DESIGN OF TENSION PILES

NOS OF BASEMENTS                     = 3

HEIGHT OF EACH BASEMENT      = 5 Meter

Assume depth of foundation     = 1.5 Meter

Total depth of excavation from NGL   = 16.5 Meter

Water level below NGL         = 4 Meter

Water head at foundation level           = 12.5 Meter

Uplift pressure due to water head      = 12.5 Tonne /sq.mt.

Weight of foundation system

100 mm stitch.slab = (0.1x1x1x2.5 )   = 0.25 Tonne /sq.mt.

75  mm PCC             = (0.075x1x1x2.4 )   = 0.18 Tonne /sq.mt.

625 mm boulder fill = (0.625x1x1x2.4 )   = 1.5 Tonne /sq.mt.

600 mm raft               = (0.6x1x1x2.5 )   = 1.5 Tonne /sq.mt.

100  mm PCC             = (0.1x1x1x2.4 )   = 0.24 Tonne /sq.mt.

Self weight of total system                      = 3.67 Tonne /sq.mt.

Net pressure         = uplift + self weight = (3.67‐12.5x1.2)= ‐11.330 Tonne / sq.mt.


(Factor of safty considered 1.2 against uplift)
Tension Piles 
Assume 450 dia double under‐reamed 5 mt. deep

Pile capacity in tension           = 21 Tonne (As per soil report)

Area required by each pile                     = 1.85 sq.mt.

so, we provide 450 mm dia. Double under remead pile @ 1350 mm c/c.