SR NO. PROCESS Employee MACHINE RUN TIME SET UP TOTAL TIME(in min)
no NO (min/part) TIME
(min/job)
1 NC programming
2 Board fabrication
3 LOAD 1 1 0.33 5 5.33
4 CLEAN 1 0.5 5.83
5 COAT 1 0.5 6.33
6 UNLOAD 1 1 0.33 6.66
7 EXPOSE 5 5 1.72 15 23.38
8 LOAD 1 1 0.33 5 28.71
9 DEVELOP 1 0.33 29.04
10 INSPECT 2 2 0.5 29.54
11 BAKE 1 0.33 29.87
12 UNLOAD 1 1 0.33 30.2
13 DRILLING 3 6 1.5 15 46.7
14 COOPER PLATE 2 1 0.2 5 51.9
15 FINAL TEST 6 6 2.69 15 69.59
16 SHIPPING
= approx. 70 min.
hift=960 boards.
MAN-MACHINE CHART
DESCRIPTION: 1 RAW=5MIN=1 CYCLE
RUNNING STATUS
IDLE STATUS
MACHINE MEN
ACTIVITY TIME DESTINATION ACTIVITY TIME
LOADING 10 BEING LOADED 10
IDLE 45
COPPER PLATE 5 BEING COPPER PLATE 10
IDLE 5
FINAL TEST 90 BEING TESTED 90
EN
DESTINATION DESCRIPTION MACHINE MEN
RUNNING TIME 270 230
IDLE TIME 5 45
TOTAL TIME 275 275
CAPACITY UTILIZATION 98.181818182 83.63636