You are on page 1of 2

APPROVED CHECKED PREPARED

OPERATIONAL CONTROL GUIDE MS. L.SASAKI MR. R. ULATAN

EQUIPT. DESC. ULTRASONIC MACHINE


SECTION PRODUCTION ILLUSTRATION/PICTURE :
PERSONAL PROTECTIVE
PROCESS EQUIPMENT OPERATIONAL CONTROL DETAILS EQUIPT (PPE) / other
necessary materials

1. Materials / Process - Ultrasonic Machine (see illustration 1)


Preparation a. Prepare appropriate PPE's and other necessary materials. Ear plug, Jigs, Pull-gauge, Rugs horn

2. Start Operation a. Switch on and set-up the machine. jig


parameter
b. Wear appropriate PPE's (see illustration 2). Ear plug
c. Observe the following:
1. Proper distance between the machine and operator to prevent
accident (see illustration 3).
1.1 Ensure proper position of both hands.
1.2 Never touch surfaces between jig and the horn.
2. Press emergency stop switch in case of accident.
emergency buttons for
3. Properly dispose excess materials and other related waste stop switch horn and jig
according to waste segregation guidelines.
1

proper wearing of
PPE (Ear plug)

proper position of
operator during
operation

2 3

REVISION DETAILS:
CONTROL NO : REMINDERS / SPECIAL INSTRUCTIONS :

REV
MARK DESCRIPTION ISSUED BY : APPROVED BY : DATE : OCG-008
0 Initial issue. MR. R. ULATAN MS. L. SASAKI 06/13/10 DCC STAMP:
ZPI-AD.Form-035.R0

You might also like