GENERAL INFORMATION - LOG OF PILE

(This information is common to all sheets in the Workbook)

County Project Br. No. and/or Sta.

Abutment Pier Wt. Hammer (ft) 6000

Type of Pile Wt. of Cap and/or Anvil (ft) 1000 Min. Bearing Required (tons) 55

Type of Hammer Energy Rating (ft-lbs) 45000 Max. Bearing Allowed (tons) 82.5

Guide to COMPLETING and CLEARING the Log of Pile (Form 217)


1 Piling should be measured and reported to the nearest hundredth of a foot (.01 ft) and elevations shall be
noted to the nearest thousandths of a foot (0.001 ft). This form will round all entries to two decimal points,
however, the formulas use what is entered in the cell.

2 The red triangle in the upper right corner of the cells contain information concerning the data to be entered.
To read the information, place the mouse cursor on the red triangle.

3 The Workbook has been designed to automatically transfer the General Information on this worksheet,
except for the Abutment and Pier No., to each work sheet in the workbook. The Abutment and Pier No.
have to be manually entered on each work sheet.
The Workbook contains one Log of Pile Driving sheet and one Continuous Log of Pile Driving Sheet for
4 each type of hammer. Using the appropriate worksheet, create a separate worksheet for each abutment and
pier:

a) Click on the tab of the sheet that you want to copy, tab should turn white.
b) Click on Edit
c) Click on Move or Copy Sheet ....
d) Place and X in the square next to Create a Copy in the lower left corner.
e) Under the dialog box Before Sheet: click on the sheet you want your new sheet to appear.
f) Click on OK.

5 Each work sheet has been Protected, the Tab key will take you to all open cells for data input.

6 Each sheet contains the front and back of Form 217. The back sheet is located below the front and only
needs to be filled out and printed when recording the Log of Continuous Pile Driving and/or Test Pile.

7 To print only the front sheet click on the Print Front button. To print the front and back of the form on one
sheet first click on the Print Front button and print the first sheet. Turn sheet over, put it back in the print
tray and click on Print Back. These buttons are located in the upper left hand corner of the worksheets.

8 If the "Delete" key, "Backspace" key, or the "Clear Contents" option (from the pull down menu) is used to
delete data, cells will become misaligned. If a misstake is made, enter new data over the old data.
KANSAS DEPARTMENT OF TRANSPORTATION

LOG OF PILE DRIVING


County Project Br. No. and/or Sta.

Abutment Pier Wt. Hammer (lbs) 6000

Type of Pile Wt. of Cap and/or Anvil (lbs.) 1000 Min. Bearing Required (tons) 55

Type of Hammer Energy Rating (ft-lbs) 45000 Max. Bearing Allowed (tons) 82.5

Total Plan Length (ft) = FOOTING SKETCH

Plan Cutoff Elev. (ft) =

Type of Cushioning Matl. =

Wt. per ft (piling) (lbs/ft) = 42

Bearing Formula Used = P= 2(W)(H)(0.80)


[ S + 0.1(X/W**)] ** If X/W < 1, X/W is set to 1

(SEE BACK FOR LOG OF CONTINUOUS PILE DRIVING AND/OR TEST PILE)
Length of Pile (ft.)
Actual Length Actual Measured Length Left in Pile Tip Stroke (Drop of Average Penetration Computed Bearing
Pile No. Date Driven Ordered and
Placed in Leads Cutoff (ft.) Foundation (ft.) Elevation Hammer) (ft) (in.) Power (tons)
Accepted (ft)
(ft)

Totals 0.00 0.00 0.00 0.00

Accepted Length (ft) = 0.00 Non Pay Cutoff used for Splice (ft) = No. Pay Splices =
Non Pay Cutoff (ft) = 0.00 Pay Cutoff used for Splicing (ft) = Pay Length (ft) = 0.00
Cutoff used for Splice (ft) = 0.00 Pay Cutoff (ft) = 0.00
Remarks:

Inspected By:
Checked By: Submitted by

Rev. 2006 D.O.T. Form No. 217


LOG OF CONTINUOUS PILE
DRIVING AND/OR TEST PILE

County Project Br. No. and/or Sta.


Abutment Pier Date Pile Driven = Actual Length Placed in Leads (ft) =

Actual Length in Computed


Foundation Drop of Hammer (Stroke) Average Penetration Resistance
Pile No. Number of Blows Computed Resistance (tons)
(ft) Per Blow (in.) v
From To Specified
0.00

Inspected By: Checked By:

Remarks:
KANSAS DEPARTMENT OF TRANSPORTATION

LOG OF PILE DRIVING


County Project Br. No. and/or Sta.

Abutment Pier Wt. Hammer (lbs) 10000

Type of Pile Wt. of Cap and/or Anvil (ft) 10000 Min. Bearing Required (tons) 55

Type of Hammer Energy Rating (ft-lbs) 40000 Max. Bearing Allowed (tons) 82.5

Total Plan Length (ft) = FOOTING SKETCH

Plan Cutoff Elev. (ft) =

Type of Cushioning Matl. =

Wt. per ft (piling) (lbs/ft) =

Bearing Formula Used = P= 2 E (0.80)


[ S + 0.1(X/W**)] ** If X/W < 1, X/W is set to 1

(SEE BACK FOR LOG OF CONTINUOUS PILE DRIVING AND/OR TEST PILE)

Length of Pile (ft.)


Actual
Date Length Left in Pile Tip Stroke (Drop of Computed Bearing
Pile No. Actual Length Ordered and Measured Average Penetration (in.)
Driven Foundation (ft.) Elevation Hammer) (ft) Power (tons)
Placed in Leads (ft) Accepted (ft) Cutoff (ft.)

Totals 0.00 0.00 0.00 0.00

Accepted Length (ft) = 0.00 Non Pay Cutoff used for Splice (ft) = No. Pay Splices =
Non Pay Cutoff (ft) = 0.00 Pay Cutoff used for Splicing (ft) = Pay Length (ft) = 0.00
Cutoff used for Splice (ft) = 0.00 Pay Cutoff (ft) = 0.00
Remarks:

Inspected By:
Checked By: Submitted by

Revised 2006 D.O.T. Form No. 217


LOG OF CONTINUOUS PILE
DRIVING AND/OR TEST PILE

County Project Br. No. and/or Sta.


Abutment Pier Date Pile Driven = Actual Length Placed in Leads (ft) =

Actual Length in Computed


Foundation Drop of Hammer Average Penetration Computed Resistance Resistance
Pile No. Number of Blows
(Stroke) (ft) Per Blow (in) (tons) v
Fro Specified
To
m
0.00

Inspected By: Checked By:

Remarks:
KANSAS DEPARTMENT OF TRANSPORTATION

LOG OF PILE DRIVING


County Project Br. No. and/or Sta.

Abutment Pier Wt. Hammer (lbs) 6000

Type of Pile Wt. of Cap and/or Anvil (lbs.) 1000 Min. Bearing Required (tons) 55

Type of Hammer Energy Rating (ft-lbs) 45000 Max. Bearing Allowed (tons) 82.5

Total Plan Length (ft) = FOOTING SKETCH

Plan Cutoff Elev. (ft) =

Type of Cushioning Matl. =

Wt. per ft (piling) (lbs/ft) = 42

Bearing Formula Used = P= 3 W H * W


S + 0.35 ( W + X)

(SEE BACK FOR LOG OF CONTINUOUS PILE DRIVING AND/OR TEST PILE)
Length of Pile (ft.)
Actual Computed
Length Left in Pile Tip Stroke (Drop of Average
Pile No. Date Driven Actual Length Ordered and Measured Bearing Power
Foundation (ft.) Elevation Hammer) (ft) Penetration (in.)
Placed in Leads (ft) Accepted (ft) Cutoff (ft.) (tons)

Totals 0.00 0.00 0.00 0.00

Accepted Length (ft) = 0.00 Non Pay Cutoff used for Splice (ft) = No. Pay Splices =
Non Pay Cutoff (ft) = 0.00 Pay Cutoff used for Splicing (ft) = Pay Length (ft) = 0.00
Cutoff used for Splice (ft) = 0.00 Pay Cutoff (ft) = 0.00
Remarks:

Inspected By:
Checked By: Submitted by

Revised 2006 D.O.T. Form No. 217


LOG OF CONTINUOUS PILE
DRIVING AND/OR TEST PILE

County Project Br. No. and/or Sta.


Abutment Pier Date Pile Driven = Actual Length Placed in Leads (ft) =

Actual Length in Computed


Foundation Drop of Hammer Average Penetration Computed Resistance
Pile No. Number of Blows
(Stroke) (ft) Per Blow (in) Resistance (tons) v
From To Specified

0.00

Inspected By: Checked By:


Remarks:
KANSAS DEPARTMENT OF TRANSPORTATION

LOG OF PILE DRIVING


County Project Br. No. and/or Sta.
Abutment Pier Wt. Hammer (lbs) 6000
Type of Pile Wt. of Cap and/or Anvil (lbs.) 1000 Min. Bearing Required (tons) 55
Type of Hammer Energy Rating (ft-lbs) 45000 Max. Bearing Allowed (tons) 82.5

Total Plan Length (ft) = FOOTING SKETCH

Plan Cutoff Elev. (ft) =

Type of Cushioning Matl. =


Wt. per ft (piling) (lbs/ft) = 42

Bearing Formula Used = P= 2WH


(S+ 1.0)

(SEE BACK FOR LOG OF CONTINUOUS PILE DRIVING AND/OR TEST PILE)
Length of Pile (ft.)
Actual Computed
Date Length Left in Pile Tip Stroke (Drop of Average
Pile No. Actual Length Ordered and Measured Bearing Power
Driven Foundation (ft.) Elevation Hammer) (ft) Penetration (in.)
Placed in Leads (ft) Accepted (ft) Cutoff (ft.) (tons)

Totals 0.00 0.00 0.00 0.00

Accepted Length (ft) = 0.00 Non Pay Cutoff used for Splice (ft) = No. Pay Splices =
Non Pay Cutoff (ft) = 0.00 Pay Cutoff used for Splicing (ft) = Pay Length (ft) = 0.00
Cutoff used for Splice (ft) = 0.00 Pay Cutoff (ft) = 0.00
Remarks:

Inspected By:
Checked By: Submitted by

Revised 2006 D.O.T. Form No. 217


LOG OF CONTINUOUS PILE
DRIVING AND/OR TEST PILE

County Project Br. No. and/or Sta.

Abutment Pier Date Pile Driven Actual Length Placed in Leads (ft) =

Actual Length in Computed


Foundation Computed
Drop of Hammer Average Penetration Resistance
Pile No. Number of Blows Resistance
(Stroke) (ft) Per Blow (in) v
(tons)
From To Specified

0.00

Inspected By: Checked By:


Remarks:
KANSAS DEPARTMENT OF TRANSPORTATION

LOG OF PILE DRIVING


County Project Br. No. and/or Sta.
Abutment Pier Wt. Hammer (lbs) 6000
Type of Pile Wt. of Cap and/or Anvil (lbs.) 1000 Min. Bearing Required (tons) 55
Type of Hammer Energy Rating (ft-lbs) 45000 Max. Bearing Allowed (tons) 82.5

Total Plan Length (ft) = FOOTING SKETCH

Plan Cutoff Elev. (ft) =


Type of Cushioning Matl. =
Wt. per ft (piling) (lbs/ft) = 42

Bearing Formula Used = P= 2*W*H


(S+0.1)

(SEE BACK FOR LOG OF CONTINUOUS PILE DRIVING AND/OR TEST PILE)
Length of Pile (ft.)
Actual Computed
Date Length Left in Pile Tip Stroke (Drop of Average
Pile No. Actual Length Placed in Ordered and Measured Bearing Power
Driven Foundation (ft.) Elevation Hammer) (ft) Penetration (in.)
Leads (ft) Accepted (ft) Cutoff (ft.) (tons)

Totals 0.00 0.00 0.00 0.00

Accepted Length (ft) = 0.00 Non Pay Cutoff used for Splice (ft) = No. Pay Splices =
Non Pay Cutoff (ft) = 0.00 Pay Cutoff used for Splicing (ft) = Pay Length (ft) = 0.00
Cutoff used for Splice (ft) = 0.00 Pay Cutoff (ft) = 0.00
Remarks:

Inspected By:
Checked By: Submitted by

Rev. 2006 D.O.T. Form No. 217


LOG OF CONTINUOUS PILE
DRIVING AND/OR TEST
PILE

County Project Br. No. and/or Sta.


Abutment Pier Date Pile Driven = Actual Length Placed in Leads (ft) =

Actual Length in Computed


Computed
Foundation Drop of Hammer Average Penetration Resistance
Pile No. Number of Blows Resistance
(Stroke) (ft) Per Blow (in.) v
(tons)
From To Specified
0.00

Inspected By: Checked By:


Remarks:
KANSAS DEPARTMENT OF TRANSPORTATION

LOG OF PILE DRIVING


County Project Br. No. and/or Sta.
Abutment Pier Wt. Hammer (lbs) 6000
Type of Pile Wt. of Cap and/or Anvil (lbs.) 1000 Min. Bearing Required (tons) 55
Type of Hammer Energy Rating (ft-lbs) 45000 Max. Bearing Allowed (tons) 82.5

Total Plan Length (ft) = FOOTING SKETCH

Plan Cutoff Elev. (ft) =


Type of Cushioning Matl. =
Wt. per ft (piling) (lbs/ft) = 42

Bearing Formula Used = P= 2*E


(S+0.1)

(SEE BACK FOR LOG OF CONTINUOUS PILE DRIVING AND/OR TEST PILE)
Length of Pile (ft.)
Actual Computed
Date Actual Length Length Left in Pile Tip Stroke (Drop of Average
Pile No. Ordered and Measured Bearing Power
Driven Placed in Leads Foundation (ft.) Elevation Hammer) (ft) Penetration (in.)
Accepted (ft) Cutoff (ft.) (tons)
(ft)

Totals 0.00 0.00 0.00 0.00

Accepted Length (ft) = 0.00 Non Pay Cutoff used for Splice (ft) = No. Pay Splices =
Non Pay Cutoff (ft) = 0.00 Pay Cutoff used for Splicing (ft) = Pay Length (ft) = 0.00
Cutoff used for Splice (ft) = 0.00 Pay Cutoff (ft) = 0.00
Remarks:

Inspected By:
Checked By: Submitted by

Rev. 2006 D.O.T. Form No. 217


LOG OF CONTINUOUS PILE
DRIVING AND/OR TEST PILE

County Project Br. No. and/or Sta.


Abutment Pier Date Pile Driven = Actual Length Placed in Leads (ft) =

Actual Length in Computed


Foundation Computed
Drop of Hammer Average Penetration Resistance
Pile No. Number of Blows Resistance
(Stroke) (ft) Per Blow (in.) v
(tons)
From To Specified

0.00

Inspected By: Checked By:

Remarks: