acceptance The formal act of acknowledging that the اﻟﺘﺼــﺮف اﻟﺮﺳــﻤﻲ ﻟﻼﻋﺘــﺮاف ﺑــﺄن اﻟﻤﺸــﺮوع ﻗــﺪ ﺣﻘــﻖ ﻗﺒﻮل
project has met agreed acceptance criteria ﻣﻌﺎﻳﻴﺮ اﻟﻘﺒﻮل اﻟﻤﺘﻔﻖ ﻋﻠﻴﻬـﺎ وﺑﺎﻟﺘـﺎﻟﻲ ﺣﻘـﻖ اﻟﻤﺘﻄﻠﺒـﺎت
and thereby met the requirements of its .اﻟﺨﺎﺻﺔ ﺑﺎﻷﻃﺮاف اﻟﻤﻌﻨﻴﺔ ﺑﺎﻟﻤﺸﺮوع
stakeholders.
acceptance A prioritized list of criteria that the project ﻗﺎﺋﻤـﺔ ﻣﺮﺗﺒــﺔ ﺣﺴــﺐ اﻷوﻟﻮﻳـﺎت ﻟﻠﻤﻌــﺎﻳﻴﺮ اﻟﺘــﻲ ﻳﺠــﺐ أن ﻣﻌﺎﻳﻴﺮ اﻟﻘﺒﻮل
criteria product must meet before the customer will ،ﻳﺤﻘﻘﻬﺎ اﻟﻤﻨﺘﺞ اﻟﺨﺎص ﺑﺎﻟﻤﺸـﺮوع ﺣﺘـﻰ ﻳﻘﺒﻠـﻪ اﻟﻌﻤﻴـﻞ
accept it, i.e. measurable definitions of the أي أﻧﻬﺎ ﺗﻌﺮﻳﻔﺎت ﻗﺎﺑﻠﺔ ﻟﻠﻘﻴﺎس ﻟﻠﺨﺼﺎﺋﺺ اﻟﺘـﻲ ﻳﺠـﺐ أن
attributes that must apply to the set of
ﺗﺘﻮاﺟﺪ ﻓﻲ ﻣﺠﻤﻮﻋﺔ ﻣﻦ اﻟﻤﻨﺘﺠـﺎت ﺣﺘـﻰ ﺗﻜـﻮن ﻣﻘﺒﻮﻟـﺔ
products to be acceptable to key
.ﻟﺪى اﻷﻃﺮاف اﻟﻤﻌﻨﻴﺔ اﻟﺮﺋﻴﺴﻴﺔ
stakeholders.
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 1 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ1 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
approval The formal confirmation that a product is اﻟﺘﺄآﻴﺪ اﻟﺮﺳﻤﻲ ﺑﺄن اﻟﻤﻨﺘﺞ ﻗﺪ اآﺘﻤـﻞ وﺣﻘـﻖ ﻣﺘﻄﻠﺒﺎﺗـﻪ اﻋﺘﻤﺎد
complete and meets its requirements (less )ﺑﺎﺳﺘﺜﻨﺎء أي ﺗﻨﺎزﻻت( آﻤـﺎ هـﻮ ﻣﺤـﺪد ﻓـﻲ ﻓـﻲ "وﺻـﻒ
any concessions) as defined by its Product .اﻟﻤﻨﺘَﺞ" اﻟﺨﺎص ﺑﻪ
Description.
approver The person or group (e.g. a Project Board) اﻟﺸﺨﺺ أو اﻟﻤﺠﻤﻮﻋﺔ )ﻣﺜﻞ "ﻣﺠﻠﺲ اﻟﻤﺸـﺮوع"( اﻟـﺬي اﻟﻤﻌﺘﻤِﺪ
who is identified as qualified and authorized ﻋﺮِفَ ﺑﺄﻧﻪ ﻣﺆهﻞ وﻟﺪﻳﻪ اﻟﺼﻼﺣﻴﺔ ﻻﻋﺘﻤﺎد ﻣﻨﺘﺞ )إداري أو
ُ
to approve a (management or specialist) .ﻣﺘﺨﺼﺺ( ﺑﺄﻧﻪ ﻣﻜﺘﻤﻞ وﻣﻼﺋﻢ ﻟﻠﻐﺮض
product as being complete and fit for
purpose.
assumption A statement that is taken as being true for ،هﻲ ﺟﻤﻠﺔ ﺗﺆﺧﺬ ﻋﻠﻰ أﻧﻬـﺎ ﺻـﺤﻴﺤﺔ ﻷﻏـﺮاض اﻟﺘﺨﻄـﻴﻂ ﻓﺮﺿﻴﺔ
the purposes of planning, but which could وﻳـﺘﻢ وﺿـﻊ اﻟﻔﺮﺿـﻴﺎت ﻓـﻲ.وﻟﻜﻨﻬﺎ ﻳﻤﻜﻦ أن ﺗﺘﻐﻴﺮ ﻻﺣﻘًـﺎ
change later. An assumption is made where ﺣﺎﻟﺔ ﻋﺪم ﻣﻌﺮﻓﺔ ﺑﻌﺾ اﻟﺤﻘﺎﺋﻖ ﺑﻌﺪ أو ﻋﺪم اﺗﺨﺎذ اﻟﻘـﺮار
some facts are not yet known or decided,
وﻳﻜﻮن ﻋﺎدةً ﻣﻘﺼـﻮرًا ﻋﻠـﻰ اﻷﻣـﻮر ذات اﻷهﻤﻴـﺔ،ﺑﺸﺄﻧﻬﺎ
and is usually reserved for matters of such
ﺑﺤﻴﺚ إذا ﺗﻐﻴﺮت أو أﺻﺒﺤﺖ ﻏﻴﺮ ﺻﺤﻴﺤﺔ ﻓﺴـﺘﻜﻮن هﻨـﺎك
significance that if they change, or turn out
not to be true, then there will need to be .ﺣﺎﺟﺔ ﻹﻋﺎدة ﺗﺨﻄﻴﻂ آﺒﻴﺮة
considerable replanning.
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 2 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ2 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
authority The right to allocate resources and make هﻲ ﺣﻖ رﺻﺪ اﻟﻤﻮارد واﺗﺨﺎذ اﻟﻘﺮارات )ﻳﻨﻄﺒﻖ ذﻟﻚ ﻋﻠﻰ ﺻﻼﺣﻴﺔ
decisions (applies to project, stage and .( أو اﻟﻔﺮﻳﻖ، أو اﻟﻤﺮﺣﻠﺔ،ﻣﺴﺘﻮى اﻟﻤﺸﺮوع
team levels).
authorization The point at which an authority is granted. .اﻟﻨﻘﻄﺔ اﻟﺘﻲ ﻋﻨﺪهﺎ ﻳﺘﻢ ﻣﻨﺢ اﻟﺼﻼﺣﻴﺔ ﺗﺼﺮﻳﺢ
avoid (risk A risk response to a threat where the threat ﻓﺈﻣـﺎ أن ﻳﻜـﻮن،هﻮ اﺳﺘﺠﺎﺑﺔ ﻟﻠﺨﻄﺮ ﻓـﻲ ﻣﻮاﺟﻬـﺔ ﺗﻬﺪﻳـﺪ ﺗﺠﻨـــﺐ )إﺣـــﺪى اﻻﺳـــﺘﺠﺎﺑﺎت
response) either can no longer have an impact or can أو أﻧﻪ ﻟـﻢ ﺗﻌـﺪ هﻨـﺎك إﻣﻜﺎﻧﻴـﺔ،اﻟﺨﻄﺮ ﻟﻢ ﻳﻌﺪ ﻟﻪ أي ﺗﺄﺛﻴﺮ (ﻟﻠﺨﻄﺮ
no longer happen. .ﻟﺤﺪوﺛﻪ
baseline Reference levels against which an entity is ﻣﺴــﺘﻮﻳﺎت ﻣﺮﺟﻌﻴــﺔ ﻳــﺘﻢ ﺑــﺎﻟﺮﺟﻮع إﻟﻴﻬــﺎ ﻣﺮاﻗﺒــﺔ اﻟﻜﻴﺎﻧــﺎت ﺧﻂ ﻣﺮﺟﻌﻲ
monitored and controlled. .واﻟﺘﺤﻜﻢ ﻓﻴﻬﺎ
baseline A type of management product that defines ﻳﺤـﺪد ﺟﻮاﻧـﺐ اﻟﻤﺸـﺮوع،هﻮ ﻧﻮع ﻣﻦ اﻟﻤﻨﺘﺠﺎت اﻹدارﻳـﺔ ﻣﻨـــﺘﺞ إداري ﻣـــﻦ ﻧـــﻮع ﺧـــﻂ
management aspects of the project and, once approved, وﻳﻜــﻮن ـ ﺑﻤﺠــﺮد اﻋﺘﻤــﺎدﻩ ـ ﻣﻮﺿــﻮﻋًﺎ ﻟـــ "اﻟــﺘﺤﻜﻢ ﻓــﻲ ﻣﺮﺟﻌﻲ
product is subject to change control. ."اﻟﺘﻐﻴﻴﺮ
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 3 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ3 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
Benefits Review Defines how and when a measurement of .ﺗﺤﺪد آﻴﻒ وﻣﺘﻰ ﻳﻤﻜﻦ ﻗﻴﺎس إﻧﺠﺎزات ﻓﻮاﺋـﺪ اﻟﻤﺸـﺮوع ﺧﻄﺔ ﻣﺮاﺟﻌﺔ اﻟﻔﻮاﺋﺪ
Plan the achievement of the project’s benefits إذا آــﺎن اﻟﻤﺸــﺮوع ﺗــﺘﻢ إدارﺗــﻪ داﺧــﻞ ﺑﺮﻧــﺎﻣﺞ ﻓــﺈن هــﺬﻩ
can be made. If the project is being اﻟﻤﻌﻠﻮﻣﺎت ﻗﺪ ﻳﺘﻢ إﻧﺸﺎؤهﺎ واﻻﺣﺘﻔﺎظ ﺑﻬﺎ ﻋﻠﻰ ﻣﺴـﺘﻮى
managed within a programme this
.اﻟﺒﺮﻧﺎﻣﺞ
information may be created and maintained
at the programme level.
benefits tolerance The permissible deviation in the expected اﻟﺤﻴﺎد اﻟﻤﺒﺎح ﻓﻲ اﻟﻔﻮاﺋﺪ اﻟﻤﺘﻮﻗﻌﺔ واﻟﻤﺴﻤﻮح ﺑﻪ ﻗﺒﻞ أن ﺳﻤﺎﺣﻴﺔ اﻟﻔﻮاﺋﺪ
benefit that is allowed before the deviation .ﺗﻈﻬﺮ اﻟﺤﺎﺟﺔ ﻟﺘﺼﻌﻴﺪ اﻟﺤﻴـﺎد ﻟﻠﻤﺴـﺘﻮى اﻹداري اﻟﺘـﺎﻟﻲ
needs to be escalated to the next level of راﺟـﻊ."وﻳﺘﻢ ﺗﻮﺛﻴﻖ ﺳﻤﺎﺣﻴﺔ اﻟﻔﻮاﺋﺪ ﻓـﻲ "ﻗﻀـﻴﺔ اﻟﻌﻤـﻞ
management. Benefits tolerance is
.""اﻟﺴﻤﺎﺣﻴﺔ
documented in the Business Case. See
‘tolerance’.
Business Case The justification for an organizational activity ﻣﺒﺮر اﻟﻨﺸﺎط اﻟﻤﺆﺳﺴﻲ )اﻟﻤﺸﺮوع( واﻟﺘﻲ ﻓﻲ ﺷﻜﻠﻬﺎ ﻗﻀﻴﺔ ﻋﻤﻞ
(project) which typically contains costs, ، واﻟﻤﺨــﺎﻃﺮ، واﻟﻔﻮاﺋــﺪ،اﻷﻣﺜــﻞ ﺗﺤﺘــﻮي ﻋﻠــﻰ اﻟﺘﻜــﺎﻟﻴﻒ
benefits, risks and timescales, and against واﻟﺘﻲ ﺑﻨﺎءا ﻋﻠﻴﻬﺎ ﻳﺘﻢ اﺧﺘﺒﺎر اﻟﻘﺎﺑﻠﻴﺔ،واﻟﻤﻘﺎﻳﻴﺲ اﻟﺰﻣﻨﻴﺔ
which continuing viability is tested.
.اﻟﻤﺴﺘﻤﺮة ﻟﻠﺘﺤﻘﻴﻖ
centre of A corporate co-ordinating function for ،وﻇﻴﻔــﺔ ﺗﻨﺴــﻴﻘﻴﺔ ﻓــﻲ اﻟﺸــﺮآﺔ ﻟﺤﻘﺎﺋــﺐ اﻟﻤﺸــﺎرﻳﻊ ﻣﺮآﺰ ﺗﻤﻴﺰ
excellence portfolio, programmes and projects ، ﺗﻘـــﺪم اﻟﻤﻮاﺻـــﻔﺎت اﻟﻘﻴﺎﺳـــﻴﺔ، واﻟﻤﺸـــﺎرﻳﻊ،واﻟﺒـــﺮاﻣﺞ
providing standards, consistency of methods ، وإدارة اﻟﻤﻌﺮﻓــﺔ،واﻟﺘﻮاﻓــﻖ ﻓــﻲ اﻷﺳــﺎﻟﻴﺐ واﻟﻌﻤﻠﻴــﺎت
and processes, knowledge management,
. واﻟﺘﺪرﻳﺐ،واﻟﻀﻤﺎن
assurance and training
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 4 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ4 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
change budget The money allocated to the Change اﻟﻤــﺎل اﻟﻤﺮﺻــﻮد ﻟ ــ "هﻴﺌــﺔ اﻟﺘﻐﻴﻴــﺮ" واﻟﻤﺘــﺎح ﻟﻴــﺘﻢ ﺻــﺮﻓﻪ ﻣﻴﺰاﻧﻴﺔ اﻟﺘﻐﻴﻴﺮ
Authority available to be spent on authorized .ﻋﻠﻰ ﻃﻠﺒﺎت اﻟﺘﻐﻴﻴﺮ اﻟﻤﺼﺮح ﺑﻬﺎ
requests for change.
change control The procedure that ensures that all changes اﻹﺟﺮاء اﻟﺬي ﻳﻘﻮم ﺑﺎﻟﺘﺄآﺪ ﻣـﻦ أﻧـﻪ ﻗـﺪ ﺗـﻢ ﺗﺤﺪﻳـﺪ ﺟﻤﻴـﻊ اﻟﺘﺤﻜﻢ ﻓﻲ اﻟﺘﻐﻴﻴﺮ
that may affect the project’s agreed اﻟﺘﻐﻴﻴﺮات اﻟﺘـﻲ ﻗـﺪ ﺗـﺆﺛﺮ ﻋﻠـﻰ اﻷهـﺪاف اﻟﻤﺘﻔـﻖ ﻋﻠﻴﻬـﺎ
objectives are identified, assessed and . وإﻣﺎ اﻋﺘﻤﺎدهﺎ أو رﻓﻀﻬﺎ أو ﺗﺄﺟﻴﻠﻬﺎ، وﺗﻘﺪﻳﺮهﺎ،ﻟﻠﻤﺸﺮوع
either approved, rejected or deferred.
checkpoint A team-level, time-driven review of هـﻲ ﻣﺮاﺟﻌـﺔ زﻣﻨﻴــﺔ ﻟﺘﻘـﺪم اﻟﻌﻤـﻞ ﺗــﺘﻢ ﻋﻠـﻰ ﻣﺴــﺘﻮى ﻧﻘﻄﺔ ﻣﺮاﺟﻌﺔ
progress. .اﻟﻔﺮﻳﻖ
Checkpoint A progress report of the information هﻮ ﺗﻘﺮﻳﺮ ﻋﻦ ﺗﻘﺪم اﻟﻌﻤﻞ ﻳﺤﺘﻮي ﻋﻠﻰ اﻟﻤﻌﻠﻮﻣﺎت اﻟﺘـﻲ ﺗﻘﺮﻳﺮ ﻧﻘﻄﺔ اﻟﻤﺮاﺟﻌﺔ
Report gathered at a checkpoint, which is given by واﻟﺘــﻲ ﻗــﺎم اﻟﻔﺮﻳــﻖ،ﺗــﻢ ﺗﺠﻤﻴﻌﻬــﺎ ﻓــﻲ ﻧﻘﻄ ـﺔ ﻣﺮاﺟﻌــﺔ
a team to the Project Manager, and provides وهﻲ ﺗﻘﺪم ﺑﻴﺎﻧﺎت اﻟﺘﻘﺮﻳﺮ آﻤـﺎ،ﺑﺈﻋﻄﺎﺋﻬﺎ ﻟﻤﺪﻳﺮ اﻟﻤﺸﺮوع
reporting data as defined in the Work
."هﻮ ﻣﺤﺪد ﻓﻲ "ﺑﺎﻗﺔ اﻟﻌﻤﻞ
Package.
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 5 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ5 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
closure A recommendation prepared by the Project ﺗﻮﺻﻴﺔ ﻳﻘﻮم ﺑﺈﻋﺪادهﺎ ﻣﺪﻳﺮ اﻟﻤﺸﺮوع ﻟﻤﺠﻠﺲ اﻟﻤﺸـﺮوع ﺗﻮﺻﻴﺔ ﺑﺎﻹﻏﻼق
recommendation Manager for the Project Board to send as a ﻟﻴﻘﻮم ﺑﺈرﺳﺎﻟﻬﺎ آﺈﺷﻌﺎر ﺑﺈﻏﻼق اﻟﻤﺸﺮوع ﻓﻲ ﺣﺎﻟﺔ رﺿﺎء
project closure notification when the board is .اﻟﻤﺠﻠﺲ ﺑﺄﻧﻪ ﻳﻤﻜﻦ إﻏﻼق اﻟﻤﺸﺮوع
satisfied that the project can be closed.
Communication A description of the means and frequency of ﺷﺮح ﻟﻮﺳﺎﺋﻞ وﻣﻌﺪل اﻻﺗﺼـﺎل ﺑـﻴﻦ اﻟﻤﺸـﺮوع واﻷﻃـﺮاف اﺳﺘﺮاﺗﻴﺠﻴﺔ إدارة اﻻﺗﺼﺎﻻت
Management communication between the project and the .اﻟﻤﻌﻨﻴﺔ اﻟﺨﺎﺻﺔ ﺑﻪ
Strategy project’s stakeholders.
concession An off-specification that is accepted by the هﻲ ﻣﻮاﺻﻔﺎت ﻣﺴﺤﻮﺑﺔ ﻗﺒﻠﻬـﺎ ﻣﺠﻠـﺲ اﻟﻤﺸـﺮوع ﺑـﺪون ﺗﻨﺎزل
Project Board without corrective action. .إﺟﺮاءات ﺗﺼﺤﻴﺤﻴﺔ
configuration An entity that is subject to configuration هﺬا اﻟﻜﻴﺎن ﻗﺪ ﻳﻜـﻮن أﺣـﺪ.هﻮ آﻴﺎن ﻳﺨﻀﻊ ﻹدارة اﻟﺘﻬﻴﺌﺔ ﻋﻨﺼﺮ ﺗﻬﻴﺌﺔ
item management. The entity may be a أو ﻣﺠﻤﻮﻋـﺔ ﻣـﻦ اﻟﻤﻨﺘﺠـﺎت ﻓـﻲ، أو ﻣﻨﺘﺞ،ﻣﻜﻮﻧﺎت ﻣﻨﺘﺞ
component of a product, a product, or a set .أﺣﺪ اﻹﻃﻼﻗﺎت
of products in a release.
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 6 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ6 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
configuration Technical and administrative activities اﻷﻧﺸــﻄﺔ اﻹدارﻳــﺔ واﻟﻔﻨﻴــﺔ اﻟﻤﺨﺘﺼــﺔ ﺑﺈﻧﺸــﺎء وﺻــﻴﺎﻧﺔ إدارة اﻟﺘﻬﻴﺌﺔ
management concerned with the creation, maintenance, اﻟﺘﻬﻴﺌﺔ واﻟﺘﺤﻜﻢ ﻓﻲ اﻟﺘﻐﻴﻴﺮ ﻓﻴﻬـﺎ ﻋﻠـﻰ ﻣـﺪار دورة ﺣﻴـﺎة
and controlled change of configuration .اﻟﻤﻨﺘﺞ
throughout the life of a product.
Configuration A description of how and by whom the ﺷﺮح ﻟﻜﻴﻔﻴﺔ اﻟـﺘﺤﻜﻢ ﻓـﻲ ﻣﻨﺘﺠـﺎت اﻟﻤﺸـﺮوع وﺣﻤﺎﻳﺘﻬـﺎ اﺳﺘﺮاﺗﻴﺠﻴﺔ إدارة اﻟﺘﻬﻴﺌﺔ
Management project’s products will be controlled and .وﻣﻦ ﻳﻘﻮم ﺑﺬﻟﻚ
Strategy protected.
configuration The set of processes, tools and databases ﻣﺠﻤﻮﻋﺔ اﻟﻌﻤﻠﻴﺎت واﻷدوات وﻗﻮاﻋﺪ اﻟﺒﻴﺎﻧﺎت اﻟﻤﺴﺘﺨﺪﻣﺔ ﻧﻈﺎم إدارة اﻟﺘﻬﻴﺌﺔ
management that are used to manage configuration data. ﻳﺴــﺘﺨﺪم، ﻓــﻲ اﻟﻮﺿــﻊ اﻷﻣﺜــﻞ.ﻹدارة ﺑﻴﺎﻧــﺎت اﻟﺘﻬﻴﺌــﺔ
system Typically, a project will use the configuration اﻟﻤﺸــﺮوع ﻧﻈــﺎم إدارة اﻟﺘﻬﻴﺌــﺔ اﻟﺨــﺎص إﻣــﺎ ﺑﻤﺆﺳﺴــﺔ
management system of either the customer
.اﻟﻌﻤﻴﻞ أو ﻣﺆﺳﺴﺔ اﻟﻤﻮرد
or supplier organization.
constraints The restrictions or limitations that the project .اﻟﻤﻮاﻧﻊ واﻟﺤﺪود اﻟﺘﻲ ﻳﻘﻴﺪ ﺑﻬﺎ اﻟﻤﺸﺮوع ﻗﻴﻮد
is bound by.
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 7 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ7 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
corporate or These are over-arching standards that the هــﻲ ﻣﻮاﺻــﻔﺎت ﻗﻴﺎﺳــﻴﺔ ﺣﺎآﻤــﺔ ﻳﺠــﺐ أن ﻳﻠﺘــﺰم ﺑﻬــﺎ اﻟﻤﻮاﺻـــﻔﺎت اﻟﻘﻴﺎﺳـــﻴﺔ ﻓـــﻲ
programme project must adhere to. They will influence وهــﻲ ﺗــﺆﺛﺮ ﻋﻠــﻰ اﻻﺳــﺘﺮاﺗﻴﺠﻴﺎت اﻷرﺑﻌــﺔ،اﻟﻤﺸــﺮوع اﻟﺒﺮﻧﺎﻣﺞ أو اﻟﺸﺮآﺔ
standards the four project strategies (Communication اﺳــﺘﺮاﺗﻴﺠﻴﺔ،ﻟﻠﻤﺸــﺮوع )اﺳــﺘﺮاﺗﻴﺠﻴﺔ إدارة اﻻﺗﺼــﺎﻻت
Management Strategy, Configuration
اﺳــﺘﺮاﺗﻴﺠﻴﺔ، اﺳــﺘﺮاﺗﻴﺠﻴﺔ إدارة اﻟﺠــﻮدة،إدارة اﻟﺘﻬﻴﺌــﺔ
Management Strategy, Quality Management
.إدارة اﻟﻤﺨﺎﻃﺮ( وﻋﻠﻰ ﺁﻟﻴﺎت اﻟﺘﺤﻜﻢ ﻓﻲ اﻟﻤﺸﺮوع
Strategy and Risk Management Strategy)
and the project controls.
corrective action A set of actions to resolve a threat to a ﻣﺠﻤﻮﻋﺔ ﻣﻦ اﻟﺘﺼﺮﻓﺎت ﻟﺤﻞ ﺗﻬﺪﻳـﺪ ﻟﺴـﻤﺎﺣﻴﺎت ﺧﻄـﺔ أو إﺟﺮاء ﺗﺼﺤﻴﺤﻲ
plan’s tolerances or a defect in a product. .ﻋﻴﺐ ﻓﻲ اﻟﻤﻨﺘﺞ
cost tolerance The permissible deviation in a plan’s cost واﻟﻤﺴـﻤﻮح ﺑـﻪ،اﻟﺤﻴﺎد اﻟﻤﺒﺎح ﻓﻲ اﻟﺘﻜﻠﻔﺔ اﻟﻤﺨﻄـﻂ ﻟﻬـﺎ ﺳﻤﺎﺣﻴﺔ اﻟﺘﻜﻠﻔﺔ
that is allowed before the deviation needs to ﻗﺒﻞ أن ﺗﻈﻬﺮ اﻟﺤﺎﺟﺔ ﻟﺘﺼـﻌﻴﺪ اﻟﺤﻴـﺎد ﻟﻠﻤﺴـﺘﻮى اﻹداري
be escalated to the next level of ﻳـــﺘﻢ ﺗﻮﺛﻴـــﻖ ﺳـــﻤﺎﺣﻴﺔ اﻟﺘﻜﻠﻔـــﺔ ﻓـــﻲ اﻟﺨﻄـــﺔ.اﻟﺘـــﺎﻟﻲ
management. Cost tolerance is documented
." راﺟﻊ "اﻟﺴﻤﺎﺣﻴﺔ.اﻟﻤﻨﺎﻇﺮة
in the respective plan. See ‘tolerance’.
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 8 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ8 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
Daily Log Used to record problems/concerns that can اﻟﻤﺴـﺎﺋﻞ اﻟﺘـﻲ ﻳﻤﻜـﻦ أن/ﻳﺴﺘﺨﺪم ﻟﺘﺴﺠﻴﻞ اﻟﻤﺸﺎآﻞ اﻟﺴﺮد اﻟﻴﻮﻣﻲ
be handled by the Project Manger .ﻳﻌﺎﻟﺠﻬﺎ ﻣﺪﻳﺮ اﻟﻤﺸﺮوع ﺑﺸﻜﻞ ﻏﻴﺮ رﺳﻤﻲ
informally.
dependencies The relationship between products or ، ﻋﻠــﻰ ﺳــﺒﻴﻞ اﻟﻤﺜــﺎل.اﻟﻌﻼﻗــﺔ ﺑــﻴﻦ ﻣﻨﺘﺠــﺎت أو أﻧﺸــﻄﺔ (اﻟﻌﻼﻗﺎت اﻻﻋﺘﻤﺎدﻳﺔ )اﻟﺨﻄﺔ
(plan) activities. For example, Product C cannot اﻟﻤﻨﺘﺞ ‘ج’ ﻻ ﻳﻤﻜﻦ أن ﻳﺒﺪأ ﺗﻄﻮﻳﺮﻩ ﺣﺘﻰ ﻳﻜﺘﻤﻞ آـﻞ ﻣـﻦ
start to be developed until Products A and B وﻗﺪ ﺗﻜﻮن اﻟﻌﻼﻗﺎت اﻻﻋﺘﻤﺎدﻳﺔ داﺧﻠﻴـﺔ أو.’اﻟﻤﻨﺘﺞ ‘أ’ و ‘ب
have been completed. Dependencies can
.ﺧﺎرﺟﻴﺔ
be internal or external.
Internal dependencies are those under the اﻟﻌﻼﻗﺎت اﻻﻋﺘﻤﺎدﻳﺔ اﻟﺪاﺧﻠﻴﺔ هﻲ ﺗﻠﻚ اﻟﺘﻲ ﺗﻜـﻮن ﺗﺤـﺖ
control of the Project Manager. External
أﻣـــﺎ اﻟﻌﻼﻗـــﺎت اﻻﻋﺘﻤﺎدﻳـــﺔ.ﺳـــﻴﻄﺮة ﻣـــﺪﻳﺮ اﻟﻤﺸـــﺮوع
dependencies are those outside the control
اﻟﺨﺎرﺟﻴــﺔ ﻓﻬــﻲ ﺗﻠــﻚ اﻟﺘــﻲ ﺗﻜــﻮن ﺧــﺎرج ﺳــﻴﻄﺮة ﻣــﺪﻳﺮ
of the Project Manager – for example, the
ﻣﺜﻞ ﺗﺴﻠﻴﻢ ﻣﻨﺘﺞ ﻣﻄﻠﻮب ﻟﻬﺬا اﻟﻤﺸﺮوع ﻣـﻦ،اﻟﻤﺸﺮوع
delivery of a product required by this project
from another project. .ﻣﺸﺮوع ﺁﺧﺮ
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 9 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ9 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
DSDM Atern An agile project delivery framework إﻃﺎر ﻋﻤﻞ ﻣﺮن ﻟﺘﺴﻠﻴﻢ اﻟﻤﺸـﺮوع ﻳﻄـﻮرﻩ وﻳﻤﻠﻜـﻪ اﺗﺤـﺎد اﻷﺗﺮن اﻟﺘـﺎﺑﻊ ﻻﺗﺤـﺎد اﻟﻄﺮﻳﻘـﺔ
developed and owned by the DSDM اﻷﺗﺮن ﻳﺴﺘﺨﺪم أﺳـﻠﻮب.اﻟﻄﺮﻳﻘﺔ اﻟﻤﺘﻐﻴﺮة ﻟﺘﻄﻮﻳﺮ اﻟﻨﻈﻢ اﻟﻤﺘﻐﻴﺮة ﻟﺘﻄﻮﻳﺮ اﻟﻨﻈﻢ
consortium. Atern uses a time-boxed and وهﻮ ﻳﺘﻮاﻓـﻖ،ﻣﺮاﺣﻞ ﺗﻜﺮارﻳﺔ ﻣﺤﺪود اﻟﺰﻣﻦ ﻟﺘﻄﻮﻳﺮ اﻟﻤﻨﺘﺞ
iterative approach to product development
.2ﻣﻊ ﺑﺮﻧﺲ
and is compatible with PRINCE2.
embedding What an organization needs to do to adopt 2ﻣــﺎ ﺗﺤﺘــﺎج اﻟﻤﺆﺳﺴــﺔ أن ﺗﻘــﻮم ﺑــﻪ ﻟﺘﺘﺒﻨــﻰ ﺑــﺮﻧﺲ (2اﻟﺘﻀﻤﻴﻦ )ﺑﺮﻧﺲ
(PRINCE2) PRINCE2 as its corporate project وهـــﻮ ﻳﺨﺘﻠـــﻒ ﻋـــﻦ.آﺄﺳـــﻠﻮب إدارة اﻟﻤﺸـــﺮوﻋﺎت ﺑﻬـــﺎ
management method. It is different to "اﻟﺘﻔﺼﻴﻞ" اﻟﺬي ﻳﺤﺪد ﻣﺎذا ﻳﺤﺘﺎج ﻣﺸـﺮوع ﻣـﺎ أن ﻳﻔﻌﻠـﻪ
‘tailoring’ which defines what a project
.ﻟﻴﻄﺒﻖ اﻷﺳﻠﻮب ﻋﻠﻰ ﺑﻴﺌﺔ ﻣﺸﺮوع ﻣﻌﻴﻨﺔ
needs to do to apply the method to a
specific project environment.
End Project A report given by the Project Manager to the ﻳﺆآﺪ،ﺗﻘﺮﻳﺮ ﻳﻘﺪﻣﻪ ﻣﺪﻳﺮ اﻟﻤﺸﺮوع إﻟﻰ ﻣﺠﻠﺲ اﻟﻤﺸﺮوع ﺗﻘﺮﻳﺮ ﻧﻬﺎﻳﺔ اﻟﻤﺸﺮوع
Report Project Board,that confirms the handover of ﻣﺤَﺪﱠﺛــﺔ
ُ وﻳﻘــﺪم ﻗﻀــﻴﺔ ﻋﻤــﻞ،ﺗﺴــﻠﻴﻢ ﺟﻤﻴــﻊ اﻟﻤﻨﺘﺠــﺎت
all products and provides an updated وﺗﻘﻴــﻴﻢ ﻟﺠــﻮدة أداء اﻟﻤﺸــﺮوع ﻓــﻲ ﻣﻘﺎﺑــﻞ "وﺛــﺎﺋﻖ ﺑــﺪء
Business Case and an assessment of how
."اﻟﻤﺸﺮوع
well the project has done against the original
Project Initiation Documentation.
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 10 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ10 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
End Stage Report A report given by the Project Manager to the ﺗﻘﺮﻳﺮ ﻳﻘﺪﻣﻪ ﻣﺪﻳﺮ اﻟﻤﺸﺮوع إﻟﻰ ﻣﺠﻠـﺲ اﻟﻤﺸـﺮوع ﻓـﻲ ﺗﻘﺮﻳﺮ ﻧﻬﺎﻳﺔ اﻟﻤﺮﺣﻠﺔ
Project Board at the end of each ﻳﻘـﺪم ذﻟـﻚ ﻣﻌﻠﻮﻣـﺎت.ﻧﻬﺎﻳﺔ آﻞ ﻣﺮﺣﻠﺔ إدارﻳﺔ ﻟﻠﻤﺸـﺮوع
management stage of the project. This ﺣﻮل أداء اﻟﻤﺸﺮوع ﺧﻼل اﻟﻤﺮﺣﻠﺔ وﺣﺎﻟـﺔ اﻟﻤﺸـﺮوع ﻓـﻲ
provides information about the project
.ﻧﻬﺎﻳﺔ اﻟﻤﺮﺣﻠﺔ
performance during the stage and the
project status at stage end.
enhance (risk A risk response to an opportunity where هﻮ اﺳﺘﺠﺎﺑﺔ ﻟﻠﺨﻄـﺮ ﻓـﻲ ﻣﻘﺎﺑـﻞ ﻓﺮﺻـﺔ ﺣﻴـﺚ ﻳـﺘﻢ أﺧـﺬ اﻟﺘﺤﺴﻴﻦ )إﺣﺪى اﻻﺳﺘﺠﺎﺑﺎت
response) proactive actions are taken to: :إﺟﺮاءات اﺳﺘﺒﺎﻗﻴﺔ ﻟـ (ﻟﻠﺨﻄﺮ
Enhance the probability of the event .ﺗﺤﺴﻴﻦ اﺣﺘﻤﺎل ﺣﺪوث اﻟﺤﺪث
occurring .ﺗﺤﺴﻴﻦ ﺗﺄﺛﻴﺮ اﻟﺤﺪث ﻓﻲ ﺣﺎﻟﺔ ﺣﺪوﺛﻪ
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 11 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ11 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
exception A situation where it can be forecast that هﻮ اﻟﻤﻮﻗﻒ اﻟﺬي ﻳﻤﻜـﻦ ﻓﻴـﻪ اﻟﺘﻨﺒـﺆ ﺑﺄﻧـﻪ ﺳـﻴﻜﻮن هﻨـﺎك اﺳﺘﺜﻨﺎء
there will be a deviation beyond the ﺣﻴـﺎد ﻳﺘﺠــﺎوز ﻣﺴــﺘﻮﻳﺎت اﻟﺴــﻤﺎﺣﻴﺔ اﻟﻤﺘﻔــﻖ ﻋﻠﻴﻬــﺎ ﺑــﻴﻦ
tolerance levels agreed between Project ﻣــﺪﻳﺮ اﻟﻤﺸــﺮوع وﻣﺠﻠــﺲ اﻟﻤﺸــﺮوع )أو ﺑــﻴﻦ ﻣﺠﻠــﺲ
Manager and Project Board (or between
.(اﻟﻤﺸﺮوع وإدارة اﻟﺒﺮﻧﺎﻣﺞ أو اﻟﺸﺮآﺔ
Project Board and corporate or programme
management).
exception This is a review by the Project Board to هــﻮ ﻣﺮاﺟﻌــﺔ ﻳﻘــﻮم ﺑﻬــﺎ ﻣﺠﻠــﺲ اﻟﻤﺸــﺮوع ﻻﻋﺘﻤــﺎد )أو ﺗﻘﺪﻳﺮ اﻻﺳﺘﺜﻨﺎء
assessment approve (or reject) an Exception Plan. ."رﻓﺾ( "ﺧﻄﺔ اﺳﺘﺜﻨﺎءات
Exception Plan This is a plan that often follows an Exception ﺑﺎﻟﻨﺴــﺒﺔ."هــﻲ ﺧﻄــﺔ ﻋــﺎدةً ﺗﺘﻠــﻮ "ﺗﻘﺮﻳــﺮ اﺳــﺘﺜﻨﺎءات ﺧﻄﺔ اﺳﺘﺜﻨﺎءات
Report. For a Stage Plan exception, it ﻻﺳﺘﺜﻨﺎءات "ﺧﻄﺔ ﻣﺮﺣﻠﺔ" ﻓﻬﻲ ﺗﻐﻄﻲ اﻟﻔﺘﺮة ﻣﻦ اﻟﻮﻗﺖ
covers the period from the present to the إذا آـﺎن اﻻﺳـﺘﺜﻨﺎء.اﻟﺤﺎﺿﺮ ﺣﺘﻰ ﻧﻬﺎﻳﺔ اﻟﻤﺮﺣﻠـﺔ اﻟﺤﺎﻟﻴـﺔ
end of the current stage. If the exception
ﻋﻠــﻰ ﻣﺴــﺘﻮى اﻟﻤﺸــﺮوع ﻓﺈﻧــﻪ ﻳــﺘﻢ اﺳــﺘﺒﺪال ﺧﻄــﺔ
were at a project level, the Project Plan
.اﻟﻤﺸﺮوع
would be replaced.
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 12 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ12 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
Executive The single individual with overall اﻟﺸـــﺨﺺ اﻟﻔـــﺮد ذو اﻟﻤﺴـــﺆوﻟﻴﺔ اﻟﺸـــﺎﻣﻠﺔ ﻟﻀـــﻤﺎن أن ﻣﺪﻳﺮ ﺗﻨﻔﻴﺬي
responsibility for ensuring that a project هـﺬا.اﻟﻤﺸﺮوع ﻳﺤﻘﻖ أهﺪاﻓـﻪ وﻳﻮﺻـﻞ اﻟﻔﻮاﺋـﺪ اﻟﻤﺮﺗﻘﺒـﺔ
meets its objectives and delivers the اﻟﻔﺮد ﻳﺠﺐ أن ﻳﺘﺄآﺪ ﻣﻦ أن اﻟﻤﺸﺮوع ﻳﺤﺎﻓﻆ ﻋﻠـﻰ ﺗﺮآﻴـﺰ
projected benefits. This individual should
وأن، وأﻧــﻪ ﻟﺪﻳــﻪ ﺻــﻼﺣﻴﺎت واﺿــﺤﺔ،اﻟﻌﻤــﻞ اﻟﺨــﺎص ﺑــﻪ
ensure that the project maintains its
واﻟﻤـﺪﻳﺮ. اﻟﻌﻤﻞ ـ ﺑﻤﺎ ﻓـﻲ ذﻟـﻚ اﻟﻤﺨـﺎﻃﺮ ـ ﺗـﺪار ﺑﻨﺸـﺎط
business focus, that it has clear authority
and that the work, including risks, is actively ،اﻟﺘﻨﻔﻴﺬي هﻮ رﺋـﻴﺲ ﻣﺠﻠـﺲ اﻟﻤﺸـﺮوع ﻣﻤـﺜﱢﻼً ﻟﻠﻌﻤﻴـﻞ
managed. The Executive is the chair of the ."وهﻮ ﻣﺴﺆول ﻋﻦ "ﻗﻀﻴﺔ اﻟﻌﻤﻞ
Project Board, representing the customer
and is responsible for the Business Case.
exploit (risk A risk response to an opportunity by seizing هﻮ اﺳـﺘﺠﺎﺑﺔ ﻟﻠﺨﻄـﺮ ﻓـﻲ ﻣﻘﺎﺑـﻞ ﻓﺮﺻـﺔ ﺑﺎﻧﺘﻬـﺎز اﻟﻔﺮﺻـﺔ اﺳﺘﻐﻼل )إﺣﺪى اﻻﺳـﺘﺠﺎﺑﺎت
response) the opportunity to ensure that it will happen .ﻟﻀﻤﺎن أﻧﻬﺎ ﺳﺘﺤﺪث وأن اﻷﺛﺮ ﺳﻴﺘﺤﻘﻖ (ﻟﻠﺨﻄﺮ
and that the impact will be realized.
fallback (risk A risk response to a threat by putting in هﻮ اﺳﺘﺠﺎﺑﺔ ﻟﻠﺨﻄﺮ ﻓﻲ ﻣﻮاﺟﻬﺔ ﺗﻬﺪﻳﺪ ﻋﻦ ﻃﺮﻳـﻖ وﺿـﻊ اﻟــــﺮد اﻻﻓﺘﺮاﺿــــﻲ )إﺣــــﺪى
response) place a fallback plan for the actions that will ﺧﻄﺔ اﻓﺘﺮاﺿﻴﺔ ﻟﻺﺟﺮاءات اﻟﺘﻲ ﺳﻴﺘﻢ اﺗﺨﺎذهﺎ ﻟﺘﻘﻠﻴﻞ أﺛﺮ (اﻻﺳﺘﺠﺎﺑﺎت ﻟﻠﺨﻄﺮ
be taken to reduce the impact of the threat .اﻟﺘﻬﺪﻳﺪ ﻓﻲ ﺣﺎﻟﺔ ﺣﺪوث اﻟﺨﻄﺮ
should the risk occur.
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 13 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ13 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
governance The ongoing activity of maintaining a sound اﻟﻨﺸــﺎط اﻟﻤﺴــﺘﻤﺮ ﻟﻠﺤﻔــﺎظ ﻋﻠــﻰ ﻧﻈــﺎم ﺳــﻠﻴﻢ ﻟﻠــﺘﺤﻜﻢ (اﻟﺤﻮآﻤﺔ )ﺷﺮآﺔ
(corporate) system of internal control by which the ﻳﻀﻤﻦ ﻣﻦ ﺧﻼﻟـﻪ اﻟﻤﻮﻇﻔـﻮن واﻟﻤﻮﺟﱢﻬـﻮن ﻓـﻲ،اﻟﺪاﺧﻠﻲ
directors and officers of an organization اﻟﻤﺆﺳﺴﺔ أﻧﻪ ﻗﺪ ﺗـﻢ وﺿـﻊ ﻧﻈـﻢ إدارة ﻓﻌﺎﻟـﺔ ـ ﺑﻤـﺎ ﻓـﻲ
ensure that effective management systems,
،ذﻟﻚ ﻧﻈـﻢ اﻟﻤﺮاﻗﺒـﺔ واﻟـﺘﺤﻜﻢ اﻟﻤﺎﻟﻴـﺔ ـ ﻟﺤﻤﺎﻳـﺔ اﻷﺻـﻮل
including financial monitoring and control
. وﺳﻤﻌﺔ اﻟﻤﺆﺳﺴﺔ،واﻟﻘﺪرات اﻟﻜﺴﺒﻴﺔ
systems, have been put in place to protect
assets, earning capacity and the reputation
of the organization.
governance Those areas of corporate governance that ﺗﻠﻚ اﻟﻤﻨﺎﻃﻖ ﻓﻲ ﺣﻮآﻤﺔ اﻟﺸﺮآﺎت اﻟﺘﻲ ﺗﺘﻌﻠـﻖ ﺑﺸـﻜﻞ (اﻟﺤﻮآﻤﺔ )ﻣﺸﺮوع
(project) are specifically related to project activities. اﻟﺤﻮآﻤـــﺔ اﻟﻔﻌﺎﻟـــﺔ ﻹدارة.ﺧـــﺎص ﺑﺄﻧﺸـــﻄﺔ اﻟﻤﺸـــﺮوع
Effective governance of project اﻟﻤﺸﺎرﻳﻊ ﺗﻀﻤﻦ أن ﺣﻘﻴﺒﺔ اﻟﻤﺸﺮوﻋﺎت ﻓﻲ اﻟﻤﺆﺳﺴـﺔ
management ensures that an organization’s
وأﻧﻬــﺎ ﻳــﺘﻢ ﺗﺴــﻠﻴﻤﻬﺎ،ﺗﺘﻤﺎﺷــﻰ ﻣــﻊ أهــﺪاف اﻟﻤﺆﺳﺴــﺔ
project portfolio is aligned to the
. وأﻧﻬﺎ ﻗﺎﺑﻠﺔ ﻟﻼﺳﺘﻤﺮارﻳﺔ،ﺑﻜﻔﺎءة
organization’s objectives, is delivered
efficiently and is sustainable.
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 14 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ14 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
Highlight Report A time-driven report from the Project ﺗﻘﺮﻳﺮ زﻣﻨﻲ ﻣﻦ ﻣﺪﻳﺮ اﻟﻤﺸـﺮوع إﻟـﻰ ﻣﺠﻠـﺲ اﻟﻤﺸـﺮوع ﺗﻘﺮﻳﺮ إﻟﻘﺎء اﻟﻀﻮء
Manager to the Project Board on stage .ﺣﻮل ﺗﻄﻮرات اﻟﻤﺮﺣﻠﺔ
progress.
host site A site where project work is being اﻟﻤﻮﻗــﻊ اﻟــﺬي ﻳــﺘﻢ ﻓﻴ ـﻪ ﺗﻨﻔﻴــﺬ أﻋﻤ ـﺎل اﻟﻤﺸــﺮوع )ﻋﻠــﻰ ﻣﻮﻗﻊ اﺳﺘﻀﺎﻓﺔ
undertaken (for example, an office or .( ﻣﻜﺘﺐ أو ﻣﻮﻗﻊ إﻧﺸﺎﺋﻲ،ﺳﺒﻴﻞ اﻟﻤﺜﺎل
construction site).
impact (of risk) The result of a particular threat or أو،ﻧﺘﻴﺠــﺔ ﺗﻬﺪﻳــﺪ ﻣﻌــﻴﻦ أو ﻓﺮﺻــﺔ ﻣﻌﻴﻨــﺔ ﺣــﺪﺛﺖ ﺑﺎﻟﻔﻌــﻞ (ﺗﺄﺛﻴﺮ )اﻟﻤﺨﺎﻃﺮ
opportunity actually occurring, or the .ﺗﻮﻗﻊ ﻣﺜﻞ ﺗﻠﻚ اﻟﻨﺘﻴﺠﺔ
anticipation of such a result.
inherent risk The exposure arising from a specific risk اﻻﻧﻜﺸﺎف اﻟﻨﺎﺗﺞ ﻋﻦ ﺧﻄﺮ ﻣﻌـﻴﻦ ﻗﺒـﻞ أن ﻳـﺘﻢ اﺗﺨـﺎذ أي ﺧﻄﺮ ﻣﺘﺄﺻﻞ
before any action has been taken to .إﺟﺮاء ﻹدارﺗﻪ
manage it.
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 15 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ15 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
issue Anything happening during the project أي ﺷﻲء ﻳﺤﺪث أﺛﻨﺎء اﻟﻤﺸﺮوع واﻟﺬي ـ ﻣﺎ ﻟﻢ ﻳﺘﻢ ﺣﻠﻪ ـ ﻗﻀﻴﺔ
which, unless resolved, will result in a ﻳﺆدي إﻟﻰ ﺗﻐﻴﻴﺮ ﻓﻲ ﻣﻨﺘﺞ أو ﺧﻄﺔ أو هﺪف ﺗﻢ ﻋﻤﻞ ﺧـﻂ
change to a baselined product, plan or .( ﻓﻮاﺋﺪ، ﺧﻄﺮ، ﻧﻄﺎق، ﺟﻮدة، ﺗﻜﻠﻔﺔ،ﻣﺮﺟﻌﻲ ﻟﻪ )وﻗﺖ
objective (time, cost, quality, scope, risk and
benefits).
Issue Register Used to capture and maintain information on ﻳﺴــﺘﺨﺪم ﻟﺮﺻــﺪ واﻟﺤﻔــﺎظ ﻋﻠــﻰ ﻣﻌﻠﻮﻣــﺎت ﺣــﻮل اﻟﻘﻀــﺎﻳﺎ ﻗﻴﺪ اﻟﻘﻀﺎﻳﺎ
all of the issues that are being managed وﻳﻨﺒﻐﻲ أن ﻳﺮاﻗﺐ ﻣـﺪﻳﺮ.اﻟﺘﻲ ﺗﺘﻢ إدارﺗﻬﺎ ﺑﺸﻜﻞ رﺳﻤﻲ
formally. The Issue Register should be .اﻟﻤﺸﺮوع ﻗﻴﺪ اﻟﻘﻀﺎﻳﺎ ﺑﺸﻜﻞ ﻣﻨﺘﻈﻢ
monitored by the Project Manager on a
regular basis.
Issue Report A report containing the description, impact ﺗﻘﺮﻳــﺮ ﻳﺤﺘــﻮي ﻋﻠــﻰ ﺷــﺮح وﺗﻘﻴــﻴﻢ اﻟﺘــﺄﺛﻴﺮ وﺗﻮﺻــﻴﺎت ﺗﻘﺮﻳﺮ اﻟﻘﻀﺎﻳﺎ
assessment and recommendations for a ، أو اﻟﻤﻮاﺻـﻔﺎت اﻟﻤﺴـﺤﻮﺑﺔ،ﺑﺨﺼﻮص أﺣﺪ ﻃﻠﺒﺎت اﻟﺘﻐﻴﻴﺮ
request for change, off-specification or a ﻳﺘﻢ إﻧﺸﺎؤﻩ ﻓﻘﻂ ﻟﺘﻠﻚ اﻟﻘﻀـﺎﻳﺎ اﻟﺘـﻲ.ﻣﺴﺄﻟﺔ/أو ﻣﺸﻜﻠﺔ
problem/concern. It is only created for those
.ﺗﺤﺘﺎج إﻟﻰ اﻟﺘﻌﺎﻣﻞ اﻟﺮﺳﻤﻲ
issues that need to be handled formally.
Lessons Log An informal repository for lessons that apply ﻣﺴﺘﻮدع ﻏﻴﺮ رﺳﻤﻲ ﻟﻠﺪروس اﻟﺘـﻲ ﺗﻨﻄﺒـﻖ ﻋﻠـﻰ هـﺬا ﺳﺮد اﻟﺪروس
to this project or future projects. .اﻟﻤﺸﺮوع أو ﻣﺸﺎرﻳﻊ ﻣﺴﺘﻘﺒﻠﻴﺔ
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 16 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ16 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
logs Informal repositories managed by the وﻻ،ﻣﺴــﺘﻮدﻋﺎت ﻏﻴــﺮ رﺳــﻤﻴﺔ ﻳــﺪﻳﺮهﺎ ﻣــﺪﻳﺮ اﻟﻤﺸــﺮوع اﻟﺴﺮد
Project Manager that do not require any ﺗﺤﺘــﺎج إﻟــﻰ أي ﻣﻮاﻓﻘــﺎت ﻣــﻦ ﻣﺠﻠــﺲ اﻟﻤﺸــﺮوع ﻋﻠــﻰ
agreement by the Project Board on their : ﻧﻮﻋـﺎن ﻣـﻦ اﻟﺴـﺮد2 ﻳﻮﺟﺪ ﻓﻲ ﺑـﺮﻧﺲ.ﺷﻜﻠﻬﺎ وﺗﻜﻮﻳﻨﻬﺎ
format and composition. PRINCE2 has two
. وﺳﺮد اﻟﺪروس،اﻟﺴﺮد اﻟﻴﻮﻣﻲ
logs: the Daily Log and the Lessons Log.
management Those products that will be required as part ﺗﻠــﻚ اﻟﻤﻨﺘﺠــﺎت اﻟﺘــﻲ ﺗﻜــﻮن ﺿــﺮورﻳﺔ آﺠــﺰء ﻣــﻦ إدارة اﻟﻤﻨﺘﺠﺎت اﻹدارﻳﺔ
product of managing the project, and establishing اﻟﻤﺸﺮوع وﺗﺤﻘﻴﻖ اﻟﺠﻮدة واﻟﺤﻔﺎظ ﻋﻠﻴﻬـﺎ )ﻋﻠـﻰ ﺳـﺒﻴﻞ
and maintaining quality (for example, .( إﻟﺦ... ، ﺗﻘﺎرﻳﺮ ﻧﻬﺎﻳﺔ اﻟﻤﺮﺣﻠﺔ، ﺗﻘﺎرﻳﺮ إﻟﻘﺎء اﻟﻀﻮء،اﻟﻤﺜﺎل
Highlight Reports, End Stage Reports etc.).
وﻳﻤﻜـﻦ،اﻟﻤﻨﺘﺠﺎت اﻹدارﻳﺔ ﻻ ﺗﺘﻐﻴﺮ أﻳًﺎ آﺎن ﻧﻮع اﻟﻤﺸـﺮوع
The management products stay constant,
أن ﺗﺴـــﺘﺨﺪم آﻤـــﺎ هـــﻮ ﻣﻮﺻـــﻮف أو ﻣـــﻊ أي ﺗﻌـــﺪﻳﻼت
whatever the type of project, and can be
used as described, or with any relevant ﺗﻮﺟــﺪ ﺛﻼﺛــﺔ أﻧــﻮاع ﻣــﻦ. وﻟﺠﻤﻴــﻊ اﻟﻤﺸــﺎرﻳﻊ،ﻣﻨﺎﺳــﺒﺔ
modifications, for all projects. There are ، واﻟﺴــﺠﻼت، اﻟﺨﻄــﻮط اﻟﻤﺮﺟﻌﻴــﺔ:اﻟﻤﻨﺘﺠــﺎت اﻹدارﻳــﺔ
three types of management product: .واﻟﺘﻘﺎرﻳﺮ
baselines, records and reports.
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 17 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ17 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
milestone A significant event in the plan’s schedule ﺣﺪث هﺎم ﻓﻲ اﻟﺠﺪول اﻟﺰﻣﻨﻲ ﻟﻠﺨﻄﺔ ﻣﺜﻞ إآﻤﺎل ﺑﺎﻗـﺎت ﻧﻘﻄﺔ إﻧﺠﺎز
such as completion of key Work Packages, . أو ﻣﺮﺣﻠﺔ إدارﻳﺔ، أو ﻣﺮﺣﻠﺔ ﻓﻨﻴﺔ،اﻟﻌﻤﻞ اﻟﺮﺋﻴﺴﻴﺔ
a technical stage, or a management stage.
off-specification Something that should be provided by the ﺷﻲء ﻳﻨﺒﻐﻲ أن ﻳﻘﺪﻣﻪ اﻟﻤﺸﺮوع وﻟﻜﻨﻪ ﻻ ﻳﻘﺪﻣـﻪ ﺣﺎﻟﻴًـﺎ ﻣﻮاﺻﻔﺎت ﻣﺴﺤﻮﺑﺔ
project, but currently is not (or is forecast not )أو ُﻳﺘﻨﺒﺄ ﺑﻌـﺪم ﺗﻘﺪﻳﻤـﻪ( وﻻ ﻳـﺘﻤﻜﻦ ﻣـﺪﻳﺮ اﻟﻤﺸـﺮوع ﻣـﻦ
to be) provided and that the Project ﻗـﺪ ﻳﻜـﻮن ذﻟـﻚ.ﺣﻠﻪ ﺧـﻼل اﻟﺴـﻤﺎﺣﻴﺎت اﻟﻤﺘﻔـﻖ ﻋﻠﻴﻬـﺎ
Manager is unable to resolve within agreed
هـﺬا. أو ﻣﻨـﺘﺞ ﻻ ﻳﺤﻘـﻖ ﻣﻮاﺻـﻔﺎﺗﻪ،ﻧﻘﺺ أﺣﺪ اﻟﻤﻨﺘﺠـﺎت
tolerances. This might be a missing product
.أﺣﺪ أﻧﻮاع اﻟﻘﻀﺎﻳﺎ
or a product not meeting its specifications. It
is one type of issue.
operational and A specific type of acceptance by the person ﻧﻮع ﺧﺎص ﻣـﻦ اﻟﻘﺒـﻮل ﺑﻮاﺳـﻄﺔ اﻟﺸـﺨﺺ أو اﻟﻤﺠﻤﻮﻋـﺔ ﻗﺒﻮل اﻟﺘﺸﻐﻴﻞ واﻟﺼﻴﺎﻧﺔ
maintenance or group who will support the product once it اﻟﺘﻲ ﺳﺘﺪﻋﻢ اﻟﻤﻨﺘﺞ ﺑﻤﺠﺮد أن ﻳﺘﻢ ﺗﺴﻠﻴﻤﻪ إﻟﻰ اﻟﺒﻴﺌـﺔ
acceptance is handed over into the operational .اﻟﺘﺸﻐﻴﻠﻴﺔ
environment.
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 18 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ18 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
output A specialist product that is handed over to a ﻻﺣــﻆ أن.ﻣﻨــﺘﺞ ﻣﺘﺨﺼــﺺ ﻳــﺘﻢ ﺗﺴــﻠﻴﻤﻪ ﻟﻠﻤﺴــﺘﺨﺪﻣﻴﻦ ﻣﺨﺮﺟﺎت
user(s). Note that management products اﻟﻤﻨﺘﺠﺎت اﻹدارﻳـﺔ ﻟﻴﺴـﺖ ﻣﺨﺮﺟـﺎت وﻟﻜﻨﻬـﺎ ﺗﻨﺸـﺄ ﻓﻘـﻂ
are not outputs but created solely for the .ﻟﻐﺮض إدارة اﻟﻤﺸﺮوع
purpose of managing the project.
performance A plan’s goals for time, cost, quality, scope, ، واﻟﺠــﻮدة، واﻟﺘﻜﻠﻔــﺔ،ﻏﺎﻳــﺎت اﻟﺨﻄــﺔ ﻓﻴﻤــﺎ ﻳﺨــﺺ اﻟﻮﻗــﺖ ﻣﺴﺘﻬﺪﻓﺎت اﻷداء
targets benefits and risk. . واﻟﻤﺨﺎﻃﺮ، واﻟﻔﻮاﺋﺪ،واﻟﻨﻄﺎق
plan A detailed proposal for doing or achieving ﻣــﻊ اﻟﺒﻴــﺎن،ﻋــﺮض ﺗﻔﺼــﻴﻠﻲ ﻟﻌﻤــﻞ أو ﺗﺤﻘﻴــﻖ ﺷــﻲء ﺧﻄﺔ
something detailing the what, when, how ﻳﻮﺟـﺪ.اﻟﺘﻔﺼﻴﻠﻲ ﺣﻮل ﻣﺎذا وﻣﺘﻰ وآﻴـﻒ وﺑﻮاﺳـﻄﺔ ﻣـﻦ
and by whom. In PRINCE2 there are only ﺧﻄــﺔ: اﻷﻧــﻮاع اﻟﺘﺎﻟﻴــﺔ ﻓﻘــﻂ ﻣــﻦ اﻟﺨﻄــﻂ2ﻓــﻲ ﺑــﺮﻧﺲ
the following types of plan: Project Plan, ﺧﻄـــﺔ، ﺧﻄـــﺔ اﻟﻔﺮﻳـــﻖ، ﺧﻄـــﺔ اﻟﻤﺮﺣﻠـــﺔ،اﻟﻤﺸـــﺮوع
Stage Plan, Team Plan, Exception Plan and . ﺧﻄﺔ ﻣﺮاﺟﻌﺔ اﻟﻔﻮاﺋﺪ،اﻻﺳﺘﺜﻨﺎءات
Benefits Review Plan.
planned closure The PRINCE2 activity to close a project. . اﻟﺨﺎص ﺑﺈﻏﻼق اﻟﻤﺸﺮوع2اﻟﻨﺸﺎط ﻓﻲ ﺑﺮﻧﺲ اﻹﻏﻼق اﻟﻤﺨﻄﻂ
planning horizon The period of time for which it is possible to .اﻟﻔﺘﺮة اﻟﺰﻣﻨﻴﺔ اﻟﺘﻲ ﻣﻦ اﻟﻤﻤﻜﻦ اﻟﺘﺨﻄﻴﻂ ﻟﻬﺎ ﺑﺪﻗﺔ أﻓﻖ اﻟﺘﺨﻄﻴﻂ
accurately plan.
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 19 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ19 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
premature The PRINCE2 activity to close a project ﻹﻏــﻼق ﻣﺸــﺮوع ﻗﺒــﻞ اﻹﻏــﻼق2ﻧﺸــﺎط ﻓــﻲ ﺑــﺮﻧﺲ اﻹﻏﻼق اﻟﻤﺒﻜﺮ
closure before its planned closure. The Project ﻳﺠﺐ أن ﻳﺘﺄآﺪ ﻣﺪﻳﺮ اﻟﻤﺸﺮوع ﻣﻦ أن اﻷﻋﻤـﺎل. اﻟﻤﺨﻄﻂ
Manager must ensure that work in progress وﻟﻜــﻦ ﻳﺘﺄآــﺪ ﻣــﻦ أن،اﻟﺠﺎرﻳــﺔ ﻟــﻢ ﻳــﺘﻢ إﻳﻘﺎﻓﻬــﺎ ﺑﺒﺴــﺎﻃﺔ
is not simply abandoned, but that the project
وﻳﺘﺄآﺪ،اﻟﻤﺸﺮوع ﻳﺴﺘﻨﻘﺬ أي ﻗﻴﻤﺔ أﻧﺸِﺄت ﺣﺘﻰ ﺗﺎرﻳﺨﻪ
salvages any value created to date, and
ﻣﻦ أن أي ﻓﺠﻮات ﺗﺮآﻬﺎ إﻟﻐـﺎء اﻟﻤﺸـﺮوع ﺗـﻢ رﻓﻌﻬـﺎ إﻟـﻰ
checks that any gaps left by the cancellation
of the project are raised to corporate or .إدارة اﻟﺒﺮﻧﺎﻣﺞ أو إدارة اﻟﺸﺮآﺔ
programme management.
prerequisites Any fundamental aspects that must be in أي أوﺟﻪ أﺳﺎﺳـﻴﺔ ﻳﺠـﺐ ﺗﻮاﺟـﺪهﺎ وﺑﻘﺎؤهـﺎ ﺣﺘـﻰ ﺗـﻨﺠﺢ (اﻟﻤﺘﻄﻠﺒﺎت اﻟﻘﺒﻠﻴﺔ )ﺧﻄﺔ
(plan) place, and remain in place, for the plan to .اﻟﺨﻄﺔ
succeed.
PRINCE2 A method that supports some selected .ﻃﺮﻳﻘﺔ ﺗﺪﻋﻢ ﺑﻌﺾ اﻷوﺟﻪ اﻟﻤﺨﺘـﺎرة ﻹدارة اﻟﻤﺸـﺮوﻋﺎت 2ﺑﺮﻧﺲ
aspects of project management. The وهﺬا اﻟﻤﺨﺘﺼﺮ اﻹﻧﺠﻠﻴﺰي ﻳﺮﻣﺰ إﻟﻰ ﺟﻤﻠﺔ "اﻟﻤﺸﺎرﻳﻊ ﻓﻲ
acronym stands for Projects in a Controlled ."ﺑﻴﺌﺎت ﺗﺤﺖ اﻟﺘﺤﻜﻢ
Environment.
PRINCE2 The guiding obligations for good project اﻹﻟﺰاﻣـــــﺎت اﻹرﺷـــــﺎدﻳﺔ ﻟﻠﻤﻤﺎرﺳـــــﺎت اﻟﺠﻴـــــﺪة ﻹدارة 2ﻣﺒﺎديء ﺑﺮﻧﺲ
principles management practice that are the basis of a اﻟﻤﺸﺮوﻋﺎت اﻟﺘﻲ هﻲ أﺳﺲ ﻟﻤﺸﺮوع ﻳـﺪار ﺑﺎﺳـﺘﺨﺪام
project being managed using PRINCE2. .2ﺑﺮﻧﺲ
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 20 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ20 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
probability This is the evaluated likelihood of a هﻮ اﻻﺣﺘﻤﺎﻟﻴﺔ اﻟﻤﻘﺪرة ﻟﻠﺤﺪوث اﻟﻔﻌﻠﻲ ﻟﺘﻬﺪﻳﺪ أو ﻓﺮﺻـﺔ اﺣﺘﻤﺎل
particular threat or opportunity actually ﺑﻤــﺎ ﻓــﻲ ذﻟــﻚ ﻣﺮاﻋــﺎة اﻟﻤﻌــﺪل اﻟــﺬي ﻳﻤﻜــﻦ أن،ﻣﻌﻴﻨ ـﺔ
happening, including a consideration of the .ﻳﺤﺪث ﺑﻪ ذﻟﻚ
frequency with which this may arise.
problem/concern A type of issue (other than a request for ﻧــﻮع ﻣــﻦ اﻟﻘﻀــﺎﻳﺎ )ﺑﺨــﻼف ﻃﻠــﺐ اﻟﺘﻐﻴﻴــﺮ واﻟﻤﻮاﺻــﻔﺎت ﻣﺴﺄﻟﺔ/ﻣﺸﻜﻠﺔ
change or off-specification) that the Project اﻟﻤﺴــﺤﻮﺑﺔ( اﻟﺘــﻲ ﻳﺤﺘــﺎج ﻣــﺪﻳﺮ اﻟﻤﺸــﺮوع إﻟــﻰ ﺣﻠﻬــﺎ أو
Manager needs to resolve or escalate. .ﺗﺼﻌﻴﺪهﺎ
procedure A specified series of actions for a particular ﺗﺴﻠﺴــﻞ ﻣﺤــﺪد ﻣــﻦ اﻷﻋﻤــﺎل ﻟﻮﺟــﻪ ﻣﻌــﻴﻦ ﻣــﻦ إدارة إﺟﺮاء
aspect of project management established ﻣﺜـﻞ إﺟـﺮاء إدارة،اﻟﻤﺸﺮوﻋﺎت أﻧﺸﺊ ﺧﺼﻴﺼًﺎ ﻟﻠﻤﺸﺮوع
specifically for the project, for example a risk .اﻟﻤﺨﺎﻃﺮ
management procedure.
process A structured set of activities designed to ﻣﺠﻤﻮﻋـﺔ هﻴﻜﻠﻴــﺔ ﻣــﻦ اﻷﻧﺸـﻄﺔ ﻣﺼــﻤﻤﺔ ﻹﻧﺠــﺎز هــﺪف ﻋﻤﻠﻴﺔ
accomplish a specific objective. A process ﺗﺄﺧــﺬ اﻟﻌﻤﻠﻴــﺔ واﺣــﺪًا أو أآﺜــﺮ ﻣــﻦ اﻟﻤــﺪﺧﻼت.ﻣﺤــﺪد
takes one or more defined inputs and turns . وﺗﺤﻮﻟﻬﺎ إﻟﻰ ﻣﺨﺮﺟﺎت ﻣﺤﺪدة،اﻟﻤﺤﺪدة
them into defined outputs.
producer The person or group responsible for .اﻟﺸﺨﺺ أو اﻟﻤﺠﻤﻮﻋﺔ اﻟﻤﺴﺆوﻟﺔ ﻋﻦ ﺗﻄﻮﻳﺮ ﻣﻨﺘَﺞ ﻣﻨﺘِﺞ
developing a product.
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 21 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ21 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
product A hierarchy of all the products to be ﺗﺴﻠﺴﻞ هﺮﻣﻲ ﻟﺠﻤﻴﻊ اﻟﻤﻨﺘﺠـﺎت اﻟﺘـﻲ ﺳـﻴﺘﻢ إﻧﺘﺎﺟﻬـﺎ هﻴﻜﻞ ﺗﻘﺴﻴﻢ اﻟﻤﻨﺘَﺞ
breakdown produced during a plan. .ﺧﻼل اﻟﺨﻄﺔ
structure
product checklist A list of the major products of a plan, plus ﺑﺎﻹﺿـﺎﻓﺔ إﻟـﻰ،ﻗﺎﺋﻤﺔ ﺑﺎﻟﻤﻨﺘﺠﺎت اﻟﺮﺋﻴﺴـﻴﺔ ﻓـﻲ اﻟﺨﻄـﺔ ﻗﺎﺋﻤﺔ ﻣﺮاﺟﻌﺔ اﻟﻤﻨﺘَﺞ
key dates in their delivery. .اﻟﺘﻮارﻳﺦ اﻟﺮﺋﻴﺴﻴﺔ ﻟﺘﺴﻠﻴﻤﻬﺎ
Product A description of a product’s purpose, ، وﻣﻌـﺎﻳﻴﺮ اﻻﺷـﺘﻘﺎق، وﺗﻜﻮﻳﻨـﻪ،وﺻﻒ ﻟﻠﻐﺮض ﻣﻦ اﻟﻤﻨـﺘﺞ وﺻﻒ اﻟﻤﻨﺘَﺞ
Description composition, derivation and quality criteria. It ﻳﺘﻢ إﻧﺸﺎؤﻩ ﻋﻨﺪ اﻟﺘﺨﻄـﻴﻂ ﺑﺄﺳـﺮع وﻗـﺖ.وﻣﻌﺎﻳﻴﺮ اﻟﺠﻮدة
is produced at planning time, as soon as .ﻣﻤﻜﻦ ﺑﻌﺪ اﻟﺘﻌﺮف ﻋﻠﻰ اﻟﺤﺎﺟﺔ إﻟﻰ اﻟﻤﻨﺘﺞ
possible after the need for the product is
identified.
product flow A diagram showing the sequence of رﺳــﻢ ﻳﻮﺿــﺢ ﺗﺴﻠﺴــﻞ اﻹﻧﺘــﺎج واﻟﻌﻼﻗــﺎت اﻻﻋﺘﻤﺎدﻳــﺔ ﻣﺨﻄﻂ ﺳﺮﻳﺎن اﻟﻤﻨﺘَﺞ
diagram production and interdependencies of the .اﻟﺒﻴﻨﻴﺔ ﻟﻠﻤﻨﺘﺠﺎت اﻟﻤﻮﺟﻮدة ﻓﻲ هﻴﻜﻞ ﺗﻘﺴﻴﻢ اﻟﻤﻨﺘﺞ
products listed in a product breakdown
structure.
Product Status A report on the status of products. The ﻳﻤﻜــﻦ ﺗﺤﺪﻳــﺪ اﻟﻤﻨﺘﺠــﺎت.ﺗﻘﺮﻳــﺮ ﺣــﻮل ﺣﺎﻟــﺔ اﻟﻤﻨﺘﺠــﺎت ﺣﺴﺎب ﺣﺎﻟﺔ اﻟﻤﻨﺘﺠﺎت
Account required products can be specified by اﻟﻼزﻣﺔ ﻣﻦ ﺧﻼل دﻟﻴﻞ ﺗﻌﺮﻳﻔـﻲ أو ﻣـﻦ ﺧـﻼل اﻟﺠـﺰء ﻣـﻦ
identifier or the part of the project in which .اﻟﻤﺸﺮوع اﻟﺬي ﻳﺘﻢ ﺗﻄﻮﻳﺮهﺎ ﻓﻴﻪ
they were developed.
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 22 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ22 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
programme A temporary flexible organization structure هﻴﻜــﻞ ﻣﺆﺳﺴــﻲ ﻣــﺮن ﻣﺆﻗــﺖ ﺗــﻢ إﻧﺸــﺎؤﻩ ﻟﻠﺘﻨﺴــﻴﻖ ﺑﺮﻧﺎﻣﺞ
created to coordinate, direct and oversee واﻟﺘﻮﺟﻴﻪ واﻹﺷﺮاف ﻋﻠﻰ ﺗﻨﻔﻴﺬ ﻣﺠﻤﻮﻋﺔ ﻣـﻦ اﻟﻤﺸـﺎرﻳﻊ
the implementation of a set of related واﻷﻧﺸـــﻄﺔ اﻟﻤﺮﺗﺒﻄـــﺔ ﺣﺘـــﻰ ﺗﻮﺻـــﻞ اﻟﻨﺘـــﺎﺋﺞ واﻟﻔﻮاﺋـــﺪ
projects and activities in order to deliver
ﻣـــﻦ.اﻟﻤﺘﻌﻠﻘـــﺔ ﺑﺎﻷهـــﺪاف اﻻﺳـــﺘﺮاﺗﻴﺠﻴﺔ ﻟﻠﻤﺆﺳﺴـــﺔ
outcomes and benefits related to the
.اﻟﻤﺤﺘﻤﻞ أن ﻳﻜﻮن ﻋﻤﺮ اﻟﺒﺮﻧﺎﻣﺞ ﻣﻤﺘﺪًا ﻋﺒﺮ ﻋﺪة ﺳﻨﻮات
organization’s strategic objectives. A
programme is likely to have a life that spans
several years.
project A temporary organization that is created for ﻣﺆﺳﺴﺔ ﻣﺆﻗﺘﺔ ﺗﻢ إﻧﺸﺎؤهﺎ ﻟﻐﺮض ﺗﻮﺻﻴﻞ واﺣـﺪ أو أآﺜـﺮ ﻣﺸﺮوع
the purpose of delivering one or more . ﻃﺒﻘًﺎ ﻟﻘﻀﻴﺔ ﻋﻤﻞ ﻣﺘﻔﻖ ﻋﻠﻴﻬﺎ،ﻣﻦ ﻣﻨﺘﺠﺎت اﻟﻌﻤﻞ
business products according to an agreed
Business Case.
project approach A description of the way in which the work of ﺷــﺮح ﻟﻠﻄﺮﻳﻘــﺔ اﻟﺘــﻲ ﻳــﺘﻢ ﺑﻬــﺎ اﻟﺘﻌــﺎﻃﻲ ﻣــﻊ ﻋﻤــﻞ ﺗﻮﺟﱡﻪ اﻟﻤﺸﺮوع
the project is to be approached. For هـﻞ ﻧﻘـﻮم ﺑﺒﻨـﺎء اﻟﻤﻨـﺘﺞ: ﻋﻠﻰ ﺳﺒﻴﻞ اﻟﻤﺜـﺎل.اﻟﻤﺸﺮوع
example: are we building a product from ﻣﻦ اﻟﺒﺪاﻳﺔ أو ﺷﺮاء ﻣﻨﺘﺞ ﻣﻮﺟﻮد ﺑﺎﻟﻔﻌﻞ؟
scratch or buying in a product that already
exists?
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 23 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ23 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
project Advice from the Project Board to inform all ﺗﻮﺟﻴﻪ ﻣﻦ ﻃﺮف ﻣﺠﻠﺲ اﻟﻤﺸﺮوع ﻹﻋﻼم ﺟﻤﻴﻊ اﻷﻃﺮاف إﺷﻌﺎر ﺑﺘﺼﺮﻳﺢ اﻟﻤﺸﺮوع
authorization stakeholders and the host locations that the ،اﻟﻤﻌﻨﻴﺔ واﻷﻣﺎآﻦ اﻟﻤﻀﻴﻔﺔ أﻧﻪ ﻗﺪ ﺗﻢ اﻟﺘﺼﺮﻳﺢ ﺑﺎﻟﻤﺸﺮوع
notification project has been authorized and to request وﻟﻄﻠـــﺐ أي دﻋـــﻢ ﺗﺤﻀـــﻴﺮي ﺿـــﺮوري )ﻣﺜـــﻞ وﺳـــﺎﺋﻞ
any necessary logistical support (e.g.
وأي دﻋﻢ ﻟﻠﻤﺸﺮوع( ﺑﺎﻟﻘﺪر اﻟﻜﺎﻓﻲ، واﻷﺟﻬﺰة،اﻻﺗﺼﺎﻻت
communication facilities, equipment and any
.ﻟﻤﺪة اﻟﻤﺸﺮوع
project support) sufficient for the duration of
the project.
Project Brief Statement that describes the purpose, cost, وﻣﺘﻄﻠﺒـﺎت، واﻟﻮﻗﺖ، واﻟﺘﻜﻠﻔﺔ،اﻟﻨﺺ اﻟﺬي ﻳﺸﺮح اﻟﻐﺮض ﻣﻮﺟﺰ اﻟﻤﺸﺮوع
time and performance requirements, and ﻳــﺘﻢ إﻧﺸــﺎؤﻩ ﻗﺒــﻞ. واﻟﻘﻴــﻮد اﻟﺨﺎﺻــﺔ ﺑﺎﻟﻤﺸــﺮوع،اﻷداء
constraints for a project. It is created pre- وﻳﺴــﺘﺨﺪم،"اﻟﻤﺸــﺮوع ﺧــﻼل ﻋﻤﻠﻴــﺔ "ﻗﻴــﺎم اﻟﻤﺸــﺮوع
project during the Starting up a Project
ﺧـــﻼل ﻋﻤﻠﻴـــﺔ "ﺑـــﺪء اﻟﻤﺸـــﺮوع" ﻹﻧﺸـــﺎء "وﺛــﺎﺋﻖ ﺑـــﺪء
process and is used during the Initiating a
هــﺬﻩ اﻟ ـﻨﺺ ﻻ ﻳــﺘﻢ اﻻﺣﺘﻔــﺎظ ﺑــﻪ.اﻟﻤﺸــﺮوع" وﻣﻜﻮﻧﺎﺗﻬــﺎ
Project process to create the Project
Initiation Documentation and its ."وﺗﺤﻞ ﻣﺤﻠﻪ "وﺛﺎﺋﻖ ﺑﺪء اﻟﻤﺸﺮوع
components. It is superseded by the Project
Initiation Documentation and not
maintained.
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 24 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ24 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
project initiation Advice from the Project Board to inform all ﺗﻮﺟﻴﻪ ﻣﻦ ﻃﺮف ﻣﺠﻠﺲ اﻟﻤﺸﺮوع ﻹﻋﻼم ﺟﻤﻴﻊ اﻷﻃﺮاف إﺷﻌﺎر ﺑﺒﺪء اﻟﻤﺸﺮوع
notification stakeholders and the host locations that the ،اﻟﻤﻌﻨﻴﺔ واﻷﻣﺎآﻦ اﻟﻤﻀﻴﻔﺔ أﻧﻪ ﻳﺘﻢ اﻟﺒـﺪء ﻓـﻲ اﻟﻤﺸـﺮوع
project is being initiated and to request any وﻟﻄﻠـــﺐ أي دﻋـــﻢ ﺗﺤﻀـــﻴﺮي ﺿـــﺮوري )ﻣﺜـــﻞ وﺳـــﺎﺋﻞ
necessary logistical support (e.g.
وأي دﻋﻢ ﻟﻠﻤﺸﺮوع( ﺑﺎﻟﻘﺪر اﻟﻜﺎﻓﻲ، واﻷﺟﻬﺰة،اﻻﺗﺼﺎﻻت
communication facilities, equipment and any
.ﻟﻤﺪة ﻣﺮﺣﻠﺔ اﻟﺒﺪء
project support) sufficient for the initiation
stage.
project lifecycle The period from the start-up of a project to .اﻟﻔﺘﺮة ﻣﻦ ﻗﻴﺎم اﻟﻤﺸﺮوع إﻟﻰ ﻗﺒﻮل ﻣﻨﺘﺠﺎت اﻟﻤﺸﺮوع دورة ﺣﻴﺎة اﻟﻤﺸﺮوع
the acceptance of the project product.
project The planning, delegating, monitoring and واﻟﻤﺮاﻗﺒﺔ واﻟﺘﺤﻜﻢ ﻓﻲ ﺟﻤﻴﻊ أوﺟـﻪ، واﻟﺘﻔﻮﻳﺾ،اﻟﺘﺨﻄﻴﻂ إدارة اﻟﻤﺸﺮوﻋﺎت
management control of all aspects of the project, and the ﺑﻐﺮض ﺗﺤﻘﻴﻖ أهـﺪاف، وﺗﺤﻤﻴﺲ اﻟﻤﺸﺎرآﻴﻦ،اﻟﻤﺸﺮوع
motivation of those involved, to achieve the اﻟﻤﺸﺮوع ﻓﻲ ﺣﺪود ﻣﺴـﺘﻬﺪﻓﺎت اﻷداء اﻟﻤﺘﻮﻗﻌـﺔ ﻟﻠﻮﻗـﺖ
project objectives within the expected
.واﻟﺘﻜﻠﻔﺔ واﻟﺠﻮدة واﻟﻨﻄﺎق واﻟﻔﻮاﺋﺪ واﻟﻤﺨﺎﻃﺮ
performance targets for time, cost, quality,
scope, benefits and risks.
project Covers the entire management structure of وﻣـﺪﻳﺮ،ﻳﻐﻄﻲ آﺎﻣﻞ اﻟﻬﻴﻜﻞ اﻹداري ﻟﻤﺠﻠـﺲ اﻟﻤﺸـﺮوع ﻓﺮﻳﻖ إدارة اﻟﻤﺸﺮوع
management the Project Board, and Project Manager, ﺑﺎﻹﺿﺎﻓﺔ إﻟﻰ أي "ﻣﺪﻳﺮ ﻓﺮﻳـﻖ" وأدوار "ﺿـﻤﺎن،اﻟﻤﺸﺮوع
team plus any Team Manager, Project Assurance ."اﻟﻤﺸﺮوع" و"دﻋﻢ اﻟﻤﺸﺮوع
and Project Support roles.
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 25 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ25 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
Project Manager The person given the authority and اﻟﺸﺨﺺ اﻟﺬي ﻳﻌﻄﻰ ﺳﻠﻄﺔ وﻣﺴﺆوﻟﻴﺔ إدارة اﻟﻤﺸـﺮوع ﻣﺪﻳﺮ ﻣﺸﺮوع
responsibility to manage the project on a ﺑﺸــﻜﻞ ﻳــﻮﻣﻲ ﻟﺘﻮﺻــﻴﻞ اﻟﻤﻨﺘﺠــﺎت اﻟﻤﻄﻠﻮﺑــﺔ ﻓــﻲ ﺣــﺪود
day-to-day basis to deliver the required .اﻟﻘﻴﻮد اﻟﻤﺘﻔﻖ ﻋﻠﻴﻬﺎ ﻣﻊ ﻣﺠﻠﺲ اﻟﻤﺸﺮوع
products within the constraints agreed with
the Project Board.
project mandate An external product generated by the ،ﻣﻨﺘَﺞ ﺧﺎرﺟﻲ ﻳﺼﺪر ﻣﻦ اﻟﺴﻠﻄﺔ اﻟﺘﻲ ﺗﻮآﻞ ﺑﺎﻟﻤﺸـﺮوع اﻧﺘﺪاب اﻟﻤﺸﺮوع
authority commissioning the project that .وهﻮ ﻳﺸﻜﻞ اﻟﻤﺴﺘﺤِﺚ ﻟﻘﻴﺎم اﻟﻤﺸﺮوع
forms the trigger for Starting up a Project.
project office A temporary office set up to support the ﻣﻜﺘﺐ ﻣﺆﻗﺖ ﻳﻌﺪ ﻟﺪﻋﻢ ﺗﻮﺻﻴﻞ ﻣﺒـﺎدرة ﺗﻐﻴﻴـﺮ ﻣﻌﻴﻨـﺔ ﻳـﺘﻢ ﻣﻜﺘﺐ اﻟﻤﺸﺮوع
delivery of a specific change initiative being ﻓـﺈن ﻣﻜﺘـﺐ اﻟﻤﺸـﺮوع، إذا اﺳـﺘﺨﺪِم.ﺗﻮﺻﻴﻠﻬﺎ آﻤﺸﺮوع
delivered as a project. If used, the Project ."ﻳﻀﻄﻠﻊ ﺑﻤﺴﺆوﻟﻴﺔ دور "دﻋﻢ اﻟﻤﺸﺮوع
Office undertakes the responsibility of the
Project Support role.
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 26 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ26 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
project product What the project must deliver in order to .ﻣﺎ ﻳﺠﺐ أن ﻳﺴﻠﻤﻪ اﻟﻤﺸﺮوع ﺣﺘﻰ ﻳﻠﻘﻰ اﻟﻘﺒﻮل ﻣﻨﺘَﺞ اﻟﻤﺸﺮوع
gain acceptance.
Project Product A special type of Product Description used ﻧﻮع ﺧﺎص ﻣﻦ "وﺻﻒ اﻟﻤﻨـﺘَﺞ" ﻳﺴـﺘﺨﺪم ﻟﻠﺤﺼـﻮل ﻋﻠـﻰ وﺻﻒ ﻣﻨﺘَﺞ اﻟﻤﺸﺮوع
Description to gain agreement from the user on the ،ﻣﻮاﻓﻘﺔ ﻣﻦ اﻟﻤﺴﺘﺨﺪم ﻋﻠﻰ ﻧﻄﺎق وﻣﺘﻄﻠﺒﺎت اﻟﻤﺸﺮوع
project’s scope and requirements, to define وﻟﺘﺤﺪﻳــﺪ،وﻟﺘﺤﺪﻳــﺪ ﺗﻮﻗﻌــﺎت اﻟﻌﻤﻴــﻞ ﻓﻴﻤــﺎ ﻳﺨــﺺ اﻟﺠــﻮدة
the customer’s quality expectation, and to
.ﻣﻌﺎﻳﻴﺮ ﻗﺒﻮل اﻟﻤﺸﺮوع
define the acceptance criteria for the project.
Project Support An administrative role in the project ﻳﻤﻜــﻦ أن ﻳﻜــﻮن.دور إداري ﻓــﻲ ﻓﺮﻳــﻖ إدارة اﻟﻤﺸــﺮوع دﻋﻢ اﻟﻤﺸﺮوع
management team. Project Support can be دﻋﻢ اﻟﻤﺸﺮوع ﻓﻲ ﺻﻮرة ﻧﺼﻴﺤﺔ وﻣﺴﺎﻋﺪة ﺑﺄدوات إدارة
in the form of advice and help with project واﻟﺨــﺪﻣﺎت اﻹدارﻳــﺔ ﻣﺜــﻞ ﺣﻔــﻆ، واﻹرﺷــﺎدات،اﻟﻤﺸــﺮوع
management tools, guidance, administrative
.اﻟﻤﻠﻔﺎت وﺗﺠﻤﻴﻊ اﻟﺒﻴﺎﻧﺎت اﻟﻮاﻗﻌﻴﺔ
services, such as filing, and the collection of
actual data.
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 27 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ27 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
quality The totality of features and inherent or ﻣﺠﻤـــﻮع اﻟﻤﻼﻣـــﺢ واﻟﺨﺼـــﺎﺋﺺ اﻟﻤﺘﺄﺻـــﻠﺔ أو اﻟﻤﺴـــﻨﺪة اﻟﺠﻮدة
assigned characteristics of a product, أو اﻟﺨﺪﻣــﺔ أو اﻟﻨﻈــﺎم، أو اﻟﻌﻤﻠﻴــﺔ، أو اﻟﺸــﺨﺺ،ﻟﻠﻤﻨ ـﺘَﺞ
person, process, service and/or system that اﻟﺘﻲ ﺗﻨﺘﺞ ﻗﺪرﺗﻪ ﻋﻠﻰ إﻇﻬﺎر ﺗﺤﻘﻴﻘﻪ ﻟﻠﺘﻮﻗﻌـﺎت أو ﺗﻠﺒﻴﺘـﻪ
bear on its ability to show that it meets
.ﻟﻼﺣﺘﻴﺎﺟﺎت واﻟﻤﺘﻄﻠﺒﺎت واﻟﻤﻮاﺻﻔﺎت اﻟﻤﻘﺮرة
expectations or satisfies stated needs,
requirements or specification.
quality assurance Independent check that products will be fit ﺗﺄآﺪ ﻣﺴﺘﻘﻞ ﻣﻦ أن اﻟﻤﻨﺘﺠﺎت ﺳـﺘﻜﻮن ﻣﻼﺋﻤـﺔ ﻟﻠﻐـﺮض ﺿﻤﺎن اﻟﺠﻮدة
for purpose or meet requirements. .وﺗﺤﻘﻖ اﻟﻤﺘﻄﻠﺒﺎت
quality control The process of monitoring specific project ﻋﻤﻠﻴﺔ ﻣﺮاﻗﺒﺔ ﻧﺘﺎﺋﺞ ﻣﻌﻴﻨﺔ ﻟﻠﻤﺸﺮوع ﻟﺘﺤﺪﻳﺪ ﻣﺎ إذا آﺎﻧـﺖ اﻟﺘﺤﻜﻢ ﻓﻲ اﻟﺠﻮدة
results to determine if they comply with وﺗﺤﺪﻳــﺪ،ﺗﺘﻮاﻓــﻖ ﻣــﻊ اﻟﻤﻮاﺻــﻔﺎت اﻟﻘﻴﺎﺳــﻴﺔ اﻟﻤﻼﺋﻤــﺔ
relevant standards and identifying ways to .أﺳﺎﻟﻴﺐ ﻟﻠﺘﺨﻠﺺ ﻣﻦ أﺳﺒﺎب اﻷداء ﻏﻴﺮ اﻟﻤﺮﺿﻲ
eliminate causes of unsatisfactory
performance.
quality criteria A description of the quality specification that ،ﺷﺮح ﻟﻤﻮاﺻﻔﺎت اﻟﺠﻮدة اﻟﺘﻲ ﻳﺠـﺐ أن ﻳﺤﻘﻘﻬـﺎ اﻟﻤﻨـﺘَﺞ ﻣﻌﺎﻳﻴﺮ اﻟﺠﻮدة
the product must meet, and the quality وﻗﻴﺎﺳــﺎت اﻟﺠــﻮدة اﻟﺘــﻲ ﺳــﻴﺘﻢ ﺗﻄﺒﻴﻘﻬــﺎ ﺑﻮاﺳــﻄﺔ ﻣــﻦ
measurements that will be applied by those .ﺳﻴﻘﻮﻣﻮن ﺑﻔﺤﺺ اﻟﻤﻨﺘﺞ اﻟﻨﻬﺎﺋﻲ
inspecting the finished product.
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 28 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ28 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
quality The coordinated activities to direct and اﻷﻧﺸـــﻄﺔ اﻟﻤﻨﺴـــﻘﺔ ﻟﺘﻮﺟﻴـــﻪ ﻣﺆﺳﺴـــﺔ ﻓﻴﻤـــﺎ ﻳﺘﻌﻠـــﻖ إدارة اﻟﺠﻮدة
management control an organization with regard to .ﺑﺎﻟﺠﻮدة
quality.
Quality Defines the quality techniques and ﺗﺤﺪد اﻷﺳﺎﻟﻴﺐ واﻟﻤﻮاﺻﻔﺎت اﻟﻘﻴﺎﺳـﻴﺔ اﻟﺨﺎﺻـﺔ ﺑـﺎﻟﺠﻮدة اﺳﺘﺮاﺗﻴﺠﻴﺔ إدارة اﻟﺠﻮدة
Management standards to be applied, and the various واﻟﻤﺴـﺆوﻟﻴﺎت اﻟﻤﺘﻌـﺪدة ﻟﺘﺤﻘﻴـﻖ،اﻟﺘﻲ ﺳﻴﺘﻢ ﺗﻄﺒﻴﻘﻬـﺎ
Strategy responsibilities for achieving the required .ﻣﺴﺘﻮﻳﺎت اﻟﺠﻮدة اﻟﻤﻄﻠﻮﺑﺔ أﺛﻨﺎء اﻟﻤﺸﺮوع
quality levels, during the project.
quality The complete set of quality standards, ، واﻹﺟــﺮاءات،اﻟﻤﺠﻤﻮﻋــﺔ اﻟﻜﺎﻣﻠــﺔ ﻟﻠﻤﻮاﺻــﻔﺎت اﻟﻘﻴﺎﺳــﻴﺔ ﻧﻈﺎم إدارة اﻟﺠﻮدة
management procedures and responsibilities for a site or .واﻟﻤﺴﺆوﻟﻴﺎت اﻟﺨﺎﺻﺔ ﺑﺎﻟﺠﻮدة ﻓﻲ ﻣﻮﻗﻊ أو ﻣﺆﺳﺴـﺔ
system organization. In the project context, ‘sites’ " ﻳﻨﺒﻐـــﻲ أن ﺗﻔﻬـــﻢ "اﻟﻤﻮاﻗـــﻊ،ﻓـــﻲ ﺳـــﻴﺎق اﻟﻤﺸـــﺮوع
and ‘organizations’ should be interpreted as
و"اﻟﻤﺆﺳﺴﺎت" ﻋﻠﻰ أﻧﻬﺎ اﻟﻤﺆﺳﺴـﺎت اﻟﺪاﺋﻤـﺔ أو ﺷـﺒﻪ
the permanent or semi-permanent
" أي أﻧﻬـﺎ "ﺧﺎرﺟﻴـﺔ،اﻟﺪاﺋﻤﺔ اﻟﺘﻲ ﺗﺮﻋﻰ ﻋﻤﻞ اﻟﻤﺸـﺮوع
organization(s) sponsoring the project work,
i.e. they are ‘external’ to the project’s ﻋﻠـﻰ.ﺑﺎﻟﻨﺴﺒﺔ ﻟﻠﻤﺆﺳﺴﺔ اﻟﻤﺆﻗﺘـﺔ اﻟﺨﺎﺻـﺔ ﺑﺎﻟﻤﺸـﺮوع
temporary organization. A programme, for ﻓﺈن ﺑﺮﻧﺎﻣﺠًﺎ ﻣﺎ ﻳﻤﻜﻦ اﻟﻨﻈﺮ إﻟﻴﻪ ﻋﻠﻰ أﻧـﻪ،ﺳﺒﻴﻞ اﻟﻤﺜﺎل
instance, can be regarded as a semi- وﻗـﺪ ﻳﻜـﻮن ﻟـﻪ،ﻣﺆﺳﺴﺔ ﺷﺒﻪ داﺋﻤـﺔ ﺗﺮﻋـﻰ اﻟﻤﺸـﺎرﻳﻊ
permanent organization that sponsors .ﻧﻈﺎم إدارة ﺟﻮدة ﻣﻮﺛﻖ
projects – and may have a documented
quality management system.
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 29 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ29 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
Quality Register Contains summary details of all planned and ﻳﺤﺘــﻮي ﻋﻠــﻰ ﺗﻔﺎﺻــﻴﻞ ﻣﻠﺨﺼــﺔ ﻟﺠﻤﻴــﻊ أﻧﺸــﻄﺔ اﻟﺠــﻮدة ﻗﻴﺪ اﻟﺠﻮدة
completed quality activities. The Quality ﻳﺴــﺘﺨﺪم ﻗﻴــﺪ اﻟﺠــﻮدة ﺑﻮاﺳــﻄﺔ.اﻟﻤﺨﻄﻄــﺔ واﻟﻤﻜﺘﻤﻠــﺔ
Register is used by the Project Manager and ﻣﺪﻳﺮ اﻟﻤﺸـﺮوع و"ﺿـﻤﺎن اﻟﻤﺸـﺮوع" آﺠـﺰء ﻣـﻦ ﻣﺮاﺟﻌـﺔ
Project Assurance as part of reviewing
.ﺗﻘﺪم اﻟﻌﻤﻞ
progress.
quality review See ‘quality inspection’. ."راﺟﻊ "ﻓﺤﺺ اﻟﺠﻮدة ﻣﺮاﺟﻌﺔ اﻟﺠﻮدة
quality review A quality inspection technique with defined ذو أدوار ﻣﺤــﺪدة وهﻴﻜــﻞ،أﺣــﺪ أﺳــﺎﻟﻴﺐ ﻓﺤــﺺ اﻟﺠــﻮدة أﺳﻠﻮب ﻣﺮاﺟﻌﺔ اﻟﺠﻮدة
technique roles and a specific structure. It is designed وهﻮ ﻣﺼﻤﻢ ﻟﺘﻘﻴﻴﻢ ﻣﺎ إذا آﺎن ﻣﻨﺘَﺞ ﻣﺎ ﻓـﻲ ﺻـﻮرة.ﻣﻌﻴﻦ
to assess whether a product which takes the ً ﻣﺜـﻞ ﻋـﺮض ﺗﻘـﺪﻳﻤﻲ( ﻣﻜـﺘﻤﻼ،وﺛﻴﻘﺔ )أو ﻣﺎ ﺷﺎﺑﻪ ذﻟـﻚ
form of a document (or similar, e.g. a
ﻣــﺎ ﺑﺎﻟﻤﻮاﺻــﻔﺎت اﻟﻘﻴﺎﺳــﻴﺔ وﻳﺤﻘــﻖ ﻣﻌــﺎﻳﻴﺮ اﻟﺠــﻮدةً وﻣﻠﺘﺰ
presentation) is complete, adheres to
"اﻟﻤﺘﻔـــﻖ ﻋﻠﻴﻬـــﺎ ﺑﺎﻟﻨﺴـــﺒﺔ ﻟـــﻪ ﻓـــﻲ "وﺻـــﻒ اﻟﻤﻨـــﺘَﺞ
standards and meets the quality criteria
agreed for it in the relevant Product وﻳﺘﻢ اﺧﺘﻴﺎر اﻟﻤﺸﺎرآﻴﻦ ﻣﻦ ﺑﻴﻦ هـﺆﻻء اﻟـﺬﻳﻦ،اﻟﻤﻨﺎﺳﺐ
Description. The participants are drawn from .ﻟﺪﻳﻬﻢ اﻟﻜﻔﺎءات اﻟﻀﺮورﻳﺔ ﻟﺘﻘﻴﻴﻢ ﻣﻼءﻣﺘﻪ ﻟﻠﻐﺮض
those with the necessary competence to
evaluate its fitness-for-purpose.
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 30 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ30 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
records Dynamic management products that ﻣﻨﺘﺠــﺎت إدارﻳــﺔ ﻣﺘﻐﻴــﺮة ﺗﺤــﺘﻔﻆ ﺑﻤﻌﻠﻮﻣــﺎت ﺣــﻮل ﺗﻘــﺪم اﻟﺴﺠﻼت
maintain information regarding project .اﻟﻤﺸﺮوع
progress.
reduce (risk A response to a risk where proactive actions رد ﻓﻲ ﻣﻘﺎﺑﻞ اﻟﺨﻄﺮ ﺣﻴﺚ ﻳﺘﻢ اﺗﺨـﺎذ إﺟـﺮاءات اﺳـﺘﺒﺎﻗﻴﺔ اﻟﺘﻘﻠﻴــﻞ )إﺣــﺪى اﻻﺳــﺘﺠﺎﺑﺎت
response) are taken to: :ﻣﻦ أﺟﻞ (ﻟﻠﺨﻄﺮ
Reduce the probability of the event
occurring, by performing some form of ﺗﻘﻠﻴــﻞ اﺣﺘﻤــﺎل اﻟﺤــﺪوث ﻣــﻦ ﺧــﻼل ﺗﻨﻔﻴــﺬ ﺑﻌــﺾ ﺻــﻮر
control .اﻟﺘﺤﻜﻢ
And/or
أو/و
Reduce the impact of the event should it
occur.
.ﺗﻘﻠﻴﻞ ﺗﺄﺛﻴﺮ اﻟﺨﻄﺮ إذا وﻗﻊ
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 31 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ31 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
reject (risk A response to a risk (opportunity) where a هﻮ اﺳﺘﺠﺎﺑﺔ ﻟﻠﺨﻄﺮ ﻓﻲ ﻣﻘﺎﺑـﻞ ﻓﺮﺻـﺔ ﺣﻴـﺚ ﻳـﺘﻢ اﺗﺨـﺎذ اﻟــﺮﻓﺾ )إﺣــﺪى اﻻﺳــﺘﺠﺎﺑﺎت
response) conscious and deliberate decision is taken ﻗــﺮار ﻋــﻦ وﻋــﻲ ودراﺳــﺔ ﺑﻌــﺪم اﺳــﺘﻐﻼل اﻟﻔﺮﺻــﺔ أو (ﻟﻠﺨﻄﺮ
not to exploit or enhance the opportunity, إدراآًﺎ أن ذﻟﻚ أﻓﻀـﻞ ﻣـﻦ اﻟﻨﺎﺣﻴـﺔ اﻻﻗﺘﺼـﺎدﻳﺔ،ﺗﺤﺴﻴﻨﻬﺎ
having discerned that it is more economical
ﻳﺠـﺐ.ﺑﺪﻻً ﻣﻦ ﻣﺤﺎوﻟـﺔ اﺗﺨـﺎذ إﺟـﺮاء ﻟﻼﺳـﺘﺠﺎﺑﺔ ﻟﻠﺨﻄـﺮ
to do so than to attempt a risk response
.اﻻﺳﺘﻤﺮار ﻓﻲ ﻣﺮاﻗﺒﺔ اﻟﻔﺮﺻﺔ
action. The opportunity should continue to
be monitored.
release The set of products in a handover. The ﺗــﺘﻢ إدارة واﺧﺘﺒــﺎر.ﻣﺠﻤﻮﻋــﺔ اﻟﻤﻨﺘﺠــﺎت ﻓــﻲ ﺗﺴــﻠﻴﻢ ﻣــﺎ إﻃﻼق
contents of a release are managed tested راﺟـــﻊ.وﺗﺪﺷـــﻴﻦ ﻣﺤﺘﻮﻳـــﺎت اﻹﻃـــﻼق آﻜﻴـــﺎن واﺣـــﺪ
and deployed as a single entity. See .""اﻟﺘﺴﻠﻴﻢ
‘handover’.
reports Management products providing a snapshot ﻣﻨﺘﺠﺎت إدارﻳﺔ ﺗﻌﻄﻲ ﻟﻘﻄﺎت ﺣـﻮل ﺣﺎﻟـﺔ ﺟﻮاﻧـﺐ ﻣﻌﻴﻨـﺔ ﺗﻘﺎرﻳﺮ
of the status of certain aspects of the .ﻓﻲ اﻟﻤﺸﺮوع
project.
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 32 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ32 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
responsible The person or group commissioning the اﻟﺸﺨﺺ أو اﻟﻤﺠﻤﻮﻋـﺔ اﻟﺘـﻲ أﺳـﻨﺪت اﻟﻤﺸـﺮوع )ﻋـﺎد ًة اﻟﺴﻠﻄﺔ اﻟﻤﺴﺆوﻟﺔ
authority project (typically corporate or programme إدارة اﻟﺸﺮآﺔ أو إدارة اﻟﺒﺮﻧﺎﻣﺞ( واﻟﺘﻲ ﻟﻬﺎ اﻟﺴﻠﻄﺔ ﻟﺮﺻﺪ
management) that has the authority to اﻟﻤـــﻮارد واﻟﺘﻤﻮﻳـــﻞ ﻧﻴﺎﺑـــﺔً ﻋـــﻦ اﻟﻤﺆﺳﺴـــﺔ اﻟﻤﻮآﱢﻠـــﺔ
commit resources and funds on behalf of the
.ﺑﺎﻟﻤﺸﺮوع
commissioning organization.
reviewer A person or group independent of the ﺷﺨﺺ أو ﻣﺠﻤﻮﻋﺔ ﻣﺴﺘﻘﻠﺔ ﻋﻦ اﻟﻤﻨﺘِﺞ ﺗﻘﻮم ﺑﺘﻘﻴﻴﻢ ﻣـﺎ ﻤﺮاﺟﻊ
ُ اﻟ
producer who assesses whether a product إذا آــﺎن اﻟﻤﻨ ـﺘَﺞ ﻳﺤﻘــﻖ ﻣﺘﻄﻠﺒﺎﺗــﻪ آﻤــﺎ هــﻮ ﻣﺤــﺪد ﻓــﻲ
meets its requirements as defined in its ."وﺻﻒ اﻟﻤﻨﺘَﺞ" اﻟﺨﺎص ﺑﻪ
Product Description.
risk An uncertain event or set of events that, ﺣﺪث أو ﻣﺠﻤﻮﻋﺔ ﻣـﻦ اﻷﺣـﺪاث ﻏﻴـﺮ اﻟﻤﺆآـﺪة واﻟﺘـﻲ إذا ﺧﻄﺮ
should it occur, will have an effect on the ﻳﻘــﺎس.ﺣــﺪﺛﺖ ﺳــﻴﻜﻮن ﻟﻬــﺎ ﺗــﺄﺛﻴﺮ ﻋﻠــﻰ إﻧﺠــﺎز اﻷهــﺪاف
achievement of objectives. A risk is اﻟﺨﻄــﺮ ﺑﺘﺮآﻴﺒــﺔ ﻣــﻦ اﺣﺘﻤــﺎل ﺣــﺪوث اﻟﺘﻬﺪﻳــﺪ أو اﻟﻔﺮﺻــﺔ
measured by a combination of the
. وﻣﻘﺪار ﺗﺄﺛﻴﺮهﺎ ﻋﻠﻰ اﻷهﺪاف،اﻟﻤﺘﺼﻮرة
probability of a perceived threat or
opportunity occurring, and the magnitude of
its impact on objectives.
risk actionee Some actions may not be within the remit of ﺑﻌــﺾ اﻹﺟــﺮاءات ﻗــﺪ ﻻ ﺗﻜــﻮن ﻓــﻲ ﻣﺘﻨــﺎول ﻣﺎﻟــﻚ اﻟﺨﻄــﺮ اﻟﻤُﻠﺰَم ﺑﺎﻟﺨﻄﺮ
the risk owner to control explicitly; in that ، ﻓــﻲ ﻣﺜــﻞ هــﺬا اﻟﻤﻮﻗــﻒ.ﻟﻴــﺘﺤﻜﻢ ﻓﻴﻬــﺎ ﺑﺸــﻜﻞ ﺻــﺮﻳﺢ
situation there should be a nominated owner ﻳﻨﺒﻐﻲ أن ﻳﻜﻮن هﻨﺎك ﻣﺎﻟﻚ ﻣﻌﻴﻦ ﻟﻺﺟﺮاء اﻟﺬي ﻳﻮاﺟَﻪ ﺑـﻪ
of the action to address the risk. He or she
ﺳـﻴﺤﺘﺎج هـﻮ أو هـﻲ إﻟـﻰ ﻣﺘﺎﺑﻌـﺔ ﻣﺎﻟـﻚ اﻟﺨﻄـﺮ.اﻟﺨﻄﺮ
will need to keep the risk owner apprised of
.ﺑﺎﺳﺘﻤﺮار ﺑﺘﻄﻮرات اﻟﻤﻮﻗﻒ
the situation
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 33 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ33 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
risk evaluation The process of understanding the net effect ﻋﻤﻠﻴﺔ ﻓﻬـﻢ ﺻـﺎﻓﻲ ﺗـﺄﺛﻴﺮ اﻟﺘﻬﺪﻳـﺪات واﻟﻔـﺮص اﻟﺘـﻲ ﺗـﻢ ﺗﻘﻴﻴﻢ اﻟﺨﻄﺮ
of the identified threats and opportunities on .اﻟﺘﻌﺮف ﻋﻠﻴﻬﺎ ﻋﻠﻰ ﻧﺸﺎط ﻣﺎ ﻋﻨﺪ ﺗﺠﻤﻴﻌﻬﺎ ﻣﻌًﺎ
an activity when aggregated together.
risk management The systematic application of principles, اﻟﺘﻄﺒﻴﻖ اﻟﻤﻨﻈﻢ ﻟﻠﻤﺒﺎديء واﻷﺳـﺎﻟﻴﺐ واﻟﻌﻤﻠﻴـﺎت ﻋﻠـﻰ إدارة اﻟﻤﺨﺎﻃﺮ
approaches and processes to the tasks of وﻣـﻦ ﺛـﻢ ﺗﺨﻄـﻴﻂ وﺗﻨﻔﻴـﺬ،ﻣﻬﺎم ﺗﺤﺪﻳﺪ وﺗﻘـﺪﻳﺮ اﻟﻤﺨـﺎﻃﺮ
identifying and assessing risks, and then .اﺳﺘﺠﺎﺑﺎت اﻟﺨﻄﺮ
planning and implementing risk responses.
Risk Management Describes the goals of applying risk وهـﻲ وﺻـﻒ،ﺗﺸﺮح اﻟﻐﺎﻳﺎت ﻣـﻦ ﺗﻄﺒﻴـﻖ إدارة اﻟﻤﺨـﺎﻃﺮ اﺳﺘﺮاﺗﻴﺠﻴﺔ إدارة اﻟﻤﺨﺎﻃﺮ
Strategy management, a description of the procedure ﻟﻺﺟـــــﺮاءات اﻟﺘـــــﻲ ﺳـــــﺘﺘﺒﻊ واﻷدوار واﻟﻤﺴـــــﺆوﻟﻴﺎت
that will be adopted, the roles and ،وﺳــﻤﺎﺣﻴﺎت اﻟﻤﺨــﺎﻃﺮ وﺗﻮﻗﻴــﺖ ﺗــﺪﺧﻼت إدارة اﻟﻤﺨــﺎﻃﺮ
responsibilities, risk tolerances, the timing of
وﻣﺘﻄﻠﺒـﺎت رﻓـﻊ،واﻷدوات واﻷﺳﺎﻟﻴﺐ اﻟﺘـﻲ ﺳﺘﺴـﺘﺨﺪم
risk management interventions, the tools
.اﻟﺘﻘﺎرﻳﺮ
and techniques that will be used, and the
reporting requirements.
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 34 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ34 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
risk profile Describes the types of risk that are faced by ﻳﺸـــﺮح أﻧـــﻮاع اﻟﻤﺨـــﺎﻃﺮ اﻟﺘـــﻲ ﺗﻮاﺟﻬﻬـــﺎ اﻟﻤﺆﺳﺴـــﺔ ﻣﻠﻒ اﻟﻤﺨﺎﻃﺮ
an organization and its exposure to those .واﻧﻜﺸﺎﻓﻬﺎ ﻟﺘﻠﻚ اﻟﻤﺨﺎﻃﺮ
risks.
Risk Register A record of identified risks relating to an ﺳــﺠﻞ ﺑﺎﻟﻤﺨــﺎﻃﺮ اﻟﺘــﻲ ﺗــﻢ ﺗﺤﺪﻳــﺪهﺎ اﻟﻤﺘﻌﻠﻘــﺔ ﺑﺄﺣــﺪ ﻗﻴﺪ اﻟﻤﺨﺎﻃﺮ
initiative, including their status and history. .اﻟﻤﺒﺎدرات ﺑﻤﺎ ﻓﻲ ذﻟﻚ ﺣﺎﻟﺘﻬﺎ وﺗﺎرﻳﺨﻬﺎ
risk response Actions that may be taken to bring the اﻹﺟــﺮاءات اﻟﺘــﻲ ﻗــﺪ ﺗﺘﺨــﺬ ﻟﻨﻘــﻞ اﻟﻤﻮﻗــﻒ إﻟــﻰ ﻣﺴــﺘﻮى اﺳﺘﺠﺎﺑﺔ ﻟﻠﺨﻄﺮ
situation to a level where the exposure to .ﻳﻜﻮن ﻓﻴﻪ اﻻﻧﻜﺸﺎف ﻟﻠﺨﻄﺮ ﻣﻘﺒﻮﻻً ﺑﺎﻟﻨﺴﺒﺔ ﻟﻠﻤﺆﺳﺴـﺔ
risk is acceptable to the organization. These ﺗﻠــﻚ اﻻﺳــﺘﺠﺎﺑﺎت ﺗﻘــﻊ ﻓــﻲ واﺣــﺪة ﻣــﻦ ﻋــﺪة ﺗﺼــﻨﻴﻔﺎت
responses fall into one of a number of risk
.ﻻﺳﺘﺠﺎﺑﺎت اﻟﺨﻄﺮ
response categories.
risk response For threats, the individual risk response ﻳﻤﻜﻦ أن ﺗﻜـﻮن ﺗﺼـﻨﻴﻔﺎت اﺳـﺘﺠﺎﺑﺔ،ﺑﺎﻟﻨﺴﺒﺔ ﻟﻠﺘﻬﺪﻳﺪات ﺗﺼﻨﻴﻒ اﺳﺘﺠﺎﺑﺎت اﻟﺨﻄﺮ
category category can be avoid, reduce, transfer, ، اﻟﻘﺒــﻮل، اﻟﻨﻘــﻞ، اﻟﺘﻘﻠﻴــﻞ، اﻟﺘﺠﻨــﺐ:اﻟﺨﻄــﺮ واﺣــﺪة ﻣــﻦ
accept or share. For opportunities, the ﻳﻤﻜـﻦ أن ﺗﻜـﻮن ﺗﺼـﻨﻴﻔﺎت، ﺑﺎﻟﻨﺴـﺒﺔ ﻟﻠﻔـﺮص.اﻟﻤﺸﺎرآﺔ
individual risk response category can be
، اﻟﺘﺤﺴــﻴﻦ، اﻻﺳــﺘﻐﻼل:اﺳــﺘﺠﺎﺑﺔ اﻟﺨﻄــﺮ واﺣــﺪة ﻣــﻦ
exploit, enhance, reject or share.
. اﻟﻤﺸﺎرآﺔ،اﻟﺮﻓﺾ
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 35 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ35 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
risk tolerance line A line drawn on the summary risk profile. اﻟﻤﺨـﺎﻃﺮ اﻟﺘـﻲ.ﺧﻂ ﻣﺮﺳﻮم ﻋﻠﻰ ﻣﺨﺘﺼـﺮ ﻣﻠـﻒ اﻟﺨﻄـﺮ ﺧﻂ ﺳﻤﺎﺣﻴﺔ اﻟﺨﻄﺮ
Risks that appear above this line cannot be (ﺗﻈﻬﺮ ﻓﻮق هﺬا اﻟﺨﻂ ﻻ ﻳﻤﻜﻦ ﻗﺒﻮﻟﻬﺎ )أو اﻟﺘﻌـﺎﻳﺶ ﻣﻌﻬـﺎ
accepted (lived with) without referring them ، ﺑﺎﻟﻨﺴـﺒﺔ ﻟﻤﺸـﺮوع.ﺑﺪون إرﺟﺎﻋﻬـﺎ إﻟـﻰ ﺳـﻠﻄﺔ أﻋﻠـﻰ
to a higher authority. For a project, the
ﻳﻘﻮم ﻣﺪﻳﺮ اﻟﻤﺸﺮوع ﺑﺈرﺟﺎع ﺗﻠـﻚ اﻟﻤﺨـﺎﻃﺮ إﻟـﻰ ﻣﺠﻠـﺲ
Project Manager would refer these risks to
.اﻟﻤﺸﺮوع
the Project Board.
role description Describes the set of responsibilities specific .ﻳﺒﻴﻦ ﻣﺠﻤﻮﻋﺔ اﻟﻤﺴﺆوﻟﻴﺎت اﻟﺨﺎﺻﺔ ﺑﺪور ﻣﺎ وﺻﻒ اﻟﺪور
to a role.
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 36 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ36 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
scope The scope of a plan is the sum total of its ﻧﻄﺎق ﺧﻄﺔ ﻣـﺎ هـﻮ اﻟﻤﺠﻤـﻮع اﻟﻜﻠـﻲ ﻟﻤﻨﺘﺠﺎﺗﻬـﺎ واﻣﺘـﺪاد ﻧﻄﺎق
products and the extent of their وهﺬا ﻳﺘﻢ ﺑﻴﺎﻧﻪ ﻣﻦ ﺧﻼل هﻴﻜـﻞ.ﻣﺘﻄﻠﺒﺎت ﺗﻠﻚ اﻟﻤﻨﺘﺠﺎت
requirements. It is described by the product ﺗﻘﺴﻴﻢ اﻟﻤﻨﺘَﺞ ﻓﻲ اﻟﺨﻄﺔ وأوﺻـﺎف اﻟﻤﻨﺘﺠـﺎت اﻟﻤﺮﺗﺒﻄـﺔ
breakdown structure for the plan and
.ﺑﻪ
associated Product Descriptions.
scope tolerance The permissible deviation in a plan’s scope اﻟﺤﻴﺎد اﻟﻤﺒﺎح ﻓﻲ ﻧﻄﺎق ﺧﻄﺔ ﻣﺎ واﻟﻤﺴﻤﻮح ﺑـﻪ ﻗﺒـﻞ أن ﺳﻤﺎﺣﻴﺔ اﻟﻨﻄﺎق
that is allowed before the deviation needs to .ﺗﻈﻬﺮ اﻟﺤﺎﺟﺔ ﻟﺘﺼﻌﻴﺪ اﻟﺤﻴـﺎد ﻟﻠﻤﺴـﺘﻮى اﻹداري اﻟﺘـﺎﻟﻲ
be escalated to the next level of ﻳﺘﻢ ﺗﻮﺛﻴﻖ ﺳﻤﺎﺣﻴﺔ اﻟﻨﻄـﺎق ﻓـﻲ اﻟﺨﻄـﺔ اﻟﻤﻨـﺎﻇﺮة ﻓـﻲ
management. Scope tolerance is
ﺻﻮرة ﻣﻼﺣﻈﺔ أو ﻣﺮﺟﻊ إﻟﻰ هﻴﻜﻞ ﺗﻘﺴـﻴﻢ اﻟﻤﻨـﺘَﺞ ﻓـﻲ
documented in the respective plan in the
." راﺟﻊ "اﻟﺴﻤﺎﺣﻴﺔ.ﺗﻠﻚ اﻟﺨﻄﺔ
form of a note or reference to the product
breakdown structure for that plan. See
‘tolerance’.
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 37 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ37 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
Senior Supplier The Project Board role that provides دور ﻓﻲ ﻣﺠﻠﺲ اﻟﻤﺸـﺮوع ﻳﻘـﺪم اﻟﻤﻌﺮﻓـﺔ واﻟﺨﺒـﺮة ﻓﻴﻤـﺎ اﻟﻤﻮرد اﻷﻋﻠﻰ
knowledge and experience of the main ﻳﺨــﺺ اﻟﻘﻮاﻋــﺪ اﻟﻤﻨﻈﱢﻤــﺔ اﻷﺳﺎﺳــﻴﺔ اﻟﻤﺘﻌﻠﻘــﺔ ﺑﺈﻧﺘــﺎج
discipline(s) involved in the production of the ﻳﻤﺜــﻞ اﻟﻤــﻮرد اﻷﻋﻠــﻰ اهﺘﻤﺎﻣــﺎت.ﻣﻌﻄﻴــﺎت اﻟﻤﺸــﺮوع
project’s deliverable(s). The Senior Supplier
. وﻳﻘﺪم ﻣﺼﺎدر ﺗﺘﻌﻠﻖ ﺑﺎﻟﻤﻮردﻳﻦ،اﻟﻤﻮردﻳﻦ ﻓﻲ اﻟﻤﺸﺮوع
represents the supplier interests within the
project and provides supplier resources.
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 38 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ38 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
share (risk A risk response to either a threat or an هﻮ اﺳﺘﺠﺎﺑﺔ ﻟﻠﺨﻄﺮ ﻓﻲ ﻣﻘﺎﺑﻞ ﺗﻬﺪﻳﺪ أو ﻓﺮﺻﺔ ﻣﻦ ﺧـﻼل اﻟﻤﺸــــــــــﺎرآﺔ )إﺣــــــــــﺪى
response) opportunity through the application of a آـﻼ اﻟﻄـﺮﻓﻴﻦ ﻳﺸـﺘﺮآﺎن:اﻟﻤﻜﺴـﺐ/ﺗﻄﺒﻴﻖ ﻣﻌﺎدﻟﺔ اﻷﻟﻢ (اﻻﺳﺘﺠﺎﺑﺎت ﻟﻠﺨﻄﺮ
pain/gain formula: both parties share the ﻓﻲ اﻟﻤﻜﺴﺐ )ﻓﻲ ﺣﺪود ﻣﺘﻔﻖ ﻋﻠﻴﻬﺎ ﻣﺴﺒﻘًﺎ( إذا آﺎﻧﺖ
gain (within pre-agreed limits) if the cost is
وآﻼ اﻟﻄـﺮﻓﻴﻦ ﻳﺸـﺘﺮآﺎن،اﻟﺘﻜﻠﻔﺔ أﻗﻞ ﻣﻦ ﺧﻄﺔ اﻟﺘﻜﺎﻟﻴﻒ
less than the cost plan; and both share the
ﻓﻲ اﻷﻟﻢ )أﻳﻀًﺎ ﻓﻲ ﺣﺪود ﻣﺘﻔـﻖ ﻋﻠﻴﻬـﺎ ﻣﺴـﺒﻘًﺎ( إذا ﺗـﻢ
pain (again within pre-agreed limits) if the
cost plan is exceeded. .ﺗﺠﺎوز ﺧﻄﺔ اﻟﺘﻜﺎﻟﻴﻒ
specialist product Specialist products are those products اﻟﻤﻨﺘﺠـﺎت اﻟﻤﺘﺨﺼﺼـﺔ هـﻲ ﺗﻠــﻚ اﻟﻤﻨﺘﺠـﺎت اﻟﺘـﻲ ﻳﻜــﻮن ﻣﻨﺘَﺞ ﻣﺘﺨﺼﺺ
whose development is the subject of the ﺗﻜــﻮن اﻟﻤﻨﺘﺠــﺎت اﻟﻤﺘﺨﺼﺼــﺔ.ﺗﻄﻮﻳﺮهــﺎ ﻣﻮﺿــﻮع اﻟﺨﻄــﺔ
plan. The specialist products are specific to ﺣﻤﻠــﺔ،ﺧﺎﺻــﺔ ﺑﻤﺸــﺮوع ﻣﻌــﻴﻦ )ﻋﻠــﻰ ﺳــﺒﻴﻞ اﻟﻤﺜــﺎل
an individual project (for example, an
، أﺳــﺲ ﻣﺒﻨــﻰ، ﻧﻈــﺎم آــﺮوت ﺳــﺎﺣﺔ ﺳــﻴﺎرات،إﻋﻼﻧﻴــﺔ
advertising campaign, a car park ticketing
ُﺗﻌـﺮَف أﻳﻀًـﺎ آﻤﺨﺮﺟـﺎت أو.(إﻟـﺦ... ،ﻋﻤﻠﻴﺔ ﻋﻤـﻞ ﺟﺪﻳـﺪة
system, foundations for a building, a new
business process etc.) Also known as a .ﻣﻌﻄﻴﺎت
deliverable or output.
sponsor The main driving force behind a programme ﻻ.اﻟﻘــﻮة اﻟﺪاﻓﻌــﺔ اﻷﺳﺎﺳــﻴﺔ ﺧﻠــﻒ ﻣﺸــﺮوع أو ﺑﺮﻧــﺎﻣﺞ اﻟﺮاﻋﻲ
or project. PRINCE2 does not define a role وﻟﻜﻦ اﻟﺮاﻋﻲ ﻣـﻦ، ﺗﻌﺮﻳﻒ ﻟﺪور اﻟﺮاﻋﻲ2ﻳﻮﺟﺪ ﻓﻲ ﺑﺮﻧﺲ
for the sponsor, but the sponsor is most اﻟــﻮارد ﺟــﺪًا أن ﻳﻜــﻮن اﻟﻤــﺪﻳﺮ اﻟﺘﻨﻔﻴــﺬي ﻓــﻲ ﻣﺠﻠــﺲ
likely to be the Executive on the Project . أو اﻟﺸﺨﺺ اﻟﺬي ﻋﻴﻦ اﻟﻤﺪﻳﺮ اﻟﺘﻨﻔﻴﺬي،اﻟﻤﺸﺮوع
Board, or the person who has appointed the
Executive.
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 39 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ39 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
Stage Plan A detailed plan used as the basis for project ﺧﻄــﺔ ﺗﻔﺼــﻴﻠﻴﺔ ﺗﺴــﺘﺨﺪم آﺄﺳــﺎس ﻟﻠــﺘﺤﻜﻢ ﻓــﻲ إدارة ﺧﻄﺔ اﻟﻤﺮﺣﻠﺔ
management control throughout a stage. .اﻟﻤﺸﺮوع ﻋﻠﻰ ﻣﺪار اﻟﻤﺮﺣﻠﺔ
stakeholder Any individual, group or organization that أي ﻓﺮد أو ﻣﺠﻤﻮﻋﺔ أو ﻣﺆﺳﺴـﺔ ﻳﻤﻜـﻦ أن ﺗـﺆﺛﺮ ﻓـﻲ أي اﻷﻃﺮاف اﻟﻤﻌﻨﻴﺔ
can affect, be affected by, or perceive itself أو، ﺧﻄـﺮ( أو ﺗﺘـﺄﺛﺮ ﺑﻬـﺎ، ﻧﺸـﺎط، ﻣﺸﺮوع،ﻣﺒﺎدرة )ﺑﺮﻧﺎﻣﺞ
to be affected by, an initiative (programme, .ﺗﺮى ﻧﻔﺴﻬﺎ ﻣﺘﺄﺛﺮة ﺑﻬﺎ
project, activity, risk).
start-up The pre-project activities undertaken by the اﻷﻧﺸﻄﺔ اﻟﺘﻲ ﺗﺴﺒﻖ اﻟﻤﺸﺮوع واﻟﺘﻲ ﻳﻘﻮم ﺑﻬـﺎ اﻟﻤـﺪﻳﺮ ﻗﻴﺎم
Executive and the Project Manager to ،اﻟﺘﻨﻔﻴﺬي وﻣﺪﻳﺮ اﻟﻤﺸـﺮوع ﻹﻧﺘـﺎج ﻣﺨﻄـﻂ ﻗﻀـﻴﺔ اﻟﻌﻤـﻞ
produce the outline Business Case, Project . وﺧﻄﺔ ﻣﺮﺣﻠﺔ اﻟﺒﺪء،وﻣﻮﺟﺰ اﻟﻤﺸﺮوع
Brief and initiation Stage Plan.
strategy An approach or line to take, designed to . ﻣﺼـﻤﻢ ﻟﺘﺤﻘﻴـﻖ هـﺪف ﺑﻌﻴـﺪ اﻟﻤـﺪى،ﺧﻂ أو ﺗَﻮَﺟﱡﻪ ُﻳﺘﱠﺒَﻊ اﺳﺘﺮاﺗﻴﺠﻴﺔ
achieve a long-term aim. Strategies can ﻳﻤﻜﻦ أن ﺗﻮﺟﺪ اﻻﺳﺘﺮاﺗﻴﺠﻴﺎت ﻋﻠﻰ ﻣﺴـﺘﻮﻳﺎت ﻣﺨﺘﻠﻔـﺔ؛
exist at different levels – at the corporate, أﻣــﺎ. أو اﻟﻤﺸــﺮوع، أو اﻟﺒﺮﻧــﺎﻣﺞ،ﻋﻠـﻰ ﻣﺴــﺘﻮى اﻟﺸــﺮآﺔ
programme and project level. At the project
ﺗﺤـــﺪد أرﺑـــﻊ2ﻋﻠـــﻰ ﻣﺴـــﺘﻮى اﻟﻤﺸـــﺮوع ﻓـــﺈن ﺑـــﺮﻧﺲ
level, PRINCE2 defines four strategies:
واﺳـﺘﺮاﺗﻴﺠﻴﺔ، اﺳﺘﺮاﺗﻴﺠﻴﺔ إدارة اﻻﺗﺼﺎﻻت:اﺳﺘﺮاﺗﻴﺠﻴﺎت
Communication Management Strategy,
Configuration Management Strategy, Quality واﺳــﺘﺮاﺗﻴﺠﻴﺔ، واﺳــﺘﺮاﺗﻴﺠﻴﺔ إدارة اﻟﺠــﻮدة،إدارة اﻟﺘﻬﻴﺌــﺔ
Management Strategy and Risk .إدارة اﻟﻤﺨﺎﻃﺮ
Management Strategy.
supplier The person, group or groups responsible for اﻟﺸــﺨﺺ أو اﻟﻤﺠﻤﻮﻋــﺔ أو اﻟﻤﺠﻤﻮﻋــﺎت اﻟﻤﺴــﺆوﻟﺔ ﻋــﻦ ﻣﻮرد
the supply of the project’s specialist .ﺗﻮرﻳﺪ اﻟﻤﻨﺘﺠﺎت اﻟﻤﺘﺨﺼﺼﺔ ﻓﻲ اﻟﻤﺸﺮوع
products.
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 40 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ40 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
Team Manager The person responsible for the production of اﻟﺸــﺨﺺ اﻟﻤﺴــﺆول ﻋــﻦ إﻧﺘــﺎج ﺗﻠــﻚ اﻟﻤﻨﺘﺠــﺎت اﻟﺘــﻲ ﻣﺪﻳﺮ اﻟﻔﺮﻳﻖ
those products allocated by the Project "أﺳﻨﺪهﺎ ﻣﺪﻳﺮ اﻟﻤﺸﺮوع آﻤﺎ هﻮ ﻣﺤﺪد ﻓﻲ "ﺑﺎﻗـﺔ ﻋﻤـﻞ
Manager as defined in a Work Package to ﺑﺠــﻮدة ﻣﻼﺋﻤــﺔ وﻓــﻲ اﻟﻤــﺪى اﻟﺰﻣﻨــﻲ وﺑﺘﻜﻠﻔــﺔ ﻣﻘﺒﻮﻟــﺔ
an appropriate quality, in a timescale and at
هــﺬا اﻟــﺪور ﻳﺮأﺳــﻪ ﻣــﺪﻳﺮ اﻟﻤﺸــﺮوع.ﻟﻤﺠﻠــﺲ اﻟﻤﺸــﺮوع
a cost acceptable to the Project Board. This
إذا ﻟﻢ ﻳﺘﻢ ﺗﻌﻴﻴﻦ ﻣﺪﻳﺮ ﻓﺮﻳـﻖ ﻓـﺈن.وﻳﺘﻠﻘﻰ ﻣﻨﻪ ﺗﻮﺟﻴﻬﺎت
role reports to, and takes direction from, the
Project Manager. If a Team Manager is not .ﻣﺪﻳﺮ اﻟﻤﺸﺮوع ﻳﻘﻮم ﺑﻤﺴﺆوﻟﻴﺎت دور ﻣﺪﻳﺮ اﻟﻔﺮﻳﻖ
assigned, then the Project Manager
undertakes the responsibilities of the Team
Manager role.
Team Plan An optional level of plan used as the basis ﻣﺴــﺘﻮى اﺧﺘﻴــﺎري ﻣــﻦ اﻟﺘﺨﻄــﻴﻂ ﻳﺴــﺘﺨﺪم آﺄﺳــﺎس ﺧﻄﺔ اﻟﻔﺮﻳﻖ
for team management control when .ﻟﻠﺘﺤﻜﻢ ﻓﻲ إدارة اﻟﻔﺮﻳﻖ ﻋﻨﺪ ﺗﻨﻔﻴﺬ ﺑﺎﻗﺎت اﻟﻌﻤﻞ
executing Work Packages.
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 41 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ41 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
theme An aspect of project management that أﺣــﺪ أوﺟــﻪ إدارة اﻟﻤﺸــﺮوﻋﺎت اﻟﺘــﻲ ﺗﺤﺘــﺎج إﻟــﻰ ﺗﻨﺎوﻟﻬــﺎ ﻣﻮﺿﻮع
needs to be continually addressed, and that واﻟﺘــﻲ ﺗﺘﻄﻠــﺐ ﻣﻌﺎﻣﻠــﺔ ﺧﺎﺻــﺔ ﺣﺘــﻰ ﺗﻜــﻮن،ﺑﺎﺳــﺘﻤﺮار
requires specific treatment for the PRINCE2 . ﻓﻌﺎﻟﺔ2ﻋﻤﻠﻴﺎت ﺑﺮﻧﺲ
processes to be effective.
time tolerance The permissible deviation in a plan’s time اﻟﺤﻴﺎد اﻟﻤﺒﺎح ﻓﻲ وﻗﺖ ﺧﻄﺔ ﻣـﺎ واﻟﻤﺴـﻤﻮح ﺑـﻪ ﻗﺒـﻞ أن ﺳﻤﺎﺣﻴﺔ اﻟﻮﻗﺖ
that is allowed before the deviation needs to .ﺗﻈﻬﺮ اﻟﺤﺎﺟﺔ ﻟﺘﺼﻌﻴﺪ اﻟﺤﻴـﺎد ﻟﻠﻤﺴـﺘﻮى اﻹداري اﻟﺘـﺎﻟﻲ
be escalated to the next level of راﺟـﻊ.ﻳﺘﻢ ﺗﻮﺛﻴﻖ ﺳﻤﺎﺣﻴﺔ اﻟﻮﻗﺖ ﻓـﻲ اﻟﺨﻄـﺔ اﻟﻤﻨـﺎﻇﺮة
management. Time tolerance is
.""اﻟﺴﻤﺎﺣﻴﺔ
documented in the respective plan. See
‘tolerance’.
time-driven Controls that are periodic to enable the next ﺁﻟﻴــﺎت اﻟــﺘﺤﻜﻢ اﻟﺪورﻳــﺔ اﻟﺘــﻲ ﺗﻤﻜــﻦ اﻟﺴــﻠﻄﺔ اﻷﻋﻠــﻰ ﺁﻟﻴﺎت اﻟﺘﺤﻜﻢ اﻟﺰﻣﻨﻴﺔ
control higher authority to monitor progress, e.g. a ﻣﺜـﻞ ﺁﻟﻴـﺔ اﻟـﺘﺤﻜﻢ اﻟﺘـﻲ،اﻟﺘﺎﻟﻴﺔ ﻣﻦ ﻣﺮاﻗﺒﺔ ﺗﻘﺪم اﻟﻌﻤﻞ
control that takes place every two weeks. اﺛﻨـﻴﻦ ﻣـﻦ اﻟﺘﻘـﺎرﻳﺮ2 ﺗﻘـﺪم ﺑـﺮﻧﺲ.ﺗﺤﺪث آﻞ أﺳـﺒﻮﻋﻴﻦ
PRINCE2 offers two key time-driven
ﺗﻘــﺎرﻳﺮ ﻧﻘــﺎط:اﻟﺰﻣﻨﻴــﺔ اﻟﺮﺋﻴﺴــﻴﺔ اﻟﺨﺎﺻــﺔ ﺑﺘﻘــﺪم اﻟﻌﻤــﻞ
progress reports: Checkpoint Report and
. وﺗﻘﺎرﻳﺮ إﻟﻘﺎء اﻟﻀﻮء،اﻟﻤﺮاﺟﻌﺔ
Highlight Report.
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 42 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ42 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
tranche A programme management term describing ﻣﺼﻄﻠﺢ ﻓﻲ إدارة اﻟﺒﺮاﻣﺞ ﻳﺼﻒ ﻣﺠﻤﻮﻋﺔ ﻣـﻦ اﻟﻤﺸـﺎرﻳﻊ اﻟﺸﺮﻳﺤﺔ
a group of projects structured around اﻟﻤﺒﻨﻴﺔ ﺣﻮل ﺧﻄﻮة ﻣﺴﺘﻘﻠﺔ ﻣـﻦ اﻟﺘﻐﻴﻴـﺮات ﻓـﻲ ﺗﻮﺻـﻴﻞ
distinct step changes in capability and .اﻟﻘﺪرات واﻟﻔﻮاﺋﺪ
benefit delivery.
transfer (risk A response to a threat where a third party هﻮ اﺳﺘﺠﺎﺑﺔ ﻟﻠﺨﻄﺮ ﻓﻲ ﻣﻘﺎﺑﻞ ﺗﻬﺪﻳﺪ ﺣﻴﺚ ﻳﺘﺤﻤﻞ ﻃﺮف اﻟﻨﻘـــﻞ )إﺣـــﺪى اﻻﺳـــﺘﺠﺎﺑﺎت
response) takes on responsibility for some of the ﺧﺎرﺟﻲ ﻣﺴﺆوﻟﻴﺔ ﺟﺰء ﻣﻦ اﻟﺘﺄﺛﻴﺮ اﻟﻤﺎﻟﻲ ﻟﻠﺘﻬﺪﻳﺪ )ﻋﻠـﻰ (ﻟﻠﺨﻄﺮ
financial impact of the threat (for example, ﻣﻦ ﺧﻼل ﺗﺄﻣﻴﻦ أو ﺑﻮاﺳﻄﺔ ﺑﻌﺾ اﻟﻔﻘﺮات،ﺳﺒﻴﻞ اﻟﻤﺜﺎل
through insurance or by means of
(.اﻟﻤﻨﺎﺳﺒﺔ ﻓﻲ ﻋﻘﺪ
appropriate clauses in a contract.)
trigger An event or decision that triggers a .2ﺣﺪث أو ﻗﺮار ﻳﺴﺘﺤﺚ إﺣﺪى ﻋﻤﻠﻴﺎت ﺑﺮﻧﺲ ﻣﺴﺘﺤِﺚ
PRINCE2 process.
user acceptance A specific type of acceptance by the person ﻧﻮع ﺧﺎص ﻣـﻦ اﻟﻘﺒـﻮل ﺑﻮاﺳـﻄﺔ اﻟﺸـﺨﺺ أو اﻟﻤﺠﻤﻮﻋـﺔ ﻗﺒﻮل اﻟﻤﺴﺘﺨﺪم
or group who will use the product once it is اﻟﺘــﻲ ﺳﺘﺴــﺘﺨﺪم اﻟﻤﻨــﺘﺞ ﺑﻤﺠــﺮد ﺗﺴــﻠﻴﻤﻪ إﻟــﻰ اﻟﺒﻴﺌــﺔ
handed over into the operational .اﻟﺘﺸﻐﻴﻠﻴﺔ
environment.
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 43 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ43 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
version A specific baseline of a product. Versions اﻹﺻﺪارات ﺗﺴـﺘﺨﺪم ﻋـﺎد ًة.ﺧﻂ ﻣﺮﺟﻌﻲ ﻣﺤﺪد ﻟﻤﻨﺘﺞ ﻣﺎ إﺻﺪار
typically use naming conventions that إﺻﻄﻼﺣﺎت ﺗﺴﻤﻴﺔ ﺗﻤﻜﱢﻦ ﻣﻦ ﺗﺤﺪﻳـﺪ ﺗﺴﻠﺴـﻞ أو ﺗـﺎرﻳﺦ
enable the sequence or date of the baseline ﻣـﻦ2 اﻹﺻﺪار رﻗـﻢ، ﻋﻠﻰ ﺳﺒﻴﻞ اﻟﻤﺜﺎل.اﻟﺨﻂ اﻟﻤﺮﺟﻌﻲ
to be identified. For example Project Plan
1 ﺧﻄﺔ اﻟﻤﺸﺮوع هﻮ اﻟﺨﻂ اﻟﻤﺮﺟﻌـﻲ ﺑﻌـﺪ اﻹﺻـﺪار رﻗـﻢ
version 2 is the baseline after Project Plan
.ﻣﻦ ﺧﻄﺔ اﻟﻤﺸﺮوع
version 1.
waterfall method A waterfall method describes a development ﻃﺮﻳﻘﺔ ﺷﻼل اﻟﻤﻴﺎﻩ ﺗﺼﻒ أﺳﻠﻮب ﺗﻄﻮﻳﺮ ﺧﻄﻲ ﻣﺘﺘﺎﺑﻊ ذا ﻃﺮﻳﻘﺔ ﺷﻼل اﻟﻤﻴﺎﻩ
approach that is linear and sequential with ﺑﻤﺠـﺮد اآﺘﻤـﺎل.ﻏﺎﻳﺎت ﻣﻤﻴـﺰة ﻟﻜـﻞ ﻣﺮﺣﻠـﺔ ﻣـﻦ اﻟﺘﻄـﻮﻳﺮ
distinct goals for each phase of ﻣﺮﺣﻠﺔ ﻣﻦ اﻟﺘﻄﻮﻳﺮ ﻳﻨﺘﻘﻞ اﻟﺘﻄﻮﻳﺮ إﻟﻰ اﻟﻤﺮﺣﻠﺔ اﻟﺘﺎﻟﻴﺔ وﻻ
development. Once a phase of development
ﻳــﺘﻢ اﻟﺮﺟــﻮع إﻟــﻰ اﻟﻤﺮاﺣــﻞ اﻟﺴــﺎﺑﻘﺔ )وﻣــﻦ هﻨــﺎ ﺟــﺎء
is completed, the development proceeds to
اﻟﺘﺸﺎﺑﻪ ﻓﻲ أن اﻟﻤﺎء اﻟﻤﺘﺪﻓﻖ إﻟﻰ أﺳﻔﻞ ﺟﺒﻞ ﻻ ﻳﻤﻜﻨﻪ
the next phase and earlier phases are not
revisited (hence the analogy that water .(اﻟﺮﺟﻮع ﻣﺮة أﺧﺮى
flowing down a mountain cannot go back).
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 44 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ44 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info
PRINCE2:2009 Glossary of Terms – English-Arabic
– إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ
PRINCE2_2009 Glossary English - Arabic v1.0.doc PRINCE2:2009 Glossary of Terms (English-Arabic) Document Owner – Collis Boucher/APMG
Version 1.0 (Status – Live) – إﻧﺠﻠﻴﺰي ـ ﻋﺮﺑﻲ2009 ﻣﻌﺠﻢ اﻟﻤﺼﻄﻠﺤﺎت ﻟﻌﺎم:2ﺑﺮﻧﺲ ﻣﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت/ ﻣﺎﻟﻚ اﻟﻮﺛﻴﻘﺔ – آﻮﻟﻴﺲ ﺑﻮﺗﺸﺮ
th
Date of last update – 13 April 2010
2010 إﺑﺮﻳﻞ13 :ﺗﺎرﻳﺦ ﺁﺧﺮ ﺗﻌﺪﻳﻞ
© The APM Group 2009. This paper is not for re-sale. Page 45 of 45
.APMG ©ﺣﻘﻮق اﻟﻄﺒﻊ ﻣﺤﻔﻮﻇﺔ ﻟﻤﺠﻤﻮﻋﺔ اﺗﺤﺎد إدارة اﻟﻤﺸﺮوﻋﺎت 45 ﻣﻦ45 ﺻﻔﺤﺔ Translated by: Rania Al-Maghraby, Egypt
.هﺬﻩ اﻟﻮﺛﻴﻘﺔ ﻟﻴﺴﺖ ﻟﻠﺒﻴﻊ ﻣﺼﺮ، راﻧﻴﺎ اﻟﻤﻐﺮﺑﻲ/ م:ﺗﻤﺖ اﻟﺘﺮﺟﻤﺔ ﺑﻮاﺳﻄﺔ
www.prince-officialsite.com http://www.OneWayForward.info