PRODUCTIVITY RATES

Item Description No.


1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Trade
Mech'l Helper Mech'l Helper Mech'l Helper Mech'l Helper Mech'l Helper Mech'l Helper Mech'l Helper Mech'l Helper

Unit

Output
unit / day

Productivity
man-days per unit

MECHANICAL WORKS
1 2 3 4 5 6 7 8 9 Exhaust fans Split Units Blower Kitchen Hood Ducting Fire Fighting System Conveying System (Elevator) Escalator Others.. Please insert no. no. no. lm. lm. lm. no. no.

ELECTRICAL WORKS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Electrical Conduits and Boxes Electrical Wiring and Cables Telephone System Electrical panel Board Fire Alarm System Electrical Devices (Sockets & Switches) Lighting Fixture Others.. Please insert 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Electrician Helper Electrician Helper Electrician Helper Electrician Helper Electrician Helper Electrician Helper Electrician Helper lm. lm. lm. no. lm. no. no. 8?

PLUMBING WORKS
1 2 3 Sewer Piping Water Closet Urinal 1 1 1 1 1 P. Fitter Fit. Helper P. Fitter Fit. Helper P. Fitter mt no. no.

3 4 5 6 7 8 9 10 11 12

Urinal Water Pipe and Fitting Sanitary Fitting Mixer Drains Toilet Accessories Water Tank Bath Tub Others.. Please insert

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Fit. Helper P. Fitter Fit. Helper P. Fitter Fit. Helper P. Fitter Fit. Helper P. Fitter Fit. Helper P. Fitter P. Fitter Fit. Helper P. Fitter Fit. Helper P. Fitter P. Fitter Fit. Helper

no. mt no. no. no. no. no. no. no. no.

PRODUCTIVITY RATES
Item Description No.
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Trade
Mason Helper Mason Helper Mason Helper Mason Helper Mason Helper Mason Helper Mason Helper Mason Helper Mason Helper Mason Helper Mason Helper Mason Helper Mason Helper Mason Helper Mason Helper Mason Helper Mason Helper Mason Helper Mason Helper Mason

Unit

Output
Qty/day

Productivity Man-Days per unit

CONCRETE TROWEL FINISH


1 2 Screed and concrete finishes with trowel (smooth finish) Smooth trowel finish to concrete sqm sqm

CEMENT-SAND SCREED
1 Leveling the cement-sand screed and finished smoothly for roofslab waterproofing with material shifting sqm

TERRAZO TILES
1 2 Terrazzo tiling with cement mortar and grouting Terrazzo steps tread with riser sqm LM

CERAMIC TILES
1 Ceramic tile steps treads & risers LM

2 3

Ceramic tile flooring (Grouting Included) Ceramic wall tile without plaster (Grouting included)

sqm sqm

MARBLE FLOORS / WALLS


1 2 3 4 5 6 7 8 9 Marble / Granite flooring without design with cutting on edges Marble / Granite flooring with design with cutting on edges Marble granite fixed to walls Marble / Granite fixed to walls Marble granite steps / tread & riser Marble granite skirting to the staircase Marble thresholds Black Granite kerb Marble/Granite wall cladding with fixtures & sqm sqm sqm sqm LM LM LM LM sqm

PVC VINYL FLOORS / THREADS


1 2 3 PVC vinyl flooring sheet fixed with adhesive & welding PVC vinyle floor sheet fixed to wall PVC vinyle tread & riser fixed with adhesive sqm LM LM

PVC vinyle tread & riser fixed with adhesive

1 1 0 1 1 1 1 1 1 1 1 1 1

Helper Mason Helper Mason Helper Mason Helper Mason Helper Mason Helper Mason Helper

LM

PLASTERING
1 2 3 4 5 6 Rush coat for plaster work Fixing level dots for plaster Plaster internal wall single coat with smooth Plaster internal walls two coats with smooth Fixing corner beads to walls & columns Fixing plaster mesh to walls sqm sqm sqm sqm LM sqm

PRODUCTIVITY RATES
Item Description No.
1 1 1 1 1 1

Trade
Mason Helper Mason Helper Mason Helper

Unit

Output
Qty/day

Productivity Man-Days per unit

PLASTERING
7 8 10 11 Plaster to ceiling 16mm thick External plaster to walls & columns Plaster to circular areas & arches Extra over for plaster above 4m height sqm sqm sqm

Add 15% to above rates for above 4m

EXTERNAL FINISHES
1 Tyrolean finish to external wall 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 1 1 0 1 1 1 1 1 1 1 0 1 1 1 1 1 1 0 Mason Helper Mason Helper Mason Helper Mason Helper Mason Helper Mason Helper Mason Helper Mason Helper Mason Helper Mason Helper Mason Helper Mason Helper Carpenter Helper Mason Helper Mason Helper Mason Helper Carpenter Helper Mason Helper Carpenter Helper sqm

BLOCKWORKS
1 2 3 4 5 6 7 Hollow block work 10 cm thick Hollow block work 15 cm thick Hollow block work 20 cm thick Solid block work 20 cm thick Solid block work 10 cm thick Claustra block work 20cm & pointing Claustra bock work 10cm & pointing No No No No No sqm sqm

INTERLOCK TILES
1 60/80MM interlocking tiles including sand bed sqm

KERBSTONE
1 2 3 4 5 6 7 High raised kerbstone with pointing upto 30cm Flat kerbstone including shifting Compaction for kerb stone bottom Base concrete formwork on both sides with Concreting the base with leveling Haunch con. On kerbstone backside Bituminous painting on kerb stone back side No No LM LM LM LM LM

PROTECTION BOARD
1 2 Protection board - horizontal Protection board - vertical sqm sqm

FLEXELL SHEET
1 Flexell sheet LM

HOURDI BLOCK
1 Hourdi block 1 1 1 1 Mason Helper Mason Helper No

GROOVE ON PLASTER
1 All groove on plaster LM

Resource's Basic Data


Budget
Item NO. quantity

Materials
Name unit Price /unit Rate / unit

Description
Excavation

unit

Notes

excavation in normal -1 m3 soil

-2

excavation in normal m3 soil

Excvtr Loader 1 Tippers O.labour Excvtr-h Loader 1 Tippers O.labour Cement Agg Sand 1 Water PCast.Eq Crp.Crew PCs.Crew Steel Cement Agg Sand 1 Water&ad PCast.Eq Crp.Crew Stl.Crew PCs.Crew Steel Cement Agg Sand 1 Water&ad PCast.Eq Crp.Crew Stl.Crew PCs.Crew Steel Cement Agg Sand 1 Water&ad PCast.Eq Crp.Crew Stl.Crew PCs.Crew Steel Cement Agg Sand Water&ad 1 Blocks PCast.Eq Crp.Crew Stl.Crew PCs.Crew

day day day day day day day day Ton m3 m3 m3 m3 day day Ton Ton m3 m3 m3 m3 day day day Ton Ton m3 m3 m3 m3 day day day

500 400 150 15 1200 400 150 15 250 30 6 4 14 40 50 1200 250 30 6 5 14 40 35 50 1200 250 30 6 5 14 40 35 50

500m3 Excvtr = 500m3 100m3 50m2 Excvtr-h = 70m3 250m3 60m3 O.labour = 5m2

Excavator

%Waste -10% -10% -40% -40% 10% 10% 15% 5% -10% 7% 10% 10% 15% 5% -10% 7% 10% 10% 15% 5% -10% 7% 10% 10% 15% 5% -10% -10% 7% 10% 10% 15% 5% 10% -10% -10% Cement =300kg/m3 (1 builder, 1 assistance, 1

Rates include %Wast e

Excavator with hammer

Ordinary labour

500 450 90 50 70 150 90 15

P.C For Foundation 0.25 0.8 PCast.Eq = P.c Cast Equpiment (batch plant, loader, transmixer,pump) 0.4 0.11 Crp.Crew = Carpenter Crews (1 Carpenter + 1 assistance) 100m3 5m3 PCs.Crew = Cast Crews ( 2#pump pipe, 1#Concrete distrbuation, 1# leveling) 100m3 0.1 PCast.Eq = P.c Cast Equpiment (batch plant, loader, transmixer,pump,vibrator) 0.35 0.8 PCs.Crew =Cast Crews (2#pump pipe, 1# Conc.distrbuation, 1#leveling, 1#vibrator) 0.4 0.16 StrCrew = Striker Crews (1 Craft + 1 assistance) 100m3 3m3 .5ton 100m3 0.1 PCast.Eq = P.c Cast Equpiment (batch plant, loader, transmixer,pump,vibrator) 0.35 0.8 PCs.Crew =Cast Crews (2#pump pipe, 1# Conc.distrbuation, 1#leveling, 1#vibrator) 0.4 0.16 Stl.Crew = Steel Crews (1 Craft + 1 assistance) 100m3 1m3 .5ton 100m3 0.1 PCast.Eq = P.c Cast Equpiment (batch plant, loader, transmixer,pump,vibrator) 0.35 0.8 PCs.Crew =Cast Crews (2#pump pipe, 1# Conc.distrbuation, 1#leveling, 1#vibrator) 0.4 0.16 Stl.Crew = Steel Crews (1 Craft + 1 assistance) 100m3 1.5m3 .5ton 100m3 0.04ton .05ton PCast.Eq = P.c Cast Equpiment (batch plant, loader, transmixer,pump,vibrator) 0.11 0.06 PCs.Crew =Cast Crews (2#pump pipe, 1# Conc.distrbuation, 1#leveling, 1#vibrator) .023.5m3 8 Stl.Crew = Steel Crews (1 Craft + 1 assistance) 100m3 5m3 Blocks =40*20*20 (Hollow Block Slab as two way , thickness 27cm, rft=140kg/m3 .5ton (m3 included blocks)) 100m3 0.28 0.88 0.46 0.12 90 5 10% 90

-1 P.C for foundation m3

R.C For Foundation 0.11 0.39 0.88 0.46 0.17 90 3 0.5 -10% 90 0.11 0.39 0.88 0.46 0.17 90 1 0.5 -10% 90 0.11 0.39 0.88 0.46 0.17 90 1.5 0.5 90 0.04 0.06 0.12 0.06 0.02 8.8 90 5 0.5 90

-1 P.C for Foundation m3

R.C For Column

-1

P.C for Column

m3

R.C For Slabs Ton 1200 Ton 250 m3 30 m3 6 m3 5 m3 14 day 40 day 35 day 50 Ton 1200 Ton 250 m3 30 m3 6 m3 5 1000 1200 m3 14 day 40 day 35 day 50

-1

RZ.C for Slabs

m3

-2

R.C for Hollow Block Slabs

m2

Insulation -1 Bitmeen Insulation m2 -2 Asphalt Insulation -3 Bathroom Insulation Masonary -1 Masonary Works m3 Brick Cement 1 Sand Bld.Crew 1000 Ton m3 day 180 250 6 50 440 brick 66kg Bricks has dimension = 25*12*6cm 0.22m3 Bld.Crew = Builder crew 3m3 labour) 10% 484 10% 0.07 15% 0.25 3 m2 m2 1 Bit.Mtrl m2 day L.m day m2 day 2 40 10 40 10 40 1.0m2 Bit.Mtrl = Bitmeen Material (2 layers) Bit.Crew = Bitmeen Crews (1 craft, 1 assistance) 15% 1.15 -10% 72 15% 1.15 -10% 90 15% 1.73 -10% 36

Bit.Crew Bit.Mtrl 1 Bit.Crew Bit.Mtrl 1 Bit.Crew

80m2 1.0L.m Bit.Mtrl = Bitmeen Material Bit.Crew = Bitmeen Crews (1 craft, 1 assistance) 100L.m 1.5 Bit.Mtrl = Bitmeen Material (2 layers) Bit.Crew =Bitmeen Crews (1craft,1assistance) 50m2

Resource's Basic Data


Budget
Item NO. quantity

Materials
Name unit Price /unit Rate / unit

Description
Plaster

unit

Notes

-1

Lime Plaster

m2

-2

Facad Scratch Plaster

m2

-3

Artificial Stone Plaster

m2

-4

Cement Stuco Plaster

m2

Cement Sand Lime Pla.Crew Cement Sand Lime Stone Powder Pla.Crew Cement W.Cement Sand Lime S.P. Pow S.F Pow Pla.Crew Cement W.Cement Sand Lime S.P. Pow S.F Pow Pla.Crew

Ton m3 m3 day Ton m3 m3 m3 day Ton Ton m3 m3 m3 m3 day Ton Ton m3 m3 m3 m3 day m2 Ton m3 day m2 Ton m3 day m2 Ton m3 day m2 Ton m3 day m2 Ton m3 day m2 Ton m3 day m3 m2 m3 kg m3 m2 day L.m Ton m3 day m2 Ton m3 day kg kg L.m L.m

250 6 40 50 250 6 40 50 250 600 6 40

50 250 600 6 40

50 400 250 6 50 25 250 6 50 400 250 6 50 25 250 6 50 10 250 6 50 8 250 6 45 1000 10 1000 2 6 4 40 7 250 6 50 300 250 6 50 3.5 20 15 4

5.55kg 0.020m3 0.005m3 25m2 5.75kg 0.012m3 0.004m3 0.01m3 20m2 6Kg 3Kg 0.012m4 0.004m4 .007m3 .003m3 15m2 6Kg 3Kg 0.012m4 0.004m4 .007m3 .003m3 15m2 1m2 12.75kg 0.035m3 10m2 1m2 12.75kg 0.035m3 10m2 1m2 9kg 0.03m3 10m2 1m2 9kg 0.03m3 10m2 .1m2 1.3kg 0.004m3 10m2 1m2 6kg 0.02m3 25m2 .009m3 .8m2

Plaster had 3 layer 2ed (200kg for 2 : 1 sand ,lime) 3rd (200kg for 2 : 1 sand ,lime) Pla.Crew=plast crew (1craft,1assistance,1labor) 1st (300kg cement,1m3 sand) 2ed (200kg for 2 : 1 sand ,lime) 3rd (200kg for 2 : 1 sand ,lime) 4th (200kg for 2 : 1 sand ,lime) Pla.Crew=plast crew (1craft,1assistance,1labor) W.Cement = White Cement 1st (300kg cement,1m3 sand) 2ed (200kg for 2 : 1 sand ,lime) 3rd (200kg for 2 : 1 sand ,lime) Pla.Crew=plast crew (1craft,1assistance,1labor) S.P. Pow = Stone particles Powder S.F Pow = Stone Fine Powder 1st (300kg cement,1m3 sand) 2ed (200kg for 2 : 1 sand ,lime) 3rd (200kg for 2 : 1 sand ,lime) Pla.Crew=plast crew (1craft,1assistance,1labor) S.P. Pow = Stone particles Powder S.F Pow = Stone Fine Powder S.F Pow = Stone Fine Powder

1st (300kg cement,1m3 sand)

10% 0.01 15% 0.02 15% 0.01 25 10% 0.01 15% 0.01 15% 0 10% 0.01 20 10% 0.01 10% 0 15% 0.01 15% 0 10% 0.01 10% 0 15 10% 0.01 10% 0 15% 0.01 15% 0 10% 0.01 10% 0 15 10% 1.1 10% 0.01 15% 0.04 10 10% 1.1 10% 0.01 15% 0.04 10 10% 1.1 10% 0.01 15% 0.03 10 10% 1.1 10% 0.01 15% 0.03 10 10% 0.11 10% 0 15% 0 10 10% 1.1 10% 0.01 15% 0.02 25 10% 0.01 10% 0.09 0.92 10% 10% 0.28 15% 0.09

Veneer And Cladding Marble Skirting 10CM Marble Cement 1 Sand Mrb.Crew Ceramic Cement 1 Sand Cer.Crew Marble Cement Sand Mrb.Crew Ceramic Cement Sand Cer.Crew Ceramic Cement Sand Cer.Crew C.Tiles Cement Sand Cer.Crew Slp.Wood Ins.Mtrl Scratch (450 kg cement for 1 m3 sand) For erection (350 kg cement for 1m3 sand) Mrb.Crew= Marble crew (1craft,1assistance,1labor) Scratch (450 kg cement for 1 m3 sand) For erection (350 kg cement for 1m3 sand) Cer.Crew=Marble crew (1craft,1assistance,1labor)

-1

m2

-2

Ceramic Cladding Flooring

m2

-1

Marble

m2

For erection (300 kg cement for 1m3 sand) Mrb.Crew= Marble crew (1craft,1assistance,1labor)

-2

Ceramic

m2

For erection (300 kg cement for 1m3 sand) Cer.Crew=Ceramic crew (1craft,1assistance,1labor) Scratch (450 kg cement for 1 m3 sand) For erection (350 kg cement for 1m3 sand) Cer.Crew=Ceramic crew (1craft,1assistance,1labor) C.Tiles = Cement Tiles For erection (300 kg cement for 1m3 sand) Cer.Crew= Ceramic crew (1craft,1assistance,1labor)

Ceramic Skiriting 10 -3 m2 Cm

-4

Tiles 20*20*3

m2

-5

Wood

m2

Flo.Wood 1 Nails Sand Flo.Fnsh Wod.Crew Curbes Cement 1 Sand Cur.Crew Marble

Slp.Wood = Sleepers Wood ( sleeper .4m axial,pieces 1.5m axial) Ins.Mtrl = Insulation Material & Cost excuation Flo.Wood = Floor Wood (sewdan For Room .84m3 5.2*6. Skirting 10cm) 0.25kg For erection (300 kg cement for 1m3 sand) Wod.Crew = Wood Erection Crew (1 craft, 1assistance) Flo.Fnsh = Floor Finshing (material &excution) Curbes = Cement curbes 12*30*50 with compact sand layer 10cm, mortar 2cm(300kg cement for 1 m3 sand) Cur.Crew =Curbes Crew (1craft,1assistance,1 labor)

-6

Curbes Stairs

L.M

0.08m3 1m2 10m2 1 L.m 1kg 0.014m3 10L.m

1 10 10% 1.1 10% 0 15% 0.02 10 10% 0.52 10% 0.36 15% 10% 0.03 10 33 10 1.1 10

-1

Marble

L.M

Cement

0.47m2 Marble (for Stair sleeper 0.3width,4cm thick.&stair height 17cm,2cm thick &skirting 10cm) 0.33kg 0.03m3 10L.m 30kg 10 L.m 1 L.m 10 L.m For erection (300 kg cement for 1m3 sand, mortar 3cm thickness) Mrb.Crew= Marble crew (1craft,1assistance,1 labor) Bla.Mtrl = Blaustrade Material Bla.Erct = Blaustrade Erection Hnd.Mtrl = Handrail Material (Wood & Painting) Hnd.Erct = Handrail Erection

-2 -3

Blaustrade Handrail

L.M L.M

Sand Mrb.Crew Bla.Mtrl 1 Bla.Erct Hnd.Mtrl 1 Hnd.Erct

Hnd.Mtrl Hnd.Erct

10%

%Waste

Rates include %Wast e

Resource's Basic Data


Budget
Item NO. quantity

Materials
Name unit Price /unit Rate / unit

Description
Painting

unit

Notes

-1

Painting Opening work

M2

Pan.Mtrl Pan.Erct

m2 m2

5 25

1m2 1m2

Pan.Mtrl = Painting Material (Oil Painting) Pan.Erct = Painting Erection

10%

%Waste 10% For one Building (BL= 10% 10% 10% 10% 10%

Rates include %Wast e

1.1 25

-1

Framing Opening Uits & accessories Plumbing

M2

Frm.Mtrl Frm.Erct

m3 No BL BL FL FL FL FL

1000 0.0021m3 Frm.Mtrl = Framing Material (Wood Frame 1*2.2, width 12.5cm ) 4 5 2.5 4000 2500 7000 900 10 unit Frm.Erct = Framing Erection Una.Mtrl = Unit And Acessopries Material 1m2 Building) 10m2 Una.Erct = Unit And Acessopries Erection 1FL 1FL 1FL 1FL

0 10 1.1 10 0.9 1 0.9 1

-2

M2

Una.Mtrl Una.Erct Car.Mtrl Ca.Erct Fix.Mtrl Fix.Erct

-1 Sanitry Carcassing -2 Sanitry Fixture Electric -1 Electric Carcassing -2 Electric Fixture

Fl

Car.Mtrl =Carcassing Material (Pipe and fitting ) Car.Erct = Carcassing Erection Fix.Mtrl =Fixture Material (Appartus&accessories ) Fix.Erct = Fixture Erection

Fl Fl

1 1

Cre.Mtrl Cre.Erct Ute.Mtrl Ute..Erct

FL FL FL FL

6500 1500 2000 700

1FL 1FL 1FL 1FL

Car.Mtrl = Electric Carcassing Material (Pipe and Wire ) Car.Erct = Electric Carcassing Erection Ute.Mtrl=Electric Fixture Material (Units &accessories ) Ute.Erct = Electric Fixture Erection

0.9 1 0.9 1

s Basic Data

m3 m3 m3 m2 m3 m3 m3 m2 ton m3 m3 m3 m3 m3 m3 ton ton m3 m3 m3 m3 m3 ton m3 ton ton m3 m3 m3 m3 m3 ton m3 ton ton m3 m3 m3 m3 m3 ton m3 ton ton m3 m3 m3 No m3 m3 ton m3

m2 m2 m2 m2 m2 m2 No ton m3 m3

Unit

s Basic Data

ton m3 m3 m2 ton m3 m3 m3 m2 ton ton m3 m3 m3 m4 m2 ton ton m3 m3 m3 m4 m2 m2 ton m3 m2 m2 ton m3 m2 m2 ton m3 m2 m2 ton m3 m2 m2 ton m3 m2 m2 ton m3 m2 m2 m2 m3 kg m3 m2 m2 L.m ton m3 L.m m2 ton m3 L.m kg L.m L.m L.m

Unit

s Basic Data

m2 m2

m3 No m2 m2 Fl Fl Fl Fl

Unit Fl Fl Fl Fl

Total

Material unit Unit Activity ID A44FN001 A44FN003 A44FN005 A44FN010 A44FN020 A44FN030 Activity description Building coordinates Building permits Zero & foundation level Build Axis plot down Excavation for foundation PLain concrete for footings Bill QTY Name Price/Un it Name

Labour Price/U nit Unit

Equipment Name Price/U nit Unit Name

Others Price/U nit Unit Name

Subcont. Unit Price/Unit

m3 m3

399.00 11.00

A44FN040

R.C. for footings

m3

40.00

Cement Agg W&add Steel Cement Agg W&add

m3 m3 m3 m3 m3 m3 m3

60.00 Cast Lab. 29.36 5.00 139.89 Cast Lab. 84.00 29.36 6.00

m3

11.16 Cast P.Eq.

m3

15.84 Formw

m3

Ex.Sub 12.11 Carp. Sub. Cast P.Sub. 32.4 Carp. Sub. Steel Sub. Cast R.Sub. Ins. Sub Bkf. Sub. Mas. Sub Bkf. Sub. Cast P.Sub.

m3 m3 m3 m3 m3 m3 m2 m3 m3 m3 m2

m3

13.56 Cast R.Eq.

m3

20.04 Formw

m3

11.25 7.62 5.62 146.71 15.60 11.97 8.76 361.58 4.54 10.79 139.06 10.79 2.59 7.33 37.77 21.57 17.08 625.26 26.40 18.42 14.81 540.43 147.54 7.87 49688.16 26097.45 38182.93 19.38 41.30 47908.59 8.45 55.43 44244.49 17320.51 34364.64 49688.16 26097.45 2.11

4490.17

1613.83

A44FN050 A44FN060 A44FN070 A44FN080 A44FN090

Insulation of footings Back fill arround footings B.ground level masonry Back fill Up to ground levl G. floor concrete slab

m2 m3 m3 m3 m2

554.72 77.50 31.00 77.50 174.00

14463.38 2518.42 836.23 4310.86 836.23

A44GR010

R.C for columns of Ground Floor

m3

10.50

A44GR020

R.C for roof slab of Ground Floor

m3

42.78

Cement Agg W&add Steel Cement Agg W&add Steel Cement Agg W&add

m2 m2 m2 m3 m3 m3 m3 m3 m3 m3 m3

2.43 Cast Lab. 1.31 0.23 278.94 Cast Lab. 84.00 29.36 6.00 239.94 Cast Lab. 84.00 29.36 6.00

m2

0.42

Cast P.Eq.

m2

0.36

1275.86

m3

20.01 Cast R.Eq.

m3

32.79 Formw

m3

97.74 Carp. Sub. Steel Sub. Cast R.Sub. 76.29 Carp. Sub. Steel Sub. Cast R.Sub. Mas. Sub Pla. Sub San. Sub EL. Sub D@W Sub. Ins. Sub WCer. Sub. Fl. Sub. PA. Sub. Ins. Sub Fl.Sub Fc. Sub. Stair Sub. D@W Sub. San. Sub EL. Sub PA. Sub.

m3 m3 m3 m3 m3 m3 m3 m2 lot lot lot m2 m2 lot m2 m2 lot lot lot lot lot m2

6565.23

m3

20.01 Cast R.Eq.

m3

25.20 Formw

m3

A44GR030 A44GR040 A44GR050 A44GR060 A44GR070 A44GR080 A44GR100 A44GR090 A44GR110

Masonry work of G.F. Plaster work of Ground Floor Sanitary carcassing GR. F. Electric carcassing GR. F. Opining frames GR. F. Insulation & protection Wall ceramic tiles Floor tiling for ground floor Painting primer GR. F. Roof finishing work Facad finishing Stairs finishings Doors & Windows erection Sanitary fixture Electric final fix Final paints

m3 m2 lot lot lot m2 m2 lot m2 m2 lot lot lot lot lot lot

45.26 370.50 0.13 0.13 0.03 167.71 165.43 0.25 371.00 140.00 1.00 1.00 1.00 0.50 0.50 1484.00

23119.45 6678.32 2915.84 6211.02 3262.18 954.57 3250.19 6832.39 11977.15 3133.85 7760.20 44244.49 17320.51 34364.64 24844.08 13048.73 3132.87

ch ec k

SUBJ: ITEM NO. 1

CAPABILITIES OF EQUIPMENT
TYPE OF EQUIPMENT BULLDOZER D9 D9 D9 D8 D7 D6 ACTIVITY AVE. CAPABILITY REMARKS

CLEARING STRIPPING EXCAVATION EXCAVATION EXCAVATION EXCAVATION QUARRYING PUSHING SUB-GRADING SPREADING LOADING LOADING STATIC ROLLING -13 PASSES VIBRATORY ROLLING -14 PASSES STATIC ROLLING -6 PASSES STATIC ROLLING -6 PASSES VIBRATORY ROLLING -6 PASSES ROLLING

500 SQ.M./HR. 200 SQ. M/HR 700-800 CU.M./DAY 600-700 CU.M./DAY 500-600 CU.M./DAY 500 CU. M./DAY 50 CU.M./DAY 3 CU.M./HR 300SQ.M./HR. 500-600 CU.M./DAY 300 CU.M./DAY 35 CU.M. HR. 45 CU.M./HR. 135CU.M./HR. 24 CU.M./HR. 24 CU.M./HR. 77 CU.M./HR. 500-600 CU.M./DAY 5 CU.M./TRIP 4 CU.M./TRIP 3.5 CU.M./TRIP 10 CU.M./TRIP

OUTPUT/8HRS OUTPUT/8HRS OUTPUT/8HRS OUTPUT/8HRS OUTPUT/8HRS OUTPUT/8HRS

2 3 4 5 6 7 8 9 10

GRADER PAY LOADER(2.0CU.M. CRANE SHOVEL SHEEP FOOT ROLLER ROLLER TANDEM ROLLER PNEUMATIC ROLLER SELF PROPELLED DUMP TRUCK 5 CU.M. CAP

OUTPUT/8HRS OUTPUT/8HRS 15 CM. LIFT 15 CM. LIFT 20 CM. LIFT 20 CM. LIFT 30 CM.LIFT OUTPUT/8HRS FLAT ROLLING MOUNTAINOUS FLAT TERRAIN

11 12 13 14 15 16 17 18 19 20 21 22 23 24

DUMP TRUCK 10 CU.M. CAP TRANSIT MIXER CONCRETE MIXER CONCRETE BATCH PLANT BUGGY WHEEL BARROW CONCRETE VIBRATOR WATER TRUCK ASPHALT DISTRIBUTOR CONC. PAVING BLDGS. 10 CU.M./DAY HAULING CONC. MIX HAULING AGGREGATE HAULING CONC. MIX VIBRATING CONC. MIX WATERING SPRAYING ASPHALT PRIMECOAT

24- 36 BAG/BATCH 1 1/2-2 BAG/BATCH 1-BAG/BATCH 40 TON PER HR(TPH) 6 CU.FT/TRIP 2.5 CU.FT/TRIP 1.75 CU.FT/TRIP 40 CU.M./HR. 1,000 M./HR. 300 SQ.M./HR

ROCK CRUSHER CRUSHING MIXED SAND & GRAVEL 30 CU.M./HR. CONCRETE FLOOR FINISHES FINISHING CONC. FLOOR 140 SQ.M./HR. SCRAPPER TOWED 12 CU. SCRAPPER TOURNA PULL 45 TON BACKHOE, 0.50 CU.M. CAP HAULING HEAP CAPACITY HAULING HEAP CAPACITY EXCAVATION 11 CU.M./TRIP 22 CU.M./TRIP 150 CU.M./DAY

EMARKS

T/8HRS T/8HRS T/8HRS T/8HRS T/8HRS T/8HRS

T/8HRS T/8HRS

LIFT LIFT LIFT LIFT LIFT T/8HRS

OLLING AINOUS

ERRAIN

BATCH PER HR(TPH)