CHECKLIST

GLOBAL ENTROPOLIS
VIZAG PVT LTD
CONCRETE WORKS
Checklist No.
Name of Work: Pr. Start Date
Employer: Pr. End Date
Contract No.: Checklist
Contractor: S.S.PROJECTS, VIZAG Date

Item Dscrptn: Inspection Requested by: BOQ No.

1ST INSPECTION 2ND INSPECTION 3RD INSPECTION Mix Grade:


Req. on: Req. on: Req. on:
Location Section Level By.: By.: By.: Quantity
Date: Date: Date:
Time: Time: Time:
O O O
Points to Check P Action Req. P Action Req. P Action Req. REMARKS
1. Dimensions, level & Plumb
FORM WORK

2. Tightness & Rigidity


3. Stop / Drop Formwork
4. Cleanliness
5. Shutter Release Agent
1. Bar Size & Nos., spacing & Laps
2. Bar Spacing & Laps
REBAR

3. Cleanliness
4. Covers, Hooks & Binding Rigidity
5. Starter & Bonding Bars
1. Anti Termite Treatment
2. Box Outs
3. Pipe Sleeves
4. Embedded Items
GENERAL

5. Quality of Bulk Materials / RMC


6. Plastisizers / Additives
7. Expansion Joint Provisions if any
8. Existing Concrete Hacking & Cleaning
9. Special treatments in existing surface
Agency Name Sign with Date
ENDORSEMENTS

Main Contractor
Electrical
ACMV
Fire Protection
Plumbing
Others[Specify]]
Approved for Concreting Task Start Date:
Details of Additional Steel Provided if any: [Other than specified in Drg.] Pour Start Date & Time:
POST CONCRETING

Concreting End Date & Time:


No. of Cubes Taken:
Average Slump:
Method of Pouring & Vibration Acceptable To Improve Arrangement for Curing / Ponding Acceptable To Improve

Stability of Formwork after Pour Acceptable To Improve Others [Specify] Acceptable To Improve

Line, Level & finishing Acceptable To Improve Acceptable To Improve

Sch. date for formwork removal with supports Actual Date of Removal
Sch. date for form work removal entirely Actual Date of Removal
Line, Level & finishing of Concrete surface Acceptable To Rectify Acceptable To Rectify
DESHUTTER

Removal of Battens, Maskin tape etc. Acceptable To Rectify Acceptable To Rectify

Action Required:- Remarks: Rectifications done as specified:

Dry finish
Wet finish
Grouting Task End Date:
Epoxy Treatment
Note : Record typical dimensional check on reverse of this format