Professional Documents
Culture Documents
7. Outlet Flow Rate _________ PLEASE PROVIDE PLAN OF TANK NOZZLES & INTERNAL PIPING
8. Manual Float Well required? Yes/No ______ (default: Yes). Float Dia? __________mm
14. Number of IFR manways required. ________ (default: Tank Dia.<30m; Supply 1)
(default: Tank Dia.>30m; Supply 2)
15. Deck drains required? Yes/No _____________ (default: Yes)
17. Will the tank have a floating suction line? Yes/No _______ (default: No)
31/3/08