The safety instructions on the reverse of this permit have also been explained in to details to:
Mr. __________________________ (In-charge of those who are going to perform the work)
I have over checked the safety arrangements and safety instructions given to:
Date: ________________
Sign:______________________
Name: _____________________________ (Any Safety Committee Member).
SHE/2/CW
Excavation Clearance:
1 Underground Power Cable : Existing/ Not existing Permission Given : Yes/ No.
2 Underground Telephone Cable : Existing/ Not existing Permission Given : Yes/ No.
3 Underground Drainage Line : Existing/ Not existing Permission Given : Yes/ No.
4 Underground Water Line : Existing/ Not existing Permission Given : Yes/ No.
5 Underground Computer Cable : Existing/ Not existing Permission Given : Yes/ No.
NOTE:
Excavation clearance is required for all excavations.
Obtaining the clearance is mandatory.
The above clearance is to be certified by all the concerned departments.
o Eg: EDP, Maintenance, etc.
The permission is to be taken at least five days (5 Days) before for the same.
SHE/2/CW