALL UNDERTAKE ALL ACTIVITIES IN A WAY TO MINIMIZE SEGMENT D1D2
QUALITY STRATEGIES IN 310 ENVIRONMENTAL SECTION 3.5 AIR QUALITY AND/OR BECOME EMBEDDED IN THE SOIL AND CAN BE COMPLETELY REMOVED WHEN CONSTRUCTION IMPACTS THAT MAY INITIATE FURTHER CHANNEL EROSION, IN
PREPARE A SIMILAR PROGRAM FOR REVIEW BY THE ADMINISTRATION. THE THE TEMPORARY ROAD IS NO LONGER NEEDED. A PHYSICAL SEPARATION OF STREAM SEDIMENTATION, AND DOWNSTREAM SEDIMENTATION IN LAKE FRANK.
ISSUED FOR REVIEW
CONTRACTOR SHALL PREPARE AND IMPLEMENT A DIESEL EMISSION REDUCTION THE EXISTING WETLAND SOIL AND THE DISCHARGED AGGREGATE SHALL BE
2. THERE WILL BE NO GRUBBING OF VEGETATION THAT GROWS BENEATH THE
PLAN FOR CONSTRUCTION PURPOSES. MOBILE SOURCE EMISSIONS CAN BE PROVIDED, IN ACCORDANCE WITH MDE REQUIREMENTS. THE DISCHARGE OF
PROPOSED BRIDGES OVER ROCK CREEK AND NORTH BRANCH ROCK CREEK
REDUCED DURING CONSTRUCTION BY USE OF RETROFITS-OXIDATION CATALYSTS AGGREGATES CAN BE AVOIDED ALTOGETHER BY USING TIMBER MATS WHERE
EXCEPT THE MINIMUM NEEDED TO CONSTRUCT PROJECT COMPONENTS SUCH AS
ON EQUIPMENT AND NOT PERMITTING IDLING OF DELIVERY TRUCKS OR OTHER THE SOIL IS TOO WET OR TOO SOFT TO SUPPORT CONSTRUCTION EQUIPMENT. STATE OF MARYLAND
FOUNDATIONS, HAUL ROADS, SLOPE PROTECTION, AND UTILITIES.
EQUIPMENT DURING LONG PERIODS OF TIME FOR UNLOADING. DEPARTMENT OF TRANSPORTATION
9. ANY TEMPORARY CROSSINGS OF WETLANDS (I.E., CROSSINGS THAT WILL NOT
STATE HIGHWAY ADMINISTRATION
6. NO STOCKPILING OR STORAGE OF EQUIPMENT, MATERIALS, OR STRUCTURAL REMAIN PERMANENTLY), SUCH AS WETLAND CROSSINGS REQUIRED FOR
STEEL; NO STAGING AREA; AND NO INSTALLATION OF ANCILLARY FACILITIES TEMPORARY HAUL ROADS, TEMPORARY ACCESS ROADS, AND UTILITY
SUCH AS CONCRETE OR ASPHALT PLANTS OR CONSTRUCTION TRAILERS SHALL INSTALLATIONS, SHALL BE ACCOMPLISHED IN A MANNER THAT WILL ACHIEVE INTERCOUNTY CONNECTOR
BE PERMITTED WITHIN ANY WETLAND, STREAM, STATE REGULATED WETLAND THE FOLLOWING OBJECTIVES: WHEN THE TEMPORARY CROSSING IS LOCATED
BUFFER, OR FLOODPLAIN. NO CONSTRUCTION MATERIALS, AGGREGATES, OR WHERE IT COULD BE SUBJECTED TO FLOOD FLOWS, ANY TEMPORARY EARTHEN
CONTRACT A
EARTH SHALL BE STOCKPILED OR STORED IN A MANNER THAT WOULD AFFECT ROAD MATERIAL SHALL BE STABILIZED, AND ANY OTHER APPROPRIATE MEASURES D1D2 GRADING, DRAINAGE AND PAVING
WETLANDS OR STREAMS, AND SUCH STOCKPILES SHALL HAVE EROSION AND TAKEN CONSISTENT WITH MDE REQUIREMENTS, TO ENSURE THE ROAD WILL
SEDIMENT CONTROLS APPROVED BY MDE. WITHSTAND EXPECTED FLOOD FLOWS AND BE CONTROLLED TO PREVENT ANY
7. NO CONCRETE TRUCKS SHALL BE WASHED OFF IN A MANNER THAT WOULD EROSION INTO WETLANDS AND STREAMS. REVISIONS GENERAL NOTES
ALLOW THE CEMENT-LADEN WASH WATER TO ENTER A STREAM OR WETLAND.
SCALE NA DATE OCT. 2007 CONTRACT NO. AT3765960
BY: c0036708
1.THE ICC HAS BEEN DESIGNED TO MEET MONTGOMERY COUNTY DEPARTMENT OF 18.THE CONTRACTOR SHALL USE THE FOLLOWING SPECIES FOR ALL STABIL
PERMITTING SERVICES (MCDPS) SPA STORMWATER CRITERIA FOR WATER QUALITY IN THE NON-TIDAL WETLAND AND NON-TIDAL WETLAND BUFFER: ANNUA
PLANS WITHIN SPAS. RYEGRASS (LOLIUM MULTIFLORUM), MILLET (SETARIA ITALICA), BARLEY (HO
SP.), OATS (UNIOLA SP.), AND/OR RYE (SECALE CEREALE). AREAS SHALL
2.THE ICC HAS BEEN DESIGNED TO INCORPORATE A COMBINATION OF FILTRATION, AND
SEEDED AND MULCHED TO CONTROL EROSION AFTER CONSTRUCTION AC
INFILTRATION WITHIN SPAS AND MEASURES DESCRIBED IN MDE’S 2000 MARYLAND
HAVE BEEN COMPLETED.
STORMWATER DESIGN MANUAL TO ADDRESS WATER QUALITY.
19.SHA SHALL BE IMMEDIATELY NOTIFIED OF INADVERTENT IMPACTS TO WE
3. CONSTRUCTION OF THE ICC SHALL INCLUDE EROSION AND SEDIMENT
OR WATERWAYS FOR WHICH ACTIVITIES ARE NOT PERMITTED. AREAS SHA
CONTROLS, INCLUDING RUNOFF FILTERS (SILT FENCES, SUPER SILT FENCES, AND
IMMEDIATELY RESTORED TO THE FULL SATISFACTION OF SHA.
INLET PROTECTION DEVICES), WATER HANDLING DEVICES (EARTH DIKES,
TEMPORARY SWALES, AND STORM DRAIN DIVERSIONS), SEDIMENT TRAPPING 20.THE CONTRACTOR SHALL RESTORE ANY NON-TIDAL WETLANDS, WETLAND
DEVICES (SEDIMENT TRAPS AND BASINS), DEWATERING DEVICES (SUMP PITS, BUFFERS, WATERWAYS, OR 100-YEAR FLOODPLAIN TEMPORARILY IMPACTE
SEDIMENT TANKS AND REMOVABLE PUMPING STATIONS), AND OTHER BMPS AS ANY CONSTRUCTION TO THE FULL SATISFACTION OF SHA, REGULATORY
APPROPRIATE. AGENCIES, AND IN ACCORDANCE WITH THE REQUIREMENTS OF THE USA
PERMIT.
4. IN ROADWAY SECTIONS, EXCEPT WITHIN SPECIAL PROTECTION AREAS (SPAS),
WATER QUALITY CONTROL SHALL BE PROVIDED THROUGH THE USE OF OPEN REFORESTATION
SWALES AND GRASS CHANNEL CREDITS AS ALLOWED IN THE 2000 MARYLAND
1. BEFORE REFORESTATION IS APPROVED BY THE DNR, EVERY REASONABL
STORMWATER DESIGN MANUAL.
SHALL BE MADE BY THE CONTRACTOR TO MINIMIZE THE CUTTING OR C
5.THE CONTRACTOR SHALL UNDERTAKE ALL ACTIVITIES IN A WAY TO PROTECT ALL OF TREES.
INFILTRATION AREAS DURING CONSTRUCTION THROUGH COMPLIANCE WITH MDE
2.THERE ARE TWO RECENTLY CONSTRUCTED REFORESTATION AREAS WITHIN
REGULATIONS.
I-370 / SHADY GROVE ROAD INTERCHANGE (SOUTHWEST QUADRANT). THE
6. PROPER SLOPE AND SOIL STABILIZATION TECHNIQUES SHALL BE USED IN CONTRACTOR SHALL IMPLEMENT MEASURES TO PROTECT THESE NEW PLAN
COMPLIANCE WITH MDE REGULATIONS TO PREVENT SOIL EROSION FROM WORK AREAS.
AREAS AND TRANSPORT INTO NEARBY WATERWAYS (BOTH DURING AND AFTER
3. THE CONTRACTOR SHALL REQUEST A FIELD REVIEW WITH THE ADMINIST
CONSTRUCTION).
AND PROVIDE THE ADMINISTRATION WITH JUSTIFICATION IF ADDITIONAL T
7. BEST MANAGEMENT PRACTICES (BMPS) SHALL BE IMPLEMENTED, IN ACCORDANCE ARE REQUESTED TO BE REMOVED.
WITH MDE GUIDELINES, AS THE PRIMARY AVOIDANCE AND MINIMIZATION
4.PRIOR TO PERFORMING ANY WORK, THE CONTRACTOR SHALL BE RESPONS
MEASURE TO REDUCE THE INDIRECT IMPACTS OF INCREASED IMPERVIOUSNESS.
FOR PERFORMING ALL TREE PRESERVATION MEASURES IN ACCORDANCE W
8.EXCEPT AS SHOWN ON THE ATTACHED PERMIT DRAWINGS, NO STORMWATER SECTION 120 - TREE PRESERVATION OF THE STANDARD SPECIFICATIONS FO
MANAGEMENT POND OR EROSION AND SEDIMENT CONTROL BASIN SHALL BE CONSTRUCTION AND MATERIALS.
CONSTRUCTED IN ANY WETLAND. WHERE THE DRAWINGS SHOW A
WILDLIFE
RIGHT-OF-WAY BUMP-OUT FOR A STORMWATER MANAGEMENT POND OR
EROSION AND SEDIMENT CONTROL BASIN IN THE VICINITY OF A STREAM, THE 1.FACILITIES WITHIN USE III AND IV WATERSHEDS HAVE BEEN DESIGNED TO
POND OR BASIN SHALL BE CONSTRUCTED IN A MANNER THAT DOES NOT TEMPERATURE SENSITIVE AND PROMOTE INFILTRATION TO MAXIMIZE GROUN
IMPACT THE STREAM. FOR ANY STORMWATER MANAGEMENT POND RECHARGE TO PROTECT BROWN TROUT AND OTHER TEMPERATURE SENSIT
CONSTRUCTED IN THE VICINITY OF A STREAM, THE POND SHALL BE LOCATED A 2.ICC HAS BEEN DESIGNED AND SHALL BE CONSTRUCTED SUCH THAT WILD
SUFFICIENT DISTANCE FROM THE STREAM TO MAINTAIN A 15-FOOT WIDE CORRIDORS WILL BE MAINTAINED BETWEEN FORESTED AREAS WHERE
CLEARED AREA BEYOND THE TOE OF ANY BERMS SURROUNDING THE POND, PRACTICABLE.
PLUS AN ADDITIONAL 30-FOOT WIDE, OR LARGER, VEGETATED BUFFER ALONG
THE STREAM. STORMWATER POND OUTFALLS MAY BE CONSTRUCTED ACROSS 3. IN THE CASES WHERE HIKER/BIKER PATHS ENCOUNTER FENCING, SPRING
THE 30-FOOT VEGETATED BUFFER AREA. OR SIMILAR FEATURES MAY BE CONSIDERED TO PREVENT DEER FROM
ACCESSING ROADSIDE AREAS.
9. THE CONTRACTOR WILL UTILIZE SHA’S NEW EROSION AND SEDIMENT CONTROL
PROGRAM ON THIS PROJECT. THIS NEW PROGRAM INCORPORATES THE 4. TO REDUCE FISH MORTALITY, THE CONTRACTOR SHALL RELOCATE FISH P
FOLLOWING FEATURES: TO DEWATERING WORK AREAS, AND RELEASE THE FISH DOWNSTREAM. F
RELOCATION SHALL INCLUDE AT LEAST TWO PASSES WITH A NET AND/O
A. AN INCENTIVE/DISINCENTIVE PROGRAM TO ENCOURAGE COMPLIANCE WITH ELECTROFISHING UNIT OF THE DEWATERED WORK AREA. FISH SCREENIN
THE EROSION AND SEDIMENT CONTROL PLAN. THE PUMP INTAKE SHALL BE USED TO PREVENT UPTAKE OF AQUATIC B
B. THIS PROGRAM WILL INVOLVE RANDOM, SURPRISE INSPECTIONS OF THE DURING DEWATERING. FISH RELOCATED BY ELECTROFISHING SHALL BE
CONTRACTOR’S EROSION AND SEDIMENT CONTROL DEVICES. COLLECTED IN BUCKETS AND ALLOWED TO REGAIN CONSCIOUSNESS BE
BEING RETURNED TO THE STREAM. ALL FISH SHALL BE RELEASED DOWN
C. PERIODIC INCENTIVES WILL BE PROVIDED FOR MAINTAINING AN AVERAGE
OF THE WORK AREA.
RATING OF 85 WITH NO D OR F RATINGS.
5. THE CONTRACTOR SHALL PROVIDE TO THE ADMINISTRATION DOCUMENTA
D. A RATING OF D OR F WILL RESULT IN SHUTDOWN OF ALL EARTHWORK
THE FORM OF A MEMORANDUM WITHIN ONE WEEK OF THE WORK DETA
ACTIVITIES EXCEPT EROSION AND SEDIMENT CONTROL MAINTENANCE, AND
THE FISH RELOCATION ACTIVITIES.
WILL RESULT IN ASSESSMENT OF A FINANCIAL PENALTY ON THE
CONTRACTOR. 6. THE CONTRACTOR SHOULD AVOID DISTURBANCE TO THE SEASONAL POO
HABITAT FOR POOL BREEDING AMPHIBIANS BETWEEN APRIL 1 AND JUNE
E. THE CONTRACTOR WILL HAVE 72 HOURS TO UPGRADE HIS SEDIMENT
ANY YEAR AT THE FOLLOWING LOCATIONS:
CONTROL IF A C RATING IS REPORTED.
A. STATION 1135+48 (OLD STATION 170+00) TO STATION 1140+48 (OLD
F. FAILURE TO UPGRADE TO A B RATING WITHIN 72 HOURS WILL RESULT IN
175+00);
A D RATING, REQUIRING SHUTDOWN OF ALL EARTHWORK ACTIVITIES EXCEPT
EROSION AND SEDIMENT CONTROL MAINTENANCE. B. STATION 1170+60 (OLD STATION 205+00) TO STATION 1177+56 (OLD
212+00);
G. RATINGS OF C AND LOWER WILL BE REPORTED TO THE PRINCIPALS OF
THE CONTRACTING COMPANY. C. STATION 1240+54 (OLD STATION 275+00) TO STATION 1245+54 (OLD
STATION 280+00); AND
H. TWO F RATINGS WILL RESULT IN DISMISSAL OF THE CONTRACTOR’S
EROSION AND SEDIMENT CONTROL MANAGER AND CONSTRUCTION MANAGER D. STATION 1280+54 (OLD STATION 315+00) TO STATION 1310+90 (OLD
FOR A PERIOD OF 6 MONTHS. 330+00).
I. BOTH POSITIONS MUST BE FILLED BY PEOPLE WHO HAVE RECEIVED SHA HAZARDOUS MATERIALS
CERTIFICATION IN EROSION AND SEDIMENT CONTROL. 1. IF THE HAZARDOUS MATERIALS SITES IDENTIFIED IN THE FEIS CANNOT B
10.THE EROSION AND SEDIMENT CONTROL MEASURES SHALL BE MONITORED AND AVOIDED, THE CONTRACTOR SHALL COMPLETE REMEDIATION IN ACCORDA
MAINTAINED DURING WEEKENDS AND HOLIDAYS. WITH MDE REQUIREMENTS.
11. NO FLOCCULANTS SHALL BE USED IN SEDIMENT PONDS UNTIL THE HEALTH 2. THE CONTRACTOR SHALL PREPARE AND IMPLEMENT A PLAN FOR MANA
EFFECTS OF SUCH FLOCCULANTS ON AQUATIC AND TERRESTRIAL FAUNA HAVE AND DISPOSAL OF CONTROLLED HAZARDOUS MATERIALS AND CONTAMIN
BEEN DETERMINED BY THE CONTRACTOR, AND APPROVED FOR USE BY MDE. SOIL AND GROUNDWATER THAT MAY BE ENCOUNTERED DURING STRUCT
DEMOLITION, LAND CLEARING, OR EXCAVATION ACTIVITIES.
12.BEST MANAGEMENT PRACTICES: THE PROVISIONS CONTAINED IN THE PS 310
ENVIRONMENTAL PERFORMANCE SPECIFICATION SECTION 3.3.4.2 SHALL BE OTHER
FOLLOWED. 1. WHERE UTILITY LINES PASS THROUGH OR ALONG THE BOUNDARIES OF
13.SUPER SILT FENCE SHALL BE EMPLOYED NEAR STREAMS AND WETLANDS. WETLAND AREAS, MEASURES SHALL BE TAKEN TO PREVENT THE POROU
EROSION AND SEDIMENT CONTROLS SHALL BE APPLIED TO HAUL ROADS AND BEDDING AND BACKFILL MATERIAL FROM ACTING AS A FRENCH DRAIN T
CONSTRUCTION ACCESS ROADS, IN ACCORDANCE WITH MDE REQUIREMENTS. WOULD DRAIN THE WETLAND.
16.COMPLY WITH ALL WATER QUALITY STANDARDS STATED IN THE COMAR FOR
THE PROTECTION OF AQUATIC BIOTA.
ROCK CREEK
REGIONAL PARK
ROCK CREEK
REGIONAL PARK
ROCK CREEK
REGIONAL PARK
NOTES:
1.
2.
3.
MUNCASTER MANOR/
BOWIE MILL ESTATES
HISTORIC PROPERTY
8’BIKE
BRIDGE 19
PATH
END SEGMENT C2
BEGIN SEGMENT D1D2
STA. 1257+50
BEGIN ROUGH
GRADING
STA. 1257+50
RELOCATED O/ H
PEPCO LINES
24" CASING
RELOCATED 12"
WATER MAIN
5’ SIDEWALK
8’ BIKE PATH
SEGMENT D1D2
ISSUED FOR REVIEW
STATE OF MARYLAND
DEPARTMENT OF TRANSPORTATION
STATE HIGHWAY ADMINISTRATION
INTERCOUNTY CONNECTOR
CONTRACT A
D1D2 GRADING, DRAINAGE AND PAVING
REVISIONS
DRAWN BY
SCALE: 1"=50’
CHECKED BY
INTERCOUNTY CONSTRUCTORS
TWO TAFT COURT * ROCKVILLE, MARYLAND 20850 * 301-354-8600 DRAWING NO. SHEET NO. OF
PLOTTED:
FILE: c:\pw_working_xm\ptg\c0036708\dms04232\pHD-P035_ICC-A_D1D2.dgn
MUNCASTER MANOR/
BOWIE MILL ESTATES
HISTORIC PROPERTY
REMOVE BUILDINGS
SCALE: 1"=50’
PROTECT EXISTING
SEWER DURING BRID
CONSTRUCTION
BRIDGE 20
SCALE: 1"=50’
END SEGMENT D1D2
BEGIN SEGMENT D3
STA. 1309+50
RELOCATED
10" SEWER LINE
OVERHEAD SIGN
+50
BRIDGE 21
SCALE: 1"=50’
F
490 490
480 480
470 470
MATCH LINE STA. 1270+00 - SEE DRAWING D1D2_RW_PR-38
450 450
440 440
EL. 424.18
430 430
EXISTING GROUND
P/GL
+ 0.76% - 1.56%
420 420
PROPOSED GRADE
P/GE
410 410
24" RCP
390 390
SSD = 915’
K = 388
L = 900.00’
380 380
370 370
360 360
350 350
407.80
409.36
420.68
420.25
408.58
415.60
421.04
414.04
410.92
419.76
413.26
416.38
418.59
421.84
421.74
421.57
421.34
414.82
412.48
419.21
417.91
411.70
410.14
420.0
417.16
402.0
406.3
409.9
406.1
394.2
385.5
383.7
389.4
393.8
397.7
419.0
418.9
417.9
417.9
418.9
418.9
417.7
418.4
418.8
418.3
417.8
414.5
412.1
340 340
1270+00 +50 1271+00 +50 1272+00 +50 1273+00 +50 1274+00 +50 1275+00 +50 1276+00 +50 1277+00 +50 1278+00 +50 1279+00 +50 1280+00 +50 1281+00 +50
STATE OF MARYLAND
DEPARTMENT OF TRANSPORTATION
STATE HIGHWAY ADMINISTRATION
SEGMENT D1D2
INTERCOUNTY CONNECTOR - MAINLINE HIGHWAY DESIGN DIVISION
480 480
BEGIN PAVEMENT
450 450
ELEV. 420.81
K = 206
L = 200.00’
EXISTING GROUND
430 430
PROPOSED GRADE
P/GE
+ 10
+28
420 420
414.30
- 0.19% + 0.78%
410 410
VPI 258+94.90
FINAL PROFILE
24" RCP
(FUTURE PACKAGE)
400 400
72" SRP
380 380
370 370
360 360
350 350
420.20
420.80
420.64
420.45
420.75
420.72
420.81
416.40
414.30
414.20
414.50
416.01
416.79
417.96
415.62
419.89
414.28
414.84
415.23
417.57
418.35
418.74
419.52
430.0
407.6
414.18
417.18
419.13
426.6
439.0
408.4
407.5
408.3
409.5
426.7
436.7
436.5
427.8
434.5
438.3
437.8
435.3
425.5
432.1
410.6
413.6
416.8
419.4
415.2
415.2
411.6
411.7
340 340
+50 258+00 +50 259+00 +50 260+00 +50 261+00 +50 262+00 +50 263+00 +50 264+00 +50 265+00 +50 266+00 +50 267+00 +50 268+00 +50 269+00 +50 270+00
STATE OF MARYLAND
DEPARTMENT OF TRANSPORTATION
BIKE PATH STATE HIGHWAY ADMINISTRATION
SEGMENT D1D2 HIGHWAY DESIGN DIVISION
460 460
EL. 423.14
430 430
C
+ 0.78% - 1.54%
PROPOSED GRADE
P/GE
VPI 283+14.50
420 420
EL. 403.89
410 410
400 400
380 380
360 360
350 350
340 340
330 330
407.20
406.43
405.64
420.59
404.79
402.89
420.72
420.38
408.74
407.97
403.87
409.51
418.40
414.90
410.28
401.84
413.36
416.44
415.67
420.11
419.39
412.59
419.78
418.93
417.81
411.05
417.16
409.6
406.9
386.0
406.9
414.13
411.82
409.3
409.3
405.5
420.3
420.8
409.7
397.6
382.9
397.7
418.0
413.0
401.4
410.4
417.6
381.6
416.8
415.9
415.9
413.9
418.3
414.3
415.8
418.3
417.1
411.7
320 320
270+00 +50 271+00 +50 272+00 +50 273+00 +50 274+00 +50 275+00 +50 276+00 +50 277+00 +50 278+00 +50 279+00 +50 280+00 +50 281+00 +50 282+00 +50 283+00 +50 284+00
STATE OF MARYLAND
DEPARTMENT OF TRANSPORTATION
BIKE PATH STATE HIGHWAY ADMINISTRATION
SEGMENT D1D2 HIGHWAY DESIGN DIVISION
450 450
430 430
K = 13 K = 35
L = 50.00’ L = 50.00’
410 410
ELEV. 378.48
VPC 293+65.00 EL. 378.62
VPI 293+00.00
VPI 295+46.60
VPT 284+64.50 EL. 400.38
PROPOSED GRADE
EL. 380.84
BRIDGE 20
P/GE
EL. 378.54
ELEV. 377.91
390 390
- 2.34%
- 3.4
2%
380 + 0.50% - 0.52% 380
- 3.4
2%
+ 0.50% - 0.52% + 0.89%
VPI 293+90.00
VPI 296+88.50
L = 300.00’
EL. 377.80
EL. 377.76
36" RCP
24" RCP
360 360
ELEV. 377.87
350 350
K = 46
K = 49
L = 50.00’
L = 50.00’
340 340
330 330
320 320
390.20
378.00
400.72
378.06
396.04
386.69
377.90
378.80
389.03
380.77
387.86
378.26
382.01
399.55
398.38
394.87
392.54
385.52
384.35
378.48
377.93
378.35
397.21
393.71
378.31
401.84
391.37
383.18
379.13
360.0
380.0
406.9
404.6
402.6
369.0
367.6
384.0
380.7
380.5
370.8
378.6
364.9
386.3
376.3
363.8
364.8
369.7
377.9
398.2
392.4
389.4
377.3
377.5
374.2
395.1
381.6
371.2
381.1
310 310
284+00 +50 285+00 +50 286+00 +50 287+00 +50 288+00 +50 289+00 +50 290+00 +50 291+00 +50 292+00 +50 293+00 +50 294+00 +50 295+00 +50 296+00 +50 297+00 +50 298+00
STATE OF MARYLAND
DEPARTMENT OF TRANSPORTATION
BIKE PATH STATE HIGHWAY ADMINISTRATION
SEGMENT D1D2 HIGHWAY DESIGN DIVISION
430 430
VPI 311+10.00
VPI 307+25.00
EL. 390.42
EL. 386.98
400 BRIDGE 20 400
VPI 301+80.00
EL. 382.19
EXISTING GROUND
P/GL
+ 0.89% + 0.60%
390 +0.60% 390
+ 0.89%
+ 1.64%
+ 0.90% + 1.64%
+ 0.89% + 0.16%
+ 0.16% + 0.90%
VPI 302+90.00
VPC 301+55.00 EL. 381.97
EL. 385.43
PROPOSED GRADE
EL. 382.37
P/GE
370 370
360 360
24" CSP
K = 135
L = 100.00’
350 K = 68 350
L = 50.00’
340 340
330 330
320 320
310 310
300 300
390.66
390.96
378.80
382.30
380.58
390.33
379.69
383.36
384.26
386.55
387.65
388.99
379.24
382.22
382.47
385.75
388.54
389.44
389.88
382.91
383.81
384.71
388.10
380.14
381.03
385.16
381.48
381.92
387.18
360.0
376.6
372.0
374.0
350.4
370.7
373.6
372.6
386.3
348.9
352.7
352.8
352.4
358.8
389.8
389.8
388.8
384.4
382.7
379.4
374.3
374.2
373.5
375.2
379.5
371.6
381.4
371.7
371.8
290 290
298+00 +50 299+00 +50 300+00 +50 301+00 +50 302+00 +50 303+00 +50 304+00 +50 305+00 +50 306+00 +50 307+00 +50 308+00 +50 309+00 +50 310+00 +50 311+00 +50 312+00
STATE OF MARYLAND
DEPARTMENT OF TRANSPORTATION
BIKE PATH STATE HIGHWAY ADMINISTRATION
1008
404.81 SAND STORAGE BMP
1010
408.04
ACCESS ROAD
1020
409.62
1021
411.74
1002
399.92
1008
403.30
1027
407.95
1009
405.59
DBH: 39 TRUNKS: 2
DBH: 37 TRUNKS: 1
DBH: 34 TRUNKS: 1
DBH: 32 TRUNKS: 1
DBH: 32 TRUNKS: 1
1049
375.30
1042
374.08
1033
377.97
1050
378.03
1041
375.47
1053
373.10
1040
375.65 1054
372.15
1034
377.43
1043
372.90
1048
372.81
ACCESS ROAD
DBH: 32 TRUNKS: 1
1051
375.99
1039
374.87
BORE HOLE
SWD2-B5
1038
373.54
1052
371.32
1046
370.91
1036
374.12
1045
370.82
1037
371.29
DBH: 32 TRUNKS: 1
DB
DBH
DBH: 38 TRUNKS: 1
DBH: 32 TRUN
DBH: 34 TRUNKS: 1
LOW BINDWEED
(d) TEMPORARY SILT FENCES SHALL BE PLACED IMMEDIATELY 3. DO NOT USE THE EXCAVATED MATERIAL AS BACKFILL IF IT CONTAINS WASTE METAL PRODUCTS,
SIP
STANDARD INLET PROTECTION UNSIGHTLY DEBRIS, TOXIC MATERIAL, OR ANY OTHER DELETERIOUS SUBSTANCE. IF ADDITIONAL
2. STANDARDS AND SPECIFICATIONS DOWNSTREAM OF ANY DISTURBED AREA INTENDED TO REMAIN
DISTURBED FOR MORE THAN ONE DAY. BACKFILL IS REQUIRED, USE CLEAN MATERIAL FREE OF WASTE METAL PRODUCTS, UNSIGHTLY
AGIP
THIS PLAN IS DESIGNED AND SHALL BE CONSTRUCTED IN ACCORDANCE AT GRADE INLET PROTECTION DEBRIS,TOXIC MATERIAL, OR ANY OTHER DELETERIOUS SUBSTANCE.
Q
WITH THE 1994 MARYLAND STANDARDS AND SPECIFICATIONS FOR
CIP
SOIL EROSION AND SEDIMENT CONTROL, THE 2000 MARYLAND
9. SENSITIVE AREAS CURB INLET PROTECTION 4. PLACE HEAVY EQUIPMENT ON MATS OR SUITABLY OPERATE THE EQUIPMENT TO PREVENT DAMAGE TO
NONTIDAL WETLANDS, NONTIDAL WETLAND BUFFERS, WATERWAYS, OR THE 100-YEAR FLOODPLAIN.
STORMWATER DESIGN MANUAL, VOLUMES I & II AND THE MARYLAND MIP
DEPARTMENT OF ENVIRONMENT EROSION AND SEDIMENT CONTROL AND NO CONSTRUCTION ACTIVITIES SHALL BE UNDERTAKEN WITHIN MEDIAN INLET PROTECTION
STORMWATER MANAGEMENT REGULATIONS, AND ALL REVISIONS THERE SPECIFIED SENSITIVE AREAS OF THE PROJECT WITHOUT PRIOR 5. REPAIR AND MAINTAIN ANY SERVICEABLE STRUCTURE OR FILL SO THERE IS NO PERMANENT LOSS
OF, AND AS SPECIFIED IN THE CONTRACT DOCUMENTS. THE NOTIFICATION OF THE ENGINEER. ALL WORK IN THESE AREAS SHALL GABION INFLOW PROTECTION GM OF NONTIDAL WETLANDS, NONTIDAL WETLAND BUFFERS, OR WATERWAYS, OR PERMANENT MODIFICATION
CONTRACTOR SHALL KEEP A COPY OF THE 1994 "MARYLAND STANDARDS BE MONITORED BY A RESPONSIBLE PARTY DESIGNATED BY THE OF THE 100-YEAR FLOODPLAIN IN EXCESS OF THAT LOST UNDER THE ORIGINALLY AUTHORIZED
AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL" ON CONTRACTOR TO ASSURE THAT REASONABLE CARE IS TAKEN IN OR RIPRAP INFLOW PROTECTION RRP STRUCTURE OR FILL.
THE SITE AT ALL TIMES. ADJACENT TO THESE AREAS. AREAS CONSIDERED SENSITIVE ARE DEFINED
AS: FLOODPLAINS, WETLANDS (TIDAL, NONTIDAL AND ASSOCIATED SUMP PIT SP 6. RECTIFY ANY NONTIDAL WETLANDS, WETLAND BUFFERS, WATERWAYS, OR 100-YEAR FLOODPLAIN
BUFFERS) CRITICAL AREAS, FORESTED AREAS, ARCHEOLOGICAL SITES, TEMPORARILY IMPACTED BY ANY CONSTRUCTION.
3. INGRESS / EGRESS CONTROLS HISTORIC SITES, PARKLAND AND OPEN WATER. REMOVABLE PUMPING STATION RPS
7. ALL STABILIZATION IN THE NONTIDAL WETLAND AND NONTIDAL WETLAND BUFFER SHALL CONSIST
Q
THE CONTRACTOR SHALL PROTECT ALL POINTS OF CONSTRUCTION OF THE FOLLOWING SPECIES:
Q PST
INGRESS AND EGRESS TO PREVENT THE DEPOSITION OF MATERIALS ON 10. STANDARD STABILIZATION NOTE PORTABLE SEDIMENT TANK
IB ANNUAL RYEGRASS (LOLIUM MULTIFLORUM), MILLET (SETARIA ITALICA), BARLEY (HORDEUM SP.),
PUBLIC ROADS. ALL MATERIALS DEPOSITED ON PUBLIC ROADS SHALL FOLLOWING INITIAL SOIL DISTURBANCE OR REDISTURBANCE, PERMANENT OATS (UNIOLA SP.), AND/OR RYE (SECALE CEREALE). THESE SPECIES WILL ALLOW FOR THE
INTERCEPTOR BERM
BE MECHANICALLY REMOVED IMMEDIATELY. THE FLUSHING OF ROAD OR TEMPORARY STABILIZATION SHALL BE COMPLETED WITHIN SEVEN (7) STABILIZATION OF THE SITE WHILE ALSO ALLOWING FOR THE VOLUNTARY REVEGETATION OF NATURAL
TB TB
SURFACES IS PROHIBITED. CALENDAR DAYS AS TO THE SURFACE OF ALL PERIMETER CONTROLS, DIKES, WETLAND SPECIES. OTHER NON-PERSISTENT VEGETATION MAY BE ACCEPTABLE, BUT MUST BE APPROVED
PSD-12
TEMPORARY BERM
Q
SWALES, DITCHES, PERIMETER SLOPES, AND ALL SLOPES GREATER THAN 3 BY THE NONTIDAL WETLANDS AND WATERWAYS DIVISION. KENTUCKY 31 FESCUE SHALL NOT BE UTILIZED
TYPICALLY, ALL INGRESS AND EGRESS POINTS SHALL BE CONTROLLED HORIZONTAL TO 1 VERTICAL (3:1); AND FOURTEEN DAYS (14) AS TO ALL OTHER IN WETLAND OR BUFFER AREAS. THE AREA SHOULD BE SEEDED AND MULCHED TO REDUCE EROSION
PIPE SLOPE DRAIN
THROUGH THE USE OF A "STABILIZED CONSTRUCTION ENTRANCE." DISTURBED OR GRADED AREAS ON THE PROJECT SITE. AFTER CONSTRUCTION ACTIVITIES HAVE BEEN COMPLETED.
THIS SUBMITTAL
SOST
Q OFFSITE WASTE/BORROW
ACRES USE IV WATERS: IN-STREAM WORK SHALL NOT BE CONDUCTED DURING THE PERIOD MARCH 1
TBD
5. SHUTDOWNS AND OR PENALTIES AREA LOCATION (IF KNOWN) STONE OUTLET SEDIMENT TRAP
ROST
THROUGH JUNE 15, INCLUSIVE, DURING ANY YEAR.
TOTAL COMPLIANCE WITH THE APPROVED EROSION AND SEDIMENT RIPRAP OUTLET SEDIMENT TRAP
SROST
CONTROL PLAN IS EXPECTED AT ALL TIMES. IN CASES WHERE THE 10. STORMWATER RUNOFF FROM IMPERVIOUS SURFACES SHALL BE CONTROLLED TO PREVENT THE WASHING OF
DEBRIS INTO THE WATERWAY OR WETLAND.
CONTRACTOR IS FOUND TO BE IN NON-COMPLIANCE SHA MAY TAKE
12. INCREMENTAL STABILIZATION STONE/RIPRAP OUTLET SEDIMENT TRAP
POST
STEPS TO IMPOSE SELECTED OR TOTAL SHUTDOWNS AND IMPOSE PER
Q
DAY PENALTIES FOR NON-COMPLIANCE. REFER TO THE CURRENT MARYLAND STANDARDS AND SPECIFICATIONS PIPE OUTLET SEDIMENT TRAP 11. CULVERTS SHALL BE CONSTRUCTED AND ANY RIPRAP PLACED SO AS NOT TO OBSTRUCT THE MOVEMENT OF
FOR SOIL EROSION AND SEDIMENT CONTROL FOR THE INCREMENTAL AQUATIC SPECIES, UNLESS THE PURPOSE OF THE ACTIVITIY IS TO IMPOUND WATER.
THE CONTRACTOR IS ALERTED THAT MDE CONSIDERS DEWATERING PROPOSED CONTOURS 100
6. RECORD KEEPING PRACTICES TO BE ELECTIVE IN NATURE. DEWATERING PRACTICES ARE
TIE-IN GABION BASKETS 36" MINIMUM LENGTH FENCE POST, 1. THE PROPOSED PROJECT SHALL BE CONSTRUCTED IN A MANNER WHICH WILL NOT VIOLATE
5’ MAXIMUM
TYPICAL DIMENSIONS CENTER TO
CENTER
DRIVEN A MINIMUM OF 16" INTO MARYLAND’S WATER QUALITY STANDARDS AS SET FORTH IN COMAR 26.08.02. NOTIFY WATER
GRADE AT FRONT AND 6’-0" 6’ x 3’ x 3’
GROUND MANAGEMENT ADMINISTRATION AT 410-537-3510 AT LEAST (7) DAYS PRIOR TO COMMENCING
BACK FACE OF WALL. TIE-IN
9"-DEPTH WORK. VERBAL NOTIFICATION IS TO BE FOLLOWED BY WRITTEN NOTICE WITHIN SEVEN (7)
1’ 9"-DEPTH GABION BASKETS 3’-0" 1’
GABION DAYS. ARRANGE FOR A PRE-CONSTRUCTION MEETING ON SITE.
MIN.
* MATTRESS
MIN.
* 6 MIL POLYETHYLENE SHEETING
WRAPPED OVER FENCE POST
9" 2. SEE DRAWINGS;
FLOW
D1D2_DR_E2_PS-39
D1D2_DR_E2_PS-40
INTERCEPTION
3’-0"
6" D1D2_DR_E2_PS-41
9" MIN.
WIDTH AS REQUIRED * TYP. D1D2_DR_E2_PS-42
FLOW FLOW
*ONE MATTRESS OR MULTIPLE
MATTRESSES NEED TO EXTEND
FOR MORE DETAILED SEQUENCE OF CONSTRUCTION
ELEVATION
FROM THE INTERCEPTION TO A PERSPECTIVE VIEW
36" MINIMUM FENCE
FENCE POST SECTION
MINIMUM 1’ BEYOND THE TIE IN. POST LENGTH
MINIMUM 20" ABOVE
FLOW
WATER
CLASS ’F’ GEOTEXTILE SHALL LATHING GROUND
BE ATTACHED TO THE UPSTREAM
A FACE OF ALL GABION BASKETS. DOUBLE LAYER 6 MIL U/V RESISTANT
(BLACK) POLYETHYLENE SHEETING
4’ MIN. CARRY SHEETING
FLOW TO GRADE
UNDISTURBED
6" MIN. 6"
TYP. GROUND
FLOW
5.RIPARIAN PLANTINGS WILL BE PROVIDED AS PART OF FUTURE LANDSCAPE PLAN
4. Diversion fence shall have an uninterrupted positive grade to a stable SUBMITTALS.
CLASS ’F’ outlet.
GEOTEXTILE
6.STABILIZATION TECHNIQUES MAY INCLUDE SEEDING AND MULCHING, COVERING WITH
9" MIN. 5. The contributing drainage area measured to the outlet shall not exceed 2
CHANNEL IMPERVIOUS MATERIAL OR COVER WITH MATTS.
TYP.
BOTTOM acres.
GABION BASKETS 7.AREAS NOT DRAINING TO ANY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
EMBED CLASS ’F’
TYPICAL DIMENSIONS
GEOTEXTILE 10" 6. Diversion Fence shall be inspected after each rainfall event and maintained STABILIZED WITHIN THE SAME WORKING DAY.
MINIMUM INTO GROUND
SECTION A-A 6’ x 3’ x 3’
when necessary.
DETAIL - PIPE SLOPE DRAIN THROUGH TEMPORARY GABION OUTLET STRUCTURE VARIES 11" 11"
A
3’-6"
MIN
GABION BASKET
TYP. DIMENSIONS
6’x3’x3’
TIE IN* 6’-0" TIE IN*
PIPE AS SHOWN
9" GABION MATTRESS
ON PLANS
1’-0" GRADE AT FRONT AND 9" GABION MATTRESS
3’-0"
BACK FACE OF WALL
A
DITCH SECTION
9"
NOT TO SCALE
15" 15"
3’
3’-0"
INTERCEPTI0N
1:1 1:1 2’ MIN.
9" MIN. (TYP.)
2’-0"
PIPE AS SHOWN ON PLANS
PIPE SLOPE DRAIN 2" - 3" STONE
BETWEEN GABIONS
SEE PLAN FOR SIZE
SECTION A-A SEGMENT D1D2
NOT TO SCALE
STATE OF MARYLAND
DEPARTMENT OF TRANSPORTATION
TIE-IN
STATE HIGHWAY ADMINISTRATION
GRADE AT FRONT AND
2:1 SLOPE BACK FACE OF WALL.
WETLAND PROTECTION AREA WETLAND PROTECTION AREA HIGHWAY DESIGN DIVISION
OR FLATTER 2:1 SLOPE
9"-DEPTH GABION BASKETS
SIGNAGE DETAIL - ENGLISH SIGNAGE DETAIL - SPANISH
OR FLATTER 1’
b C
MIN.
L
NOT TO SCALE NOT TO SCALE INTERCOUNTY CONNECTOR
FLOW FLOW 18" TYPE ’A’ DIKE
30" TYPE ’B’ DIKE
4" MIN.
CONTRACT A
a a
d d
EROSION AND SEDIMENT CONTROL
c c
EXCAVATE TO PROVIDE
REQUIRED FLOW WIDTH
EXCAVATE TO PROVIDE
REVISIONS DETAILS
AT DESIGN FLOW DEPTH EX. GROUND
REQUIRED FLOW WIDTH
NOTE: HEIGHT OF DIKE WILL SCALE N.T.S. DATE OCT.
OCT. 2007
2007 CONTRACT NO. AT3765960
AT DESIGN FLOW DEPTH
VARY TO MEET REQUIRED 4"
BY: c0036380
SEDIMENT TRAP
DIVERSION FENCE
SUPER SILT FENCE
SANDBAG DAM
SUPER SILT FENC
ENDWALL
Q10=22.7 CFS
V10=7.20 FPS
DIVERSION FENCE
4’x4’x19"
CL I RIPRAP
LIMIT OF DISTURBANCE
DIVERSION
PROTECTION
RED MAPLE(35" DBH)
SPECIMENT TREE
MAINTAIN MOUNTABLE EARTH DIKE TO
ENSURE WATER WEST OF EARTH DIKE DRAIN
TO THE SEDIMENT TRAP
1Z
DIVERSION FENCE
DIVERSION FENCE
1Z
LIMIT OF DISTURBANCE
DITCH SCHEDULE
SHEET BASELINE STATION OFFSET LINING A B W D INVERT REMARK
NOTES:
W2
A A
WIDTH OF APRON
L
W
LENGTH OF APRON
W
PROP. PIPE AND
W
END SECTION
PROP. PIPE AND
W1
HEADWALL
RIP RAP OUTLET PROTEC
FOR END SECTIO
RIP RAP OUTLET PROTECTION DETAIL NOT TO SCALE
FOR HEADWALLS A
PROP.
NOT TO SCALE
GRADE GR
VA T
RI
ES
A A
WIDTH OF APRON
L
W
LENGTH OF APRON
W
GEOTEXTILE SHALL
PROP. PIPE AND BE EMBEDDED A
ENDWALL MIN. OF 4" AND
RIP RAP (FOR
RIP RAP OUTLET SHALL EXTEND AT
LEAST 6" BEYOND CLASS SEE
SECTION
NOT TO SC
PLAN L W W1 W2 T D
STRUCTURE RIPRAP
BASELINE CLASS DETAIL
SHEET (FT) (FT) (FT) (FT) (FT) (IN)
NO. (SY)
D1D2_RW_PS-40 EW-446 ICC 14 7 0 0 1 19 11 1 B
D1D2_RW_PS-41 ES-461 ICC 10 8 0 0 1 19 9 I C
D1D2_RW_PS-40 EW-464 ICC 10 8 0 0 1 19 9 I B
D1D2_RW_PS-41 EW-459 ICC 14 10 0 0 1 19 16 I A
D1D2_RW_PS-41 EW-475 ICC 10 8 0 0 1 19 9 1 B
D1D2_RW_PS-39 EW-440 ICC 22 11 0 0 1 19 27 1 B
BY: c0036380
150 140 130 120 110 100 90 80 70 60 50 40 30 20 10
440
430
2.
414.29
25.00
5:
420 1
125
440
430
2:1
25.00
413.91
420
125
440
430
2.
5:
1
415.05
25.00
420
410
125
440
430
2.
414.67
5:
25.00
420
1
410
125
LOD MATCHLINE
440
430
MATCHLINE
440
430
2.
5:
1
25.00
415.81
420
410
126
440
430
2.
5:
415.43
25.00
1
420
410
125
450
440
430
2.
5:
416.57
1
25.00
420
3:1 2.0%
6.0% 2.0% 6.0%
10:1
6:1
410
12
440
430
2.
5:
1
25.00
416.19
420
3:1 2.0% 2.0%
6.0% 6.0%
10:1
6:1
410
126
440
430
2.
417.33
5:
25.00
1
420
3:1 2.0% 2.0% 6.0%
6.0% 10:1
6:1
410
126
450
440
430
2.
5:
416.95
1
25.00
420
3:1 2.0% 2.0%
6.0% 6.0%
10:1
6:1
410
126
150 140 130 120 110 100 90 80 70 60 50 40 30 20 10
150 140 130 120 110 100 90 80 70 60 50 40 30 20 10
440
430
418.09
25.00
2.
5:
1
420
2.0% 2.0% 6.0%
3:1 6.0% 10:1
6:1
410
126
440
430
2.
25.00
5:
1 417.71
420
3:1 2.0% 2.0% 6.0%
6.0% 10:1
6:1
410
126
430
LOD
418.85
25.00
420 2.0% 2.0% 6.0%
3:1 6.0% 10:1
6:1
410
126
LOD
430
418.47
25.00
2.
5:
1
420
2.0% 2.0% 6.0%
6.0% 10:1
3:1 6:1
410
126
430
419.62
25.00
LOD
2.0% 2.0% 6.0%
420
2.0 % 4:1 6.0% 10:1
6:1
2:1 2:1
410
12
400
430
419.23
25.00
LOD
410
12
430
420.38
25.00
2.0% 2.0% 6.0%
420 LOD 2.0 % 4:1 6.0% 10:1
6:1
2:1
2:1
410
400
126
430
420.00
25.00
LOD 2.0% 2.0% 6.0%
420 2.0 % 4: 6.0% 10:1
1 6:1
2:1
2:1
410
400
126
430
25.00
421.10
LOD 2.0% 2.0% 6.0%
2.0 % 4:1 6.0% 10:1
420 6:1
2:1
2:1
410
400
1267
430
420.76
25.00
2.0% 2.0% 6.0%
2.0 % 4:1 6.0% 10:1
420 6:1
2:1
2:1
410
400
126
430
25.00
421.61
LOD
410
126
430
421.39
25.00
LOD
2.0% 2.0% 6.0%
2.0 % 4:1 6.0% 10:1
420 6:1
2:1 2:1
410
126
400
430
LOD
421.85
25.00
2:1 2.0% 2.0% 6.0%
2.0 % 4 6.0% 10:1
420 2:1 :1 6:1
410
126
430
421.76
25.00
LOD
410
126
430 LOD
421.84
25.00
2:1 2.0 % 2.0% 2.0% 6.0%
2:1 3:1 6.0% 10:1
420
7.6:1
410
127
430 LOD
421.88
25.00
2:1 10:1 2.0%
2.0 % 6.0% 2.0% 6.0%
2:1 3:1
:1
10:1
420 3.7
410
126
430 LOD
421.57
25.00
2:1 2.0 %
2:1 3:1 6.0% 2.0% 2.0% 6.0% 10:1
420 6:1
410
127
430 LOD
421.74
25.00
2:1 2.0 % 2.0%
2:1 3:1 6.0% 2.0% 6.0%
10:1
420 6:1
410
127
LOD
430
421.04
25.00
2:1 2.0 %
2:1
3:1 2.0% 2.0% 6.0%
6.0% 10:1
420 6:1
410
127
LOD
430
421.34
25.00
2:1 2.0 %
2:1 2.0% 2.0% 6.0%
3:1 6.0% 10:1
420 6:1
410
127
430 LOD
420.25
25.00
3:1 2.0% 2.0% 6.0%
420 6.0% 10:1
6:1
410
127
430 LOD
420.68
25.00
2:1 2.0 %
2:1
3:1 2.0% 2.0% 6.0%
420
6.0% 10:1
6:1
410
127
430
LOD
25.00
419.21
420 2.0% 2.0% 6.0%
3:1 6.0% 10:1
6:1
410
400
127
430
LOD
419.76
25.00
2.0% 2.0% 6.0%
420 3:1 6.0% 10:1
6:1
410
400
127
440
LOD
430
25.00
417.91
2:1
420
2.0% 2.0% 6.0%
6.0% 10:1
6:1
410
400
390
127
430 LOD
418.59
25.00
420 2:1
2.0% 2.0% 6.0%
3:1 6.0% 10:1
6:1
410
400
390
127
440 LOD
430
25.00
417.16
2:1
420
3:1 2.0% 2.0% 6.0%
6.0% 10:1
6:1
410
400
390
127
440
LOD
430
416.38
25.00
2:1 2.0%
2:1
420
2:1 2.0%
6.0% 2.0% 6.0%
3:1 10:1
6:1
410
400
390
380
127
430
LOD
415.60
25.00
420
410
400
390
380
127
414.82
25.00
420
LOD
2.0% 2.0% 6.0%
2% 6.0% 10:1
4:1 6:1
3:1
410 2:1
2:1
400
390
380
370
127
25.00
420
ROW
2.0% 2.0%
2% 6.0%
4:1 6:1
410
LOD
2:1
400
2:1
2:1
390
380
370
25.00
420
2.0% 2.0%
2% 6.0%
4:1 6:1
410
2:1
400
2:1
390 2:1
380
370
420
410
2:1
390
CULVERT DD 17’ SPP
380
370
430
420
412.48
25.00
2.0% 2.0% 6.0%
2% 6.0% 10:1
4:1 6:1
410
MATCHLINE - SEE ABOVE
400
390
17’ SPP
380
370
127
420
25.00
411.70
2.0% 2.0% 6.0%
2% 6.0% 10:1
4:1 6:1
410
2:1
400
390
380
127
430
420
25.00
410.14
2.0% 2.0% 6.0%
410 2% 6.0% 10:1
4:1 6:1
2:1
400
24" RCP
390
24" RCP
128
420
410.92
25.00
2.0% 2.0% 6.0%
2% 6.0% 10:1
410 4:1 6:1
2:1
400 24" RCP
390
24" RCP
12
430
420
408.58
25.00
410 2.0%
LOD 6.0% 2.0% 6.0%
2% 4:1 10:1
6:1
2:1
400
24" RCP
24" RCP 12
390
430
420
409.36
25.00
410 2.0% 2.0% 6.0%
2% 6.0% 10:1
4:1 6:1
LOD
2:1
400
24" RCP
24" RCP
390
128
420
407.02
25.00
410
2.0% 2.0% 6.0%
3:1 6.0% 10:1
6:1
24" RCP
400
12
430
420
407.80
25.00
410
2.0% 2.0% 6.0%
2% 6.0% 10:1
4:1 6:1
3:1
400
24" RCP
24" RCP 12
420
405.33
25.00
410
TYPE ’K’
INLET
128
420
406.21
25.00
410
128
ROW
420
LOD
403.38
25.00
410
2:1 2%
2:1
2:1
2.0% 2.0% 6.0%
3:1 6.0% 10:1
6:1
400
12
420
404.39
25.00
410
2:1
2:1 2% 2:1
2.0% 2.0% 6.0%
3:1 6.0% M
6:1
400
128
ROW
420
410 LOD
25.00
401.17
2:1 2% 2.0% 2.0% 6.0%
2:1 3:1 6.0% 10:1
400 6:1
390
128
ROW
420
LOD
410
402.31
25.00
2:1 2%
2:1 2:1
6.0% 2.0% 2.0% 6.0%
3:1 10:1
6:1
400
390
128
ROW
410
398.83
LOD
25.00
400 2.0% 2.0% 6.0%
2:1 2% 6.0% 10:1
4:1
2:1
390
380
128
ROW
420
410
400.00
LOD
25.00
2.0% 2.0% 6.0%
400 2:1 2% 6.0% 10:1
2:1 4:1 6:1
390
12
ROW
410
LOD
396.49
25.00
400
390
380
128
ROW
410
LOD
397.66
25.00
400
2.0% 2.0% 6.0%
2:1 2% 6.0% 10:1
4:1
2:1 6:1
390
12
380
420
ROW
410
394.15
25.00
400
LOD
380
128
ROW
410
395.32
LOD
25.00
400
380
128
410
ROW
400
25.00
391.81
LOD
2.0% 2.0% 6.0%
2% 6.0% 10:1
4:1 6:1
390
2:1 2:1
380
370
128
ROW
410
392.98
400
25.00
LOD
2.0% 2.0% 6.0%
2% 6.0% 10:1
4:1 6:1
390
2:1 2:1
380
12
370
410
ROW
400
389.47
25.00
LOD
380
370
129
410
ROW
400
390.64
25.00
LOD
380
370
128
LOD
400
387.13
25.00
390
2.0% 2.0% 6.0%
2% 6.0% 10:1
2:1 4:1 6:1
2:1
380
370
ROW
410
400
LOD
388.30
25.00
390
2.0% 2.0% 6.0%
2% 6.0% 10:1
2:1 4:1 6:1
2:1
380
370
129
400
LOD
CONSTRUCT BERM
FROM +10 TO +30
384.79
25.00
390
2:1
6.0% 1.5%
1.7% 2.0% 6.0%
2%
2:1 4:1
2%
6:1
10:1
380
24" RCP
TYPE ’K’
INLET
370
129
410
LOD
400
385.96
25.00
390
380
370
ROW
400
LOD
382.47
390
25.00
2:1 2% 6.0% 0.7% 2.0% 6.0%
4:1
2:1 6:1 10:1
380
370
129
ROW
400
LOD
383.62
25.00
390
2:1
2% 0.4% 2.0%
2:1 4:1
6:1
6.0% 6.0% 10:1
380
370
129
380.62
25.00
2% 5.0% 2.0% 2.0% 6.0%
4:1
380 7.6:1 10:1
2:1
2:1
370
1294+00
ROW
390
381.47
25.00
LOD
370
129
400 ROW
390
LOD
379.41
25.00
380 2:1 2% 5.0% 2.0% 2.0% 6.0%
4:1
2:1 6:1 6:1
4:1
370
360
129
ROW
390
379.93
25.00
LOD
370
36" RCP
360
129
ROW
400
LOD
390
379.04
25.00
2:1 2%
2:1 3:1 5.0% 2.0% 2.0%
380 6.0%
6:1 6:1
4:1
370
360
12
410
400
2:1
2%
2:1
390
378.84
25.00
2.5
:1
370
360
12
350
LOD
2:1 2%
2:1
400
2.5
:1
390
380
370
210 200 190 180 170 160 150 140 130 120 110
410
400
MATCHLINE - SEE ABOVE
2.5
:1
390
378.80
25.00
380 5.0% 2.0% 2.0%
3:1 6:1 6.0%
6:1
4:1
370
360
12
350
420
LOD
410
2.5
:1
390
380
370
210 200 190 180 170 160 150 140 130 120 110
410
MATCHLINE - SEE ABOVE
400
2.5
:1
390
378.92
25.00
2.5
:1
380 3:1 3.3% 2.0% 2.0%
6:1 6.0%
6:1
4:1
370
360
350
129
420
LOD
410
2.5
:1
390
380
370
210 200 190 180 170 160 150 140 130 120 110
410
MATCHLINE - SEE ABOVE
400
2.5
:1
390
379.20
25.00
2.5
:1
12" CS
370
360
350
129
410
400
2.5
:1
390
379.63
25.00
3:1 0.7% 2.0% 2.0%
380 6:1 2.5% 10:1
370
360
350
129
400
B
390
380.07
25.00
2.0% 2.0% 2.0% 2.0%
380
370
360
350
129
ROW
400
LOD
B
390
380.51
25.00
2.0% 2.0% 2.0% 2.0%
380
370
360
350
340
129
390 B
380.96
25.00
ROW 2.0% 2.0% 2.0% 2.0%
380
370
LOD
360
350
340
129
390 B
381.40
25.00
2.0% 2.0% 2.0% 2.0%
380
ROW
370
LOD
360
350
340
130
390
381.84
25.00
B
ROW
370
360
LOD
350
340
130
400
390
382.29
25.00
2.0% 2.0% 2.0% 2.0%
380
ROW
370
360
LOD
350
13
400
382.73
382.73
390
25.00
25.00
2.0% 2.0% 2.0% 2.0% 1.7% 2.0%
10:1 10:1
380
370
360
350
1301+50.000
110 100 90 80 70 60 50 40 30 20 10 0 10 20 30
120 110 100 90 80 70 60 50 40 30 20 10 0 10 20
400
383.17
390
25.00
25.00
1.0% 2.0% 2.0% 3.7% 0.3%
6:1 2 6:1
:1 2:1
380
370
360
350
1302+00.
ROW
400
383.62
25.00
390
LOD
24" RCP
TYPE ’K’
INLET
370
360
350
130
410
ROW
400
LOD
384.06
25.00
390
3:1
3:1 3.1% 2.0% 2.0% 6.0%
6:1
6:1
2:1
380
370
360
350
130
LOD
400
384.94
25.00
390
2:1
380
370
360
130
ROW
400
LOD
384.50
25.00
390
2:1
370
360
130
350
ROW
400
LOD
385.83
25.00
390
380
370
360
130
400
385.39
25.00
390 2:1
380
370
360
130
400
386.72
25.00
ROW
390
380
2:1
LOD
12
370
360
130
400
ROW
386.27
25.00
390
370
360
130
400
387.60
25.00
390 ROW
0.6% 2.0% 2.0% 5.9%
10:1
380
LOD 12" C
370
360 EX.
10" SAN.
130
400
387.16
25.00
390
2% 4:1 1.4% 2.0% 2.0% 6.0%
6:1 10:1
380
2:1
12"
370
360 EX.
10" SAN.
130
400 BRIDGE 21
388.49
25.00
390
ROW 2.0% 2.0% 2.0% 2.0% 10:1
380
12" CSP
LOD
370
400
388.05
25.00
390 ROW
2.0% 2.0% 2.0% 3.9% 10:1
380
370
400 B
389.38
25.00
ROW
390
2.0% 2.0% 2.0% 2.0%
380 LOD
370
EX.
8" SAN.
360
13
400
388.93
B
25.00
ROW
390 2.0% 2.0% 2.0% 2.0% 10:1
380
LOD
370
EX.
360
10" SAN.
8" SAN.
13
400 B
389.82
25.00
ROW
LOD
380
370
EX.
8" SAN.
13
360