First Major Project Progress Report


Project Status Report – Periodic Progress Summary

ONLINE BANKING SYSTEMt

Group Members Name: Project Guide:


Roll Numbers: Date: dd/mm/yyyy

Section:

OBJECTIVE Description of The Project:

• The project named online banking system is developed using .NET.

• This provides the facilities in managing finance processes.

• Using this we can easily calculate the amount. and details.

• It is a software using which we can manage and provide loan, service.

• We can determine our profit loan easily

• We can provide effective service.

Key Objectives achieved till last period:


 Designing of the master page..
 Complete the 30%.
 Till now it’s work good.

Upcoming tasks for this period:


 We plan the working of next pages .
 We use the proper validation and the concept in design further pages .
 It’s work better in the predicted time
N.C College Of Engineering CSE and IT Deptt.Feb-May-2011

Current lifecycle phase project is in:

PROJECT STATUS Planned Actual Planned Actual Percent Status or Comments


Start Date Start Date Complete Complete complete
Date Date
Feasibility Study
Requirement Analysis

Design
Implementation
Testing

Performance Feedback By Guide

Parameter Marks Out 5 Marks Out 5


(First Member Roll N.) (Second Member Roll N.)
Project Progress Status
Interaction With Guide

Mid Term Viva


Total

(Signature) Submitted To:


Name of Project Guide: Sanjeev Kapoor
Designation: Project In-charge
Deptt. CSE and IT Department.

Dated:-