Water Requirement for Air-Conditioning Plant

Total Air-conditioning Plant Load = 636 TR


Water required per TR = 3 USGPM
Losses for circulation rate considered as = 1.5 %

Water Requirement per TR. Per Hour = 2.7 USGPH


10.21 Lts/Hr
AC Cooling Tower Make-up @ 10 hours a day
= 64910.16 Lts/day
Say = 65000 Lts/day
Swagat Hospital Hot Water Requirement
HEAT PUMPS

Number of rooms : 77 Rooms


Total no. of peoples : 160 Persons
Hot water required @50 lts/peoples : 8000 Lts/day
Hot water for sterile area : 1500 Lts/day
Hot water for laboratories : 1000 Lts/day
Hot water for Kitchen : 3000 Lts/day
Hot water for laundry : 3000 Lts/day
Total hot water required : 16500 Lts/day
Average ambient temperature : 10 degree Celcius
Final temperature required : 55 degree Celcius
Difference in temperature : 45 degree Celcius
Thus, heat load required : 742500 Kcl
2 Nos. 25TR Heat Pump gives : 250000 Kcl/hr

Hence, in just 3 hrs. of heat pumps working you will get 24 hrs. hot water.

The system consists of the following:

a) 2 nos. 25 TR Heat Pumps


b) 2 nos. Primary Pumps
c) 2 nos. Secondary Pumps
d) 1 no. Electrical panel

Note: (1)
1) M. S. Hot water pressure tanks 2 nos. of 8000 lts. capacity
2) We have worked out the above considering that you will have a Hydropneumatic system for water supply for the entire p
3) Heat pumps have been considered as an energy saving device by the Government of India and allows you 80% DEPRE

Quantity : 2 Nos.
Capacity : 25 TR
Price : 32,31,000/-
Installation charges : 1,50,000/-
Total : 33,81,000/-

Note:
The above prices are exclusive of VAT @12.5% on 67% value, service tax @ 10.30% on 33% value, Packing, Handling,
Freight, Insurance, Octroi and/or any other levies applicable.
water supply for the entire project.
and allows you 80% DEPRECIATION during the first year of purchase.

value, Packing, Handling,

You might also like