ELECTRICAL ENGINEERING ACTIVITIES SEQUENCE SCHEMATIC

PROCUREMENT
DESIGN ANALYSIS DOCUMENTATION
SUPPORT

SPECIFICATION
SHORT CIRCUIT AND
RELAY COORD STUDY

DESIGN BASIS

LOAD DATA/LOAD
TELEPHONE - SYSTEM FLOW ANALYSIS

CATHODIC PROTEC.
ANALYSIS
1. ENG. PROCEDURE

ONE LINE DIAGRAM 2. FABRICATION


INSTALLATION PROCEDURE AND
MANUAL
L/O SUB STATION
ELECTRICAL EQUIPMENT TELEPHONE CABLE CATHODIC PROTECTION
LIST LAYOUT LAYOUT 3. INSTALLATION
PROCEDURE AND
MANUAL
ELECTRICAL EQUIPMENT
SCHEMATIC DIAGRAM LAYOUT 4. TECHNICAL SPEC'S
GROUNDING/LIGHTNNG AND DATA SHEETS
ILLUMINATION
PROTECTION LAYOUT
LEVEL ANALYSIS
AREA CLASSIFICATION
EMEERGENCY SHUTDOWN
SYSTEM LIGHTING LAYOUT

POWER AND CONTROL


CABLE LAYOUT
VOLTAGE DROP AND
CABLE SIZING ANALYSIS
REQUISITON
DETAIL DRAWING CABLE AND CONOUT PANEL SCHEDULE
FOR QUOTATION
SCHEDULE

BILL OF MATERIAL VENDOR EVALUATION

VENDOR INTERCONNECTION
DRAWINGS DIAGRAM VENDOR DOCUMENT
CHECK
PT. TRIPATRA Engineering General Engineering Management Procedure

WORK CATEGORY
HAZARDOUS AREA CLASSIFICATION

- Deviation/Clarification.
- Contract document. STUDY OF PROJECT
- Client spec. & data.

- Flammable Gas/Fluid STUDY FOR HAZARDOUS


information. AREA CLASSIFICATION
- Recommended Practise ,
NEC, API-500, API-505

PREPARATION OF HAZARDOUS
PLOT PLAN
AREA CLASSIFICATION

HAZARDOUS AREA
CLASSIFICATION DWGS :
- PLAN VIEW.
- SECTION VIEW.

ENG-EX-WI-22-001 Page 3 of 8
R168 Work Flow.doc
PT. TRIPATRA Engineering General Engineering Management Procedure

WORK CATEGORY
SUBSTATION WORK

- Deviation/Clarification.
- Contract document. STUDY OF PROJECT
- Client spec. & data.

- Preliminary load calculation


- Equipment list/motor
information PREPARATION ELECTRICAL
- Instrument power LOAD CALCULATION
information

- Electrical Load calc.


- Power system calc.
- Preliminary Single Line
Diagram.
- Power System Study :
* Short Circuit PREPARATION OF
* Load Flow
SINGLE LINE DIAGRAM
* Protection relay,
* Etc.

Single line
diagram Dwg.

- Preliminary substaion
equipment layout. PREPARATION OF :
- Preliminary cable schedule. - Subst. Equipment Layout
- Vendor data & drawings - Cable Tray layout
For subst. Equipment. - Cable Schedule
- Interphase signal info. - Connection diagram
- Specification - Motor schematic diagram

- S/S Equipment Layout dwg.


- Installation layout dwg.
- Cable Tray Layout dwg.
- Cable Schedule.
- Motor schematic diagram
- MTO

ENG-EX-WI-22-001 Page 7 of 8
R168 Work Flow.doc
PT. TRIPATRA Engineering General Engineering Management Procedure

WORK CATEGORY
LIGHTING WORK

- Deviation/Clarification.
- Contract document. STUDY OF PROJECT

- Basic design document. PREPARATION


- Equipment layout. LIGHTING LAYOUT DRAWINGS
- Vendor data & drawings.
- Lighting Calculation.
- Harzardous area
classification.
- Specification.

- Lighting Layout dwg.


- Cable Tray Layout dwg.
-Typ.Install. Detail dwg.
- MTO

ENG-EX-WI-22-001 Page 4 of 8
R168 Work Flow.doc
PT. TRIPATRA Engineering General Engineering Management Procedure

WORK CATEGORY
POWER WORK

- Deviation/Clarification.
- Contract document. STUDY OF PROJECT

- Basic design document. PREPARATION


- Single Line Diagram. POWER LAYOUT DRAWINGS
- Plot Plan.
- Cable Sizing.
- Vendor data & drawings.
- Hazardous area
classification.
- Specification.

- Power Layout dwg.


- Cable Tray Layout dwg.
-Typ.Install. Detail dwg.
- MTO

ENG-EX-WI-22-001 Page 5 of 8
R168 Work Flow.doc
PT. TRIPATRA Engineering General Engineering Management Procedure

WORK CATEGORY
GROUNDING WORK

- Deviation/Clarification.
- Contract document. STUDY OF PROJECT

- Basic design document. PREPARATION OF


- Equipment layout. GROUNDING LAYOUT
- Vendor data & drawings.
- Instrument grounding
information.
- Specification.

- Grounding Layout dwg.


-Typ.Install. Detail dwg.
- MTO

ENG-EX-WI-22-001 Page 6 of 8
R168 Work Flow.doc
PT. TRIPATRA Engineering General Engineering Management Procedure

WORK CATEGORY
SUBSTATION WORK

- Deviation/Clarification.
- Contract document. STUDY OF PROJECT
- Client spec. & data.

- Preliminary load calculation


- Equipment list/motor
information PREPARATION ELECTRICAL
- Instrument power LOAD CALCULATION
information

- Electrical Load calc.


- Power system calc.
- Preliminary Single Line
Diagram.
- Power System Study :
* Short Circuit PREPARATION OF
* Load Flow
SINGLE LINE DIAGRAM
* Protection relay,
* Etc.

Single line
diagram Dwg.

- Preliminary substaion
equipment layout. PREPARATION OF :
- Preliminary cable schedule. - Subst. Equipment Layout
- Vendor data & drawings - Cable Tray layout
For subst. Equipment. - Cable Schedule
- Interphase signal info. - Connection diagram
- Specification - Motor schematic diagram

- S/S Equipment Layout dwg.


- Installation layout dwg.
- Cable Tray Layout dwg.
- Cable Schedule.
- Motor schematic diagram
- MTO

ENG-EX-WI-22-001 Page 7 of 8
R168 Work Flow.doc
PT. TRIPATRA Engineering General Engineering Management Procedure

ELECTRICAL ENGINEERING INTERFACES FLOWCHART

Flammable
P HAZARDOUS AREA
oil/gases
R information CLASSIFICATION PLANS
O
C I
ELECTRICAL LOAD LIST
E N
P & ID
S S
ELECTRICAL EQUIPMENT Essential
S Equipment List
Load
T
LAYOUT
R
U
M MECHANICAL PACKAGE Equipment &
Electrical M
E EQUIPMENT field
Specification
Instrument
E
C SPECIFICATION
N
H T
A UPS SYSTEM DESIGN
Tank Layout
N
I CABLE ROUTING DIAGRAM
C
A Under groung CATHODIC PROTECTION Over all C
L piping Layout DESIGN BASIS Layout
I

P BASIC GROUNDING AND


Soil V
I LIGHTNING PROTECTION Resistivity
P PLANS
I
I
Building
N Plot plan BASIC LIGHTING PLAN Layout L
G
CONCEPTUAL LAYOUT Equipment
GENERATOR, SWITCHGEAR dimention &
& MCC BLD. space

ENG-EX-WI-22-001 Page 2 of 8
R168 Work Flow.doc