Professional Documents
Culture Documents
should be addressed at some point of the 2 year program. The information needed
to design and document these LEED project is essential at my place of employment.
To be able to understand the requirements and process to get a project accredited
would give a graduate a leg up compared to a graduate that does not have this
basic knowledge. It may be troublesome to sift through the complete process and
narrow it down to general information needed to play an active/productive role in
the process.
Cogeneration
The use of a single facility to simultaneously produce power and heat or
steam.
CC
Cubic centimeters.
CFM
Cubic feet per minute.
D&D
Decontamination and decommissioning.
Decommissioning
The retirement of a facility, including decontamination and/or dismantlement.
Decontamination
The removal of unwanted hazardous contamination by a chemical or
mechanical process.
Design-Build
A system of contracting under which one entity performs both
architecture/engineering and construction under one single contract.
Downstream
The refining or process of crude oil into finished fuel products.
E&C
Engineering and construction.
E,P & C
Engineering, procurement and construction.
E,P,C & M
Engineering, procurement, construction and maintenance.
Fast Track
A scheduling process in which design and construction activities overlap.
Design documents and equipment and trade subcontracts are released in
phases.
FEED
Front-end engineering and design.
Fixed Cost
An expenditure or expense that does not vary with volume level of activity.
LOI
Letter of intent.
LNG
Liquefied natural gas.
Lump-Sum Turnkey Project
Fixed price project for which all components are within a single supplier's
responsibility.
MOU
Memorandum of understanding.
O&M
Operations and maintenance.
PPB
Parts per billion.
SCFD
Standard cubic feet per day.
SNG
Synthetic natural gas.
Turnkey Project
A project in which all components are within a single supplier's responsibility.
TIC
Total installed cost.