I Foundation
1 Excavation m3 2,707.20
2 Sand Bedding m3 30.08
3 Bed Course C10 m3 60.16
4 Concrete C30 m3 1017.97
5 Formworks m2 758.66
6 Rebar ton 119.17
II Beam JL - 1 ~ 5 m3
1 Concrete C30 m3 5.86
2 Formworks m2 62.91
3 Rebar ton 0.72
IV Concrete Wall m3
1 Concrete C40 m3 1,176.00
2 Formworks m2 7,005.96
3 Rebar t 153.40
XIII Stair
1 Concrete C30 m3 39.77
2 Formworks m2 224.21
3 Rebar ton 7,158.65
Hitung Vol Besi
0.006165
20 7.1 4 70.03
20 7 3 51.79
20 6.7 4 66.09
20 4.3 4 42.42
22 4.3 4 51.32
16 1.55 2 4.89
16 4.45 2 14.05
10 2 2 2.47
10 3.05 2 3.76
8 1.5 115 68.06
25 6.7 8 206.53
20 6.5 4 64.12
20 4.25 4 41.92
22 4.1 12 146.81
10 2.2 2 2.71
8 1.5 120 71.02
20 7.03 3 52.01
20 7 4 69.05
25 7.3 4 112.51
22 4.3 10 128.31
20 1.65 2 8.14
14 4.45 2 10.75
10 2 2 2.47
10 3.05 2 3.76
8 1.5 110 65.10
18 6.6 3 39.55
12 6.6 2 11.72
8 1.3 29 14.87
25 6.65 4 102.49
20 7.05 2 34.77
18 2.75 2 10.99
8 1.5 39 23.08
18 4.57 4 36.51
6 0.9 25 4.99
22 6.6 4 78.77
18 6.92 2 27.64
8 1.5 29 17.16
20 8.86 4 87.40
8 1.1 40 17.36
16 2.55 4 16.10
6 0.9 11 2.20 Beton
2,229.91 16.47 m3
20,685.62
20,737.05
Volume Form Works
Foundation Beam
lebar tinggi panjang qty Luas Formworks
JL-1 0.25 0.50 6.00 2.00 15.00
JL-2 0.25 0.50 6.00 2.00 15.00
JL-3 0.25 0.50 6.00 1.00 7.50
JL-4 0.25 0.50 6.00 2.00 15.00
JL-5 0.25 0.45 5.50 1.00 6.33
JL-6 0.25 0.40 3.89 1.00 4.08
Jml Total 62.91
Elevator PIT
lebar tinggi panjang qty Luas Formworks
3.86 2.34 5.02 1.00 83.26
83.26
7,005.96
Beam
250x600 0.25 0.60 126.80 183.86
250x500 0.25 0.50 6.00 7.50
250x400 0.25 0.40 8.11 8.52
250x300 0.25 0.30 3.60 3.06
jml 202.94
429.31
Straight Stair
107.2094
46.8
70.2 224.2094
Beton Plat Beton
El. 5.57 21.65
16.47 38.12 4,305.12 112.94
El 26.780 182.2
102.5 284.7 16,676.46 58.58
El 44.465 18.7
6.42
2.84
0.39
4.6
3.3
1.5
0.14
0.1 37.99
El 48.465 21.1
9.73
9.09 39.92
Roof 27.26
10.96 38.22
Straight Stair
Slab 25.73027
5.616
8.424 39.77027