Professional Documents
Culture Documents
Tracing traps 55
OK traps 41
Leaking 3
Blocked 11
55
Header traps 48
OK 21
Leaking 8
Blocked 7
NIO 12
Formulation
Total number of traps 117
Header traps 31
OK traps 19
Leaking 5
Blocked 7
GE
Total traps 82
Header traps 38
Blocked traps 3
OK traps 30
Leaking 5
MEG section
Total traps 238
Header traps 26
OK traps 21
Leaking 4
Blocked 1
237
Total number of header traps 534 Total number of prcess traps 109
OK traps 333 OK traps 60
Leaking 88 Leaking traps 12
Blocked 90 Blocked 3
NIO 16 NIO 31
No trap locations 8 No trap locations 3
Present traps status
Section Total traps Ok traps Passing traps Waterlogged/ Blocked NIOP
Boiler and OSBL 293 201 29 52 4
Ethoxylytes 64 34 8 7 15
Formulation 117 61 11 23 22
MEG section 238 148 50 36
GE section 82 60 13 4 5
Other Sections. 39 29 5 3 2
Total 833 533 116 125 48
% of total 100 64 14 15 6
Right selection
Wrong Selection of traps
614 219
Right selection Wrong Selection of traps
s
No trap Wrong Selection of traps
7 58
4
64
4 71
15
7
11 219
1.3 26
1
6
15
Ok traps
Passing traps
Waterlogged/ Blocked
NIOP
14 No trap
64
raps
STEAM TRAP DATA
Tag No Location Type Size Make Pressure Application Choice Working Status Recommen Remarks
(mm) kg/cm2 dation
B1 Boiler no 2, near NRV, In boiler house. TD 20 Spirax 34 Header OK OK No drip leg
B2 Boiler no 1, near NRV, In boiler house. TD 20 UKL 34 Header OK Passing PC01N 15 No drip leg, NRV is leaking
NB of Boiler 1.
B3 Common header of Boiler 1 and 2. TD 20 ESCO 34 Header OK Passing PC01N 15 No drip leg
NB
B4 Common header of Boiler 1 and 2. No trap 34 Header PC01N 15
NB
B5 Common header of Boiler 1 and 2., after riser. TD 20 Spirax 34 Header OK Waterlogged PC01N 15
NB
B6 Common header end of power house (LP No trap 34 Header PC01N 15
letdown) NB
B7 IJT 80 TPH interconnection near power house. No trap 34 Header PC01N 15
NB
B8 Near column no 52. TD 20 Pennat 34 Header OK Passing PC01N 15
NB
B9 CVL boiler house, near column no. 11 TD 20 Armstrong 34 Header OK OK
B 10 TBW boiler house, near column no. 10 and 11. TD 20 UKL 34 Header OK OK
ETH 9 LP steam line, near condensate drum. TD 20 Spirax 3 Header OK Passing PC01N 15
NB
ETH 10 LP steam line, near condensate drum. TD 20 UKL 3 Header OK OK Bypass valve leaking
ETH 11 MP steam line, near condensate drum. TD 20 - 13 Header OK Waterlogged PC01N 15
NB
ETH 12 steam line, near condensate drum. TD 20 UKL - Header OK Waterlogged PC01N 15
NB
ETH 13 steam line, near condensate drum. TD 20 Pennat - Header OK Waterlogged PC01N 15
NB
ETH 14 HP steam line, near melter section TD 20 - 34 Header OK Passing PC01N 15
NB
ETH 15 LP steam line, near shift roomph 2, v13. TD 20 UKL 3 Header OK OK
ETH 16 LP steam line, near v13. TD 20 Pennat 13 Header OK OK
STEAM TRAP DATA
Tag No Location Type Size Make Pressure Application Choice Working Status Recommen Remarks
(mm) kg/cm2 dation
F1 Steam Main line, near textile plant 1 column. TD 20 Pennat 13 Header OK OK
F2 Steam Main line, near textile plant 1 column. TD 20 Pennat 3 Header OK Passing PC01N 15 Root valve leaking
NB
F3 Steam Main line, near textile plant 1 column. TD 20 UKL 3 Header OK OK
F4 Steam Main line, near textile plant 2 column. TD 20 Spirax 3 Header OK OK No drip leg
F5 Steam Main line, near textile plant 2 column. TD 20 Spirax 3 Header OK OK No drip leg
GE 6 HP steam line, near T 301 TD 20 UKL 34 Header OK Waterlogged PC01N 15
NB
GE 7 MP steam line, near T 301 TD 20 Pennat 13 Header OK Passing PC01N 15 Bypass open
NB
GE 8 MP steam line, near T 301 TD 20 Spirax 13 Header OK OK Bypass open
GE 9 Tracing steam line, near T 301, textile plant TD 20 Spirax 3 Tracing NOK OK BPT
GE 10 LP steam line, near T 301 TD 20 Spirax 3 Header OK Passing PC01N 15
NB
GE 11 Tracing steam line, near T 301, textile plant TD 20 UKL 3 Tracing NOK OK 15 NB BPT
GE 12 Tracing steam line, near T 301, textile plant TD 20 Spirax 3 Tracing NOK OK 15 NB BPT
GE 13 Tracing steam line, near T 301, textile plant TD 20 Spirax 3 Tracing NOK OK 15 NB BPT
GE 14 Tracing steam line, near T 301, textile plant TD 20 Spirax 3 Tracing NOK Waterlogged 15 NB BPT
GE 15 Tracing steam line, near T 301, textile plant TD 20 Pennat 3 Tracing NOK Waterlogged 15 NB BPT
GE 16 Tracing steam line, near T 301, textile plant TD 20 Pennat 3 Tracing NOK OK 15 NB BPT
STEAM TRAP DATA
Tag No Location Type Size Make Pressure Application Choice Working Status Recommen
(mm) kg/cm2 dation
PC01N
meg/osb/1 meg osbl Td 20 PENNANT 34 header OK blocked
15NB
PC01N
meg/osb/2 meg osbl Td 20 PENNANT 34 header OK blocked 15NB
PC01N
meg/osb/3 meg osbl Td 15 PENNANT 34 header OK blocked
15NB
PC01N
meg/osb/4 meg osbl Td 15 PENNANT 34 header OK leak
15NB
PC01N
meg/osb/5 meg osbl Td 20 PENNANT 34 header OK leak
15NB
isolation valve
damaged,closed
STEAM TRAP DATA
Remarks
BYPASS ON TOP
BYPASS ON TOP
STEAM TRAP DATA
Tag No Location Type Size Make Pressure Application Choice Working Status Recommen Remarks
(mm) kg/cm2 dation
FLANGE LEAK,NO DRIP
GE 1/1 BATTERY LIMIT NEAR D701 TD 20 PENNANT 32 HEADER OK OK
LET
BATTERY LIMIT LET DOWN HEADER INLET TO BY PASS LEAK, NO DRIP
GE 1/2 TO MP TD 20 PENNANT 32 CONTROL VALVE OK OK LET
BATTERY LIMIT LET DOWN HEADER AFTER CONTROL INLET VALVE LEAK, NO
GE 1/3 TD 20 PENNANT 14 OK OK
TO MP VALVE DRIP LET
E210 VERTICAL REBOILER
GE 1/4 FT 50 SPIRAX 14 VERTICAL REBOILER OK OK NO CHECK VALVE
ALCOHOL COLUMN
E210 VERTICAL REBOILER
GE 1/5 FT 50 SPIRAX 14 VERTICAL REBOILER OK OK NO CHECK VALVE
ALCOHOL COLUMN
PG/11 PEGEE D2600 TD 15 PENNANT 3 TRACER NOT OK OK 15 NB BPT ISOLATION VALVE LEAK