You are on page 1of 25

CHECK LIST RUNNING GENSET

PACIFIC PLACE JAKARTA

PT.MASTER ENGINEERING SERVICE


Office : Taman Harapan Baru
Blok A1 No.16 Bekasi 17131
Telp. (021) 88865043-88978144
Fax. (021) 88866099

MONITORING RUNNING GENSET


Status
Genset Time Voltage Ampere Water
Location Breaker KW PF Hz RPM
No. Temp.
RUN OFF GCP GCB R S T R S T
Jakarta, 2010
Checked by, Acknowledge by, Acknowledge by,

(……………………….........) (…………………………..) (…………………………..)


Engineering Dept.
Date :
Shift :

Oil Battery Running Hours


Remark
Pressure
V AWAL AKHIR
CHECK LIST GENSET HARIAN
PACIFIC PLACE JAKARTA
PT.MASTER ENGINEERING SERVICE
Of f ice : Taman Harapan Baru
Blok A1 No.16 Bekasi 17131
Telp. (021) 88865043-88978144
Engineering Dept.
Fax. (021) 88866099
Date :
Shift :

PEMERIKSAAN GENSET HARIAN


LOKASI GENSET
NO. DESCRIPTION KETERANAGN
GENSET RETAIL EAST WEST HOTEL CHILLER
G1 G2 G3 G4 G5 G6 G7 G8 G1 G2 G1 G2 G1 G2 G3 G4 G1 G2 G3 G4
ENGINE
1 Fuel Solar
2 Tank & Valve
3 Air Radiator
4 Oil Mesin
5 Accu (Volt)
6 V-Belt
7 Baut-baut Mesin
8 Hour Counter
ELECTRICAL
1 Status Control
a. GCP -21
b. ATS (CB/MCCB)
c. Synchron Switch
d. Engine Leader/Basic
e.Load Monitoring
f. Synchrone
2 Charger GCP
a. DC Voltage
b. DC Ampere
3 UPS
4 Hour Counter
5 Charger MSB
a. Supply Power
b. DC Voltage
c. DC Ampere

Jakarta, 2010
Checked by, Acknowledge by, Acknowledge by,

(……………………….........) (…………………………..) (…………………………..)


CHECK LIST MSB-SS
PACIFIC PLACE JAKARTA
PT.MASTER ENGINEERING SERVICE
Office : Taman Harapan Baru
Blok A1 No.16 Bekasi 17131
Telp. (021) 88865043-88978144
Fax. (021) 88866099

PM
No Description Lokasi
V A KW KWH

MSB-A / SS-1
1 Incoming PLN S/S South Side Line-1 S/S-1 LT.6A
2 Incoming PLN S/S South Side Line-2 S/S-1 LT.6A
3 Outgoing Sub-3 S/S-1 LT.6A
4 Outgoing Sub-5+4 S/S-1 LT.6A
5 Incoming Genset A S/S-1 LT.6A
6 Incoming Genset B S/S-1 LT.6A
7 Battery Charger for MSB-A S/S-1 LT.6A
8 Battery Charger KBC 24/50 S/S-1 LT.6A
MSB-B / GENSET RETAIL
1 Incoming Genset-1 Genset Retail LT.6
2 Incoming Genset-2 Genset Retail LT.6
3 Incoming Genset-3 Genset Retail LT.6
4 Incoming Genset-4 Genset Retail LT.6
5 Incoming Genset-5 Genset Retail LT.6
6 Incoming Genset-6 Genset Retail LT.6
7 Incoming Genset-7 Genset Retail LT.6
8 Incoming Genset-8 Genset Retail LT.6
9 Outgoing MSB-A Busbar-1
10 Outgoing MSB-a Busbar-2
11 Battery Charger For MSB-B Genset Retail LT.6
MSB-C
1 Incoming PLN S/S South Side Line-2 Genset Chiller LT.6
2 Outgoing Trafo CH-1/D Genset Chiller LT.6
3 Outgoing Trafo CH-2/C Genset Chiller LT.6
4 Outgoing Trafo CH-3/B Genset Chiller LT.6
5 Outgoing Trafo CH-4/A Genset Chiller LT.6
6 Battery Charger For MSB-C Genset Chiller LT.6
MSB-D / SS-11
1 Incoming PLN S/S North Side Line-1 S/S-11 LT.6 Hotel
2 Outgoing Trafo TR-11A S/S-11 LT.6 Hotel
3 Outgoing Trafo TR-11B S/S-11 LT.6 Hotel
4 Battery Charger For MSB-D S/S-11 LT.6 Hotel
S/S-8
1 Incoming for S/S-8 S/S-8 Parkir P1

Jakarta, 2010
Checked by, Acknowledge by,

(……………………….........) (…………………………..)
T MSB-SS
CE JAKARTA

Engineering Dept.
Date :
Shift :

M Sepam Charger
AC DC DC Remark
KVARH L1-A L2-A L3-A
Volt Volt Amp.
Acknowledge by, Acknowledge by,

…………………………..) (…………………………..)
CHECK LIST PANEL LVSMB
PACIFIC PLACE JAKARTA
PT.MASTER ENGINEERING SERVICE
Office : Taman Harapan Baru
Blok A1 No.16 Bekasi 17131
Telp. (021) 88865043-88978144
Fax. (021) 88866099

Volt Hertz Ampere


No Description Location WBP
L1 L2 L3
V Hz
1 MCC-CH-A LT.7 Chiller Hotel
2 MCC-CH-B LT.7 Chiller Hotel
3 MCC-CH-C LT.7 Chiller Hotel
4 MCC-CH-D LT.7 Chiller Hotel
5 LVMSB-1A LT.6A Apartement
6 LVMSB-1B LT.6A Apartement
7 LVMSB-2A LT.6A Apartement
8 LVMSB-2B LT.6A Apartement
9 LVMSB-3A LT.7 Chiller Hotel
10 LVMSB-3B LT.7 Chiller Hotel
11 LVMSB-4A LT.7 Chiller Hotel
12 LVMSB-4B LT.7 Chiller Hotel
13 LVMSB-4A LT.7 Mall
14 LVMSB-5B LT.7 Mall
15 LVMSB-6A LT.LG BLK R.ENG
16 LVMSB-6B LT.LG BLK R.ENG
17 LVMSB-7A Management Office
18 LVMSB-7B Management Office
19 LVMSB-8A Parkir P1
20 LVMSB-8B Parkir P1
21 LVMSB-9 LT.6 Tower West
22 LVMSB-10 LT.6 Tower East
23 LVMSB-11A LT.6 Hotel
24 LVMSB-11B LT.6 Hotel
25 LVMSB-12A LT.22 ME Hotel
26 LVMSB-12B LT.22 ME Hotel

Jakarta, 2010
Checked by, Acknowledge by,

(……………………….........) (…………………………..)
LIST PANEL LVSMB
FIC PLACE JAKARTA
PT.MASTER ENG
Office : Taman Ha
Blok A1 N
Engineering Dept.
Date : Telp. (021
Shift : Fax. (02

Capasitor Bank
LWBP KVARH 1 KVARH 2 KW KVA Remark
PF Step

Acknowledge by,

(…………………………..)
PT.MASTER ENGINEERING SERVICE
Office : Taman Harapan Baru
Blok A1 No.16 Bekasi 17131
Telp. (021) 88865043-88978144
Fax. (021) 88866099
CHECK LIST TRANSFORMATOR 20000V
PACIFIC PLACE JAKARTA

PT.MASTER ENGINEERING SERVICE


Office : Taman Harapan Baru
Blok A1 No.16 Bekasi 17131 Engineering Dept.
Telp. (021) 88865043-88978144 Date
Shift
Fax. (021) 88866099

Status Imped.V
No Description Location Remark
Trafo Control olt %
1 TR-GT-1 Genset Retail
2 TR-GT-2 Genset Retail
3 TR-GT-3 Genset Retail
4 TR-GT-4 Genset Retail
5 TR-GT-5 Genset Retail
6 TR-GT-6 Genset Retail
7 TR-GT-7 Genset Retail
8 TR-GT-8 Genset Retail
9 TR-GAT-1 Genset Retail
10 TR-GAT-2 Genset Retail
11 TR-1A S/S-1
12 TR-1B S/S-1
13 TR-2A S/S-2
14 TR-2B S/S-2
15 TR-3A S/S-3
16 TR-3B S/S-3
17 TR-4A S/S-4
18 TR-4A S/S-4
19 TR-5A S/S-5
20 TR-5B S/S-5
21 TR-6A S/S-6
22 TR-6B S/S-6
23 TR-7A S/S-7
24 TR-7B S/S-7
25 TR-8A S/S-8
26 TR-8B S/S-8
27 TR-9 S/S-9
28 TR-10 S/S-10
29 TR-11A S/S-11
30 TR-11B S/S-11
31 TR-12A S/S-12
32 TR-12B S/S-12
33 TR-CH-1/D Chiller Hotel LT.7
34 TR-CH-2/C Chiller Hotel LT.7
35 TR-CH-3/B Chiller Hotel LT.7
36 TR-CH-4/A Chiller Hotel LT.7
37 TR-GCP-1 S/S Chiller LT.6
38 TR-GCP-2 S/S Chiller LT.6
39 TR-GCP-3 S/S Chiller LT.6
40 TR-GCP-4 S/S Chiller LT.6

Jakarta, 2010
Checked by, Acknowledge by, Acknowledge by,
(………………) (………………….) (………………….)
Voltage Ampere
Kapasitas
KV LV KV LV
CHECK LIST OPERASIONAL LV
PACIFIC PLACE JAKARTA
PT.MASTER ENGINEERING SERVICE
Office : Taman Harapan Baru
Blok A1 No.16 Bekasi 17131
Engineering Dept.
Telp. (021) 88865043-88978144 Date :
Fax. (021) 88866099 Shift :

Circuit Breaker
No. Description Location Status Control
LVBSB Coupler Cap.Bank

1 MCC-CHILLER
MCC-CH-A LT.7 Chiller Hotel
MCC-CH-B LT.7 Chiller Hotel
MCC-CH-C LT.7 Chiller Hotel
MCC-CH-D LT.7 Chiller Hotel
2 LVSMB-1
Incoming From TR-1A LT.6A Mall
Incoming From TR-1B LT.6A Mall
Capasitor Bank A LT.6A Mall
Capasitor Bank B LT.6A Mall
3 LVSMB-2
Incoming From TR-2A LT.6 Mall
Incoming From TR-2B LT.6 Mall
Capasitor Bank A LT.6 Mall
Capasitor Bank B LT.6 Mall
4 LVSMB-3 LT.7 Chiller Hotel
Incoming From TR-3A LT.7 Chiller Hotel
Incoming From TR-3B LT.7 Chiller Hotel
Capasitor Bank A LT.7 Chiller Hotel
Capasitor Bank B LT.7 Chiller Hotel
5 LVSMB-4 LT.7 Chiller Hotel
Incoming From TR-4A LT.7 Chiller Hotel
Incoming From TR-4B LT.7 Chiller Hotel
Capasitor Bank A LT.7 Chiller Hotel
Capasitor Bank B LT.7 Chiller Hotel
6 LVSMB-5
Incoming From TR-5A
Incoming From TR-5B
Capasitor Bank A
Capasitor Bank B
7 LVSMB-6 LT.LG BLK R.ENG
Incoming From TR-6A LT.LG BLK R.ENG
Incoming From TR-6B LT.LG BLK R.ENG
Capasitor Bank A LT.LG BLK R.ENG
Capasitor Bank B LT.LG BLK R.ENG
8 LVSMB-7
Incoming From TR-7A
Incoming From TR-7B
Capasitor Bank A
Capasitor Bank B
9 LVSMB-8
Incoming From TR-8A
Incoming From TR-8B
Capasitor Bank A
Capasitor Bank B
10 LVSMB-9 LT.6 Tower West
Incoming From TR-9 LT.6 Tower West
Capasitor Bank LT.6 Tower West
11 LVSMB-10 LT.6 Tower East
Incoming From TR-10 LT.6 Tower East
Capasitor Bank LT.6 Tower East
12 LVSMB-11 LT.6 Hotel
Incoming From TR-11A LT.6 Hotel
Incoming From TR-11B LT.6 Hotel
Capasitor Bank A LT.6 Hotel
Capasitor Bank B LT.6 Hotel
13 LVSMB-12
Incoming From TR-12A S/S-12 Lt.ME
Incoming From TR-12B S/S-12 Lt.ME
Capasitor Bank A S/S-12 Lt.ME
Capasitor Bank B S/S-12 Lt.ME

Jakarta, 2010
Checked by, Acknowledge by, Acknowledge by,

(………………) (………………….) (………………….)


eering Dept.

Circuit Breaker
Remark
Merk Type Kap.
Acknowledge by,

(………………….)
CHECK LIST OPERASIONAL MV
PACIFIC PLACE JAKARTA
PT.MASTER ENGINEERING SERVICE
Office : Taman Harapan Baru
Blok A1 No.16 Bekasi 17131 Engineering Dept.
Telp. (021) 88865043-88978144 Date :
Fax. (021) 88866099 Shift :

Status
No. Description Location Remark
GCB LBS MCB Control
1 MSB-A
Metering VT"S S/S-1 LT.6A
Outgoing Trafro GAT-1 S/S-1 LT.6A
Outgoing Sub-1 S/S-1 LT.6A
Outgoing Sub-6 S/S-1 LT.6A
Outgoing Sub-3 S/S-1 LT.6A
Incoming Genset B S/S-1 LT.6A
Incoming PLN S/S South Side Line-1 S/S-1 LT.6A
Coupler S/S-1 LT.6A
Incoming Genset B S/S-1 LT.6A
Incoming PLN S/S South Side Line-1 S/S-1 LT.6A
Outgoing Sub-5+4 S/S-1 LT.6A
Outgoing Sub-8+7 S/S-1 LT.6A
Outgoing Sub-2 S/S-1 LT.6A
Battery Charger For MSB-A S/S-1 LT.6A
Battery Charger KBC 24/50 S/S-1 LT.6A
2 SS-1
Incoming From MSB-A SS-1 LT.6 Tower East
Outgoing Trafo TR-1A SS-1 LT.6 Tower East
Outgoing Trafo TR-1A SS-1 LT.6 Tower East
Outgoing To SS-2 SS-1 LT.6 Tower East
3 MSB-B / GENSET RETAIL
Metering VT"S Genset Retail LT.6
Outgoing Trafo-2 Genset Retail LT.6
Incoming Genset-8 Genset Retail LT.6
Incoming Genset-7 Genset Retail LT.6
Incoming Genset-6 Genset Retail LT.6
Incoming Genset-5 Genset Retail LT.6
Outgoing MSB-A Busbar-1 Genset Retail LT.6
Coupler Genset Retail LT.6
Outgoing MSB-a Busbar-2 Genset Retail LT.6
Incoming Genset-4 Genset Retail LT.6
Incoming Genset-3 Genset Retail LT.6
Incoming Genset-2 Genset Retail LT.6
Incoming Genset-1 Genset Retail LT.6
Battery Charger For MSB-B Genset Retail LT.6
4 MSB-C / SS Chiller
Incoming Genset GCP-1 Genset Chiller LT..6 Hotel
Incoming Genset GCP-2 Genset Chiller LT..6 Hotel
Incoming Genset GCP-3 Genset Chiller LT..6 Hotel
Incoming Genset GCP-4 Genset Chiller LT..6 Hotel
Incoming PLN S/S South Side Line-1 Genset Chiller LT..6 Hotel
Outgoing Trafo CH-1 Genset Chiller LT..6 Hotel
Outgoing Trafo CH-2 Genset Chiller LT..6 Hotel
Outgoing Trafo CH-3 Genset Chiller LT..6 Hotel
Outgoing Trafo CH-4 Genset Chiller LT..6 Hotel
Battery Charger For MSB-D SS-11 LT.6 Hotel
5 MSB-D / SS-11
Incoming PLN S/S North Side Line-1
OutGoing MSB-F Line-1 SS-11 LT.6 Hotel
OutGoing MSB-F Line-2 SS-11 LT.6 Hotel
Outgoing Trafo TR-11A SS-11 LT.6 Hotel
Outgoing Trafo TR-11B
6 MSB-E / SS-10
Incoming PLN S/S South Side Line-3 SS-10 LT.6 Tower East
Outgoing Trafo TR-10 SS-10 LT.6 Tower East
Outgoing MSB-G / SS-9 SS-10 LT.6 Tower East
7 MSB-F / SS-12
Incoming MSB-F Line-1 S/S-12 ME Hotel Lt.22
Incoming MSB-F Line-2 S/S-12 ME Hotel Lt.22
Outgoing Trafo TR-11A S/S-12 ME Hotel Lt.22
Outgoing Trafo TR-11B S/S-12 ME Hotel Lt.22
8 MSB-G / SS-9
Incoming From MSB-E SS-9 LT.6 Tower West
Outgoing Trafo TR-9 SS-9 LT.6 Tower West
9 SS-2
Incoming From MSB-A SS-2 Mall Lt.6
Outgoing Trafo TR-2A SS-2 Mall Lt.6
Outgoing Trafo TR-2B SS-2 Mall Lt.6
Outgoing To SS-1 SS-2 Mall Lt.6
10 SS-3
Incoming From MSB-A SS-3 Chiller LT.7
Outgoing Trafo TR-3A SS-3 Chiller LT.7
Outgoing Trafo TR-3\B SS-3 Chiller LT.7
11 SS-4
Incoming From SS-5 SS-4 Chiller LT.7
Outgoing Trafo TR-4A SS-4 Chiller LT.7
Outgoing Trafo TR-4B SS-4 Chiller LT.7
Incoming From SS-3 SS-4 Chiller LT.7
12 SS-5
Incoming From MSB_A S/S-5 LT.7 Hotel
Outgoing Trafo TR-5A
Outgoing Trafo TR-5B
Outgoing To S/S-4
13 SS-2
Incoming From MSB-A SS-2 Mall Lt.6
Outgoing Trafo TR-2A SS-2 Mall Lt.6
Outgoing Trafo TR-2B SS-2 Mall Lt.6
Outgoing To SS-1 SS-2 Mall Lt.6
14 SS-6
Incoming From MSB_A SS-6 BLK R.ENG LT.LG
Outgoing Trafo TR-6A SS-6 BLK R.ENG LT.LG
Outgoing Trafo TR-6B SS-6 BLK R.ENG LT.LG
Outgoing To SS-7 SS-6 BLK R.ENG LT.LG
15 SS-7
Incoming From S/S-6 Management Office Lt.B1
Incoming From S/S-8 Management Office Lt.B1
Outgoing Trafo TR-6A Management Office Lt.B1
Outgoing Trafo TR-6B Management Office Lt.B1
16 SS-8
Incoming From MSB-A S/S-8 Parkir P1
Incoming From S/S-7 S/S-8 Parkir P1
Outgoing Trafo TR-8A S/S-8 Parkir P1
Outgoing Trafo TR-8B S/S-8 Parkir P1
Outgoing Equity Tower S/S-8 Parkir P1

Jakarta, 2010
Checked by, Acknowledge by, Acknowledge by,

(………………) (………………….) (………………….)

You might also like