You are on page 1of 3

Date/Assignme Collaborator BC Collaborator CC Collaborator PUC

nt

July 21, 2008 – • E mail and E mail and phone • E mail and
July 27, 2008 phone calls with calls with fellow phone calls
fellow collaborators to set with fellow
collaborators to up project collaborators
set up project management and to set up
management action plans for project
and action plans U03A1. management
for U03A1. and action
• Drafted and plans for
disseminated U03A1.
initial draft of • Reviewed
BC’s theoretical potential
framework. model
• Worked with research for
fellow group. Sent
collaborators to journal articles
draft, review, to
revise, collaborators.
“workplace • Drafted and
analysis” disseminated
portion of initial draft of
U03A1. integration of
• Phone all three
conference with Workplace
fellow Analysis.
collaborator re • Worked with
status of fellow
workplace collaborators
analysis and to draft,
theoretical review, revise,
framework. “workplace
• Started “who analysis”
did what” listing portion of
and U03A1.
disseminated to • Phone
fellow conference
collaborators with both
• Drafted and fellow
disseminated collaborator re
second draft of status of
BC’s theoretical workplace
framework for analysis and
comment. theoretical
framework.
• Phone
conference with • Reviewed
fellow changes of
collaborators re workplace
status of analysis.
workplace • Set up file
analysis and sharing online
theoretical in google docs
framework.
• Reviewed • Conducting
changes of review to
workplace create draft of
analysis. workplace
analysis.
• Phone and
skype
conference
with
collaborators
• Integration
and revisions
of framework
• Formatting
changes
• Log revision
and formating
for later
document
integration.

July 28, 2008 –


August 3, 2008

You might also like