TABLE OF CONTENTS

1 Introduction 3

1.1 House Connection 3


2 Procedure for Building Permit Application 5

3 Foul Sewerage Design Criteria 8

3.1 General 8
3.1.1 Domestic Flows 8
3.2 Sewerage System Design 8
3.2.1 Minimum Pipe Sizes and Gradients 9
3.3 Manholes and Inspection Chambers 9
3.4 Pipework 10
3.4.1 Materials 10
3.4.2 Construction 11
3.5 Building Drainage 11
3.5.1 Construction 11
3.6 Septic Tanks, Holding Tanks and Soakaways 12
3.6.1 Ground Conditions 12
3.6.2 Design Issues 13
3.6.3 Siting of Septic Tanks and Soakaways 13
3.6.4 Design and Construction 13
3.6.5 Warning Notice 14
3.6.6 Sewage Holding Tanks 15
3.7 Pumping Stations and Rising Mains 16
3.7.1 Rising Mains 16
3.7.2 Pumping Stations 16

4 Storm Drainage 19

4.1 Introduction 19
4.2 Managed Drainage Systems 20
ADVICE NOTE NO 1 - SOAKAWAYS AND STORM STORAGE TANKS FOR SINGLE RESIDENTIAL
DEVELOPMENT 24
ADVICE NOTE NO 2 -- DRAINAGE FOR TOWER BLOCKS AND RESIDENTIAL DEVELOPMENTS 29
ADVICE NOTE NO 3 - APPLICATION OF THE DRAINAGE IMPACT ASSESSMENT PROCESS TO
ZONAL AND DISTRICT DEVELOPMENT PROJECTS 33
APPENDIX SI - INFORMATION REQUIRED FOR PROJECT PROFILE 37
APPENDIX SII - INFORMATION REQUIRED FOR DRAINAGE IMPACT ASSESSMENT STUDY
REPORT 39

Volume 8 Developer's Guide December 2006 Page 1 of 47


State of Qatar Public Works Authority
Drainage Affairs

APPENDICES
Appendix 1 - Building Permit Application

Appendix 2 - Design Unit Flows

Appendix 3 - Standard Drawings

Volume 8 Developer's Guide December 2006 Page 2 of4?


State of Qatar Public Works Authority
Drainage Affairs

1 Introduction
The PWA is responsible for all public foul sewerage, surface water and ground water
drainage systems in the State of Qatar.

All applications for sewerage and drainage for servicing new developments are subject to
approval by the Drainage Affairs as part of the BUilding Permit approval procedure before
such facilities can be built.

This Developer's Guide is for small developments up to 350 persons, where the peak flow
does not exceed 51/s. Larger developments should be designed in accordance with the
requirements of Drainage Affairs' Vol 2- Foul Sewerage design manual.

1.1 House Connection


A house connection is defined as the connection from a development (comprising domestic,
commercial, industrial, institutional premises, etc) to transfer foul flows to the public
sewerage system.

For every house connection, a terminal manhole (Manhole Number 1 - MH1), in


accordance with the Standard Drawings, should be provided and should be positioned as
shown on 3.3.

The terminal manhole should normally have maximum depth 1.2m. The depth of first
Inspection Chamber should be 0.45m.

All house connections should comply with the following general principles:

• They should be designed and constructed to enable foul flows to pass to the public
sewer without flooding or surcharge

• They should be of 150mm minimum internal diameter

• They should laid at minimum gradients 1:60

• They should be constructed to watertight standards in accordance with the standard


drawings and specifications

• The last Inspection Chamber is know as MH1 (terminal manhole) shall be located
within the property boundary but is PWA property.

The private sewerage system shall be designed and constructed as a separate system,
capable of accepting foul flows only. Illegal connections allowing the entry of storm water
runoff shall not be made to the foul sewerage system.

House connection to existing pipelines should be made preferably to the nearest manhole
whenever possible, or failing that to a V-junction previously incorporated into the pipeline
during its construction, to facilitate future connections. V-branches and saddles are not to be
added to existing pipelines to avoid the permanent damage resulting from such
modifications to the public sewer.

Y branches will only be approved by DA if manholes are impractical due to access


restrictions

Volume 8 Developer's Guide December 2006 Page 3 of 47


State of Qatar Public Works Authority
Drainage Affairs

Sewer must be surrounded with a Grade OPC 20 Concrete in case of :


• The pipe under the Foot path and the depth less than 0.9m
• The pipe under the Carriageway and the depth less than 1.2m

Volume 8 Developer's Guide December 2006 Page 4 of 47


State of Qatar Public Works Authority
Drainage Affairs

2 Procedure for Building Permit Application


The basic procedure for application and approval of drainage facilities for developments is
as follows;

• Open a building permit file at the Planning Affairs


• Produce Outline Design
• Obtain utility approvals
• Obtain DC1 approval
• Obtain DC 2 approval
• Collect building permit
The information that Drainage Affairs require to enable them to approve the development is
contained in Appendix 1.

Drainage Affairs requirement vary according to the nature of the property. A list of
properties and the associated requirements is provided overleaf. The list is a guide and is
not limiting.

The provision of septic tanks or holding tanks will only be necessary where there is no
existing sewerage system to connect to. Further information on the choice between septic
tank and holding tank is provided in Section 3.5.

Volume 8 Developer's Guide December 2006 Page 5 of 47


State of Qatar Public Works Authority
Drainage Affairs

Table 2.1 • Foul Sewerage Requirements

Category Type of Development Septic Holding Sand Petrol Oil/ Chemical Screen Swimming
Tank Tank trap Interceptor Grease stabilisation / Pool
trap dilution Discharge
Control

Residential Single Unit ./ ./

Multiple Units /Multi ./ ./


Storey

Commercial Office (small/large) small./ large./

Shops (small/large) small./ large./

Restaurants / Food small./ large./ ./


Outlet

Poultry shop ./

Shopping Mall ./ ./ ./

Hotels ./ ./ ./

Sports Clubs ./ ./ ./

Industrial Garages ./ ./ ./

Car Washing ./ ./

Volume 8 Developer's Guide December 2006 Page 6 of 47


State of Qatar Public Works Authority
Drainage Affairs

Category Type of Development Septic Holding Sand Petrol Oill Chemical Screen Swimming
Tank Tank trap Interceptor Grease stabilisation I Pool
trap dilution Discharge
Control

Petrol Station v' v'

Abattoir v' v'

Farm Livestock v' v'

Public Service Mosque v'

Hospital/Clinic v' v' v'

Laboratory v' v'

School v' v'

School with laboratory v' v' v'

University / College v' v' v'

Offices v'

Volume 8 Developer's Guide December 2006 Page 7of 47


State of Qatar Public Works Authority
Drainage Affairs

3 Foul Sewerage Design Criteria

3.1 General
Sewerage and drainage design shall generally comply with the requirements of EN 752
Drain and Sewer Systems outside Buildings. Particular requirements are detailed in the
following sections.

3.1.1 Domestic Flows


Domestic flows derive from normal domestic appliances such as sinks, basins, toilets,
showers, washing machines, baths, etc. and are dependent on the number of persons in a
dwelling. In order to determine suitable domestic contributions to the sewerage system, it is
necessary to make certain assumptions. For example, each property has to be assumed to
house a certain number of persons, and this will vary from one type of property to another.
For design purposes 270 litres per person per day should be used.

Peak flows from domestic properties are calculated on a Design Unit (DU) For ease of use
a table of populations, design units, peak flows and average flows is provided in Appendix 2.

3.2 Sewerage System Design


The sewerage system should be designed to facilitate flows within the development by
gravity, in a branched arrangement of small sewers from buildings connected to the main
sewer leading to MH1.

Manholes/inspection chambers and sewers should be sited wherever possible a minimum of


1.5m from any structural building line

Building over sewers, or directly adjacent to them, causes major problems with access for
maintenance and renewal. In extreme cases demolition may be required, and therefore
building over sewers should not be carried out.

Foundations and basements of buildings should be designed to ensure that no building load
is transferred to the sewer. The general principles of foul sewer design are:

• Pipe size should not decrease downstream.

• Sewers should be designed to convey peak flows without surcharge.

• Sewers should achieve self-cleansing velocity at least once per day.

• To allow for ventilation of the system, maximum design depth of flow should not
exceed 0.75 x pipe diameter.

• Inspection chambers should be provided at each junction, change of diameter,


change of direction, change of gradient and at the head of each system.

• Inspection chambers should be provided where the connection from each building
meets the main sewerage system of the development

• Spacing between inspection chambers should not exceed 30m.


Volume 8 Developer's Guide December 2006 Page 8 of 47
State of Qatar Public Works Authority
Drainage Affairs

• At inspection chambers, all pipes should be laid such that their soffits (tops) are at
the same level.

3.2.1 Minimum Pipe Sizes and Gradients


The minimum size of external sewer from each building is 150mm at a gradient of 1:60.

3.3 Manholes and Inspection Chambers


All manholes and inspection chambers within the development shall have their own unique
reference number. Manholes and chambers shall be numbered in ascending order
upstream from the terminal manhole MH1. Foul manholes shall be prefixed F and
stormwater manholes shall be prefixed S.

Manholes and chambers at the head of each system shall include min 75mm or (1/2 x d)
piped vents fixed to adjacent walls and exiting at roof level.

Buliding line

GATE

Layout plans for both foul and storm water systems shall contain schedules as follows:

MH Ref Cover Invert Depth MHDia Cover Type


Level Level

All levels and dimensions are to be in metres to Qatar National Height Datum (QNHD).

Volume 8 Developer's Guide December 2006 Page 9 of 47


State of Qatar Public Works Authority
Drainage Affairs

Standard manhole/inspection chamber sizes are.


SCHEDULES OF INSPECTION CHAMBERS

MH. DEPTH COVER.SIZE COMMENTS


SIZE (m) (mm) No. of Connections from Buildings
(mm)
600X600 < 1.2 600X600 Up to 3 bldg. connections each side

1200X600 < 1.2 1200x600 Up to 7 bldg. connections each side


1220 x675 1220x675

900 DIA > 1.2 600X600 MH 1

The Cover Type for Manholes depend on the Location:


• For foot traffic it should be Light Duty (LD)
• For slow light vehicle traffic it should be Medium Duty (MD)

3.4 Pipework

3.4.1 Materials
The preferred material for foul sewers is extra strength vitrified clay pipes and fittings to BS
EN 295 or PVC-U to EN1401-1, with flexible joints.
Material

Pipe size mm Min Crushing Strength KNI m2

150 34

200 40

No concrete or asbestos cement pipes shall be used as they will be eaten away by sewer
gasses.

Pumping mains may be flexibly jointed ductile iron pipes (it is recommended that these are
lined internally with fusion bonded epoxy, ceramic epoxy, or polyurethane to resist sewage
gases) or HDPE. uPVC should not be used as it is brittle and can fail.

Volume 8 Developer's Guide December 2006 Page 10 of 47


State of Qatar Public Works Authority
Drainage Affairs

3.4.2 Construction
Construction should be in accordance with the Standard Drawings provided with this
document.

3.5 Building Drainage


Requirements for building drainage are applicable to domestic buildings or small non-
domestic buildings. Systems are generally located within the building and above ground
level, unless the building has a basement. Complex systems in larger buildings should be
designed to BS EN 12056.
Building drainage of basement and ground floor shall employ a twin pipe system for
separate discharge of soil and waste flows to foul sewage manholes, as shown below:

Source of Discharge System to which Discharge is to be


made

Toilet, urinals Soil

Bidet Soil

Wash basin, bath, Waste


shower

Kitchen Waste
. .
BUilding drainage of first floors and above shall employ a single pipe system.

Swimming Pools: To prevent flooding of the sewerage system the discharge from
swimming pools shall be limited to a maximum flow rate of 10 lis. Positive means of flow
control shall be provided such as a sharp edge orifice plate (50-60mm), a locked flow
control valve or a small diameter pipe (e.g 50mm x 3m long or 75mm x 10m long). As the
flow control will be dependent upon the particulars of the swimming pool installation the
developer shall provide calculations to demonstrate the design of the flow control device.

3.5.1 Construction
All sewerage and waste discharge pipes inside the bUilding as far as the manhole should be
PVC-U (unplasticised polyvinyl chloride) to BS 4660 and EN1401-1 with push-fit joints
incorporating elastomeric sealing rings to provide flexibility at joints.

Constructing pipelines below building should be avoided where possible. Where


unavoidable the design shall ensure that neither the structural integrity of the pipeline or the
building is compromised.
Pipeline trenches should not be excavated lower than the foundations of the building unless
concrete bedding and surround are used to the lowest level of the building foundation.

Volume 8 Developer's Guide December 2006 Page 11 of 47


State of Qatar Public Works Authority
Drainage Affairs .

3.6 Septic Tanks, Holding Tanks and Soakaways


Septic tanks and soakaways are used to store and treat foul flows from premises, prior to
future connection to the main sewerage system. They comprise an underground tank for
anaerobic treatment followed by a soakaway tank or pipe system to encourage effluent
flows to percolate into the surrounding ground.

Septic tank standard details are shown in Org OG 8 and OG9; soakaways for use with septic
tanks are shown in Org OG10.
Since septic tanks only provide partial treatment, these tanks are a major source of
groundwater pollution and therefore should not be constructed where the main sewerage
system is available. For existing developments, house connections from Manhole number 1
to the main sewerage system should be made at the earliest opportunity, and usage of the
septic and sewage holding tank stopped.

3.6.1 Ground Conditions


Since the soakaway relies for its operation on outflows infiltrating into the surrounding
ground, it is vital that the ground conditions allow such infiltration. Ground that is of low
permeability or with high existing water table will prevent percolation taking place, and the
septic tank system will fail.

Groundwater levels in many parts of this country have risen markedly in recent years, due
to:

• the flat and undulating topography resulting in localised depressions in the underlying
impermeable layers. Such areas are without efficient drainage routes, and hence
susceptible to rises in groundwater levels during heavy rainfall.

• Urban development has increased flows soaking into the ground, due to septic tanks,
water supply leakage and irrigation. The result has been significant rises in
groundwater levels, due to limited permeability of the ground.

• Ground conditions and permeability are highly variable even within very localised
areas;

• Most groundwater levels rise by between 1.0m and 1.5m during a wet period when
monthly rainfall exceeds 30mm. Level rise reduces to between 0.5m and 0.6m
nearer the coast;

Where soakaways do not work Holding Tanks should be provided for a period of 2 days
(min) storage.

Any proposed septic tank soakaway system must demonstrate that the surrounding ground
has satisfactory permeability.

Volume 8 Developer's Guide December 2006 Page 12 of 47


State of Qatar Public Works Authority
Drainage Affairs

3.6.2 Design Issues


The following issues require consideration when the use of soakaways is contemplated. The
list is indicative only and site-specific geotechnical and hydrogeological investigation and
interpretation is always required as the basis for successful design.

For the standard ring-type soakaway chamber some 3m overall depth it is recommended
that:
• The minimum (wet season) groundwater depth should be more than 3.5 m below
ground level;
• In areas where groundwater levels are rising use the groundwater depth should be
more than 4 mbelow ground level as a precautionary measure.
The permeability of the ground has a significant influence on the ability of soakaways to
function. If the permeability is attributable to sub-vertical jointing which is very variable over
short distances and use of trench type soakaways may overcome this because the chances
of encountering fissured zones is increased. For soakaways a permeability (k) of more than
1x 10-5 m/s required

Soakaways can become inefficient due to becoming 'clogged'. This may be due to silting up
(which can occur early as the initial 'slug' of water laden with silt generated when
groundwater is disturbed during construction work), and/or 'smearing' when the soakaway is
drilled (i.e. the fissures are blocked off by the crushed drill cuttings). These problems may
be minimised by jetting the system clean prior to its first use.

3.6.3 Siting of Septic Tanks and Soakaways


Septic tanks should be sited min 7m from any habitable parts of buildings.

The septic tank must be sited in a location where a suction tanker can get to it to empty it.
The bottom of the tank should be less than 3m below the level where the vehicle will stand.

Where practical the soakaway should be located at a minimum of 5m from the septic tank or
any other structure. The soakaway should not be located within 10m of potable water
supplies in order to avoid possible cross-contamination.

3.6.4 Design and Construction


Septic tanks for domestic use should have a capacity below the level of the inlet of at least
C litres where:

C =(225P + 2000)
C is the capacity of the tank (in litres) with a minimum value of 2900 litres.

P is the design population with a minimum value of four.

Volume 8 Developer's Guide December 2006 Page 13 of 47


State of Qatar Public Works Authority
Drainage Affairs

Sepf IC Tan k : S'Ize an d TIype


Population Drainage Affairs Type Capacity (Iitres)

4 A 2,900

10 A 4,500

20 B 6,500

40 C 11,000

80 D 20,000

100 E 24,500

200 F 47,000

300 F 78,500

350 F 80,750

Where septic tanks are required to accept discharges from other than domestic sources,
details of actual flows shall be provided.

Septic tanks are to be constructed in accordance with the Standard Details Drg. Nos. DG8
or DG9 as appropriate, or approved alternative prefabricated tanks. Tanks shall be
watertight and prevent leakage of their contents and ingress of groundwater. Ventilation is to
be provided with outlets distant from habitation.

The inlet and outlet of the septic tank shall be designed to prevent disturbance to the
surface scum or settled sludge, and shall incorporate at least two chambers or
compartments operating in series. Where the width of the tank does not exceed 1200mm
the inlet should be made via a dip pipe. To minimise turbulence, provision shall be made to
limit the flow rate of the incoming foul water. For incoming pipes up to 150mm diameter, the
velocity shall be limited by laying the last 12m of the incoming pipe at a gradient of 1 in 50 or
flatter.
The inlet and outlet pipes of the septic tank shall be provided with access for sampling and
inspection.

Septic tanks shall be provided with facilities for emptying and cleaning. Access covers shall
be of durable quality having regard to the corrosive nature of the tank contents. All access
shall be lockable or otherwise engineered to prevent unauthorised entry.

3.6.5 Warning Notice


A notice shall be fixed within an adjacent building describing the necessary maintenance.
The wording shall be in Arabic and English liThe foul sewage system from this property
discharges to a septic tank and soakaway. The septic tank requires monthly inspections of
the outlet chamber or distribution box to observe that the effluent is free flowing and clear.
The septic tank requires emptying at least once every 12 months by a licensed contractor.

Volume 8 Developer's Guide December 2006 Page 14 of4?


State of Qatar Public Works Authority
Drainage Affairs

The property owner is legally responsible for ensuring that the system does not cause
pollution, a health hazard or a nuisance."

3.6.6 Sewage Holding Tanks


Where soakaways cannot be permitted due to unfavourable ground conditions or the
number of units delivering to the tank is high, it will be necessary to provide a sewage
holding tank.

The site of the sewage holding tank should preferably be on ground sloping away from and
sited lower than any existing bUilding in the immediate vicinity.
The tank shall be sited at least 7m from any habitable parts of buildings and preferably
down slope. Sewage holding tanks shall be sited such levels that they can be emptied and
cleaned without hazard to the building occupants or the contents being taken through a
dwelling or place of work. Access to the tank may be through a covered space, which may
be lockable.

Sewage holding tanks should have a minimum capacity for the population range as shown
in the Holding Tanks Capacity table.
Thereafter the size should be calculated as follows:

Volume (m 3) =Population x Retention x 0.27


Where the calculated volume is less than the minimum shown the minimum capacity is to be
provided.

Holding Tank Capacity

Population. Retention Size


(days) (m3)
2- 20 25 18 - 135

21-40 20 135-216

41- 80 15 216 -324

80 -150 12 324 - 486

150- 350 10 486 - 945

Tanks should be designed as water retaining structures, and be constructed in reinforced


concrete, or alternative watertight material. The design of the tank shall ensure
watertightness and provide protection from external corrosion.

Sewage holding tanks should have no openings except for inlet, outlet and ventilation.
Tanks should be provided with access for emptying and cleaning. Access covers shall be of
durable material, having regard for the corrosive nature of the tank contents. Every access
should be lockable or otherwise engineered to prevent unauthorised entry.

The developer shall be responsible for making satisfactory arrangements with the Drainage
Affairs for emptying. of the sewage holding tank. Details of all maintenance arrangements
Volume 8 Developer's Guide December 2006 Page 15 of 47
State of Qatar Public Works Authority
Drainage Affairs

will require to be approved by the Drainage Affairs prior to approval of the building permit
application.

3.7 Pumping Stations and Rising Mains


Pumping stations should only be used where it is impossible to gravitate into the PWA main
sewerage system. Bypassing or overflowing from pumping stations is generally not
practical therefore failure of the pumping station may results in discharge of sewage to the
surrounding land or within the property
Responsibility for operation and maintenance of all pumping stations and rising mains will
remain with the developer. This Guide provides general information for pumping
installations. It is recommended that specialist advice be sought, supported by
manufacturers' recommendations.

3.7.1 Rising Mains


The desirable range of velocity should be 1mls to 2m/s. If small pipes are (.75mm) used
then the pump should be able to chop up the sewage.

The roughness value used for the design of the rising main should be shown in the
calculations and should be in accordance with "Tables for the Hydraulic Design of Pipes,
Sewers and Channels" published by HR Wallingford. The following roughness values (ks)
shall generally apply:

Mean Velocity in m/s ks

Up to 1.1m/s O.3mm

Between 1.1 mls and 1.5m/s O.15mm

Over 1.5m/s O.06mm

In the design of pressurised pipelines, thrust blocks are to be provided on flexibly jointed
pipelines where any pipe movement would open up the joints in the line and cause water
leakage.
Thrust blocks are also necessary near valves where a flexible joint is located to facilitate
removal of the valve for maintenance purposes.
The size of block is dependent upon the deflection of the flow, the size of the pipe and the
head of water inside the pipe.

3.7.2 Pumping Stations


Submersible Pumping Stations

It is expected that the maximum flows to be pumped will be less than 51/s, for which
submersible pumping stations are to be provided. Submersible pumping stations should
incorporate the following features:

Volume 8 Developer's Guide December 2006 Page 16 of 47


State of Qatar Public Works Authority
Drainage Affairs

• Minimum of one duty and one standby pump with all pumps being of the same make
and pump model number.

• Pumps and associated equipment suitable for the duty required.

• Non return and gate valve for each pump isolation.

• Operation level controls (either electrode or ultrasonic) as follows:


High level alarm
Pump start

Pump stop
Low level pump protection in addition to the method installed for pump
control.

• Ultrasonic level controls should be configured to hold the last measurement in the
event of a lost echo.

Design Requirements

Detailed design should incorporate the following:

• There should be sufficient space between the pumps to prevent interaction between
the pump suctions.

• Pump stools should be securely bolted to the structural concrete of the sump and not
the benching.

• Discharge and non return valves to be in a separate easily accessible chamber


adjacent to the pump sump and not located within the pump sump.

• Pump guide rails should rise close to the underside of the sump covers above the
pumps.

• The covers should have a clear opening large enough to allow the removal of the
pump while on the guide rails.

• Support points for the pump power cables and lifting chain should be provided under
the pump covers, these should be easily accessible from the surface.
Details of the capacity, power consumption and efficiency of the proposed pumps should be
submitted for approval. It would be expected that pumping stations would comply with the
pump manufacturer's requirements.

Submersible Pump Requirements

Sewage pumps should have an open type impeller with a minimum passage of 100mm
unless chopper pumps are being used. Impellers with smaller passages are likely to suffer
from frequent blockage due to the nature of sewage debris.

Volume 8 Developer's Guide December 2006 Page 17 of 47


State of Qatar Public Works Authority
Drainage Affairs

Centrifugal pumps are recommended to have a maximum running speed of 1450 rpm (4
pole motor) pumps. Speeds in excess of this we cause excessive wear and premature
failure.

The maximum allowable starts per hour should be as specified by the pump or motor
manufacturer. In the absence of any specified figure a maximum of 15 starts/hour is
acceptable.

Structure Requirements
The developer shall supply full details of general arrangement and structural drawings and
supporting calculations for approval.

Package pumping stations contained in GRP or Polyethyelene structures as supplied by the


pump manufacturers are acceptable. The structures are to be surrounded by a minimum of
150mm of OPC20 concrete.

All other pumping stations shall be constructed of reinforced concrete, designed in


accordance with BS8110 "The Structural Design of Concrete" with specific requirements for
wet wells of BS8007 "Design of Concrete Structures for Retaining Aqueous Liquids".
Design crack widths shall be in accordance with BS8007 and shall not exceed a maximum
design surface crack width of 0.20mm from direct tension, flexure and temperature effects.
Ventilation and Odour Control

Small pumping stations generally do not require odour control. However, where odour
control is required passive activated carbon unit should be sufficient.

Electrical Requirements

All electrical equipment, cabling and installations shall meet the requirements of the
KAHRAMAA.
Control equipment shall be housed in dust and damp-proof, compartmentalised cubicles,
complying with the relevant British Standards. Adequate anti-condensation heaters are to be
provided in all compartments. All outdoor equipment shall be waterproof. All control panels
shall be provided with a 13-amp single-phase power outlet and a 25-volt outlet for a portable
inspection lamp.
Emergency stop, lock-off buttons shall be provided adjacent to all plant installations. Unless
specifically designed for submersible operation, all electrical plant shall be located above
maximum water level.

Site Requirements

Pumping stations will generally be located with the development site. Consideration should
be given to the need for light vehicle access for maintenance purposes.

Volume 8 Developer's Guide December 2006 Page 18 of 47


State of Qatar Public Works Authority
Drainage Affairs

4 Storm Drainage

4.1 Introduction
The purpose of this guide is to advise developers of the Public Works Authority (PWA)
requirements for the provision of surface water and ground water management within
development sites.
The existing surface water and groundwater systems in Qatar are of limited extent. Primarily
these systems manage surface water runoff and control groundwater levels for the
highways. Urbanisation of the catchments increases the amount of potential runoff from
development sites which would cause overload of these systems. This guide has therefore
been developed to guide and assist developers in designing a managed drainage system
that does not adversely affect the existing drainage network but will provide protection from
flooding for the development.
This guide sets out the criteria that Drainage Affairs (DA) requires developers to follow for
the provision of a Managed Drainage Systems for the disposal of surface water and
groundwater.
Drainage Affairs have developed Advice Notes for four types of development which contain
information on how the Managed Drainage System approach can be achieved.
The types of development specified are as follows:-
single residential development
residential compounds
tower blocks
zonal &regional development
Figure 1 indicates the decision process for the appropriate type of development.

Volume 8 Developer's Guide December 2006 Page 19 of 47


State of Qatar Public Works Authority
Drainage Affairs

I Developer's Drainage Requirements I


1
Managed Drainage System
I I
I
1 1 ~

I
Single Residential
Development I I
Residential
Compounds I r Tower Blocks l I Zonal and Regional
Developments
I
J. 1 l
See Advice Note 1
I I I
See Advice Note 2
I I See Advice Note 2
I I
See Advice Note 3
I
i 1 1 1
Definition: Definition: Definition: Appoint Recognised and
Single house on a development plot. A residential compound is a development Tower block is defined as a multistorey Experienced Drainage Consultant
consisting of properties and internal roads residential or commercial development.
Drainage Philosophy: upto 5 hectares in area. 1
Infiltration/percolation systems Drainage Philosophy:
Definition:
(soakways, infiltration basin etc) in areas Drainage Philosophy: Storage/Allenuation tank system.
Development of residential compounds
of low groundwater table. Infiltration/percolation systems
greater than 5 hectares and development
(soakways, infiltration basin etc) and Disposal of Surface Water
of single and multiple QAR Zones.
Tanks in areas of high groundwater table. storage system (tank sewers, retention Direction connection permitted to
tanks ,etc) in areas of low groundwater Drainage Affairs assets IT available.
Drainage Philosophy:
Drainage systems to serve roofs and table. Storage tanks in areas of high
Drainage Impact Assessment (DIA)
hardstanding areas as necessary. groundwater table. Permitted Discharge:
required.
101/s per ha of development.
Disposal of Surface Water Disposal of Surface Water
Disposal of Surface Water
No Direct connection to Drainage Affairs Direction connection permitted to Typical Minimum Storage Requirements
SUbject to approved DIA.
assets permitted Drainage Affairs assets if available. 390m 3/ha
Permitted Discharge:
Permitted Discharge: Permitted Discharge:
Subject to approved DIA.
Not Applicable 101/s per ha of development.
Typical Storage Requirements
Typical storage ReqUirements: Typical Minimum Storage Requirements
Subject to approved DIA.
150m3/ha 270m 3/ha
1
Drainage Affairs Requirements
Submission of Project Profile
Submission and Approval of DIA

1
Proposal for Soakawayl Proposal for Managed Proposal for Managed Proposal for Managed
Stormtank System Stormwater System for Stormwater System for Stormwater System for Zonal and
I I I Residential Compound I I Tower Block I Regional Development

Figure 1: DEVELOPERS DRAINAGE REQUIREMENTS

Volume 8 Developer's Guide December 2006 Page 20 of 47


State of Qatar Public Works Authority
Drainage Affairs

4.2 Managed Drainage Systems


The Developer should consider a number of basic principles before commencing with a site
layout plan as follows:-

• Site topography with respect to site levels should be studied in detail. Development
in the lowest parts ofthe sites should be avoided. The lowest parts of the site can be
used to store and collect any stormwater runoff minimizing the construct costs of
piped networks. Building on the highest part of the site may reduce amount of
protection from flooding that is required.

• High groundwater tables can cause problems not only during construction but
afterwards with damage to underground structures and utilities. Drainage Affairs
have information available on the areas in Qatar where high groundwater is a
problem and can provide guidance as to its control. If a site is water logged filling the
low lying areas does not remove the problem, it only hides it from view. A long term
solution is needed which may include ground water control.

• Drainage Affairs require surface water runoff to be managed and controlled for all
developments and therefore adequate provision should be made in all developments
for the storage/attenuation of stormwater runoff.

• Ground conditions within the site should be understood, whether there is sand, fill
material or massive rock will all have an influence on the type of surface water
drainage systems that may be developed for the site.

• Site grading has a considerable influence on the cost and effectiveness of the site
drainage and therefore should be considered at a very early stage. A flat or level site
is much more expensive to drain than a site which has some fall across it where
natural drainage paths can be developed. Development adjacent to the coast should
be graded to a minimum of level of 3.5m above Qatar datum. This will allow gravity
drainage systems to be developed and will protect other utilities and building
foundations from damage through high groundwater levels.

• The design standards for the drainage system for the development should be
established at an early stage. The degree of protection from flooding for the
development needs to be established at an early stage to

Drainage Affairs philosophy is to manage to surface water and groundwater systems by the
use of various techniques that are part of the stormwater management philosophy described
under various names around the world such as SUDS(Sustainable Urban Development
(UK)), BMP (Best Management Practice (USA)) and Stormwater Management(Australia).

The techniques that have been identified as appropriate for Qatar are:-

Preventative measures

The first stage of the Managed Approach is to reduce the runoff quantities. This may include
reducing the amount of hard surfacing within a development and using soft landscaping

Volume 8 Developer's Guide December 2006 Page 21 of 47


State of Qatar Public Works Authority
Drainage Affairs

suitable for a desert climate instead. Construction of individual tanks or soakaways for each
property to store or disperse the rainfall.

Pervious surfaces

Surfaces that allow inflow of rainwater into the underlying construction or soil. This is a
development of the block paving technique that is currently in extensive use in Qatar to
develop its full potential by the use of geotextile filter membranes.

Filter drains

Linear drains consisting of trenches filled with a permeable material or modular plastic tank
systems, often with a perforated pipe in the base of the trench to assist drainage, to store
and conduct water; they may also permit infiltration.

Swales

Swales consist of wide shallow channels with or without vegetation that conduct and retain
water, and may also permit infiltration. These work well within development sites with a
large proportion of landscaping where the design of the landscaping can easily incorporate
these features.

Emergency Flood Areas (EFA)

The use of Emergency Flood Areas (EFA) is well established in Qatar and is a viable option
for the management of surface water run off.

Infiltration devices

Sub-surface structures such at modular tanks systems that can promote the infiltration of
surface water to the ground. There are a number of proprietary systems on the market for
this.

Oversize Pipes and Throttles

This option is appropriate if there is a positive drainage system nearby that can take a
controlled amount of runoff for the site.

All of these techniques are valid solutions to produce a Managed Drainage System,
however every development site is different and will have different problems that will require
different solutions.

Volume 8 Developer's Guide December 2006 Page 22 of4?


State of Qatar Public Works Authority
Drainage Affairs

Stormwater Drainage References

1 Qatar Sewerage and Drainage Design Manual

Volume 3 Surface and Groundwater Drainage


2 Qatar Highways Design Manual

3 Soakaways: BRE Digest 151

4. Scope for Control of Urban Runoff: CIRAI Report 124 1992

5 Interim Code of Practice for Sustainable Drainage Systems: National SUDS Working
Group(UK) July 2004

6 Stormwater Best Management Practices in an Ultra-Urban Setting


US Department of Transport Federal Highway Administration

7 Statutory Instrument 1999 No. 1783


The Environmental Impact Assessment (Land Drainage Improvement Works)
Regulations 1999 : DEFRA UK

Volume 8 Developer's Guide December 2006 Page 23 of 47


State of Qatar Public Works Authority
Drainage Affairs

ADVICE NOTE NO 1· SOAKAWAYS AND STORM STORAGE TANKS FOR SINGLE RESIDENTIAL
DEVELOPMENT

1.0 Introduction

Soakaways and storm tanks are simple methods of managing storm water run off in situations where there
is no positive stormwater system available or planned for the future.

The three determining factors for the design of a soakaway drainage system are:-

the size of the area which relates to the volume of water to be drained
the percolation rate of the soil/sub-soil
the depth to the water table i.e. the upper level of the groundwater that is naturally held
within the soil, sub-soil or bedrock. '.

Soakaways should be provided for all roof areas and hard standing areas within the building plot.

2.0 Soakaways or Storm Tanks

The choice of soakaway or storm tank for managing the surface water runoff from a site will
depend upon the depth of the ground water level for the ground surface.

The method of determining whether a soakaway or storm tank is appropriate is indicated 'on the
following flow chart.

Volume 8 Developer's Guide December 2006 Page 24 of 47


State of Qatar Public Works Authority
Drainage Affairs

Residential Properties
Soakaway I Stormtank
Design Choice

Obtain Information on Ground water


levels from design query

No Yes

Design the Soakway Design the Storm


in accordance with Tank in accordance
the guidelines with the guidelines

Obtain Drainage Affairs


Approval

Figure 1: Choice of Soakaway or Storm Tank


3.0 Sizing of Facilities
3.1 Size of Soakaway
The following table shows the size of soakaway/tank that needs to be constructed.

Table 1: Depth of soakaway required for the design rainfall for different drainage areas
Chamber Volume Calculation Chamber Diameter

Rainfall
Roof Area
Depth for 1in Runoff Volume of
to be 1.2 1.5 1.8 2.1
2 year 24 hr Coefficient Storage
drained
Duration

m2 Mm m3 m m m m

100 25 0.9 2.3 1.99 1.27 0.88 0.65


200 25 0.9 4.5 3.98 2.55 1.77 1.30
300 25 0.9 6.8
><>< 2.65 1.95
400 25 0.9 9.0
><>< 3.54 2.60
500 25

Volume 8 Developer's Guide


0.9 11.3
><><
December 2006
4.42 3.25

Page 25 of4?
State of Qatar Public Works Authority
Drainage Affairs

Note that this is the storage volume required between the dry base or water table level of the soakaway,
and the invert (inlet) level of the incoming drainage pipe, and assumes that the chamber is empty.

For example if the drainage area indicates that a 1.5metre diameter chamber with a soakaway depth of
2.55 then if the invert level of the incoming pipe is, say, 600mm below ground level, and assuming the
base is above water table level, then the overall depth of the soakaway is...

2.55m + 0.6m =3.15m overall depth.

If there is insufficient depth because of a high water table, the required volume of the soakaway can be
met by increasing the plan size or placing two or more soakaways of this size side by side.

3.2 Size of Storm Tank

The sizing of the stormtankl tank should follow the procedure indicated in Table 2.
Table 2: Depth of Tank required for the design rainfall for different drainage areas
Tank Volume Calculation Tank Diameter

Rainfall
Depth for
Area to Factor Volume
1in 2 Runoff
be of of 1.2 1.5 1.8 2.1
year 24 Coefficient
drained Safety Storage
hour
Duration

m2 mm m3 m m· m m

100 25 0.9 1.1 2.5 2.19 1.40 0.97 0.71

200 25 0.9 1.1 5.0 4.38 2.80 1.95 1.43

300 25 0.9 1.1 7.4


><>< 2.92 2.14

400 25 0.9 1.1 9.9


>< >< 3.89 2.86

500 25 0.9 1.1 12.4


>< >< 4.86 3.57

It should be noted that the tank will have to be pumped out after the rainfall has finished, restoring the
flood protection of the property.

4.0 Construction details

4.1 Soakaway Construction

A typical standard detail drawing of a soakaway is included as Figure A1 of this advice note.

Volume 8 Developer's Guide December 2006 Page 26 of4?


State of Qatar Public Works Authority
Drainage Affairs

Ready-made soakaway systems are locally available in pre-cast concrete. These tend to be circular
sections that can be stacked to give the required depth and storage volume, and then topped with a
suitable cover.

4.2 Tank Construction

A typical standard detail drawing for a stormwater tank is included in Appendix 3.


Pre-cast chamber rings are locally available and can be stacked to give the required depth and storage
volume.

Modular plastic boxes which can be used to provide both storage and soakaway functions are available in
the local market. For further information please contact Drainage Affairs.

5.0 Maintenance of Stormwater Systems


5.1 Soakaways

Soakaways do require some maintenance to keep them operating satisfactorily. Each year after the rainy
season the following maintenance task should be carried out:-
Inspect catchpit and remove any silt in the catchpit.
Inspect soakaway and remove any silt in the chamber.

5.2 Tanks

In order to make the tank effective in the control of stormwater runoff, after each rainfall event the tank
should be emptied of water and silt. The water in the tank should be tankered away or it can be used for
irrigation of any garden areas. Under no circumstances should the tank be emptied to the foul
sewerage system.
Each year after the rainy season the following maintenance tasks should be carried out:-
Inspect silt trap and remove any silt in the trap.
Inspect tank and remove any silt in the tank.
Inspect and repair any leaks.

6.0 Safety
6.1 Excavations

Excavations can be dangerous and the following points should be noted.


all excavations should be fenced off or covered to prevent accidents.
deep excavations should have sufficient support provided to prevent collapse of the
excavation or debris falling into the excavation.

Volume 8 Developer's Guide December 2006 Page 27 of 47


State of Qatar Public Works Authority
Drainage Affairs

6.1.1 Entry into Confined Spaces

Any tank buried in the ground can be dangerous. Only qualified and experienced operatives who have
and are trained in the use the appropriate safety equipment for entry into confined spaces should be
employed to carry out the cleaning and inspection works.

References

Qatar Sewerage and Drainage Design Manual


Volume 3 Surface and Groundwater Drainage

2 Qatar Highways Design Manual

3 Soakaways: BRE Digest 151

Volume 8 Developer's Guide December 2006 Page 28 of 47


State of Qatar Public Works Authority
Drainage Affairs

ADVICE NOTE NO 2 •• DRAINAGE FOR TOWER BLOCKS AND RESIDENTIAL DEVELOPMENTS

1.0 Introduction
The drainage of tower blocks and small residential compounds requires the designer of the drainage
system to develop site specific solutions to protect the development from the results of flooding.

The basic requirement is that the development must deal with its runoff within the site and not export the
problem to adjacent developments. Drainage affairs recommend a number of methods that could be used
to manage the drainage system form tower blocks and residential developments. The designer of the
proposed system should make himself aware of the concepts of managed drainage systems and choose
the most appropriate system for the site in question.

It is not obligatory, but it may be useful for the developer to produce a project profile for the site drainage.
The project profile provides a means to collect all relevant data for the development area which will help to
produce the Managed Drainage System proposal.

2.0 Managed Drainage systems

Drainage Affairs recommend that the designer of drainage system for the development investigates the
following measures and systems to manage the surface water run off.
Preventative measures

The first stage of the Managed Approach is to reduce the runoff quantities. This may include
reducing the amount of hard surfacing within a development and using soft landscaping suitable for
a desert climate instead. The use of individual tanks or soakaways for each property to store or
disperse the surface run off is another method of reduction in surface water run-off.

Pervious surfaces

Pervious surfaces are surfaces that allow inflow of rainwater into the underlying construction or soil.
In Qatar extensive use is made of block paving for footpaths and parking area. Instead of bedding
the concrete blocks directly on sand bed if they are laid on a granular sub-base water can stored in
the sub-base and infiltrate into the ground. Typically the sub-base consists of 300m of 25 - 150mm
grades stone overlain with a geotextile. The bedding for the block paving consists of 50 mm of 4-
10 mm graded stone.

Filter drains
Linear drains consisting of trenches filled with a permeable material or modular plastic tank
systems, often with a perforated pipe in the base of the trench to assist drainage, to store and
conduct water; they may also permit infiltration.

Swales

Volume 8 Developer's Guide December 2006 Page 29 of 47


State of Qatar Public Works Authority
Drainage Affairs

Swales consist of wide shallow channels with or without vegetation that conduct and retain water,
and may also permit infiltration. These work well within development sites with a large proportion
of landscaping where the design of the landscaping can easily incorporate these features. The
swales can be used for infiltration and evaporation. Areas of planting which are lower than the
surround areas can be used in a similar way to a swale.

Emergency Flood Areas (EFA)


The use of Emergency Flood Areas (EFA) is well established in Qatar and is a viable option for the
management of surface water run off. An area of the development site is designated as an EFA
and depending on the site usage and the depth of water to be stored may need to be fenced of to
prevent accidents to children and adults.

Infiltration devices

Sub-surface structures such at modular tanks systems that can promote the infiltration of surface
water to the ground. There are a number of proprietary systems on the market for this. This is
growth area in the field of managed drainage systems with a number of manufacturers being able
to provide plastic modular systems to build large tanks that can be installed under car parks
recreation areas etc which provide storage, attenuation and infiltration facilities for the surface
water run-off.

Oversize Pipes and Throttles


This option is appropriate if there is a positive drainage system nearby that can take a controlled
amount of runoff for the site. A smaller diameter pipe or orifice plate is used at the outlet to control
the discharge rate.

3.0 Basic Design Principles

The basic principle of the design of the drainage system for the development is to control runoff
within the development as follows:

No Drainage Affairs stormwater system available. Drain to on site stormwater storage


system as indicated on Figure 1 of these guidelines.
Existing or proposed Drainage Affairs stormwater system. Connection to the Drainage
Affairs system by overland flow, or direct connection via managed drainage system as
indicated on Figure1 of these guidelines.

4.0 Project Profile

In order that the designer can assess the requirements it is recommended but not obligatory to
produce a project profile. The project profile should include all relevant information available.
Information should be in note form. The checklist below is provided as a guide only, to assist in

Volume 8 Developer's Guide December 2006 Page 30 of 47


State of Qatar Public Works Authority
Drainage Affairs

identifying major items which should be included or considered in completing the project profile to
assist in the choice of managed drainage system for the site.

1. AN OUTLINE DESCRIPTION OF THE PROJECT

Provide the following information:

• Project title
• Developer
• Contact Person (name/telephone)
• Nature and description of the project
• Location (include plans)
• Area of project site and % paved/unpaved
• Finished site platform level
• Whether planning permission application is required
• Recent and dated photographs to show a panoramic view of the site

2. AN OUTLINE OF THE PLANNING AND IMPLEMENTATION PROGRAMME

a) Explain how the project will be planned and implemented

e.g. authorized person/consultants/contractor.

b) Identify the project timetable for:

• appointing consultants/authorized person


• planning/preliminary designs
• preparing a Drainage Impact Assessment (DIA)study (if required - see
Advice Note No.3)
• finalizing designs
• implementation
• completion/commencing operation
c) Identify any interactions with other projects which should be considered.

3. AN OUTLINE OF THE EXISTING DRAINAGE

Volume 8 Developer's Guide December 2006 Page 31 of 47


State of Qatar Public Works Authority
Drainage Affairs

Provide the following drainage details:

• A 1:20000 scale plan of the catchment in which the project site is located with the
drainage system relevant to the proposed project highlighted.
• A detailed layout plan at 1:5000 scale or larger, of the project site with the site
boundary, existing ground levels, existing drainage and existing land uses all
identified both within and adjacent to the project site.
• A general description of the existing drainage including adequacy of the drainage
system and flooding history.

4. OTHER INFORMATION

Provide the following information:

• Potential drainage impacts (described in broad terms) arising from the project.
• A general description of the proposed drainage impact mitigation measures (if any) to
be provided.
• A general description of the proposed drainage system.
• A general statement on the flooding situation upon completion of the project.

References
1 Qatar Sewerage and Drainage Design Manual
Volume 3 Surface and Groundwater Drainage

2 Qatar Highways Design Manual

3 Soakaways : BRE Digest 151


4. Scope for Control of Urban Runoff: CIRAI Report 124 1992

5 Interim Code of Practice for Sustainable Drainage Systems: National SUDS Working Group(UK)
July 2004

6 Stormwater Best Management Practices in an Ultra-Urban Setting


US Department of Transport Federal Highway Administration

7 Statutory Instrument 1999 No. 1783


The Environmental Impact Assessment (Land Drainage Improvement Works) Regulations 1999 :
DEFRA UK

Volume 8 Developer's Guide December 2006 Page 32 of4?


State of Qatar Public Works Authority
Drainage Affairs

ADVICE NOTE NO 3· APPLICATION OF THE DRAINAGE IMPACT ASSESSMENT PROCESS TO


ZONAL AND DISTRICT DEVELOPMENT PROJECTS

Table 1
1. INTRODUCTION
1.1 This Advice Note outlines the Drainage Affairs assessment procedures for the drainage impact
of zonal and district development projects. It is anticipated that the information contained in
this document will assist in preparing project profiles and in addressing the project's potential
drainage impacts.
1.2 Many private sector projects have the potential to cause adverse impacts on stormwater
drainage, groundwater and flooding. These impacts need to be considered at the early stages
of the project planning and designed to minimize drainage and flooding problems and to avoid
expensive remedial measures.

1.3 The Drainage Impact Assessment (DIA) process provides for a systematic approach in
addressing drainage issues associated with any project. The primary objective of the DIA
process is to demonstrate that with the implementation of necessary mitigation measures, the
project will not cause an unacceptable increase in the risk of flooding in areas upstream of ,
adjacent to, or downstream of the development.

2. ROLES AND RESPONSIBILITIES OF THE DEVELOPER

2.1 The developer of a zonal or district development project is responsible for:

(a) preparing the project profile and undertaking the DIA study if required;

(b) implementing all measures necessary to mitigate adverse drainage impacts identified
by the DIA study;

(c) monitoring the project's drainage performance during construction; and

(d) taking all measures necessary to redress unanticipated or unacceptable impacts arising
during project construction.

2.2 The application of the DIA process to a particular project should not be separated from the
other basic investigation and design processes. Thus, the developer can integrate drainage,
environmental, technical and economic assessments to produce the best and most
appropriate project design.

3. ROLES OF DRAINAGE AFFAIRS

3.1 DA is responsible for examining project profile; determining whether DIA study is required;
approving DIA study report submitted under the DIA process; and advising the Planning
Department drainage conditions on the project.

Volume 8 Developer's Guide December 2006 Page 33 of 47


State of Qatar Public Works Authority
Drainage Affairs

3.2 Notwithstanding that the developer may have submitted proposals in accordance with the
guidelines stipulated in this Advice Note and DA may have accepted such proposals or have
required such proposals to be amended prior to acceptance, DA shall have no liability to the
proponent for any damage, injury, losses, claims, charges or fees which may arise from any
act, omission or negligence howsoever caused by DA, its agents, servants or employees.
4. THE DRAINAGE IMPACT ASSESSMENT PROCESS

4.1 The DIA process comprises two principal elements, a project profile and, if necessary, a DIA
study.
4.2 All development projects for Zonal or Regional Developments will require the preparation of a
Project Profile.

The project profile and DIA study require substantial engineering input and judgement, and
should be undertaken under the direction of a registered professional engineer in the Civil
Engineering discipline. Any submission made as part of the DIA process should be signed
and certified by the registered professional engineer in charge. Failure to submit a satisfactory
project profile or DIA study report, if required, may unnecessarily delay the DIA?? process.

4.3 Development projects within urban areas served by an engineered positive stormwater
drainage system will generally not require the DIA process to be completed as the project
profile should contain sufficient information for approval, the exception will be those
developments which are of sufficient scale to make a significant change to the drainage
characteristics of a stormwater drainage system.

4.4 In areas not served by an engineered positive stormwater drainage system, the scale of the
development, the form and location will determine the necessity of DIA process. As a general
rule, if the answer to any of the following questions is positive or unknown, DIA process shall
be applied to the project:

(a) will a natural drainage path be affected by the development?

(b) will there be a significant increase in impervious area and therefore a significant
increase in runoff from the development site?

(c) will reclamation or filling be required to form the site for the development?

(d) will the drainage system downstream of the development site require to be upgraded to
convey the runoff from the site?

(e) will the development be situated at flood prone areas?

(D will the development be situated in an area of high groundwater?

(g) will the development have substantial area of planting which will require irrigation?

(h) will irrigation cause a rise in groundwater levels that may cause concern for building
and road foundations?

Project Profile

4.5 An outline of the information required for the project profile is given in Appendix I. Based on
the information in the project profile, DA will decide upon the extent and scope of the DIA
study that is required by considering the likely impact of the proposed project on:

Volume 8 Developer's Guide December 2006 Page 34 of 47


State of Qatar Public Works Authority
Drainage Affairs

(a) the existing capacity of drainage paths;

(b) the changes in surface runoff hydrographs and flood storage; and
(c) the risk of flooding in other areas in the catchment.

(d) the risk of rising groundwater levels due to development.


Drainage Impact Assessment Study

4.6 The scope and requirements of the DIA study shall be proposed by the developer for DA'S
agreement. In setting the parameters for the study, a conscious effort should be made to
constrain its scope as far as practicable while ensuring that the validity of the study is
maintained. The findings of the DIA study shall be documented in a report prepared by the
proponent for submission to DA and the Planning Department. An outline of the information
likely to be required for a DIA study report is given in Appendix II.

4.7 The DIA study shall be carried out in accordance with the standards set out in by DA Drainage
Manual.

4.8 The findings of the DIA study will be used as the basis for setting any requirements on
drainage provisions, flood mitigation measures and performance monitoring tasks which may
be placed on the project. DA will advise the Planning Department or Lands Department of
such requirements on the project as appropriate.
5. DESIGN, IMPLEMENTATION AND MONITORING OF MITIGATION MEASURES

5.1 The developer shall be responsible for incorporating the drainage impact mitigation measures
into the design of the project to ensure that the expected drainage performance of the project
is achieved. The Authorized Person in charge of the project should state in writing that
necessary mitigation measures identified in the DIA study have been incorporated into the
plans.

5.2 The developer shall be responsible for implementing the drainage impact mitigation measures
and undertaking the monitoring programme during the construction stage to ensure
compliance with the conditions on drainage requirements, flood mitigation measures and
performance monitoring requirements as imposed by the DA.

5.3 DA shall recommend the Planning Department to issue a Certificate of Compliance for a
development only if the imposed conditions on drainage requirements and flood mitigation
measures have been fulfilled.

5.4 The developer shall sort out and agree with the maintenance parties on any requisite
monitoring programme during the operation stage. The responsibility for undertaking such
monitoring programme, if necessary, shall rest with the maintenance parties. Depending on
the nature and type of the drainage works, the maintenance parties may be the developer
himself, his agent, other person or DA.

Volume 8 Developer's Guide December 2006 Page 35 of4?


State of Qatar Public Works Authority
Drainage Affairs

References

1 Qatar Sewerage and Drainage Design Manual

Volume 3 Surface and Groundwater Drainage


2 Qatar Highways Design Manual
3 Soakaways: BRE Digest 151

4. Scope for Control of Urban Runoff: CIRAI Report 124 1992


5 Interim Code of Practice for Sustainable Drainage Systems: National SUDS Working Group(UK)
July 2004
6 Stormwater Best Management Practices in an Ultra-Urban Setting

US Department of Transport Federal Highway Administration

7 Statutory Instrument 1999 No. 1783


The Environmental Impact Assessment (Land Drainage Improvement Works) Regulations 1999 :
DEFRAUK

Volume 8 Developer's Guide December 2006 Page 36 of4?


State of Qatar Public Works Authority
Drainage Affairs

APPENDIX 51 ·INFORMATION REQUIRED FOR PROJECT PROFILE

In order that the need for a DIA study can be assessed, the project profile should include all relevant
information available. Information should be in note form. The checklist below is provided as a guide only,
to assist in identifying major items which should be included or considered in completing the project
profile.

1.
4.1.1.1 AN OUTLINE DESCRIPTION OF THE PROJECT

Provide the following information:

• Project title
• Developer
• Contact Person (name/telephone)
• Nature and description of the project
• Location (include plans)
• Area of project site and % paved/unpaved
• Finished site platform level
• Whether planning permission application is required
• Whether lease modification application is required
• Statutory land use zoning
• Recent and dated photographs to shown a panoramic view of the site

2. 4.1.1.2 AN OUTLINE OF THE PLANNING AND IMPLEMENTATION PROGRAMME

a) Explain how the project will be planned and implemented

e.g. authorized person/consultants/contractor.

b) Identify the project timetable for:

• appointing consultants/authorized person


• planning/preliminary designs
• preparing a Drainage Impact Assessment (DIA) study (if required)
• finalizing designs
• implementation
• completion/commencing operation
c) Identify any interactions with other projects which should be considered.

Volume 8 Developer's Guide December 2006 Page 37 of 47


State of Qatar Public Works Authority
Drainage Affairs

3. 4.1.1.3 AN OUTLINE OF THE EXISTING DRAINAGE

Provide the following drainage details:

• A 1:20000 scale plan of the catchment in which the project site is located with the drainage
system relevant to the proposed project highlighted.
• A detailed layout plan at 1:5000 scale or larger, of the project site with the site boundary,
existing ground levels, existing drainage and existing land uses all identified both within and
adjacent to the project site.
• A general description of the existing drainage including adequacy of the drainage system
and flooding history.

4. OTHER INFORMATION

Provide the following information:

• Potential drainage impacts (described in broad terms) arising from the project.
• A general description of the proposed drainage impact mitigation measures (if any) to be
provided.
• A general description of the proposed drainage system.
• A general statement on the flooding situation upon completion of the project.

Any other available information relevant to Appendix II may also be submitted to facilitate DA in
deciding whether a DIA study is required. Submission of sufficient information under this
heading may enable DA to make an early decision on whether exemption from submission of a
DIA study can be granted.

Volume 8 Developer's Guide December 2006 Page 38 of4?


State of Qatar Public Works Authority
Drainage Affairs

APPENDIX SII· INFORMATION REQUIRED FOR DRAINAGE IMPACT ASSESSMENT STUDY


REPORT

In order that the DIA study can be completed as quickly as possible, the DIA study report should include
all relevant information available. In addition to the information submitted in the project profile (Appendix
I), the following information should be included in the report. The checklist below is provided as a guide
only, to assist in identifying major items which should be included or considered in completing the DIA
study.
The findings of the D1A study should be documented in a report prepared by the proponent which will then
be used as the basis for setting any requirements on drainage provisions, flood mitigation measures and
performance monitoring tasks which may be placed on the project.

1. AN OUTLINE OF THE CURRENT FLOODING SUSCEPTIBILITY AND PROPOSED


DRAINAGE

Provide the following details:

• An assessment of the susceptibility of the project site to flooding, preferably with a


record of any past flooding which occurred within or adjacent to the project site.
• An assessment of the groundwater levels within the project site and whether there is a
record of any previous problems within the site or adjacent to the project site.
• A detailed layout plan, at an appropriate scale, of the project site with the site boundary,
proposed ground levels and proposed drainage, including any necessary upgrading
drainage work within the catchment, and proposed land uses, all identified. If the
proponent is aware that the ground levels or drainage or land uses adjacent to, but
outside the project site are likely to change, details should be provided if possible or,
alternatively, attention drawn to the fact that changes are likely.

2. AN OUTLINE OF THE CHANGES TO THE DRAINAGE CHARACTERISTICS AND


POTENTIAL DRAINAGE IMPACTS WHICH MIGHT ARISE FROM THE PROPOSED
PROJECT

Provide the following details to quantify the changes to the drainage characteristics of the
catchment arising from the proposed project:

• Changes in land use and surface runoff characteristics.


• Changes to existing groundwater levels that might be expected.
• Changes to surface runoff hydrographs for 2, 10, 25 and 50 years return period flood

Volume 8 Developer's Guide December 2006 Page 39 of4?


State of Qatar Public Works Authority
Drainage Affairs

events for the project site, any affected natural drainage paths or existing positive or
non positive drainage system.
• Change in flood storage caused by the project.
• Assessment of timing of peak runoff from project site relative to timing of catchment
peak runoff.
• Hydraulic capacity of existing drainage upstream, within and downstream of project site
if applicable. This information will be made available by Drainage Affairs .
• Hydraulic capacity of proposed drainage upstream, within and downstream of project
site. This will depend upon the drainage systems designed by the developer.
• Changes in peak runoff, peak flood levels and/or peak velocities for 2, 10, 25 and 50
years return period flood events at critical locations.
• Details of temporary drainage during construction including hydraulic capacities.

Provide details of all potential impacts which might arise as a result of changes to the
drainage characteristics caused by the proposed project and identify land users who might
be affected. Provide details of the impacts caused by the following:

• Changes in flood levels, flood frequency and/or velocities.


• Changes in timing and magnitude of runoff peaks.
• Changes to maintenance requirements and access for maintenance.
• Changes to the drainage paths and regime during construction and after completion of
the project.
• Cumulative effects taking account of other concurrent developments in catchment.
• Other relevant considerations.

The potential impact should be considered on upstream, downstream and adjacent land
users, and land uses should be identified (e.g. residential, commercial, institutional,
industrial, infrastructure, agricultural, recreational, conservation areas).

Volume 8 Developer's Guide December 2006 Page 40 of4?


State of Qatar Public Works Authority
Drainage Affairs

Volume 8 Developer's Guide December 2006 Page 41 of 47


State of Qatar Public Works Authority
Drainage Affairs

Appendix 1
Building Permit Application

Volume 8 Developer's Guide December 2006 Page 42 of4?


State of Qatar Public Works Authority
Drainage Affairs

DOCUMENTS TO BE SUPPLIED TO DRAINAGE AFFAIRS FOR


BUILDING PERMIT APPLICATION
Mandatory information is shown in bold type

Information Required (2 copies) Scale Notes

Both copies of submission will be stamped approved by the Drainage Affairs. One copy will be returned to
the Developer, the other copy will be retained by the Drainage Affairs

Developer's Programme

Estimated Construction Start Date

Site Location Plan (A3) 1:5000 North sign, co-ordinates of


corners, street names,
principal landmarks
Drainage Services Location Plan (A3) 1:1000 Existing pUblic sewerage and
drainage services adjacent to
A4· Single Property the Site to which the site will
A3· Developments (Compounds, Mult) discharge

Site Plan (A) showing: (Foul Sewer)


All levels related to Qatar National Datum 1:1000, or
Site boundary 1:500, or
Building outline
1:200
Building with descriptive label
Manholes numbered from
Internal Roads, Footpath
MH1.
Internal Sewer Layout
Septic tank, soakaway, sewage holding tank
Drains and manholes Diameter, length between
manholes, gradient flow
Schedules of foul manholes direction. All levels are in 'm'
Pumping Stations and Ref. To QNHD.
Rising Mains
Existing sewers and drains
Road gullies/highway drains
Arch. Levels and QNHD
Site levels levels.

Site Plan (B) showing: (Surfacewater Sewer)


All levels related to Qatar National Datum
Site boundary 1:1000, or

Volume 8 Developer's Guide December 2006 Page 43 of 47


State of Qatar Public Works Authority
Drainage Affairs

Building with descriptive label 1:500, or


Internal Roads, Footpath Manholes numbered from
1:200 MH1.
Internal Pipe Layout
Soakaway
Drains and manholes Diameter, length between
manholes, gradient flow
Schedules of storm manholes
direction. All levels are in 'm'
Pumping Stations and Ref. To QNHD.
Rising Mains
Existing sewers and drains
Road gullies/highway drains
Arch. Levels and QNHD
Site levels
levels.

Building Drainage (A1) 1:50

Floor plans
Fittings and Sanitary fittings
Pipeline details
Discharge points
Gullies

Copies of hydraulic design calculations (A4)

Foul water (including trade effluents)


Surface water (including impermeable area plan
and attenuation details)
Design parameters used

Pumping Stations information showing:

General arrangement details


Wet well capacity
Rising Main Capacity

Volume 8 Developer's Guide December 2006 Page 44 of 47


State of Qatar Public Works Authority
Drainage Affairs

Appendix 2
Design Unit Foul Flows

Volume 8 Developer's Guide December 2006 Page 45 of4?


State of Qatar Public Works Authority
Drainage Affairs

Peak and Average Foul Flows Using Design Units Based on 270 IIh/d

Avg Flow Sewage Peak flow


Population lIs m3/d lIs

1 0.003 0.259 1.64


5 0.016 1.382 2.53
10 0.031 2.678 2.82
15 0.047 4.061 3.09
20 0.063 5.443 3.35
25 0.078 6.739 3.51
30 0.094 8.122 3.62
40 0.125 10.8 3.83
50 0.156 13.478 4.03
60 0.188 16.243 4.22
70 0.219 18.922 4.41
80 0.250 21.6 4.59
90 0.281 24.278 4.74
100 0.313 27.043 4.86

Volume 8 Developer's Guide December 2006 Page 46 of 47


State of Qatar Public Works Authority
Drainage Affairs

Appendix 3
Drawings

Drg No. Title

DG1 Inspection Chambers - Typical Details Sheet 1


DG2 Inspection Chambers - Typical Details Sheet 2
DG3 MH1 - Standard Details
DG4 Typical Manhole Construction Details

DG5 Sewerage Connection to Properties - Typical Details


DG6 Typical Small Submersible Pumping Station
DG7 Sand Trap & Grease Trap - Typical Details

DG8 Septic Tank Type A&B GA Details (pops 1- 20)


DG9 Septic Tank Type CDEF GA Details (pops 21 - 350)

DG10 Soakaway Details

DG 11 Stormwater Soakaway Details

DG12 Stormwater Tank

Volume 8 Developer's Guide December 2006 Page4? of4?


1JQJTh
1. ALL DKN5IOItS All! It H1WHETRtS lJI,ESS DlHEftWISE STAna
2. TillS DRAM 10 BE A£,f,D1H CIlNJWlCTlDltWlTKAU A[LEVA~U1AlIHllt
DnAl~S

iPrtKfllEAMFORCOVERS 3. STEP IRO~S 10 IE PROVIlED A' :JOOlIa cone BOTH tlORIlCMAu..,


Vl:RTKALLY I' DEP1HTO *VERT fXCUOS '110m
'.ALllmAIlAt.N!OOOERIlAlFACESOfTtECtW1BERSTOftPAMED
WITtilWOClIATS0' CaAL l.utEPOX'i
r------, r-----n-f-----, 5.HIJItU1(OWR 10Pll'[ Dl'IMSPftlaN [IIMIUTo BE.OOIIIl
r-----,

:~
I

~
I

lX
l.FllRAllDIlIOkALLAlE!lAlCONIICTNI!OICt!flGSKALLIlfMllDfIED
'DSl.lTAkDfACII~tcN[(TIONBUlLTIMEXTEkDEDfjUlUla.
I I I I I
I I COVDIIrFRAMETOSUlT
I I I C!NtAIPAA1'ETOSLn
I I
I 15tIH.mAROPE~llli I I UI .. mCllARCPfttNIlo I
I I I I I I I
L ____ ...J
I _____ ...JI
L IL _____u_ _ _ _ _ ...JI

PLAN ON COVER PLAN ON COVER PLAN ON COVER

'"~
,
r,t5t,.. 1M
'00 ...
,
r 0"
~M
'" JO'
,
t...

... 1M
."
"
~ r--J!!-

~'~~:~~\~ :.;::
r
1f.':: t~~ IE
~L ' - -
~
{)/ r'~~;~ IE ,:;.. IE

r-Er-- i--- --1+-----1

~
),'
-
-..
~OJ ~ OJ ',::
-
-- --
-
-- 3= i
r--
-E f--.
I--
f--
. . - -
-
--
--+ f - ::....-: ~! Ii
rrr-- :--
c-~
- --+ ----
-
-- 3= i
.~

.:~
,,:':-
......,... '-- .: .... - f--
·;~';n '; I ~:~\ \- I
15IDIAEXTR4&1AfHGTH
'.~.,

.~; .. IE

~
".:.,~ ."

~ e:,
VI1llIfID (LAY PFE
REV. AMEI<D~ENTS BY DA'T£
CONSULTANTS

SECTIONC) SECTIONC) SECTIONC9

CHAMBER TYPE'A' CHAMBER TYPE 'B' DRAWING STATUS

'"
ST£Il'IllOIt5-
1"--- CClYEA l FIWE TO sur
W1TNSEALINGPl.Al[

llRADESRC:lO

J~':'-'
1-'-'· EH12'a.WA15DlHAlOlllE
105ll11UtCLLEAROP£Nk'&

HORTAIlIWJ[Kf«!TOrltAtR
J.AEGUl.AlNliCOlml5

! ~
DRAINAGE AFFAIRS

e-~:
:r.....i ; ~DPC2IlMS1TUCOlKRm
e-~ ~ ~~~Rl~~tEoreETE P.O, 60)(23337
't:':
., ~
,:<:;:--
..
~~=r~lr:~OW
liIWlE lAC 21 CONCRETE -, SU1 twfIOl.E fUME OPE"G SIZE

w: Cot«mE ILOClt'lilDRIC WAlLS


-,
PROJECT
TEL. 4950055 FAX. 4950555

I- _ !"'ERNALBl.OCKWOllICfAaTOtlAVt
HAY£UlIIOCHlRTAlIl[IODtfUi
200 MC!HkALTlllClOE!S
DEVELOPERS GUIDE
GRNXOPC:tOHASS
COJjCIl£1EWALLU.ut:--- umocMaRrARAEtfIlERII6
~ bll! I
alHrC~HDRTARRE!IJ(RIIG

L GRADESIIC20
Z[ '.~:~
,0 lIIlADE SRI: 20 0 COlltJl£lElKNCIlttG TITlE
.:.'";.:.
':"'t~ 0,
" j,;~~ CQNCRETEeENCHIIIG
.. ~~
o\~~ •
~EIIl(20WESl.AB

","'HE_I<
PlltlTl!~&IWl[SRt20
r;
!l.L
MA5s(QNCAETE8A5E
1JQJTh
",. . . . .
PROTECTlOt(&RAOESRt211

UTHKBL
~,L
llIWlI!:sRI::n .J"',,,."......
INSPECTION CHAMBER
TYPICAL DETAILS
SHEETI

""",.".
15TKICILH
SUIGIl4DESRtJ' t rtPr: 'A' AllWmM[Nl YO DE IIUD rOil V," Til' Ifa,.IlRAIKtl
eatll£t1llll1!: TO L\CH LOIrlG alE lFCHiMBrR
1t.AB000DCSRCD

DRAWN DII'T£ PROJECT CODE

SECTlONC9 2. TYPE'8'ARRAIIG£"'~Tl08EUSEOFDRJTOlIRANCH
COlINEnlO1tI TOEAl':HLOMISGE OF OlAMIlER
SECTION@
CHECKED
D~ NOV. 08
-
DWM NOV. D6 PROJECT NO.
CHAMBER TYPE 'A' (TYPE 'B' SIMilAR)
J,ClASS DlIOHHCOVlR4'lWI! TO III; I15mlNTIlAfPl:KlD
.POS5aE It:AVY LlIADEDARUs. OTktRWlSEUASS
BUS C!M:R • FRAtE TO 8£ USlO
CHAMBER TYPE '(' APPROVED
JEA NOV. D6
-
DRAWING NO. REVISION
SCAl£ (Al)
1:70 DGI
• • a .._ • • _ . . . . . . . . . . . . ._ ...... -'.•••
~
lJQill;
t.ILL OilOSlOI(S AAE III )tWMEJR[S UlUSSOTHERWlSE SlAT!D

.r--
:1
ill ~~~,\':'..OHf:tvID~lf AIm
NII.0IBHAMH

. QultEHEICIS
Z. fXTDlHAL rAuS or OtAtelR TO R.,AMm wnHTWD (001115 II'
BI'MINOU5PAllfT
J.lJfIEIlNAl. StIRfAas 1IF [HANSER WALL AI«I (OYER lOBE pAMED WRH
lWOCllATSOFUW.1AREPOXYPAlIf'r

THlSDfTAillSfImSPIm.
SO(l(ElPll£S.FCItPPES
~l15D~ "
),311101-'
14
WITH tOLLARS S£f DETALJ ~
tT17It.ftI:

&- ---.J
&- "
bIoTUG3-15

"
---.J
REINFOR[EMENT

TO"".....AS~~t·tll:"·LO' ..,..""
't'tP! (If SlUl. WTREnF BARS
BARtLlMETE BARHARK
.c.1U05
11 BAR LOCATIONS
T TOft Ff fAIIFACf
880TTllH U EACHfACE
'" NEAR FAa: EW UCIlWAY

'M 1",1 An ALrERlCATlY!!,lRSIIMRSEII."SIlDWWHERERE4UlREDI


III 'D1'DlA

'02'01'\
3DO 1610

DETAIL E9 PLAN ON COVER SLAB REINFORCEMENT


TYPICAL SECTION ON BASE IFOR PIPES WITH COLLARS) IMINIMUM COVER TO REINFORCEMENT 10m.1

DUCTllEIIlOltMA!ItIl[COYERI.FRAME
lDSUlT'1SDIACLEAROPEItIltG

,0.
'n¥n¥;~
BEIlIlCllOH""r""'' ' '
lI-uAlil ~
-~ .!l. {]~I
r-II - I
~
\ ~l
. ["r""""'''''''COVIR
. ••" ., ". S!.A1tGRAD! llPOS
I Dh~ I
i ~MASstotomGll:lDESRtJO SECTIONIt\
mL- .. v AMENDI,IENTS DATE
L=. ~.7 'AR ,m '"
REV.
CONSULT,6NTS
'"
""BfA • IF
""" StZl! MlIIls

~r~"iiiE~~~"~'
[OVER sua ;; TU ,
• ., (DkCRnEBACKFllL iiiOLi"" !! - -1'I
I "Il,--..........
TU
. "__'_,,-~~~h':. AS SPOOFED .!!
19
-Sl
HASSCCWCRETEat:NOlItl6
.p'" T5THlDCCOMCRll[
BUIlDlIlU!UDE IRC: n ~
~
... "a
GRAIlESIlI:JOWlTK121tllCIC OT T1Z I-f--I-"
EPOJIYMllRTARREIlIlI:lIItG !ill!!.!l.AII_ !! TU , • '"...
SECTIONC) SECTlONC9
"'D. .!!.
u
TU
,,
1 •
"
DRAWING STAT\JS

~ ~ .!!.
(SHGWlNG COVER FLUSH WITH FGL OETAILI IIHDWING RAISED COVER DETAIU
..
112
TU
1
,
"
"

~
T12 t" Z'lS a
Ju.8ElQINIiDINENSlllItSAAEICACCOADAlCEWlTHB~UI
INSPECTION CHAMBER CLASSIFICATION
• 5P!CftD 10 TtR t4Af1UT_
., D.
D1 Dl
• SPI!(flEDTDTHEII£"WSY2SlI11

mIKI&!WIll
tRAlRD COWRDnU TOil[ 115tO IN utflAyn ORlHttsH!D
=~¥Ji::=DETA" UBEUSWINAU.PAVEDOR

2. nus '0' caYERS "AVY DUTYI TO BE UWI FOR ALL IlCSl'mlOk DRAINAGE AFFAIRS
CHAIeERIIN ~DAns OR ounrlTH PROPtIlTY aautl)ARYWAUS P.O. BOX23337
a.AsS'I'CClV'ERSlM!IllLtfDl1JYJlOeEUSEDltAU.CASai\lftTHIk TEL. 04950055 FAX. 04950555
p.etaPERTVIICll/IIIA1tYWALLS'DABOTKRAlSEDAliDFlUSHDETAILS
PROJECT
tlTtlUCSIllDCONCRflEBLOCKWOIIIl
liAADElPCJ5SEDPEDIlt6TIICI(
SEWERAGE
""'"'-\""
"r
STANDARD DETAILS

~~
_.._-~
TITLE

.... TWOCOATRENtD
50lP Cet«MTE N1ROl.tCl
CiWlESRCHTOCGVfRWITH •
• INSPECTION CHAMBER
~DS[AARl5tS .~. TYPICAL DETAILS
PRlWTcaYCRHAIIQRADEOPC]5 •
SHEET2

.1= DRAWN
D~
-=r.; NOV. G6
PROJECT' CODE

CHECJ<ED
DWM I NOV. D6 PROJECT 1\10.

DETAIL
' 'D
E9 AFPRDVED
J....
SCAlE (Al}
I NOV. 06
DRAWING NO. IREviSlON
1:20. h10 DG2
CAD A'h I.:\O'TAR~STDS\OO2.d'Ng
!!Qmi
1. A~L QlH!M5l11NSARE IN I'tl.LtETRES UHLUS OUER\tI5! STATED
2.Al.L COtKRE1E SHALL IE GlW)E OPC 21 t$,ESS GlIQWlSf STATED
lYAAlA1lIl!lTOSTAl/DARODElALSAllEPEIUtT1EDTDHE£T$l'T!SPfClPlC
RUlUlJlDQTS
4. ALL .'S 8ETWfDt SEnlON$ Of GR1' LKWS SHlU BE LAHftAUD DYER
WITH 101... WIlE RE5tI R!H &LASS TAPE aRAM APPRO'40IlSlTU
BAlI)lGEJatn101HEOUtsID£O'1tf:IIPLlkERPIllOR10(OIKR£1I~
S"A&.lJQteTSBElWEEMPlPES,fIlCtURESl/IIGRPlJfER5SH1oU.I!sw.m
,. AU JOItTSBtTWEEN PIPES AIeD ClIMtllfTE SHALL lIE WATEnlll11
1.ALLltll:otIIIGPFES5HAl.LIELAlDSDffITTOSOfFn~ITtiTHEOlITGOIItG
'PI

;l
i --E!1
2H MANHOLE DETAILS

j
PLAN AT COVER LEVEL

SECTIONC)

GRPSEALN3Pl.ATE
CLASS DUO TO EM U4 t1EAVY OUTY
DOUIU!1RlANGllARIIlICTJLElRdtCQ'RR
&.fRAMEWITH'lSDlACLEARllPfNIcli REV. AMENDMENTS BY I DATE
CONSULTANTS

~I~
~I
DRAWING STATUS

~ ~~'V:toWRETE

~
TAltGNlI«ltlRANt&PflDTtnICN

e-..,.. . . II~ -, j
DRAINAGE AFFAIRS
GAPLlItNlTOllEPCllNUIIMRT
H1k6'rtf(NOIISLPSlA'ACE ~ P.O. BOX23337
IiiRl'LHHG10IlEl«HIN1I&!MVERT TEL. 4950065 FAX. ...50555
MlN.6THCNllIISLPS\lFA,Cl
PROJECI

DEVELOPERS GUIDE

TITLE

:P=z i :m~~Rm
rOUL SEWER t.4Hl
STANDARD DETAILS

DRAWN DATE I PROJECI CODE


OM NOV. 06
CHECKED
SECTIONC) DWM NOV. 06 I PROJECT NO.
APPROVED
JEA NOV. 06
DRAWING NO.. REVISION
SCALE (AI)
l2Ve~~Y(~rsl~nr 1120 D03
CAD Rd. IJ\ClATAR-SiDS\0G3.dw9
!l!!lli;
lALLDlt£NSIONSARflNtlUlKETRfSUNlfSSOTH£RWISESTATED
2.THlSORA\iWGTOSHOULDBEIlf:ADlNCONJUNCTIONWlTHDET.&I.SSHllWN
ON DRGNoLfS\fS2.fSJ"FSnl. FSZ4
3. All HATfJlIA1.S, FABRICATION AN:l CONSTflUCTlDN SHAll BE IN
ACCOROAN:EWITHTHESPttfICATlOHS
4. VAIllATIIN TO STAHOARD Il£TAIlS ARE PEAturrm TO HEEl SITE SPECIFIC
RroUIREtlENTS
RESIMSPACEJl:TOSlJIT
lADDfRAl.IGNI'EHT S.FORTAItQNGDETAIlSREFERToDAGNil.GEU
STAlfrl.ESSSTEEL ANOJJR IHAJC.l00THIClO Ii1lPSTRIUR
TWO LAYERS Of WATERPROOf BOLT BoTTCH FlXWG TO BE
MAXlHUKOFnSABDYE
I1Et1BRAHEITANKHD BENCHING DR RfST PlATFOIltl
FlXlNGS TO SE AT 1500
CENTRESHAXt1tJH

BDnDH RUNG TOef


HAlCIKlttOFZ50
ABDVfBflOllNGoR
GAADEDPClSRElNfORCfD RESTPLATfDlll1
D:lN:Ft£TE COVER SLAB

DETAIL
'.'0
1 DETAIL
1,10
C9 DETAIL
'110
l DETAIL
1110
E9 DETAIL
1,10
E9
TANKING AT GROUND LEVEL TANKING AT INTERNAL CORNER TANKING AT EXTERNAL CORtiR TANKING AT FORMATION LEVEL LADPER ARRANGEMENT (8QTTOM!

WHERE APPLICABLE
WHERE APPLICABLE

GRPLKll
JOtlTB(TWUNGAPllNERl. ROCKfR PIPE. Sl'Il.iOTI
PIPfTDBEllUlllATWOVER SOCKET ON UPSTREAH SlOE
WfTH RESIN RICH liUSS TAP' OF IWfIOLE " DOUBlE
SPIGOT ON.OOWHSTREAH StoE
SECTIONC9 SECTlONE9
REV. AMENDMENTS BY I OATE
DETAIL CONSULTANTS
1.10 _
LADDER ARRANGEMENT !TOP! & HANDHOLO

...
'c.J. 1·.··.01 L!J /
..
BEDDlllIiKATERlAl.AS
"'["' DRAWING SfATUS

EADllIlIIiil1ADEUPFRoH
4No.SEGtlENTST5TIAOC

DETAIL 0
vr PIPE (ONNECTION DETAILS
DETAIL C)
GRP PIPE COhl£CnON DETAILS
~I

~
DRAINAGE: AFFAIRS
P.O. BOX 23337
TEL 4950066 FAX. 4950665
PROJECT

DETAIL OF PRECAST CONCRETE DEVELOPERS GUIDE


SEATING RING UNDER MANHOLE COVER
IGRADE OPC 35 CONCRETE)
SCALE 1:10 TITLE
WATERl'ADllftmlBRANE
WATfRPROOFHEH!IRAHE' COllAR IIlH.)OO WIlE
COLLAR "If.3DO WIOE
TYPICAL MANHOLE
CONSTRUCTION DETAILS
4DI4IBlTUtIIIOUS
HASTlCAUET

STARCUTWItoTERPROOFI1EttIIRAN£ STAItClITWAT£RPROOfKEHBRAI£
WORKED ARllUPIJ PPf I UPPED WDIlKe:PAltOUNDI'lPt:.UpptD
WO.""'"
c:
WlntCOlUA DRAWN OATE I PROJECT CODE
NOV.06
C)
OM
DETAIL .!!l!!ll DETAIL CHECKED
1,10 PI'EJlIINTIS NOT SliOWN 1110 OW" NOV. 06 I PROJECT NO.
AN D.EVATIOH HR a.ARITY
TANKING SEAL AT PIPE EHTRY TANKING SEAL AT PIPE ENTRY APPROVED
.u...LIlJ..fJW .EWilUII!fli JfA NOV. 06
DRAWING NO. IREVISION
SCALE (All
1:20 &: 1:10 DG4
(AD Itt" L:\OATAR-STDS\DG4.dwg
1lQill,
1. ALI. DlM!t(SIO/fS ARl! IN InUMETltES UN.ESS OTI€AWlSE: 11.1ID
2.111$ DRAWffG TO IEIllADfI H'ULIICTIDNWllttDRG Nu.FSlItfSt1

Sl.EEVEADAPllA

~I----'oo'1~"
,r
--- .JL

CONNECTION OF EXISTING TO NEW


DRAINAGE PIPEWORK
N.T.S.

fA.
fl.

'.1:; ;~. '. II~ :' ..

LATtIlAlCOIIIIEl:TIOII
lDKAlItRWfR
=
INSPECTION CHAMBER
(SUDR&Mo.FS11l
ISEE ORG No. FS81

I'·

REV. AMEI<DMENTS BY I DATE


CONSULTANTS

PLUG

TEEORlIBLIGl.f;U·
Afttmllwrntll[!I)

Sl.nYfJlIllIT·
DRAWlNG stATUs

.GL

~
r:.lt:-;~· "._~':

INSPECTION CHAMBER
(SEE ORG No. FS8)
LAuaAL CONHR11l11l
Til HAlM$fW[fl
DRAINAGE AFFAIRS
~
-=-r=ii~~~ .... PROJECT
P.O. BOX 23337
TB.. 4950055 fAX. 4950556

DEVELOPERS GUIDE

TITLE
TYPICAL CONNECTIONS TO EXISTING PROPERTY
DRAINAGE REQUIRING EXTERNAL INSPECTION CHAMBER SEWERAGE CONNECTIONS TO PROPERTIES
TYPICAL DETAILS

DRAWN -DATE I PRllJEDT CODE


OU NDV.D6
CHECKED
DWM NOV.D6 rPRdJEcr NO.
APPROVED
JEA NOV. DB
DRAWING NO. REViSION
SCALE 1
1:20 DG5
"tl[fR.'1 Ll\G'TAR-srDS\D05.dwg
.!!Qilli
tA.U IlKHSIlINS ARE IItHlLUE1IIS lII.m OTH£A\III5! S1.um
2.ALLLEYllSAREIk~lRESTDQATARHAT101tAl.HElGIlTDi\lIl4

1 ALL A[lIrfORtEII CDNUlm TOfI!0PC]5


4.ALLPIPEWORKtS DLIC1ILE lRCft OR STAH.!SS IUU mADE 3M
51" OVElWL SlJIUCTUAAL COIrICRETE lII.!5SlIClKAlEOOTII:RWIi!

150
Qiiiii
JOO. '00
." ... I "" ~"I ""
,. S-DltfNSlll!t5lL£YD.S NlCATEII ARt: FllAUUl1RA1M
PURPDS6OM.T

DAVlTSlKKET
DAVITFOI»IlATlON
lOO.t,OO.ttlIDEEP LEGEND,
fRC P!tISI£DROADUW.
EXTRAtTFAHIaPTlOICALTOOIXIURUlllTI
Flte5HED GllOUHD UVEL

PlPES\lWORTSTO
i +ST50 SCREEDTIICXIPS

~
_ !!~~~~~~~WIT.~
1I9DIUALOCOUPI.Ni
~l~:r"TJ.~m:MH'O' UfM:EIlSAP!'ROVA~-""::::::::::t::::::-IK~~".~$:jjI/!=*",~~ IV GAlP.:YALVE

Fc-i
~I ii f. F1.AA'G£ADAPTER

0.. . . ~~~~~"'l,mI!iiliit'idll=!~$~j';.1i~ --..J


111 TO 10 llA AlMER
'RY ,,*,"RETIMYAl.YE
100lASItllRTRADllS
I
• ~IiEDEDGE$ !
l~~Aftl~~~":\~------I-iH-
nEAIl OPUIIIIi ClltPLUE ImH
XI
TO
D1iCHARGE!'WfHOLE-t
j
PAClOCK .. ""SP ~

=aa~T~;ll~¥t~ AcassLAIIll£A SID.51•• iSI


DEEPSUHP

PLAN AT GROUND FLOOR SLAB SECTIONE9

~ REV. AMENDMOOS BY I DATE

CONSULTANTS

,.

e- ~H'J=&7i'! -,
DRAWiNG STA1US


~
WATERPROOFTAIlIOIIG
8OTIOHQFAllOORAC1PI'E
• SPIIIDlE UPOllT WooT

~HIfG
~ilf.1It wn wr:L~ TOIlf GAP
A.u.INTEIlNALCONCRtTE

!i¥.t/iIlfoW/·.umtL"
2MDlAVCSEW£R
-, DRAINAGE AFFAIRS
P.o. BOX 23337
TEL. <49500/15 FAX. _
~ 1:-:;""'''')[ I··~jo<.· I IOTIICTAlfCNlHEMBltAII: IJECT
i ~ OPCIOPROTECTIONSCFlf£D
SECTIONC9 ·?.TII(IflC2IBLIN_
DEVELOPERS GUIDE
'WATER PROllf TJdIICM
I 2DtllACASTlllGlCPEkSTOCK

lITLE
SECTIONE0
TYPICAL SMALL SUBMERSIBLE
PUMPING STATION

NOTE,-
1.'tHEPUHPCON1ROLPAIIELlSAJlPRDX.IOI.'l'Hxlto
TttELEYE.LCOffTROLPAtm.ISAl'PRGX.1111l7Ol1'fO DRAWN DATE I PROJECT CODE
2. CELL TYPE OEOllORl2ER WITH IIfTflilW. FAN NAY BE PROVIlEDTO OM NOV. 06
MAINTAIN 1UIt CHAIl6ESPERHOllRIIt TtlE WEt ~m
cHECKED
OWM NOlI. 06 I PROJECT NO.
APPROVED
JFA NOV. 06
SCALE (AI)
1:50
Ci.D Rtf> 1.::\c»tTAR:':-srDS\OOe.d*V
CLASSSt25CGY(R&FRAMETO---
surr,oa.taOCUAROPEHlN6
1!2.lli!
tAU ElHEkSlDNS All( lie MUtlETAES KESS OTIERW\SE nAnD

I !!I' I '"~
FGlPA~"REA
z. ALL Jatmi IETWEEN PIPlWORIC Mf) (DNCAEn ARE TO BE WATERTIGIIT
LTRAYflWl£slt4S1l_50dALutlIItaA'tAIlllL[
4, tflL PAlIELS 10TRAY fRNES fRaH dlill A1.LNl~M

: AllOOERHALfA(ESTO!ElAt«m s.~::.m6RP~MS~::La..~~:r'J.V&lHGAIlOCASTlNSrTU.

f~--:----------l ~\:l~t/NrTOlKGRP'-_--~:tiii--0o1'"i1l I.ALLCCfrt(RnE lOBE C1.ASSEI UHLEl$01t£RWI5t SlATED


~I
:iI, '~ I .' ,
7.fDIITAIIIlIt4GDElAUREFERTDDR&Nll.F14

ml ~,
I
I
I
I
J
I
7- :=:~:.::..
"t" .1,..~ ~t
I
L._ _ .JI •• ~

~. -

Q,ASS ItUS(D't'ER & FAAtt:: 10


LEGEND,
S\IT 79 x60D tuAA lPfh1«i FGL F1JISH!OGRllUN9LML

ROOF PLAN
!

I 15' II--J!.
SECTIONE9
"12

.
II fQLPA'SPAIIEA
'II 'fIftllOO
"'' -.. ..--.: . . ~~::"'::~ ;. ~'it~lll:OlIIlSE
51. II!
'"
:.~, ,- \;:,:::(/.; AJ9'MlIH'''H5IIOVIR
""I~';,:~
1''''~''''''_
E1-~~F- 8
.. ....-_.;.J
j I I
ti+- 'I - - - II -- -- ~
~J! ;~:!
-l-_ _: ---

Y I ,:',-1 --, il
.:.

....•
.. •••1

R!.V. I AMENDMENTS frf DATE


I , i'.·- :"':I~ "/.'(

/: ;~'I; :.; f-:~:-:"1.lI-';"'~'-:-1,', -----r--n


CONSULTANTS

:::," ':~:'J:.::'
I
I
I
TAItKNi TO AlJ, COIKR£U SURFACES
~W~~
~ - •• :'". CDI«R£TECLAss'C'
.I I.;; ',? ! .... I :~:.;...... 5[llf:m1O~9TtlK

/J~:L i;I1::~/'
DRAWING STATUS
§

,.. I.!"
SECTlONC9

"'.
""
;fJRPLADDtRIOLTr:D
... ~
DRAINAGE AFFAIRS
p,o, eOX23337
TEL, 495D055 FAX. 4950556
PRo.JEcr

,~,,~ ~t .li:··t1":;1 II
C) E9 ;r DEVELOPERS GUIDE

~":1~
I• • :.~ • DETAIL DETAIL
" "',
I'
1t1\
prl!fQ!lATfpgRugTBAY .Il.IIllli.IlIl

~I ii!....J
TITLE

[tJ .[[J
TAAnrpyfAMK6lrQ IH 4J!IH!tIft.tl

Iv ,",=I-:-=:J--;-1--'
~I
T L-j'~i ;.:~ ~ ':
",!
:; " SAND TRAP Ie GREASE TRAP
15fDlAllUTfIPE
:: ~ .. '.:" ' >~',' ~; ~ ;':,,',:"
ul".fI5SUHP 1SDtlAaunnPPE
DRAWN
OM
'1 DATE
NOV. DB
PROJECT CODE

CHECKED
SECTIONE9 DWM I NOV. D6 PRo.iECT--NO.
PLAN PLAN APPROVED
SAND TRAP JEA I NOV. OB
GREASE TRAP SCoIL£ (AI)
DRAWING NO. IREVISION
(LARGEI 1:20 at 1:2 DG7
(AD bl, I.l\OA.TAR-STDS\OO7.-11tg
1!!!I§;
1. All DIMENSIONS ARE IN HILLIHETRES UNLESS OTHERWISE
STATED
2. INTERNAL fACES OF THE TANK TO BE PAINTED WITH 1(OAT OF
BITUMINOUS EMULSION AN[) 2 (OATS OF BITUMINOUS PAINT
1 All FITTINGS TO 8E STAINLESS STEEL
4. FOR REINFORCEMENT DETAilS REFER TO ORG No. FS25

~b~rz~~f;lN iO~EcJfm~ Y I lOO I 1185 1350

~
',4._

4. 'I .~
.

"'" I ~I "'" I,
'1 j r-----------
I
I
I
I
1
1
----l
I
I
~
-$$=t==-~t I
I
I~
L_
':JI
-~
I
I

,'"'.1I
~... • :
I.:
I.· 'I I L_____________ _
I
J
I

;!'

DOUBLE T' MDUTY


GRADE' LE
COVER.
675DIA

SECTION A-A PLAN AT COVER LEVEL

REV. AMENDMENTS BY I DATE


~~I~!W6m ~e~IiRETE GRADE ope lO
T12@l 1
15

I /' ;iSl T12@l1501\


CONSULTANTS

0,
N' " "1 ~
Z
>:
0 fA ~, ~ DRAWING STATUS

'r,~,
~
~ T16@l150
T16@l150~
~T16@l150
~
DRAINAGE AFFAIRS
P.O. BOX 23337
TEL 4950055 FAX. 4950555

~~. ~.
" , < :;:: ::::::: if::::::::; ;;
T16@l15
FALL ~
!WL (ON(RETE BLINDING LAYER
T16@l15O JY
PROJECT

SEWERAGE
STANDARD DETAILS

ml£

SECTION B-B SECTION C-C


SEPTIC TANK lYPE A a: B
TANK DIMENSIONS GENERAL ARRANGEMENT AND
REINFORCEMENT DETAILS
TYPE I PERSONS
SERVED
LENGTH (L)
(INSIDE)
WIDTH (WI
(lNSIDEI
BASE THICKNESS
H
WALL T~I(KNESS I DIM X

A I nOlO lOOO 1000 l50 l50 I 150


'DRAWN
JM
DAlE
JAN. 14
PROJECT CODE

-
8 I 1no 20 4000 1300 l50 l50 I 200
CHECKED
RK JAN. 14 PROJECT NO.
APPROVED
SN JAN. H
-
DRAWING NO. IREVISION
SCAlE (AI)
1:25 DC8
".DRtf: L:\QTOOl29\OGB.GA &: RC.aw,
./QlliJ
1. ALL Qn'lENSIONS ARE IN MILllf1ETRES UNLESS OTHERWISE
STATED
2. INTERNAL fACES OF THE TANK TO BE PAINTED WITH 1COAT OF
BITUMINOUS EMULSION AND 2 COATS OF BITUMINOUS PAINT

STEP IRONS AT 300 CENTRES 150 DlA PIPE TO SOA~ 3. All fITTINGS TO BE S1AINlESS STEEL
HORIZONTALLY & VERTIC AllY OR BOREHOLE 4. THE TOP lEVEL OF THE SCUM BOARD TO BE SDmm ABOVE

.:
C1 ttGHES1UWAGfLEY(l
S. FOR REINFORCEHENT OET AilS REFER TO QRG NG. FS2fi

..
...
.'';'
'W' 1'1 ".
.I, ";,'
0-

,------------------------,
1<. 0.
I I
If----::l

AS
-

- ~-
- ;
~
~
3 I~I
I I
l_~~J
i~
I
I~
I
I
~ ...
-tf;! /=:$- ~ 1..:: _ _ _

INLET PIPEWORK I I
L_ f-----------------------~
.''':
0'

0'
'.
;",' :".-
0-

1000 T ~ l T OOUBl TRIANGULAR MEDIUM DUTY


GRADE 'B' (ClASS 21 MANHOLE
COVER AND FRAME TO SUIT
SECTION A-A 615 DlA CLEAR OPENING

TANK DIMENSIONS PLAN AT COVER LEVEL


PERSONS lENGTH III WIDTHIWI BASE THICKNESS WAll THICKNESS
TYPE DIM X
SERVED (INSIDE) (lNSIDEI H T
C 21 TO 40 4150 1600 500 400 300

0 41 TO 80 6000 2000 600 450 345

[
~

6500 2150 375


E 81 TO 100 600 500 -
F 101 TO 3S0 9150 2500 600 600 650
AMENDMENTS BY DATE
:= REV.
CONSULTANTS

§lL REINFORCED CONCRETE GRADE OPC 30


SUSprNDED SLAB ./
I 150 I
T12~1 T12@11S~
"- DET AIL OF PRECAST WEIR DRAWING STATUS
r- 0

"
~
N
SCALE 1:2
;< l-
rA ~o:;

~
SCREED TO FAll
I- :>: MIN. 25 THICK

kR
0
N PRECAST CONCRET
"- 150' '50 TEE GRADE 5RC 30 WEIR
..
--1-1
r-
JB
HIGHEST SEWAGE lEYfl / ' f- lO THICK MORTAR No.2--
..
--!- W~ T20@llS<l'
/
75'15STAI;~
r- ~O@l150 STEEL ANGLE '.
.'.
116@1~~
.'I .
REINFORCED CONe. DRAINAGE AFFAIRS
GRADE OPC 30 IN _
WAll & BASE SLAB
I- 116@115
I 116@11
6 x 200 STAINLESS
STEEL SCUM BOARO
P.O. BOX 23337
'. .',dj. TEL 4950055 FAX. 4950555
!"- &- /---f46@11S0
I- lJ...-DETAI 1 0 If"' ~ PROJECT

K' '-. -.
0
b- 0 N
.'
T20@l151\-..--
116@115
I'-
b-
I'-' ~T20~ 0
L1<o ".
SEWERAGE
STANDARD DETAILS
116@11 0 0 . ".
- ~

011 . ' '" .~".


11TLE

- FAll

~j'"
I-s 4'". ~~.
..
SEPTIC TANK TYPE C. D. E t F
II
Ix
II . GENERAL ARRANGEMENT AND
REINFORCEIAENT DETAILS
(ONCREl T20@l1So-"
BLINDING lA m@lll
300 T DRAWN DATE PROJECT CODE

SECTION B-B SECTION C-C CHECKED


J" JAN. 14

PROJECT NO.
-
RK JAN. 14
DETAIL 1 APPROVED -
SN JAN. 14-
SCALE 1:10 DRAWING NO. rEVISION
SCAlE (AI)
1:25.1:10 AI: 1:2 DG9
,.... "••. ,.\ ..............."\""'0,.'" ~ ..,. .. ~.~
mill;
DlAVARlES \ AU DtlEMAlllS ARllltHUtRTRES I'UIS OTt£RWISf: STATED
__ L_ 2.COHCRETE
IlUHlESSOtTAlILDlDltfRWlS!.Au.IIf-Sl1VCDNC:RETESHAlL£lEGRADl
aPCIOAIOAllPIlECASTCDNCRETESHAllSEG!Wl£CPC»

~\
".' I -
1tOHCIIUPROTEtTIOH
"~UDB >' I ±. I I II AIlHlilf LAYER (If TANdili III ACCORDAIICE WITH SP!C«AlIONCLAUlE'
2H·1" SHALL ~E APPlED TO AlL EXT£RICAL MFAtES
//" I .... " ,
una
bl All lPO'tllHAl SURFAtESD[Ct:PT EPOXY MORTAR COYUtlDSUllfA.CES
:r:1
---{
I I \
m·IOOB / ARf TO Be (OAUa WITH Gilt COAT If IlCIut'lHOUli EKI.lSIOItNfJ TWO
CGATSDPSlTIJMtNPAlIfT
•• 8UILDIMG Tt\lIt'J&l$TlluCTURtS

_r~:=1---
L_ ---+~--- I /"-..... ,
_..L ~I \11 II'o/f -.J ... .....,,, T !iI.f

L--J \
.\ I V Ar-+-f'--l'- "~1'" I VPTOJlO
I
flfXlBlfJoftT

'DDHAXftUM
fltlClMntT
SIOKAXr.llHfRDH
.'os,_
\ lAOH STEPS TO !S 12'H SPACED AT lGl "'.UDB \ II '.,± I I I ~DHAXJMuH

, CENTERS HlIIaDllTALLV A/to YfRTlCAllV 300-"10


\ m·1008
no-tloe I
"
OvtR," 6tD HAXHlK

....... _ ~
I ,'" " "~I'" '" I -'1- I I
-1--

PLAN OF SOAKAWAY ARRANGEMENT PLAN AT ROOF LEVEL PLAN

P~::~f::~:'~"
M

"
~~-::d3t:~·_--
=,
.VSPACm

""
SSTA6f&AEO

-+-
L-!"l ii I . I

" II
SECTIONC) R<V. I AMENDMENTS BY I DATE
CONSULTN-rrS

SECTION ON CHAMBER RING COVER SLAB FOR SOAKAWAY CHAMBER

675111500UBLEITRlAMGULAAOUCTL!
IlOHCOVEAI.RUJt;W'rTH''lSDIA
Q.EARqI'ENM

COIICIlETEttAIIIOilillADE511C2I DRAWiNG srATUS


\11IlHBlTUHEHPA'tTFN5tI

1TDlClIJRSESOf PRECAST CClHrRf:TE

~
lSAClOlBAltKSIIICLAlS1KORTAII

lilWESIlC)6PRECAST
COltCRET'fCoYEIlS1AII

.TEllRA!ltfDLtIEDOVEIlTI£TOP
OFCRUSttEDSrtNS~

DRAINAGE AFFAIRS
P.O. BOX 23337
m.4950056 FAA._
PROJECT

J...I 0 °...::........:J:~~yc:f:!UCtlAHBfR DEVELOPERS GUIDE

o n.....a I I .!.~~~~=.~·.n~.r:~~~_"!!'. I I I II ~ Cl 1II ..... 1 I I TITLE

SOAKAWAY DETAILS
CAIISHlDSTDII:SlIlRDllG'7!ruI

;!'-w
SlkWSlUWlTHlllTLEllUlOflNES

liIWlESRCHColitRET£BAsE :J;iW ~
~; GAADEIIl(JlCOltWT£IJ,AH
I
t a/:;J~(;;'ili*';M$i{'~ BLllIIl1tliCOIltRtTE
j!:!1 til BI.OtDlIIGCDIlCIlETE DRAWN DATE PROJECT CODE
OM NOY. 06
~I CHECKED
rPROJEClNO.
OWM NOV. OB
STANDARD SOAK'AWAY STANDARD SOAKAWAY APPRovED
JEA
WITH CONCRETE BASE WITH CONCRETE BASE RING
SCALE \A~""
NOlI. 06
I ORAWING NO. TRE\OSION
0010
tAi'-A." L:\QA'rAfi=.STDs\D01D.clflll
.llDilll
tALLDIHENSIOflSAREWrtwItEmESLN..ESsoTHERWISESTATED
2.CONCllETE
a)UNLESSOETAlllEll0Tt£AWlS£.AUIt-SITUCON:1lETfS1fAU.8fCilAOE
OPaOANO AlL PREtASTCONCRETE SHAll BE WDE OPtJa

3.CONCAfTEPflOncnoN
II ASHGLE LAYER OfTANOlCiNACCORDoUlCEWlTHSPEClfICATIONCLAI
20_~1.G6 SHALL BE APPLED TO AU EXTERHALSURFAW

bIALt.IfTERNALSWA(fSEXCEPTEPO)(yI1Oll:URCOYEREDSlRFACU
D1AVAAES ARET06E COATED WITH ONE COAT OF BlTUI1INJUS EHULSlllN AIlD TWO
COATSOF8ITUMfNPAINT

L IllONSTEPSTOBSl14TSPACEOAT)OD

/,--. -- CENT£RS HORIZONTALLY "NDV£RTICAUY

.......
"-
I
4. BUlllIlNGTHROOliiSTRUCTlIl£S

lit
Fl,EXIlLEJOINT

/.~=+=~
/
/ "- 121-11108 7/ I ± I 1
'\
{ B\\
,17 10 125 B OPT01DO 'I5011AX!HUH
// :6'1
~
;:7 I "" no-1IIOB /

I
\---~--:-:.:
i'

-8
)1)lI-GtIo 300HAXI1UH

;1\ I/ _ :-:r.:---: --4.--- \1/-


~::a-~
~
6QOKAlCtIUH

~T --1----- ---- \ -- ~
\
\ 1--- - \I~T20-."
\
\ /
I
\.\~ I / no-ta" \ II'.. I I 1
\
, '- /
/
/
~ -J
I
/7
--=="-r-::.-~-9
/I
nl·WOB
126-100B

'....... I ,/ I
--1--

PLAN OF SOAKAWAYICATCHPIT ARRANGEMENT PLAN AT SOAKAWAY ROOF LEVEL PLAN

REV. I AMENDMENTS BY I DATE


SECTION C-C
CONSULTANTS
COVER SLAB FOR SOAKAWAY CHAMBER

11
l!
um DUTY COYER AN) FRAHE
8SEN11l,CLASS04CIOWlTH~
IlSDIAo.EAlIllPENING

i
.
y<;, ~ ".1
.....
CUSS81Z5 "4NI1IlI.f
COVER I. fRAJ1E TO 5UlT
lSOJ:UOClEAAOPENING

jf~~""''''''C'"''''£"'UIlOl
WlTHBlTUHENPAlNTFlNSH
-1
;[ ---] DRAWING STATUS

~
PItECASTtDNtRrnCOVEA
SLAB U5aI THKK WITH Y:~-'
GRPLIlIHG. 1COATOFBlTUl"IHDll5
D1UlSION&.ZCOATSOF
BlrutltlOUSPAlNTTOlNTEANAl,.
l-EXTEANALSURFACfS ,g~mH"
o CHAMBER RING DElAIL

PAE-CASTCONCR£TE o -0 HASS COHeAETE lASE DRAINAGE AFFAIRS


OW18ERRlNliS SLABliRADEOPC20 P.O. BOX 23337
I
I o ". "" lOG TEL. 4950055 FAX. 4950555

==E~
I o
m
". m PROJECT

t-.!!!.- DEVELOPERS GUIDE


5hI111PfllFORATUlNS
(OUALlVSPAaoAT
) II i STEP IRONS
UCHl£YEL,VERTlCAL
·:~~~O.=~ I
SrAGCiEJl[l)Svtll£TRlCALlY(
o o (Ehr!".,l Pi: l!I •. :::
l; mtE

250 mocfilIAtMAR STORMWATER


TYPICAL CATCHPIT a: SOAKAWAY DETAILS
-E=tt---~~ ~
S~UIlD
7$1111 SINGLE SIZE WITH
o
umE ORHO fINES
....,:""" i ;;1
lO... Ttl:KSRCZOBA5:E . ~"'~;;.
.\ ,
~
~.::~.~ ~,

~;~::j). <:~;).I
1SIIIIITKUSRC151lLJr10~

VAR£S ..I ~I DRAWN DATE I PROJECT CODE


OM JAN. 07
CHECKED
DWM JAN. 07 I PROJECT NO.
SOAKAWAYICATCHPIT ARRANGEMENT SECTION B-B APPROVED
SECTION A-A JEA JAN. 07
IREVISION
DRAWING NO.
SCALE (Al)
,"" 0011
CADR." L:\QATAR~S1DS\OG'l.clwg
.!:!.Qlli:
lJ.lllllHttlSlONS AAZ IN Hlli1ETRU Utfuss lIll1ERWlSfSTllEO
l.CoIlCIlfTE
al IiHUSS OETAULEO OTHfRWISE, All ""mu eONCAIn SltALL II[GRAlIE
Of'UOAhtlALLP/I£CASTCOHCRn£5HALLBEGRAt!£OPC)t
J.col«:llmPROUClJON
.j ASf'lG'.EUYERQF TAIlICIMGIN ACCQl1D.IJICEWITH SPEC!FKAT!OtfClAUSE
It-S·106SHAllBt APPl.I£nlOAU EXlERliAlSUilFACE!O
bl AU IIH£AAAl SU!lFACES rXCE9T EPOXY IWRlAR COVERED SURFA(ES
DlAYAIl£S ARE TO 8[(OATED \l'1lI101tE COAT OF 8lTuHt!ouStHUlSlotiAtiD1WO
COATS OF I!ITIM:~ PAl!lT
L IRIJNSupSTOeS12,1,1Sf>ACEOA130C
1.
-- tEKTERSI'\OIllIOkTAll'fAIlDYER1[,\llV 4. l\UlI.OlNGlHIWUl!tlSTROCTlmES

+8
,.
/.~;:-+!~~
/
",.,...--, ......
"- PlPEDlAI",ETtn 1 FLEXl:tJOIl(T FlEXll\lEJOltfT

/ / "'\ 1. 7
,;(/ ~
~
4"TZSB UPT031G I lliI"AXtlUH
~GlIHAXlHliHfRl»1
flRSTJoI!(T

~
1

I I ~t,%~~£R

--i------~'\~il
/,1 )"-40~ )HKAXItlH

/11 \J \\- - - -
~T __~-i-~ -:1==*=-- _' __ ,.---I.-:::l~
FlRST)lIINT
I \ '1!>l1HIICHUKANlI
2:~PIPEDl,tMmR

" I __
I
~
Tl~""
OVER6DO 6GaHlXlItlH HAXlHU'MfROH
I _ I
---.f----- ----" =±__ , .=rY - ~
~
- -
11
-
-
FRST JOINT

\ I ?-___ I
ut-jooa
\ I ~ I ..!j

'" [J
J U
\ /
\
'\
"
/
/
"':::::..-.J.
'" I -9//#
-..,.-;;:..~
'
no-1MB -+J~l~
~"-----------------~~=i~~
nG.lt;B_~_ ft:Y1 '" UD.""
+.--/
/
............ 1",.../ I
--1--
I~
PLAN OF STORMWATER TANK/CATCHPIT ARRANGEMENT PLAN AT STORMWATER TANK ROOF LEVEL PLAN

~ I. ~I L......J
>If
I,~ I
VARIES
,n
opdiiKG L~tJ"
401

REV. AMENDMENTS BY I DATE


SECTION A-A
CONSULTANTS

COVER SLAB FOR STORMWATER TANK CHAMBER

LlGliTDlfTYCGVERANDFRAHE
eStllTZ4UASSOloOOWntl
4'1501AClEAROPfHtlli
:l OR!oWING STATUS

~
<~ ~",I

.
~
~
". ~
';".:-, I'-(;~

I'rmf
I--r--I:,l '..
:';':'~:::_~~ :~ .:~~:~SlAIlGRADEOPOO
"\-':;";I.MAS5COHCllnEBASE DRAINAGE AFFAIRS
p;o, BOX 2J337
TEl. 4950055 FAX. 4950555

~
S4THK!'lEHBIW!E PROJECT
!i PROTECllOkGRADESR'24
~'H(BL.ttOikG
DEVELOPERS GUIDE
CiRAOESRCN

~ TITLE

·t··
":":'.(
~~:; ,·~~.':f
:.~\~~::~:·I J STORMWATER TANK

""""''''''''A''~ttr {:~ ~-: :_i ;::~15§L


~i
'1~ THICK SRC 25 8LHlI!tG

J'M VARIES
4
Il! SECTION A-A
DRAWN I~ PROJECT CODE
OM JAN. 07
CHECKED
STORMWATER TANK ARRANGEMENT -OWM I JAN. 07 PROJECT NO"
SECTION B-B APPROVED
JEA I JAN. 07
sCALT(A-,) DRAWING NO. IREVISION
1:20 0012